Invitation for Bid (IFB) for the project.

View the file

Other files

File Type Posted
Bid_Tabs_NV_FTNP_Lake_114(1)_Sch_A.pdf PDF
Bid_Tabs_NV_FTNP_Lake_114(1)_Opt_X.pdf PDF
NV_FTNP_LAKE_114(1)_Bid_Summary_11_19_15.xlsx XLSX spreadsheet
A001.pdf PDF
NV_FTNP_PRA-LAKE_114(1)_Final_Geotech_Report_(100__Final).pdf PDF
Hydraulics_Memo_LAKE114_1__Overall.pdf PDF
Q-A_11_4_15.pdf PDF
Plans.pdf PDF
Cross_Section.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SOLICITATION NUMBER: DTFH6815B00021

PROJECT NUMBER: NV FTNP PRA LAKE 114(1)

PROJECT NAME: KATHERINE ACCESS ROAD

BID OPENING DATE:

See Page A-1, Block 13A

This solicitation cites Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-03 US Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: http://www.fbo.gov E-mail: CFLContracts@dot.gov

PROJECT NV FTNP PRA LAKE 114(1)

LOCATION KATHERINE ACCESS ROAD

COUNTY MOHAVE COUNTY

STATE NEVADA

LENGTH 4.24 MILES

TYPE OF IMPROVEMENT GRADING, DRAINAGE, MECHANICALLY

STABILIZED EARTHWALL, AGGREGATE

BASE, AND ASPHALT SURFACING

TABLE OF CONTENTS

Notice to Bidders ............................................................................................................. A-i

Solicitation, Offer, and Award ........................................................................................ A-1

Basis for Award and Bid Schedule ................................................................................ A-6

Solicitation Provisions .....................................................................................................B-7

Contract Clauses ..............................................................................................................C-1

Davis Bacon Wage Determination .................................................................................. D-1

Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-31 Division 200 ................................................................................................................... E-56 Division 300 ................................................................................................................... E-76 Division 400 ................................................................................................................... E-77 Division 500 ................................................................................................................. E-112 Division 600 ................................................................................................................. E-125 Division 700 ................................................................................................................. E-137

APPENDICES

Appendix A ............................................................................................................. Fire Plan

Appendix B ................................................................................................ 401 Certification

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

NOTICE TO BIDDERS

A-i

ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Block 8). Please submit the following with your bid:

Submit the following documents with your Bid Package–

SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2

If applicable, indication of interest in formal Partnering?

Bid Schedule including Buy American Act & Hazardous Materials?

Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.

Completed VETS 100, Page A-ii; Bidders’ Information; Reps and Certs and Certification Regarding Responsibility Matters (FAR 52.209-5).

HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C.

Provide an alternate price for Contractor Testing (using a Government Furnished Laboratory) on the last page of each bid schedule?

Bidders should retain all other pages for their information. Bids should be submitted in a sealed enveloped and include the Contractor’s Name, Solicitation Number and the Project Number/Name.

I. PRE-BID INFORMATION

It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.

This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 US Customary Units (FP-03).

The FP-03 was utilized for the design of this project. Hard copies of the FP-03 will not be provided to bidders. The FP-03 is available electronically at http://flh.fhwa.dot.gov/resources/pse/standard/ or may be purchased by contacting Bob Rosenblatt at ARC Western, telephone number 303-785- 2520 or email bob.rosenblatt@e-arc.com. Limited numbers of hard copies of the FP-03 will be provided to the awarded Prime Contractor.

Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/.

A-ii

Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103©. Register online at www.sam.gov.

Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications on Page B-7. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the System for Award Management (SAM). Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.

Vets100 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.

My firm had a qualifying Federal Contract in 2015 and has complied with the reporting requirements.

My firm did not have a qualifying Federal Contract in 2015 and is therefore exempt from the reporting requirements

This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern. The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.

In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.

§126.700 of the Code of Federal Regulations (Title 13, Part 126, Subpart G), stated below, will replace the performance of work requirements stated in the above mentioned FAR clause.

A qualified HUBZone SBC receiving a contract under this solicitation for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.

A-iii

Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart

102.03 of the FP-03. Bid bonds must be originals and have original signatures and corporate seals.

Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.

ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:

http://osdbuweb.dot.gov.

The Contractor is fully responsible to verify that all data is correct when an offer is submitted.

Failure to properly update your data may cause the offer to be rejected.

Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Block 9 on Page A-3).

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON NOVEMBER 10, 2015

Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov

Modifications to Bids - Bids may be modified or withdrawn by facsimile or telegraphic notice, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of telegraphic or facsimile data.

For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.

FAX Number to submit modifications to bids for this project is (720) 963-3360

II. Post Award Information.

Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.

Jeremiah.Rogers Typewritten Text

A-iv

FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award.

The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. To view and download a sample plan for subcontracting requirements, visit http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.

Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.

A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.ccr.gov

Insurance requirements - See Subsection 107.05 of the FP-03.

A-1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

1. SOLICITATION NO.

DTFH68-15-B-00021

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

10/21/2015

PAGE OF

PAGES

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

NV FTNP PRA LAKE 114(1)

7. ISSUED BY:

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CODE: 69050001 8. ADDRESS OFFER TO:

Jeremiah Rogers, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228

9. FOR INFORMATION CALL

SEE PAGE A-3

A. NAME:

SEE PAGE A-3

B. TELEPHONE NO. (Include area code)

SEE PAGE A-3

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

CONSTRUCT ROADWAY CONSTRUCTION PROJECT NV FTNP LAKE 114(1), KATHERINE LAKE IN STRICT ACCORDANCE

WITH:

1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)

2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES

3. SPECIAL CONTRACT REQUIREMENTS

4. PLANS

5. BID SCHEDULE

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS

7. SUBCONTRACTING PLAN (IF APPLICABLE)

See Subsection 104.04 of the FP-03 for governing order of precedence

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 11/19/2015 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53-236-1(e)

X

X

X

X

X

A-2

GPO: 1985 0 - 469-796 STANDARD FORM 1442 PAGE 2 (REV. 4-85)

OFFEROR (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

DUNS NO.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

SEE INDIVIDUAL BID SCHEDULE(S)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED

TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27

(4 copies unless otherwise specified)

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

□ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE:

27. PAYMENT WILL BE MADE BY

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by

(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON

AUTHORIZED TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

A-3

Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Block 13A.

Item 9: FOR GENERAL INFORMATION: Call 720-963-3090 or e-mail us at

CFLContracts@dot.gov.

FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov or by fax to 720-963-3360.

FOR PHYSICAL DATA: The following data is available electronically with this solicitation:

Hydraulics Report Geotechnical Report

Item 11: COMPLETION DATE: When completing the bid schedules, provide the number of calendar days necessary to complete all contract work from the Notice to Proceed until the day of final construction completion, both dates included.

THE TOTAL NUMBER OF DAYS BID SHALL NOT EXCEED OR BE

LOWER THAN:

Schedule A: MIN 100 Calendar Days MAX 200 Calendar Days Option X: 0 Calendar Days (Concurrent) MAX: 90 Calendar Days

Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15

Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-03.

Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee

(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-03. All bid guarantees must have original signatures with original corporate seals.

Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO

ACKNOWLEDGE AMENDMENTS, IN BLOCK 19 OF THE SF-1442, BY

THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION

MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov.

Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the

FP-03.

ESTIMATED

PRICE: The price range of the project work is between $10 and $15 million.

A-4

Bid Schedule Instructions

BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule and one option.

Before preparing the bid, carefully read the Solicitation Provisions and the following:

• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government

• Multiply the unit price by the quantity for each pay item and show the amount bid.

When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.

• Total all amounts bid for each pay item and show the Construction Cost Total (Part

A-see below) for Schedule A and Option X.

• When completing the schedules, provide the number of calendar days necessary to complete all contract work from the Notice to Proceed until the day of final construction completion, both dates included. The total number of calendar days bid will become the basis for determining the fixed contract completion date (see Subsection 108.01). It is against this date that liquidated damages would be assessed according to Subsection 108.04. The number of calendar days bid must fall within these ranges:

Minimum Calendar Days Maximum Calendar Days

Schedule A 100 200

Option X 0 (Concurrent) 90

• Multiply the number of days bid by the Road User/Administrative Cost of $6,500.00 per day to determine the Road User/Administrative Cost Subtotal (Part B) for each schedule.

• Add the Construction Cost Subtotal (Part A) to the Road User/Administrative Cost Subtotal (Part B) to determine each schedule’s Project Total (Part A+B). See bid schedule.

NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.

Bid Schedule Instructions- Alternate Bid Item

Pay Item 15401-0000 Contractor testing - Bidders must provide prices on alternative Contractor Testing pay items for EACH SCHEDULE.

Bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory for each schedule. The price for this item will be included in the Construction Cost Total for each schedule and all totals on the Bid Summary will be included in the evaluation for award.

A-5

Bidders must also provide a stand alone price on the last page of each schedule for the alternative item, Contractor Testing using a Government-furnished field laboratory. This price will not be factored into the evaluation for award.

The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.

Evaluation Factors for Award

To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A and Option X. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available.

Per FAR provision 52.217-5, Evaluation of Options (JULY 1990), the Government will evaluate offers for award purposes by adding the A+B total for all options to the A+B total for Schedule A.

Evaluation of options will not obligate the Government to exercise the option(s). If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 60 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989).

PARTNERING

A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.

CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.

A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.

Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-03. Costs of partnering would be in addition to the contract award amount.

Please indicate your desire to participate in a formal partnering meeting on this project.

(___) We would like to participate in a formal partnering meeting.

(___) We do not want to participate in a formal partnering meeting.

NV FTNP LAKE 114(1)

Katherine Access Road

A‐6 Schedule A

Pay Item

Number Pay Item Description Unit Quantity Unit Price Amount Bid

15101-0000 MOBILIZATION LPSM ALL

15206-0000

SLOPE, REFERENCE, AND

CLEARING AND GRUBBING

STAKE

STA 201.000

15210-3000 CENTERLINE, VERIFICATION

AND STAKING STA 182.500

15214-2000 SURVEY AND STAKING,

RETAINING WALL LPSM ALL

15215-3000 SURVEY AND STAKING,

DRAINAGE STRUCTURE EACH 30

15215-6000 SURVEY AND STAKING,

ROADWAY CROSS-SECTIONS EACH 60

15215-7000 SURVEY AND STAKING,

PARKING AREA EACH 15

15216-2000 SURVEY AND STAKING,

GRADE FINISHING STAKES STA 201.000

15301-0000 CONTRACTOR QUALITY

CONTROL LPSM ALL

15401-0000 CONTRACTOR TESTING LPSM ALL

15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

15705-0100 SOIL EROSION CONTROL,

SILT FENCE LNFT 14,000

15705-1400 SOIL EROSION CONTROL,

SEDIMENT LOG LNFT 7,700

15705-1500 SOIL EROSION CONTROL,

SEDIMENT WATTLE LNFT 10,000

15706-0200 SOIL EROSION CONTROL,

CHECK DAM EACH 22

15706-0400 SOIL EROSION CONTROL,

SEDIMENT TRAP EACH 5

15706-1600

SOIL EROSION CONTROL,

STABILIZED CONSTRUCTION

ENTRANCE

EACH 2

15802-0000 WATERING FOR DUST

CONTROL LPSM ALL

20103-0000 CLEARING AND GRUBBING SQYD 92,000

20301-0700 REMOVAL OF DELINEATOR EACH 65

20301-0900 REMOVAL OF FIRE HYDRANT EACH 1

20301-1200 REMOVAL OF HEADWALL EACH 20

20301-1500 REMOVAL OF LIGHT POLE EACH 1

20301-1900 REMOVAL OF PIPE CULVERT EACH 4

20301-2400 REMOVAL OF SIGN EACH 65

20301-2700 REMOVAL OF STRUCTURE EACH 1

20301-3400 REMOVAL OF WHEELSTOP EACH 15

20302-0400 REMOVAL OF CURB, ASPHALT LNFT 9,300

Bid Schedule‐ Schedule A

A‐7 Schedule A

20302-0500 REMOVAL OF CURB,

CONCRETE LNFT 11,000

20302-1200 REMOVAL OF GUARDRAIL LNFT 1,500

20303-0300 REMOVAL OF CONCRETE SQYD 60

20303-1500 REMOVAL OF PAVED

WATERWAY, STONE SQYD 320

20303-3200 REMOVAL OF SIDEWALK,

CONCRETE SQYD 220

20304-8000 REMOVAL OF WINGWALL

CONCRETE LPSM ALL

20402-0000 SUBEXCAVATION CUYD 3,300

20420-0000 EMBANKMENT

CONSTRUCTION CUYD 35,900

20421-0000 ROCK EXCAVATION CUYD 17,000

20425-1000 DITCH, EXCAVATION LNFT 140

20442-0000 SLOPE SCALING CUYD 2,000

20502-0000 CONTROLLED BLASTING SQFT 6,575

20804-0000 STRUCTURAL BACKFILL TON 400

21101-2000 ROADWAY OBLITERATION,

METHOD 2 SQYD 930

25101-3000 PLACED RIPRAP, CLASS 3 CUYD 2,260

25101-4000 PLACED RIPRAP, CLASS 4 CUYD 200

25101-6000 PLACED RIPRAP, CLASS 6 CUYD 550

25110-3000 GROUTED RIPRAP, CLASS 3 CUYD 25

25125-0000 BOULDER EACH 50

25301-1000 GABIONS, GALVANIZED OR

ALUMINIZED COATED SQFT 1,300

25501-1000

MECHANICALLY STABILIZED

EARTH WALL, WELDED WIRE

FACE

SQFT 4,700

30303-3000 ROADWAY RECONDITIONING SQYD 71,000

30306-1500 PULVERIZING, 3-INCH DEPTH SQYD 75,500

30306-3000 PULVERIZING, 6-INCH DEPTH SQYD 84,000

30801-2000 ROADWAY AGGREGATE,

METHOD 2 CUYD 7,300

40201-4700

HOT ASPHALT CONCRETE

PAVEMENT, HVEEM TEST,

CLASS B, GRADING C OR E

TON 26,700

40205-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 265

40501-0000 OPEN-GRADED ASPHALT

FRICTION COURSE TON 7,700

40505-3000 ANTISTRIP ADDITIVE, TYPE 3

(OGFC) TON 80

40961-0000 BLOTTER SQYD 32,500

41103-0000 PRIME COAT SQYD 168,500

41201-1000 TACK COAT GRADE CSS-1,

CSS-1H, SS-1, OR SS-1H TON 73

A‐8 Schedule A

50101-1200

REINFORCED RIGID

PAVEMENT, 9-INCH DEPTH,

TYPE C

SMOOTHNESS/ROUGHNESS

SQYD 4,700

60101-0000 CONCRETE CUYD 180

60201-0600 18-INCH PIPE CULVERT

(ASPHALT COATED) LNFT 62

60201-0800 24-INCH PIPE CULVERT

(ASPHALT COATED) LNFT 540

60201-0900 30-INCH PIPE CULVERT

(ASPHALT COATED) LNFT 20

60201-1000 36-INCH PIPE CULVERT

(ASPHALT COATED) LNFT 420

60201-1600 72-INCH PIPE CULVERT

(ASPHALT COATED) LNFT 150

60202-0500

30-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE CULVERT

(ASPHALT COATED)

LNFT 130

60202-0800

48-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE CULVERT

(ASPHALT COATED)

LNFT 350

60210-0600

END SECTION FOR 18-INCH

PIPE CULVERT (ASPHALT

COATED)

EACH 2

60210-0800

END SECTION FOR 24-INCH

PIPE CULVERT (ASPHALT

COATED)

EACH 10

60210-1600

END SECTION FOR 72-INCH

PIPE CULVERT (ASPHALT

COATED)

EACH 4

60212-0600 ELBOW, 18-INCH (ASPHALT

COATED) EACH 2

60212-0800 ELBOW, 24-INCH (ASPHALT

COATED) EACH 4

60212-1000 ELBOW, 36-INCH (ASPHALT

COATED) EACH 2

60220-1800

8 FEET SPAN, 4 FEET RISE

PRECAST REINFORCED

CONCRETE BOX CULVERT (8

FEET SPAN, 4 FEET RISE

PRECAST REINFORCED

CONCRETE U-STRUCTURE,

OPEN CHANNCEL)

LNFT 124

60221-3250

10 FEET SPAN, 10 FEET RISE

REINFORCED CONCRETE BOX

CULVERT, SINGLE BARREL

LNFT 60

60230-0000 DEBRIS RACK EACH 1

60403-2200 INLET, TYPE 7A EACH 1

60404-2000 CATCH BASIN, TYPE 2 EACH 3

60405-0000 MANHOLE ADJUSTMENT EACH 4

60526-0000 DRAINAGE CHASE LNFT 36

A‐9 Schedule A

60704-0000 CLEANING CULVERT IN PLACE EACH 25

60901-1300 CURB, CONCRETE, 15-INCH

DEPTH LNFT 1,750

60902-1000 CURB AND GUTTER,

CONCRETE, 12-INCH DEPTH LNFT 8,000

60915-1000 WHEELSTOP, CONCRETE EACH 44

61102-3200 8-INCH WATERLINE,

POLYVINYL CHLORIDE (PVC) LNFT 70

61103-1480 20-INCH ENCASEMENT PIPE,

STEEL LNFT 45

61106-0000 FIRE HYDRANT EACH 1

61108-1000 ADJUST WATER VALVE EACH 20

61501-0100 SIDEWALK, CONCRETE SQYD 1,000

61505-1000 ACCESSIBILITY RAMP,

CONCRETE EACH 23

61701-1800 GUARDRAIL SYSTEM G4, TYPE

4, CLASS A STEEL POSTS LNFT 3,100

61702-0800 TERMINAL SECTION TYPE

TANGENT EACH 14

61703-2000 TERMINAL END, TYPE ROUND

END SECTION EACH 2

61901-2250 FENCE, RAIL LNFT 420

61902-0900 GATE, METAL EACH 3

61904-0000 BOLLARD POST EACH 6

62201-0200 DUMP TRUCK, 8 CUBIC YARD

MINIMUM CAPACITY HOUR 20

62201-0550

BACKHOE LOADER, 6 CUBIC

FOOT MINIMUM RATED

CAPACITY BUCKET, 24-INCH

WIDTH

HOUR 20

62201-0900

WHEEL LOADER, 2 CUBIC

YARD MINIMUM RATED

CAPACITY

HOUR 20

62201-1150 BULLDOZER, 70HP MINIMUM

FLYWHEEL POWER HOUR 20

62201-1300 BULLDOZER, 160HP MINIMUM

FLYWHEEL POWER HOUR 20

62201-2750 MOTOR GRADER HOUR 20

62201-3350

HYDRAULIC EXCAVATOR, 1

CUBIC YARD MINIMUM

CAPACITY

HOUR 20

62202-1000 MATERIALS TRANSFER

VEHICLE LPSM ALL

62301-0000 GENERAL LABOR HOUR 40

62302-1000 SPECIAL LABOR, HIRED

TECHNICAL SERVICES HOUR 40

62302-1100 SPECIAL LABOR, HIRED

SURVEY SERVICES HOUR 40

63301-0000 SIGN SYSTEM EACH 90

63308-3000 OBJECT MARKER, TYPE 3 EACH 30

A‐10 Schedule A

63309-0100 DELINEATOR, TYPE 1 EACH 70

63313-0000 RUMBLE STRIP LNFT 15,000

63316-1000 REMOVE AND RESET SIGN EACH 60

63403-0400 PAVEMENT MARKINGS, TYPE

D SQFT 1,700

63404-0400 PAVEMENT MARKINGS, TYPE

D GAL 650

63405-0050 PAVEMENT MARKINGS,

SYMBOLS EACH 110

63501-1000

TEMPORARY TRAFFIC

CONTROL, TRAFFIC AND

SAFETY SUPERVISOR

LPSM ALL

63501-2000

TEMPORARY TRAFFIC

CONTROL, TRAFFIC SIGNAL

SYSTEM

LPSM ALL

63502-0700 TEMPORARY TRAFFIC

CONTROL, CONE EACH 655

63502-1300 TEMPORARY TRAFFIC

CONTROL, DRUM EACH 815

63502-1700

TEMPORARY TRAFFIC

CONTROL, WARNING LIGHT

TYPE C

EACH 50

63503-0300

TEMPORARY TRAFFIC

CONTROL, BARRICADE TYPE

LNFT 100

63503-0400

TEMPORARY TRAFFIC

CONTROL, CONCRETE

BARRIER

LNFT 400

63503-0500

TEMPORARY TRAFFIC

CONTROL, MOVING

CONCRETE BARRIER

LNFT 400

63504-1000

TEMPORARY TRAFFIC

CONTROL, CONSTRUCTION

SIGN

SQFT 783

63505-1000

TEMPORARY TRAFFIC

CONTROL, PAVEMENT

MARKINGS

MILE 9.0

63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER HOUR 5,000

63506-0600 TEMPORARY TRAFFIC

CONTROL, PILOT CAR HOUR 1,400

63621-1000 UTILITY BOX, PULLBOX EACH 16

64620-0500 REMOVE AND RESET FLAG

POLE EACH 1

Submitted by: Schedule A Total:

A‐11 Schedule A

# of Calendar

Days*

*The number of calendar days used shall include all weekends, holidays, periods of inclement weather, winter shutdown periods, and all other days during which work may or may not be performed.

Schedule A Alternate Bid Item 15401‐0000, Contractor Testing

(Government furnished lab trailer)** $_________________

**See Page A‐4 of this Solicitation for an explanation of how to bid this item.

Road User/Administrative Cost

(total of Part A and Part B above)

Part B

Part B Total (Days * Road User Cost)

Schedule A (A+B Equation)

Part A

Part A Total (Construction Cost)

(A+B) Total for Schedule A=

Schedule A‐ Construction Cost (from bid schedule)=

Jeremiah.Rogers Typewritten Text $6,500 per day

A‐12 Option X

Pay Item

Number Pay Item Description Unit Quantity Unit Price Amount Bid

15101-0000 MOBILIZATION LPSM ALL

15206-0000

SLOPE, REFERENCE, AND

CLEARING AND GRUBBING

STAKE

STA 43.000

15210-3000 CENTERLINE, VERIFICATION

AND STAKING STA 43.000

15215-3000 SURVEY AND STAKING,

DRAINAGE STRUCTURE EACH 4

15216-2000 SURVEY AND STAKING,

GRADE FINISHING STAKES STA 43.000

15301-0000 CONTRACTOR QUALITY

CONTROL LPSM ALL

15401-0000 CONTRACTOR TESTING LPSM ALL

15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

15705-0100 SOIL EROSION CONTROL,

SILT FENCE LNFT 3,000

15705-1400 SOIL EROSION CONTROL,

SEDIMENT LOG LNFT 2,700

15706-0400 SOIL EROSION CONTROL,

SEDIMENT TRAP EACH 5

15706-1600

SOIL EROSION CONTROL,

STABILIZED CONSTRUCTION

ENTRANCE

EACH 2

15802-0000 WATERING FOR DUST

CONTROL LPSM ALL

20103-0000 CLEARING AND GRUBBING SQYD 17,000

20301-0700 REMOVAL OF DELINEATOR EACH 16

20301-2400 REMOVAL OF SIGN EACH 6

20420-0000 EMBANKMENT

CONSTRUCTION CUYD 7,300

25101-3000 PLACED RIPRAP, CLASS 3 CUYD 220

30306-3000 PULVERIZING, 6-INCH DEPTH SQYD 16,500

30801-2000 ROADWAY AGGREGATE,

METHOD 2 CUYD 1,050

40201-4700

HOT ASPHALT CONCRETE

PAVEMENT, HVEEM TEST,

CLASS B, GRADING C OR E

TON 2,700

40205-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 28

40501-0000 OPEN-GRADED ASPHALT

FRICTION COURSE TON 490

40505-3000 ANTISTRIP ADDITIVE, TYPE 3

(OGFC) TON 6

40961-0000 BLOTTER SQYD 2,800

41103-0000 PRIME COAT SQYD 14,500

41201-1000 TACK COAT GRADE CSS-1,

CSS-1H, SS-1, OR SS-1H TON 7

60201-1000 36-INCH PIPE CULVERT

(ASPHALT COATED) LNFT 50

60210-1000 END SECTION FOR 36-INCH

PIPE CULVERT EACH 5

60704-0000 CLEANING CULVERT IN PLACE EACH 2

Bid Schedule‐ Option X

A‐13 Option X

60902-1000 CURB AND GUTTER,

CONCRETE, 12-INCH DEPTH LNFT 680

61701-1800 GUARDRAIL SYSTEM G4, TYPE

4, CLASS A STEEL POSTS LNFT 1,690

61702-0800 TERMINAL SECTION TYPE

TANGENT EACH 14

62201-0200 DUMP TRUCK, 8 CUBIC YARD

MINIMUM CAPACITY HOUR 20

62201-0550

BACKHOE LOADER, 6 CUBIC

FOOT MINIMUM RATED

CAPACITY BUCKET, 24-INCH

WIDTH

HOUR 20

62201-0900

WHEEL LOADER, 2 CUBIC

YARD MINIMUM RATED

CAPACITY

HOUR 20

62201-1150 BULLDOZER, 70HP MINIMUM

FLYWHEEL POWER HOUR 20

62201-1300 BULLDOZER, 160HP MINIMUM

FLYWHEEL POWER HOUR 20

62201-2750 MOTOR GRADER HOUR 20

62201-3350

HYDRAULIC EXCAVATOR, 1

CUBIC YARD MINIMUM

CAPACITY

HOUR 20

62202-1000 MATERIALS TRANSFER

VEHICLE LPSM ALL

62301-0000 GENERAL LABOR HOUR 40

62302-1000 SPECIAL LABOR, HIRED

TECHNICAL SERVICES HOUR 40

62302-1100 SPECIAL LABOR, HIRED

SURVEY SERVICES HOUR 40

63301-0000 SIGN SYSTEM EACH 6

63308-3000 OBJECT MARKER, TYPE 3 EACH 10

63309-0100 DELINEATOR, TYPE 1 EACH 46

63313-0000 RUMBLE STRIP LNFT 4,300

63316-1000 REMOVE AND RESET SIGN EACH 2

63403-0400 PAVEMENT MARKINGS, TYPE

D SQFT 100

63404-0400 PAVEMENT MARKINGS, TYPE

D GAL 140

63405-0050 PAVEMENT MARKINGS,

SYMBOLS EACH 6

63501-1000

TEMPORARY TRAFFIC

CONTROL, TRAFFIC AND

SAFETY SUPERVISOR

LPSM ALL

63502-0700 TEMPORARY TRAFFIC

CONTROL, CONE EACH 140

63502-1300 TEMPORARY TRAFFIC

CONTROL, DRUM EACH 170

63502-1700

TEMPORARY TRAFFIC

CONTROL, WARNING LIGHT

TYPE C

EACH 10

63503-0300

TEMPORARY TRAFFIC

CONTROL, BARRICADE TYPE

LNFT 20

A‐14 Option X

63504-1000

TEMPORARY TRAFFIC

CONTROL, CONSTRUCTION

SIGN

SQFT 385

63505-1000

TEMPORARY TRAFFIC

CONTROL, PAVEMENT

MARKINGS

MILE 1.6

63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER HOUR 1,000

63506-0600 TEMPORARY TRAFFIC

CONTROL, PILOT CAR HOUR 300

Submitted by:

# of Calendar

Days*

*The number of calendar days used shall include all weekends, holidays, periods of inclement weather, winter shutdown periods, and all other days during which work may or may not be performed.

Option X Alternate Bid Item 15401‐0000, Contractor Testing

(Government furnished lab trailer)** $_________________

**See Page A‐4 of this Solicitation for an explanation of how to bid this item.

Option X‐ Construction Cost (from bid schedule)=

(A+B) Total for Option X=

Option X Total:

(total of Part A and Part B above)

Part B

Part B Total (Days * Road User Cost)

Option X (A+B Equation)

Part A

Part A Total (Construction Cost)

Road User/Administrative Cost

Jeremiah.Rogers Typewritten Text $6,500 per day

Jeremiah.Rogers Typewritten Text

A-15

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

UNDER TRADE AGREEMENTS

It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.

NOTE TO CONTRACTOR:

The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

A-16

HAZARDOUS MATERIALS

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.

Hazardous Material Identification Number

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:

It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.

B-1

BID BOND

(See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB NO. 9000-0045

Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.

PRINCIPAL (Legal name and business address)

TYPE OF ORGANIZATION (AX@ one)

INDIVIDUAL PARTNERSHIP

JOINT VENTURE CORPORATION

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PENAL SUM OF BOND BID IDENTIFICATION

PERCENT OF

BID PRICE

AMOUNT NOT TO EXCEED BID DATE INVITATION NO.

DTFH6815B00021

20 PERCENT

MILLION(S)

THOUSAND(S)

HUNDRED(S) CENTS FOR (Construction, Supplies or Services) CONSTRUCTION

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of

us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty

(60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

1.

(Seal)

2.

3.

Corporate

Seal

NAMES(S) &

TITLE(S)

(Typed)

2. 3.

INDIVIDUAL SURETY(IES)

NAME(S)

CORPORATE SURETY(IES)

NAME &

ADDRESS

STATE OF INC. LIABILITY LIMIT

SURETY A

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (Rev. 10-98) Previous edition is usable Prescribed by GSA - FAR (48 CFR) 53.228(a)

B-2

CORPORATE SURETY(IES) (Continued)

SURETY B

SURETY C

SURETY D

SURETY E

SURETY F

SURETY G

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated “Principal” on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed 3,000,000.00 dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury=s list of approved sureties and must act within the limitation listed therein. Where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed “CORPORATE SURETY(IES).” In the space designated “SURETY(IES)” on the face of the form, insert only the letter identification of the sureties.

(b) Where individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capacity.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word “Corporate Seal”;

and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms “bid” and “bidder” shall include “proposal” and “offeror.”

STANDARD FORM 24 (Rev. 10-98) BACK

B-3

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

BIDDER'S INFORMATION

INSTRUCTIONS: Answer all questions on this form inserting "none" or "not applicable" where appropriate. If more space is required attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.

If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.

1. Name and address of business:

Name DUNS Number (See FAR Provision 52.204-6)*

Street Home Office Congressional District (Insert District #) *

City State Zip Code

* Necessary for Government reporting purposes only To obtain a Dun & Street number, call County 800-333-0505.

Telephone Number (Include Area Code)

Fax Number (Include Area Code)

2. a. Type of organization (check appropriate box):

If a Foreign entity:

Individual

Non-profit organization

Corporation

Partnership

Joint Venture

Registered in:

b. Size and type of Business Concern (check appropriate boxes):

Large Business Concern

Small Disadvantaged Business Concern

Emerging Small Business

Small Business Concern

Women-Owned Small Business

SBA 8(a) Certified

HUB Zone Business Concern

Veteran Owned Business Concern

Service-Disabled Veteran-Owned Business Concern

Individual

Non-profit organization

Corporation

Partnership

Joint Venture Incorporated in:

B-4

3. If a joint venture or general partnership:

a. Provide the name under which the project will be bid, the home office address, and name of the principal who will represent the company with regard to this project if different from "1." above.

Principal

Business Name

Street

City State Zip Code

b. Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner. Attach a separate sheet for additional partners.

Sponsoring Partner Other Partner

Street Street

City State Zip Code City State Zip Code

4. Date organization established: _______________________

5. Name of succeeded business, if any: _________________________________________________________

6. How many years have you been in business as:

a. General contractor years.

b. Subcontractor years.

7. a. Furnish the following information concerning the owner, partners, officers and directors:

Percent of Business Owned

Years of Business Experience

Name

Title Contracting

Other

b. Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following:

- Present position, responsibility, and length of employment.

- Amount and type of construction experience.

- Amount and type of highway construction experience, including position, responsibility, and a brief project description of each period of employment.

- Formal education and training, professional or technical registrations or licenses.

B-5

8. a. Contracts in force. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, and

Contact Name and Telephone #

Scope of Work Performed

Contract Amount

Estimated

Completion Date

Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.

B-6

9. a. List at least five of the largest jobs you have completed in the last five years which are similar in project work scope to this project. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, Contact Name and Telephone #

Scope of Work

Performed

Original and Final Contract Amounts

Original and Final Completion Dates

Names of On-site Project

Manager and Superintendent

Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.

B-7