Bid_Tabs_NV_FTNP_Lake_114(1)_Sch_A.pdf

PDF 102 KB Posted

Attached to
NV FTNP LAKE 114(1), Katherine Lake
Solicitation number
DTFH6815B00021
Issued by

About this file

Bid Tabs Schedule A

View the file

Other files

File Type Posted
Bid_Tabs_NV_FTNP_Lake_114(1)_Opt_X.pdf PDF
NV_FTNP_LAKE_114(1)_Bid_Summary_11_19_15.xlsx XLSX spreadsheet
A001.pdf PDF
NV_FTNP_PRA-LAKE_114(1)_Final_Geotech_Report_(100__Final).pdf PDF
Hydraulics_Memo_LAKE114_1__Overall.pdf PDF
Q-A_11_4_15.pdf PDF
IFB_DTFH6815B00021.pdf PDF
Plans.pdf PDF
Cross_Section.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B U L A T I O N O F B I D S Schedule A Total of Bid Items: 13,003,713.58$ -23.5% 9,946,236.00$ Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

15101-0000 Line A0020 ALL LPSM 1,211,401.58$ 1,211,401.58$ 997,000.00$

15206-0000 Line A0040 201.000 STA 110.00$ 22,110.00$ 15,075.00$

15210-3000 Line A0060 182.500 STA 120.00$ 21,900.00$ 9,125.00$

15214-2000 Line A0080 ALL LPSM 8,000.00$ 8,000.00$ 2,400.00$

15215-3000 Line A0100 30 EACH 980.00$ 29,400.00$ 12,000.00$

15215-6000 Line A0120 60 EACH 600.00$ 36,000.00$ 4,200.00$

15215-7000 Line A0140 15 EACH 4,500.00$ 67,500.00$ 36,000.00$

15216-2000 Line A0160 201.000 STA 160.00$ 32,160.00$ 13,065.00$

15301-0000 Line A0180 ALL LPSM 250,000.00$ 250,000.00$ 110,000.00$

15401-0000 Line A0200 ALL LPSM 100,000.00$ 100,000.00$ 195,000.00$

15501-0000 Line A0220 ALL LPSM 50,000.00$ 50,000.00$ 15,000.00$

15705-0100 Line A0240 14,000 LNFT 5.00$ 70,000.00$ 56,000.00$

15705-1400 Line A0260 7,700 LNFT 11.00$ 84,700.00$ 30,800.00$

SURVEY AND STAKING, RETAINING WALL

2,400.00$

MOBILIZATION

SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

CENTERLINE, VERIFICATION AND STAKING

SURVEY AND STAKING, PARKING AREA

SURVEY AND STAKING, GRADE FINISHING STAKES

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, ROADWAY CROSS-SECTIONS

SOIL EROSION CONTROL, SEDIMENT LOG

SWP

75.00$

997,000.00$

400.00$

50.00$

65.00$

2,400.00$

70.00$

195,000.00$

110,000.00$

4.00$

15,000.00$

4.00$

Engineer's Estimate

12/2/2015 Page 1 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

15705-1500 Line A0280 10,000 LNFT 5.50$ 55,000.00$ 20,000.00$

15706-0200 Line A0300 22 EACH 340.00$ 7,480.00$ 3,960.00$

15706-0400 Line A0320 5 EACH 3,000.00$ 15,000.00$ 6,000.00$

15706-1600 Line A0340 2 EACH 2,200.00$ 4,400.00$ 7,600.00$

15802-0000 Line A0360 ALL LPSM 45,000.00$ 45,000.00$ 50,000.00$

20103-0000 Line A0380 92,000 SQYD 2.00$ 184,000.00$ 64,400.00$

20301-0700 Line A0400 65 EACH 38.00$ 2,470.00$ 1,430.00$

20301-0900 Line A0420 1 EACH 2,100.00$ 2,100.00$ 750.00$

20301-1200 Line A0440 20 EACH 2,400.00$ 48,000.00$ 17,000.00$

20301-1500 Line A0460 1 EACH 500.00$ 500.00$ 1,300.00$

20301-1900 Line A0480 4 EACH 2,200.00$ 8,800.00$ 6,400.00$

20301-2400 Line A0500 65 EACH 200.00$ 13,000.00$ 4,550.00$

20301-2700 Line A0520 1 EACH 5,500.00$ 5,500.00$ 1,100.00$

SOIL EROSION CONTROL, SEDIMENT TRAP

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE

WATERING FOR DUST CONTROL

REMOVAL OF SIGN

REMOVAL OF STRUCTURE

CLEARING AND GRUBBING

REMOVAL OF DELINEATOR

REMOVAL OF FIRE HYDRANT

REMOVAL OF HEADWALL

REMOVAL OF LIGHT POLE

REMOVAL OF PIPE CULVERT

SOIL EROSION CONTROL, SEDIMENT WATTLE

SOIL EROSION CONTROL, CHECK DAM

2.00$

1,200.00$

180.00$

50,000.00$

3,800.00$

22.00$

0.70$

850.00$

750.00$

1,600.00$

1,300.00$

1,100.00$

70.00$

12/2/2015 Page 2 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

20301-3400 Line A0540 15 EACH 63.00$ 945.00$ 555.00$

20302-0400 Line A0560 9,300 LNFT 4.00$ 37,200.00$ 18,600.00$

20302-0500 Line A0580 11,000 LNFT 6.50$ 71,500.00$ 33,000.00$

20302-1200 Line A0600 1,500 LNFT (CQ) 5.90$ 8,850.00$ 7,500.00$

20303-0300 Line A0620 60 SQYD 56.00$ 3,360.00$ 960.00$

20303-1500 Line A0640 320 SQYD 20.00$ 6,400.00$ 7,040.00$

20303-3200 Line A0660 220 SQYD 25.00$ 5,500.00$ 3,080.00$

20304-8000 Line A0680 ALL LPSM 4,500.00$ 4,500.00$ 5,000.00$

20402-0000 Line A0700 3,300 CUYD 22.00$ 72,600.00$ 9,900.00$

20420-0000 Line A0720 35,900 CUYD 20.00$ 718,000.00$ 305,150.00$

20421-0000 Line A0740 17,000 CUYD 45.00$ 765,000.00$ 110,500.00$

20425-1000 Line A0760 140 LNFT 20.00$ 2,800.00$ 2,240.00$

20442-0000 Line A0780 2,000 CUYD 110.00$ 220,000.00$ 25,000.00$

REMOVAL OF GUARDRAIL

ROCK EXCAVATION

DITCH, EXCAVATION

SLOPE SCALING

REMOVAL OF CONCRETE

REMOVAL OF PAVED WATERWAY, STONE

REMOVAL OF SIDEWALK, CONCRETE

REMOVAL OF WINGWALL CONCRETE

SUBEXCAVATION

EMBANKMENT CONSTRUCTION

REMOVAL OF WHEELSTOP

REMOVAL OF CURB, ASPHALT

REMOVAL OF CURB, CONCRETE

2.00$

37.00$

5.00$

3.00$

22.00$

16.00$

5,000.00$

14.00$

8.50$

3.00$

16.00$

6.50$

12.50$

12/2/2015 Page 3 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

20502-0000 Line A0800 6,575 SQFT 150.00$ 986,250.00$ 78,900.00$

20804-0000 Line A0820 400 TON 20.00$ 8,000.00$ 16,400.00$

21101-2000 Line A0840 930 SQYD 7.00$ 6,510.00$ 1,302.00$

25101-3000 Line A0860 2,260 CUYD 90.00$ 203,400.00$ 339,000.00$

25101-4000 Line A0880 200 CUYD 150.00$ 30,000.00$ 30,000.00$

25101-6000 Line A0900 550 CUYD 124.00$ 68,200.00$ 82,500.00$

25110-3000 Line A0920 25 CUYD 380.00$ 9,500.00$ 4,750.00$

25125-0000 Line A0940 50 EACH 330.00$ 16,500.00$ 12,000.00$

25301-1000 Line A0960 1,300 SQFT 53.00$ 68,900.00$ 35,100.00$

25501-1000 Line A0980 4,700 SQFT 80.00$ 376,000.00$ 202,100.00$

30303-3000 Line A1000 71,000 SQYD 2.00$ 142,000.00$ 102,950.00$

30306-1500 Line A1020 75,500 SQYD 3.75$ 283,125.00$ 264,250.00$

30306-3000 Line A1040 84,000 SQYD 2.75$ 231,000.00$ 315,000.00$

CONTROLLED BLASTING

STRUCTURAL BACKFILL

ROADWAY OBLITERATION, METHOD 2

MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE

ROADWAY RECONDITIONING

PULVERIZING, 3-INCH DEPTH

PULVERIZING, 6-INCH DEPTH

PLACED RIPRAP, CLASS 3

PLACED RIPRAP, CLASS 4

PLACED RIPRAP, CLASS 6

GROUTED RIPRAP, CLASS 3

BOULDER

GABIONS, GALVANIZED OR ALUMINIZED COATED

12.00$

1.40$

41.00$

150.00$

150.00$

190.00$

150.00$

27.00$

240.00$

1.45$

43.00$

3.75$

3.50$

12/2/2015 Page 4 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

30801-2000 Line A1060 7,300 CUYD 15.00$ 109,500.00$ 273,750.00$

40201-4700 Line A1080 26,700 TON 90.00$ 2,403,000.00$ 2,269,500.00$

40205-3000 Line A1100 265 TON 141.00$ 37,365.00$ 46,375.00$

40501-0000 Line A1120 7,700 TON 104.00$ 800,800.00$ 739,200.00$

40505-3000 Line A1140 80 TON 185.00$ 14,800.00$ 11,600.00$

40961-0000 Line A1160 32,500 SQYD 1.00$ 32,500.00$ 19,500.00$

41103-0000 Line A1180 168,500 SQYD 0.75$ 126,375.00$ 185,350.00$

41201-1000 Line A1200 73 TON 540.00$ 39,420.00$ 41,245.00$

50101-1200 Line A1220 4,700 SQYD 100.00$ 470,000.00$ 587,500.00$

60101-0000 Line A1240 180 CUYD 790.00$ 142,200.00$ 144,000.00$

60201-0600 Line A1260 62 LNFT 149.00$ 9,238.00$ 5,270.00$

60201-0800 Line A1280 540 LNFT 120.00$ 64,800.00$ 51,300.00$

60201-0900 Line A1300 20 LNFT 145.00$ 2,900.00$ 2,500.00$ 125.00$

95.00$

85.00$

800.00$

ROADWAY AGGREGATE, METHOD 2

HOT ASPHALT CONCRETE PAVEMENT, HVEEM TEST, CLASS B, GRADING C OR E

REINFORCED RIGID PAVEMENT, 9-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS

CONCRETE

18-INCH PIPE CULVERT

24-INCH PIPE CULVERT

30-INCH PIPE CULVERT

ANTISTRIP ADDITIVE, TYPE 3

OPEN-GRADED ASPHALT FRICTION COURSE

ANTISTRIP ADDITIVE, TYPE 3

BLOTTER

PRIME COAT

TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H

85.00$

37.50$

96.00$

175.00$

0.60$

145.00$

125.00$

565.00$

1.10$

12/2/2015 Page 5 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

60201-1000 Line A1320 420 LNFT 164.00$ 68,880.00$ 48,300.00$

60201-1600 Line A1340 150 LNFT 290.00$ 43,500.00$ 29,250.00$

60202-0500 Line A1360 130 LNFT 110.00$ 14,300.00$ 9,750.00$

60202-0800 Line A1380 350 LNFT 200.00$ 70,000.00$ 45,500.00$

60210-0600 Line A1400 2 EACH 520.00$ 1,040.00$ 1,600.00$

60210-0800 Line A1420 10 EACH 730.00$ 7,300.00$ 8,500.00$

60210-1600 Line A1440 4 EACH 3,200.00$ 12,800.00$ 12,800.00$

60212-0600 Line A1460 2 EACH 310.00$ 620.00$ 1,500.00$

60212-0800 Line A1480 4 EACH 430.00$ 1,720.00$ 3,200.00$

60212-1000 Line A1500 2 EACH 490.00$ 980.00$ 1,930.00$

60220-1800 Line A1520 124 LNFT 1,800.00$ 223,200.00$ 238,700.00$

60221-3250 Line A1540 60 LNFT 1,650.00$ 99,000.00$ 90,000.00$

60230-0000 Line A1560 1 EACH 3,500.00$ 3,500.00$ 7,500.00$ 7,500.00$

1,500.00$

1,925.00$

965.00$

800.00$

750.00$

3,200.00$

850.00$

800.00$

130.00$

75.00$

195.00$

115.00$

36-INCH PIPE CULVERT

ELBOW, 18-INCH

ELBOW, 24-INCH

ELBOW, 36-INCH

8 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

10 FEET SPAN, 10 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL

DEBRIS RACK

72-INCH PIPE CULVERT

30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

END SECTION FOR 18-INCH PIPE CULVERT

END SECTION FOR 24-INCH PIPE CULVERT

END SECTION FOR 72-INCH PIPE CULVERT

12/2/2015 Page 6 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

60403-2200 Line A1580 1 EACH 4,900.00$ 4,900.00$ 5,350.00$

60404-2000 Line A1600 3 EACH 2,500.00$ 7,500.00$ 16,050.00$

60405-0000 Line A1620 4 EACH 1,000.00$ 4,000.00$ 4,300.00$

60526-0000 Line A1640 36 LNFT 260.00$ 9,360.00$ 5,760.00$

60704-0000 Line A1660 25 EACH 1,400.00$ 35,000.00$ 26,875.00$

60901-1300 Line A1680 1,750 LNFT 23.00$ 40,250.00$ 41,125.00$

60902-1000 Line A1700 8,000 LNFT 20.00$ 160,000.00$ 188,000.00$

60915-1000 Line A1720 44 EACH 116.00$ 5,104.00$ 7,040.00$

61102-3200 Line A1740 70 LNFT 50.00$ 3,500.00$ 11,200.00$

61103-1480 Line A1760 45 LNFT 150.00$ 6,750.00$ 5,625.00$

61106-0000 Line A1780 1 EACH 4,200.00$ 4,200.00$ 7,500.00$

61108-1000 Line A1800 20 EACH 590.00$ 11,800.00$ 12,900.00$

61501-0100 Line A1820 1,000 SQYD 50.00$ 50,000.00$ 64,000.00$ 64.00$

645.00$

7,500.00$

125.00$

160.00$

160.00$

23.50$

23.50$

1,075.00$

160.00$

1,075.00$

5,350.00$

5,350.00$

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

WHEELSTOP, CONCRETE

8-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)

20-INCH ENCASEMENT PIPE, STEEL

FIRE HYDRANT

ADJUST WATER VALVE

INLET, TYPE 7A

CATCH BASIN, TYPE 2

MANHOLE ADJUSTMENT

DRAINAGE CHASE

CLEANING CULVERT IN PLACE

CURB, CONCRETE, 15-INCH DEPTH

SIDEWALK, CONCRETE

12/2/2015 Page 7 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

61505-1000 Line A1840 23 EACH 2,000.00$ 46,000.00$ 46,805.00$

61701-1800 Line A1860 3,100 LNFT 30.00$ 93,000.00$ 66,650.00$

61702-0800 Line A1880 14 EACH 2,700.00$ 37,800.00$ 52,500.00$

61703-2000 Line A1900 2 EACH 210.00$ 420.00$ 2,680.00$

61901-2250 Line A1920 420 LNFT 70.00$ 29,400.00$ 14,280.00$

61902-0900 Line A1940 3 EACH 2,500.00$ 7,500.00$ 27,300.00$

61904-0000 Line A1960 6 EACH 710.00$ 4,260.00$ 5,130.00$

62201-0200 Line A1980 20 HOUR 110.00$ 2,200.00$ 1,920.00$

62201-0550 Line A2000 20 HOUR 120.00$ 2,400.00$ 1,400.00$

62201-0900 Line A2020 20 HOUR 130.00$ 2,600.00$ 2,000.00$

62201-1150 Line A2040 20 HOUR 120.00$ 2,400.00$ 3,500.00$

62201-1300 Line A2060 20 HOUR 160.00$ 3,200.00$ 3,800.00$

62201-2750 Line A2080 20 HOUR 175.00$ 3,500.00$ 2,560.00$ 128.00$

190.00$

175.00$

100.00$

70.00$

96.00$

855.00$

9,100.00$

34.00$

1,340.00$

3,750.00$

21.50$

2,035.00$

GATE, METAL

BOLLARD POST

DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY

BULLDOZER, 70HP MINIMUM FLYWHEEL POWER

ACCESSIBILITY RAMP, CONCRETE

GUARDRAIL SYSTEM G4, TYPE 4, CLASS A STEEL POSTS

TERMINAL SECTION TYPE TANGENT

TERMINAL END, TYPE ROUND END SECTION

FENCE, RAIL

BULLDOZER, 160HP MINIMUM FLYWHEEL POWER

MOTOR GRADER

12/2/2015 Page 8 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

62201-3350 Line A2100 20 HOUR 190.00$ 3,800.00$ 2,560.00$

62202-1000 Line A2120 ALL LPSM 25,000.00$ 25,000.00$ 80,000.00$

62301-0000 Line A2140 40 HOUR 50.00$ 2,000.00$ 740.00$

62302-1000 Line A2160 40 HOUR 135.00$ 5,400.00$ 5,800.00$

62302-1100 Line A2180 40 HOUR 165.00$ 6,600.00$ 16,000.00$

63301-0000 Line A2200 90 EACH 500.00$ 45,000.00$ 48,150.00$

63308-3000 Line A2220 30 EACH 175.00$ 5,250.00$ 4,800.00$

63309-0100 Line A2240 70 EACH 27.00$ 1,890.00$ 3,010.00$

63313-0000 Line A2260 15,000 LNFT 1.00$ 15,000.00$ 3,150.00$

63316-1000 Line A2280 60 EACH 300.00$ 18,000.00$ 32,100.00$

63403-0400 Line A2300 1,700 SQFT 5.00$ 8,500.00$ 7,480.00$

63404-0400 Line A2320 650 GAL 84.00$ 54,600.00$ 41,600.00$

63405-0050 Line A2340 110 EACH 130.00$ 14,300.00$ 10,560.00$ 96.00$

64.00$

4.40$

535.00$

0.21$

43.00$

160.00$

535.00$

400.00$

145.00$

18.50$

80,000.00$

128.00$

SPECIAL LABOR, HIRED SURVEY SERVICES

SIGN SYSTEM

OBJECT MARKER, TYPE 3

DELINEATOR, TYPE 1

RUMBLE STRIP

REMOVE AND RESET SIGN

HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

MATERIALS TRANSFER VEHICLE

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

PAVEMENT MARKINGS, TYPE D

PAVEMENT MARKINGS, TYPE D

PAVEMENT MARKINGS, SYMBOLS

12/2/2015 Page 9 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

63501-1000 Line A2360 ALL LPSM 75,000.00$ 75,000.00$ 107,000.00$

63501-2000 Line A2380 ALL LPSM 50,000.00$ 50,000.00$ 16,000.00$

63502-0700 Line A2400 655 EACH 27.00$ 17,685.00$ 16,375.00$

63502-1300 Line A2420 815 EACH 118.00$ 96,170.00$ 35,045.00$

63502-1700 Line A2440 50 EACH 68.00$ 3,400.00$ 4,000.00$

63503-0300 Line A2460 100 LNFT 64.00$ 6,400.00$ 8,000.00$

63503-0400 Line A2480 400 LNFT 32.00$ 12,800.00$ 15,000.00$

63503-0500 Line A2500 400 LNFT 27.00$ 10,800.00$ 7,600.00$

63504-1000 Line A2520 783 SQFT 25.00$ 19,575.00$ 10,179.00$

63505-1000 Line A2540 9.0 MILE 1,600.00$ 14,400.00$ 12,060.00$

63506-0500 Line A2560 5,000 HOUR 52.00$ 260,000.00$ 150,000.00$

63506-0600 Line A2580 1,400 HOUR 75.00$ 105,000.00$ 77,000.00$

63621-1000 Line A2600 16 EACH 1,700.00$ 27,200.00$ 30,800.00$ 1,925.00$

55.00$

30.00$

1,340.00$

13.00$

19.00$

37.50$

80.00$

80.00$

43.00$

25.00$

16,000.00$

107,000.00$

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR

TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

UTILITY BOX, PULLBOX

12/2/2015 Page 10 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

SWPEngineer's Estimate

64620-0500 Line A2620 1 EACH 2,700.00$ 2,700.00$ 6,425.00$ 6,425.00$

REMOVE AND RESET FLAG POLE

12/2/2015 Page 11 of 44

Schedule A Total of Bid Items:

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15206-0000 Line A0040 201.000 STA

15210-3000 Line A0060 182.500 STA

15214-2000 Line A0080 ALL LPSM

15215-3000 Line A0100 30 EACH

15215-6000 Line A0120 60 EACH

15215-7000 Line A0140 15 EACH

15216-2000 Line A0160 201.000 STA

15301-0000 Line A0180 ALL LPSM

15401-0000 Line A0200 ALL LPSM

15501-0000 Line A0220 ALL LPSM

15705-0100 Line A0240 14,000 LNFT

15705-1400 Line A0260 7,700 LNFT

SURVEY AND STAKING, RETAINING WALL

MOBILIZATION

SLOPE, REFERENCE, AND CLEARING AND GRUBB

CENTERLINE, VERIFICATION AND STAKING

SURVEY AND STAKING, PARKING AREA

SURVEY AND STAKING, GRADE FINISHING STAK

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, ROADWAY CROSS-SECT

SOIL EROSION CONTROL, SEDIMENT LOG

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

935,000.00$ 1,573,000.00$

14,070.00$ 13,065.00$

8,030.00$ 7,300.00$

2,200.00$ 2,000.00$

11,250.00$ 10,260.00$

3,900.00$ 3,480.00$

30,000.00$ 27,600.00$

12,060.00$ 11,256.00$

252,000.00$ 82,000.00$

82,000.00$ 120,000.00$

10,000.00$ 8,500.00$

53,200.00$ 42,000.00$

26,026.00$ 36,575.00$

2,200.00$ 2,000.00$

935,000.00$ 1,573,000.00$

Fann Contracting, Inc. Interstate Rock Products

375.00$ 342.00$

70.00$ 65.00$

44.00$ 40.00$

60.00$ 56.00$

2,000.00$ 1,840.00$

65.00$ 58.00$

82,000.00$ 120,000.00$

252,000.00$ 82,000.00$

3.80$ 3.00$

10,000.00$ 8,500.00$

3.38$ 4.75$

12/2/2015 Page 12 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15705-1500 Line A0280 10,000 LNFT

15706-0200 Line A0300 22 EACH

15706-0400 Line A0320 5 EACH

15706-1600 Line A0340 2 EACH

15802-0000 Line A0360 ALL LPSM

20103-0000 Line A0380 92,000 SQYD

20301-0700 Line A0400 65 EACH

20301-0900 Line A0420 1 EACH

20301-1200 Line A0440 20 EACH

20301-1500 Line A0460 1 EACH

20301-1900 Line A0480 4 EACH

20301-2400 Line A0500 65 EACH

20301-2700 Line A0520 1 EACH

SOIL EROSION CONTROL, SEDIMENT TRAP

SOIL EROSION CONTROL, STABILIZED CONSTR

WATERING FOR DUST CONTROL

REMOVAL OF SIGN

REMOVAL OF STRUCTURE

CLEARING AND GRUBBING

REMOVAL OF DELINEATOR

REMOVAL OF FIRE HYDRANT

REMOVAL OF HEADWALL

REMOVAL OF LIGHT POLE

REMOVAL OF PIPE CULVERT

SOIL EROSION CONTROL, SEDIMENT WATTLE

SOIL EROSION CONTROL, CHECK DAM

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

18,000.00$ 44,000.00$

5,940.00$ 880.00$

29,000.00$ 8,200.00$

7,000.00$ 4,460.00$

32,000.00$ 198,000.00$

18,400.00$ 55,200.00$

1,170.00$ 1,820.00$

2,200.00$ 1,180.00$

10,000.00$ 34,000.00$

1,750.00$ 400.00$

8,400.00$ 7,940.00$

3,900.00$ 6,500.00$

2,500.00$ 2,700.00$

1.80$ 4.40$

5,800.00$ 1,640.00$

270.00$ 40.00$

32,000.00$ 198,000.00$

3,500.00$ 2,230.00$

18.00$ 28.00$

0.20$ 0.60$

500.00$ 1,700.00$

2,200.00$ 1,180.00$

2,100.00$ 1,985.00$

1,750.00$ 400.00$

2,500.00$ 2,700.00$

60.00$ 100.00$

12/2/2015 Page 13 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

20301-3400 Line A0540 15 EACH

20302-0400 Line A0560 9,300 LNFT

20302-0500 Line A0580 11,000 LNFT

20302-1200 Line A0600 1,500 LNFT (CQ)

20303-0300 Line A0620 60 SQYD

20303-1500 Line A0640 320 SQYD

20303-3200 Line A0660 220 SQYD

20304-8000 Line A0680 ALL LPSM

20402-0000 Line A0700 3,300 CUYD

20420-0000 Line A0720 35,900 CUYD

20421-0000 Line A0740 17,000 CUYD

20425-1000 Line A0760 140 LNFT

20442-0000 Line A0780 2,000 CUYD

REMOVAL OF GUARDRAIL

ROCK EXCAVATION

DITCH, EXCAVATION

SLOPE SCALING

REMOVAL OF CONCRETE

REMOVAL OF PAVED WATERWAY, STONE

REMOVAL OF SIDEWALK, CONCRETE

REMOVAL OF WINGWALL CONCRETE

SUBEXCAVATION

EMBANKMENT CONSTRUCTION

REMOVAL OF WHEELSTOP

REMOVAL OF CURB, ASPHALT

REMOVAL OF CURB, CONCRETE

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

450.00$ 1,350.00$

4,650.00$ 27,900.00$

11,000.00$ 57,200.00$

10,500.00$ 6,000.00$

960.00$ 384.00$

2,560.00$ 1,024.00$

1,320.00$ 704.00$

5,000.00$ 6,600.00$

132,000.00$ 52,800.00$

682,100.00$ 416,440.00$

272,000.00$ 226,100.00$

2,100.00$ 1,302.00$

26,000.00$ 27,200.00$

0.50$ 3.00$

30.00$ 90.00$

7.00$ 4.00$

1.00$ 5.20$

8.00$ 3.20$

16.00$ 6.40$

5,000.00$ 6,600.00$

6.00$ 3.20$

19.00$ 11.60$

40.00$ 16.00$

15.00$ 9.30$

16.00$ 13.30$

13.00$ 13.60$

12/2/2015 Page 14 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

20502-0000 Line A0800 6,575 SQFT

20804-0000 Line A0820 400 TON

21101-2000 Line A0840 930 SQYD

25101-3000 Line A0860 2,260 CUYD

25101-4000 Line A0880 200 CUYD

25101-6000 Line A0900 550 CUYD

25110-3000 Line A0920 25 CUYD

25125-0000 Line A0940 50 EACH

25301-1000 Line A0960 1,300 SQFT

25501-1000 Line A0980 4,700 SQFT

30303-3000 Line A1000 71,000 SQYD

30306-1500 Line A1020 75,500 SQYD

30306-3000 Line A1040 84,000 SQYD

CONTROLLED BLASTING

STRUCTURAL BACKFILL

ROADWAY OBLITERATION, METHOD 2

MECHANICALLY STABILIZED EARTH WALL, WELD

ROADWAY RECONDITIONING

PULVERIZING, 3-INCH DEPTH

PULVERIZING, 6-INCH DEPTH

PLACED RIPRAP, CLASS 3

PLACED RIPRAP, CLASS 4

PLACED RIPRAP, CLASS 6

GROUTED RIPRAP, CLASS 3

BOULDER

GABIONS, GALVANIZED OR ALUMINIZED COATE

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

78,900.00$ 31,231.25$

12,800.00$ 12,400.00$

4,650.00$ 5,394.00$

214,700.00$ 203,400.00$

21,000.00$ 25,000.00$

55,000.00$ 42,350.00$

4,250.00$ 3,250.00$

6,750.00$ 19,000.00$

22,100.00$ 31,200.00$

202,100.00$ 211,500.00$

106,500.00$ 120,700.00$

188,750.00$ 113,250.00$

441,000.00$ 189,000.00$

12.00$ 4.75$

5.00$ 5.80$

32.00$ 31.00$

105.00$ 125.00$

95.00$ 90.00$

170.00$ 130.00$

100.00$ 77.00$

17.00$ 24.00$

135.00$ 380.00$

1.50$ 1.70$

43.00$ 45.00$

5.25$ 2.25$

2.50$ 1.50$

12/2/2015 Page 15 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

30801-2000 Line A1060 7,300 CUYD

40201-4700 Line A1080 26,700 TON

40205-3000 Line A1100 265 TON

40501-0000 Line A1120 7,700 TON

40505-3000 Line A1140 80 TON

40961-0000 Line A1160 32,500 SQYD

41103-0000 Line A1180 168,500 SQYD

41201-1000 Line A1200 73 TON

50101-1200 Line A1220 4,700 SQYD

60101-0000 Line A1240 180 CUYD

60201-0600 Line A1260 62 LNFT

60201-0800 Line A1280 540 LNFT

60201-0900 Line A1300 20 LNFT

ROADWAY AGGREGATE, METHOD 2

HOT ASPHALT CONCRETE PAVEMENT, HVEEM TE

REINFORCED RIGID PAVEMENT, 9-INCH DEPTH,

CONCRETE

18-INCH PIPE CULVERT

24-INCH PIPE CULVERT

30-INCH PIPE CULVERT

ANTISTRIP ADDITIVE, TYPE 3

OPEN-GRADED ASPHALT FRICTION COURSE

ANTISTRIP ADDITIVE, TYPE 3

BLOTTER

PRIME COAT

TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

306,600.00$ 189,800.00$

2,189,400.00$ 2,296,200.00$

47,700.00$ 50,085.00$

808,500.00$ 847,000.00$

14,400.00$ 15,120.00$

11,375.00$ 32,500.00$

151,650.00$ 278,025.00$

71,540.00$ 73,000.00$

399,500.00$ 611,000.00$

111,600.00$ 189,000.00$

3,968.00$ 5,456.00$

45,360.00$ 50,760.00$

2,080.00$ 2,200.00$ 104.00$ 110.00$

84.00$ 94.00$

64.00$ 88.00$

620.00$ 1,050.00$

82.00$ 86.00$

42.00$ 26.00$

105.00$ 110.00$

180.00$ 189.00$

0.35$ 1.00$

180.00$ 189.00$

85.00$ 130.00$

980.00$ 1,000.00$

0.90$ 1.65$

12/2/2015 Page 16 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

60201-1000 Line A1320 420 LNFT

60201-1600 Line A1340 150 LNFT

60202-0500 Line A1360 130 LNFT

60202-0800 Line A1380 350 LNFT

60210-0600 Line A1400 2 EACH

60210-0800 Line A1420 10 EACH

60210-1600 Line A1440 4 EACH

60212-0600 Line A1460 2 EACH

60212-0800 Line A1480 4 EACH

60212-1000 Line A1500 2 EACH

60220-1800 Line A1520 124 LNFT

60221-3250 Line A1540 60 LNFT

60230-0000 Line A1560 1 EACH

36-INCH PIPE CULVERT

ELBOW, 18-INCH

ELBOW, 24-INCH

ELBOW, 36-INCH

8 FEET SPAN, 4 FEET RISE PRECAST REINFORCE

10 FEET SPAN, 10 FEET RISE REINFORCED CON

DEBRIS RACK

72-INCH PIPE CULVERT

30-INCH EQUIVALENT DIAMETER ARCH OR ELLI

48-INCH EQUIVALENT DIAMETER ARCH OR ELLI

END SECTION FOR 18-INCH PIPE CULVERT

END SECTION FOR 24-INCH PIPE CULVERT

END SECTION FOR 72-INCH PIPE CULVERT

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

52,080.00$ 60,900.00$

36,600.00$ 45,000.00$

13,520.00$ 16,250.00$

60,900.00$ 52,500.00$

1,060.00$ 1,200.00$

6,000.00$ 7,000.00$

10,400.00$ 13,200.00$

390.00$ 1,200.00$

880.00$ 2,640.00$

640.00$ 1,320.00$

167,400.00$ 241,800.00$

82,800.00$ 126,000.00$

5,500.00$ 12,400.00$ 5,500.00$ 12,400.00$

1,380.00$ 2,100.00$

1,350.00$ 1,950.00$

320.00$ 660.00$

220.00$ 660.00$

195.00$ 600.00$

2,600.00$ 3,300.00$

600.00$ 700.00$

530.00$ 600.00$

174.00$ 150.00$

104.00$ 125.00$

244.00$ 300.00$

124.00$ 145.00$

12/2/2015 Page 17 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

60403-2200 Line A1580 1 EACH

60404-2000 Line A1600 3 EACH

60405-0000 Line A1620 4 EACH

60526-0000 Line A1640 36 LNFT

60704-0000 Line A1660 25 EACH

60901-1300 Line A1680 1,750 LNFT

60902-1000 Line A1700 8,000 LNFT

60915-1000 Line A1720 44 EACH

61102-3200 Line A1740 70 LNFT

61103-1480 Line A1760 45 LNFT

61106-0000 Line A1780 1 EACH

61108-1000 Line A1800 20 EACH

61501-0100 Line A1820 1,000 SQYD

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

WHEELSTOP, CONCRETE

8-INCH WATERLINE, POLYVINYL CHLORIDE (PVC

20-INCH ENCASEMENT PIPE, STEEL

FIRE HYDRANT

ADJUST WATER VALVE

INLET, TYPE 7A

CATCH BASIN, TYPE 2

MANHOLE ADJUSTMENT

DRAINAGE CHASE

CLEANING CULVERT IN PLACE

CURB, CONCRETE, 15-INCH DEPTH

SIDEWALK, CONCRETE

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

5,300.00$ 1,200.00$

14,100.00$ 11,400.00$

3,400.00$ 3,800.00$

9,000.00$ 9,360.00$

15,375.00$ 15,000.00$

49,000.00$ 70,000.00$

200,000.00$ 200,000.00$

2,640.00$ 2,640.00$

8,400.00$ 7,000.00$

12,375.00$ 11,250.00$

7,500.00$ 5,000.00$

6,900.00$ 10,000.00$

97,000.00$ 32,000.00$ 97.00$ 32.00$

345.00$ 500.00$

7,500.00$ 5,000.00$

275.00$ 250.00$

120.00$ 100.00$

60.00$ 60.00$

25.00$ 25.00$

28.00$ 40.00$

615.00$ 600.00$

250.00$ 260.00$

850.00$ 950.00$

4,700.00$ 3,800.00$

5,300.00$ 1,200.00$

12/2/2015 Page 18 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

61505-1000 Line A1840 23 EACH

61701-1800 Line A1860 3,100 LNFT

61702-0800 Line A1880 14 EACH

61703-2000 Line A1900 2 EACH

61901-2250 Line A1920 420 LNFT

61902-0900 Line A1940 3 EACH

61904-0000 Line A1960 6 EACH

62201-0200 Line A1980 20 HOUR

62201-0550 Line A2000 20 HOUR

62201-0900 Line A2020 20 HOUR

62201-1150 Line A2040 20 HOUR

62201-1300 Line A2060 20 HOUR

62201-2750 Line A2080 20 HOUR

GATE, METAL

BOLLARD POST

DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACIT

BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA

WHEEL LOADER, 2 CUBIC YARD MINIMUM RATE

BULLDOZER, 70HP MINIMUM FLYWHEEL POWER

ACCESSIBILITY RAMP, CONCRETE

GUARDRAIL SYSTEM G4, TYPE 4, CLASS A STEE

TERMINAL SECTION TYPE TANGENT

TERMINAL END, TYPE ROUND END SECTION

FENCE, RAIL

BULLDOZER, 160HP MINIMUM FLYWHEEL POWE

MOTOR GRADER

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

47,610.00$ 41,400.00$

68,200.00$ 62,000.00$

46,200.00$ 43,400.00$

2,400.00$ 2,300.00$

32,760.00$ 34,020.00$

18,900.00$ 14,400.00$

2,760.00$ 12,900.00$

1,900.00$ 1,000.00$

1,700.00$ 1,000.00$

1,900.00$ 1,600.00$

1,600.00$ 2,600.00$

2,300.00$ 3,000.00$

2,400.00$ 1,600.00$ 120.00$ 80.00$

115.00$ 150.00$

80.00$ 130.00$

95.00$ 80.00$

85.00$ 50.00$

95.00$ 50.00$

460.00$ 2,150.00$

6,300.00$ 4,800.00$

78.00$ 81.00$

1,200.00$ 1,150.00$

3,300.00$ 3,100.00$

22.00$ 20.00$

2,070.00$ 1,800.00$

12/2/2015 Page 19 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

62201-3350 Line A2100 20 HOUR

62202-1000 Line A2120 ALL LPSM

62301-0000 Line A2140 40 HOUR

62302-1000 Line A2160 40 HOUR

62302-1100 Line A2180 40 HOUR

63301-0000 Line A2200 90 EACH

63308-3000 Line A2220 30 EACH

63309-0100 Line A2240 70 EACH

63313-0000 Line A2260 15,000 LNFT

63316-1000 Line A2280 60 EACH

63403-0400 Line A2300 1,700 SQFT

63404-0400 Line A2320 650 GAL

63405-0050 Line A2340 110 EACH

SPECIAL LABOR, HIRED SURVEY SERVICES

SIGN SYSTEM

OBJECT MARKER, TYPE 3

DELINEATOR, TYPE 1

RUMBLE STRIP

REMOVE AND RESET SIGN

HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU

MATERIALS TRANSFER VEHICLE

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

PAVEMENT MARKINGS, TYPE D

PAVEMENT MARKINGS, TYPE D

PAVEMENT MARKINGS, SYMBOLS

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

2,500.00$ 2,000.00$

35,000.00$ 36,750.00$

1,280.00$ 1,400.00$

2,600.00$ 4,000.00$

5,600.00$ 4,800.00$

45,000.00$ 43,200.00$

4,500.00$ 4,320.00$

2,940.00$ 3,850.00$

3,750.00$ 3,750.00$

30,000.00$ 28,800.00$

6,800.00$ 6,800.00$

39,000.00$ 39,000.00$

10,780.00$ 9,900.00$ 98.00$ 90.00$

60.00$ 60.00$

4.00$ 4.00$

500.00$ 480.00$

0.25$ 0.25$

42.00$ 55.00$

150.00$ 144.00$

500.00$ 480.00$

140.00$ 120.00$

65.00$ 100.00$

32.00$ 35.00$

35,000.00$ 36,750.00$

125.00$ 100.00$

12/2/2015 Page 20 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

63501-1000 Line A2360 ALL LPSM

63501-2000 Line A2380 ALL LPSM

63502-0700 Line A2400 655 EACH

63502-1300 Line A2420 815 EACH

63502-1700 Line A2440 50 EACH

63503-0300 Line A2460 100 LNFT

63503-0400 Line A2480 400 LNFT

63503-0500 Line A2500 400 LNFT

63504-1000 Line A2520 783 SQFT

63505-1000 Line A2540 9.0 MILE

63506-0500 Line A2560 5,000 HOUR

63506-0600 Line A2580 1,400 HOUR

63621-1000 Line A2600 16 EACH

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGH

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, CONCRETE BAR

TEMPORARY TRAFFIC CONTROL, MOVING CONC

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

TEMPORARY TRAFFIC CONTROL, TRAFFIC AND S

TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNA

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

UTILITY BOX, PULLBOX

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

32,000.00$ 50,400.00$

45,000.00$ 50,000.00$

15,065.00$ 19,650.00$

81,500.00$ 44,825.00$

2,850.00$ 8,000.00$

82,500.00$ 30,000.00$

9,200.00$ 20,000.00$

6,800.00$ 4,000.00$

15,660.00$ 19,575.00$

10,800.00$ 10,440.00$

135,000.00$ 150,000.00$

56,000.00$ 56,000.00$

8,000.00$ 12,000.00$ 500.00$ 750.00$

40.00$ 40.00$

27.00$ 30.00$

1,200.00$ 1,160.00$

20.00$ 25.00$

17.00$ 10.00$

23.00$ 50.00$

825.00$ 300.00$

57.00$ 160.00$

100.00$ 55.00$

23.00$ 30.00$

45,000.00$ 50,000.00$

32,000.00$ 50,400.00$

12/2/2015 Page 21 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

64620-0500 Line A2620 1 EACH

REMOVE AND RESET FLAG POLE

-22.7% 10,047,724.00$ -18.3% 10,621,731.25$

Unit Price Amount Unit Price Amount

Fann Contracting, Inc. Interstate Rock Products

5,000.00$ 1,850.00$ 5,000.00$ 1,850.00$

12/2/2015 Page 22 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15206-0000 Line A0040 201.000 STA

15210-3000 Line A0060 182.500 STA

15214-2000 Line A0080 ALL LPSM

15215-3000 Line A0100 30 EACH

15215-6000 Line A0120 60 EACH

15215-7000 Line A0140 15 EACH

15216-2000 Line A0160 201.000 STA

15301-0000 Line A0180 ALL LPSM

15401-0000 Line A0200 ALL LPSM

15501-0000 Line A0220 ALL LPSM

15705-0100 Line A0240 14,000 LNFT

15705-1400 Line A0260 7,700 LNFT

SURVEY AND STAKING, RETAINING WALL

MOBILIZATION

SLOPE, REFERENCE, AND CLEARING AND GRUBB

CENTERLINE, VERIFICATION AND STAKING

SURVEY AND STAKING, PARKING AREA

SURVEY AND STAKING, GRADE FINISHING STAK

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, ROADWAY CROSS-SECT

SOIL EROSION CONTROL, SEDIMENT LOG

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

753,673.49$ 1,600,000.00$

3,360.72$ 50,250.00$

16,353.83$ 7,300.00$

1,635.30$ 10,000.00$

6,541.20$ 30,000.00$

21,804.00$ 36,000.00$

24,529.50$ 90,000.00$

21,804.48$ 40,200.00$

141,726.00$ 200,000.00$

74,645.56$ 200,000.00$

13,605.70$ 50,000.00$

61,040.00$ 56,000.00$

25,179.00$ 30,800.00$

1,635.30$ 10,000.00$

753,673.49$

Pace Contracting RBK Construction, Inc.

218.04$ 1,000.00$

1,600,000.00$

16.72$ 250.00$

89.61$ 40.00$

108.48$ 200.00$

1,635.30$ 6,000.00$

363.40$ 600.00$

74,645.56$ 200,000.00$

141,726.00$ 200,000.00$

4.36$ 4.00$

13,605.70$ 50,000.00$

3.27$ 4.00$

12/2/2015 Page 23 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15705-1500 Line A0280 10,000 LNFT

15706-0200 Line A0300 22 EACH

15706-0400 Line A0320 5 EACH

15706-1600 Line A0340 2 EACH

15802-0000 Line A0360 ALL LPSM

20103-0000 Line A0380 92,000 SQYD

20301-0700 Line A0400 65 EACH

20301-0900 Line A0420 1 EACH

20301-1200 Line A0440 20 EACH

20301-1500 Line A0460 1 EACH

20301-1900 Line A0480 4 EACH

20301-2400 Line A0500 65 EACH

20301-2700 Line A0520 1 EACH

SOIL EROSION CONTROL, SEDIMENT TRAP

SOIL EROSION CONTROL, STABILIZED CONSTR

WATERING FOR DUST CONTROL

REMOVAL OF SIGN

REMOVAL OF STRUCTURE

CLEARING AND GRUBBING

REMOVAL OF DELINEATOR

REMOVAL OF FIRE HYDRANT

REMOVAL OF HEADWALL

REMOVAL OF LIGHT POLE

REMOVAL OF PIPE CULVERT

SOIL EROSION CONTROL, SEDIMENT WATTLE

SOIL EROSION CONTROL, CHECK DAM

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

27,300.00$ 50,000.00$

10,792.98$ 2,200.00$

2,725.50$ 7,500.00$

4,360.80$ 4,000.00$

50,149.20$ 25,000.00$

14,720.00$ 46,000.00$

1,062.75$ 650.00$

981.18$ 1,500.00$

65,412.00$ 10,000.00$

545.10$ 2,000.00$

2,180.40$ 12,000.00$

3,543.15$ 4,550.00$

5,451.00$ 15,000.00$

2.73$ 5.00$

545.10$ 1,500.00$

490.59$ 100.00$

50,149.20$ 25,000.00$

2,180.40$ 2,000.00$

16.35$ 10.00$

0.16$ 0.50$

3,270.60$ 500.00$

981.18$ 1,500.00$

545.10$ 3,000.00$

545.10$ 2,000.00$

5,451.00$ 15,000.00$

54.51$ 70.00$

12/2/2015 Page 24 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

20301-3400 Line A0540 15 EACH

20302-0400 Line A0560 9,300 LNFT

20302-0500 Line A0580 11,000 LNFT

20302-1200 Line A0600 1,500 LNFT (CQ)

20303-0300 Line A0620 60 SQYD

20303-1500 Line A0640 320 SQYD

20303-3200 Line A0660 220 SQYD

20304-8000 Line A0680 ALL LPSM

20402-0000 Line A0700 3,300 CUYD

20420-0000 Line A0720 35,900 CUYD

20421-0000 Line A0740 17,000 CUYD

20425-1000 Line A0760 140 LNFT

20442-0000 Line A0780 2,000 CUYD

REMOVAL OF GUARDRAIL

ROCK EXCAVATION

DITCH, EXCAVATION

SLOPE SCALING

REMOVAL OF CONCRETE

REMOVAL OF PAVED WATERWAY, STONE

REMOVAL OF SIDEWALK, CONCRETE

REMOVAL OF WINGWALL CONCRETE

SUBEXCAVATION

EMBANKMENT CONSTRUCTION

REMOVAL OF WHEELSTOP

REMOVAL OF CURB, ASPHALT

REMOVAL OF CURB, CONCRETE

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

1,362.75$ 1,500.00$

30,411.00$ 55,800.00$

71,940.00$ 88,000.00$

32,700.00$ 4,500.00$

2,060.40$ 4,200.00$

7,849.60$ 20,800.00$

6,476.80$ 14,300.00$

6,541.20$ 32,000.00$

53,955.00$ 165,000.00$

508,703.00$ 1,220,600.00$

834,020.00$ 17,000.00$

3,392.20$ 4,200.00$

130,820.00$ 40,000.00$

3.27$ 6.00$

90.85$ 100.00$

21.80$ 3.00$

6.54$ 8.00$

24.53$ 65.00$

34.34$ 70.00$

6,541.20$ 32,000.00$

29.44$ 65.00$

14.17$ 34.00$

16.35$ 50.00$

24.23$ 30.00$

49.06$ 1.00$

65.41$ 20.00$

12/2/2015 Page 25 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

20502-0000 Line A0800 6,575 SQFT

20804-0000 Line A0820 400 TON

21101-2000 Line A0840 930 SQYD

25101-3000 Line A0860 2,260 CUYD

25101-4000 Line A0880 200 CUYD

25101-6000 Line A0900 550 CUYD

25110-3000 Line A0920 25 CUYD

25125-0000 Line A0940 50 EACH

25301-1000 Line A0960 1,300 SQFT

25501-1000 Line A0980 4,700 SQFT

30303-3000 Line A1000 71,000 SQYD

30306-1500 Line A1020 75,500 SQYD

30306-3000 Line A1040 84,000 SQYD

CONTROLLED BLASTING

STRUCTURAL BACKFILL

ROADWAY OBLITERATION, METHOD 2

MECHANICALLY STABILIZED EARTH WALL, WELD

ROADWAY RECONDITIONING

PULVERIZING, 3-INCH DEPTH

PULVERIZING, 6-INCH DEPTH

PLACED RIPRAP, CLASS 3

PLACED RIPRAP, CLASS 4

PLACED RIPRAP, CLASS 6

GROUTED RIPRAP, CLASS 3

BOULDER

GABIONS, GALVANIZED OR ALUMINIZED COATE

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

54,441.00$ 9,862.50$

15,264.00$ 20,000.00$

25,351.80$ 2,790.00$

216,621.00$ 214,700.00$

34,014.00$ 19,200.00$

73,859.50$ 53,350.00$

7,847.25$ 6,250.00$

13,627.50$ 25,000.00$

38,584.00$ 39,000.00$

269,686.00$ 446,500.00$

670,240.00$ 426,000.00$

84,560.00$ 7,550.00$

94,080.00$ 630,000.00$

8.28$ 1.50$

27.26$ 3.00$

38.16$ 50.00$

170.07$ 96.00$

95.85$ 95.00$

313.89$ 250.00$

134.29$ 97.00$

29.68$ 30.00$

272.55$ 500.00$

9.44$ 6.00$

57.38$ 95.00$

1.12$ 7.50$

1.12$ 0.10$

12/2/2015 Page 26 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

30801-2000 Line A1060 7,300 CUYD

40201-4700 Line A1080 26,700 TON

40205-3000 Line A1100 265 TON

40501-0000 Line A1120 7,700 TON

40505-3000 Line A1140 80 TON

40961-0000 Line A1160 32,500 SQYD

41103-0000 Line A1180 168,500 SQYD

41201-1000 Line A1200 73 TON

50101-1200 Line A1220 4,700 SQYD

60101-0000 Line A1240 180 CUYD

60201-0600 Line A1260 62 LNFT

60201-0800 Line A1280 540 LNFT

60201-0900 Line A1300 20 LNFT

ROADWAY AGGREGATE, METHOD 2

HOT ASPHALT CONCRETE PAVEMENT, HVEEM TE

REINFORCED RIGID PAVEMENT, 9-INCH DEPTH,

CONCRETE

18-INCH PIPE CULVERT

24-INCH PIPE CULVERT

30-INCH PIPE CULVERT

ANTISTRIP ADDITIVE, TYPE 3

OPEN-GRADED ASPHALT FRICTION COURSE

ANTISTRIP ADDITIVE, TYPE 3

BLOTTER

PRIME COAT

TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

190,968.00$ 146,000.00$

2,328,774.00$ 2,963,700.00$

41,891.20$ 49,025.00$

917,532.00$ 908,600.00$

12,646.40$ 14,800.00$

3,900.00$ 3,250.00$

53,920.00$ 101,100.00$

43,771.53$ 51,100.00$

302,868.00$ 554,600.00$

117,741.60$ 153,000.00$

6,231.62$ 6,510.00$

60,134.40$ 59,400.00$

2,365.80$ 2,300.00$ 118.29$ 115.00$

111.36$ 110.00$

100.51$ 105.00$

654.12$ 850.00$

87.22$ 111.00$

26.16$ 20.00$

119.16$ 118.00$

158.08$ 185.00$

0.12$ 0.10$

158.08$ 185.00$

64.44$ 118.00$

599.61$ 700.00$

0.32$ 0.60$

12/2/2015 Page 27 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

60201-1000 Line A1320 420 LNFT

60201-1600 Line A1340 150 LNFT

60202-0500 Line A1360 130 LNFT

60202-0800 Line A1380 350 LNFT

60210-0600 Line A1400 2 EACH

60210-0800 Line A1420 10 EACH

60210-1600 Line A1440 4 EACH

60212-0600 Line A1460 2 EACH

60212-0800 Line A1480 4 EACH

60212-1000 Line A1500 2 EACH

60220-1800 Line A1520 124 LNFT

60221-3250 Line A1540 60 LNFT

60230-0000 Line A1560 1 EACH

36-INCH PIPE CULVERT

ELBOW, 18-INCH

ELBOW, 24-INCH

ELBOW, 36-INCH

8 FEET SPAN, 4 FEET RISE PRECAST REINFORCE

10 FEET SPAN, 10 FEET RISE REINFORCED CON

DEBRIS RACK

72-INCH PIPE CULVERT

30-INCH EQUIVALENT DIAMETER ARCH OR ELLI

48-INCH EQUIVALENT DIAMETER ARCH OR ELLI

END SECTION FOR 18-INCH PIPE CULVERT

END SECTION FOR 24-INCH PIPE CULVERT

END SECTION FOR 72-INCH PIPE CULVERT

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

54,259.80$ 51,240.00$

36,385.50$ 26,250.00$

18,141.50$ 15,600.00$

72,135.00$ 54,250.00$

2,027.78$ 1,300.00$

8,067.50$ 5,000.00$

15,480.84$ 10,000.00$

1,460.86$ 1,300.00$

3,008.96$ 3,000.00$

1,700.72$ 1,600.00$

195,416.56$ 136,400.00$

143,906.40$ 102,000.00$

6,541.20$ 18,000.00$ 6,541.20$ 18,000.00$

2,398.44$ 1,700.00$

1,575.94$ 1,100.00$

850.36$ 800.00$

752.24$ 750.00$

730.43$ 650.00$

3,870.21$ 2,500.00$

806.75$ 500.00$

1,013.89$ 650.00$

206.10$ 155.00$

139.55$ 120.00$

242.57$ 175.00$

129.19$ 122.00$

12/2/2015 Page 28 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

60403-2200 Line A1580 1 EACH

60404-2000 Line A1600 3 EACH

60405-0000 Line A1620 4 EACH

60526-0000 Line A1640 36 LNFT

60704-0000 Line A1660 25 EACH

60901-1300 Line A1680 1,750 LNFT

60902-1000 Line A1700 8,000 LNFT

60915-1000 Line A1720 44 EACH

61102-3200 Line A1740 70 LNFT

61103-1480 Line A1760 45 LNFT

61106-0000 Line A1780 1 EACH

61108-1000 Line A1800 20 EACH

61501-0100 Line A1820 1,000 SQYD

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

WHEELSTOP, CONCRETE

8-INCH WATERLINE, POLYVINYL CHLORIDE (PVC

20-INCH ENCASEMENT PIPE, STEEL

FIRE HYDRANT

ADJUST WATER VALVE

INLET, TYPE 7A

CATCH BASIN, TYPE 2

MANHOLE ADJUSTMENT

DRAINAGE CHASE

CLEANING CULVERT IN PLACE

CURB, CONCRETE, 15-INCH DEPTH

SIDEWALK, CONCRETE

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

9,811.80$ 6,000.00$

39,244.20$ 19,500.00$

2,616.44$ 4,000.00$

7,064.64$ 21,600.00$

9,539.25$ 50,000.00$

41,965.00$ 43,750.00$

174,400.00$ 216,000.00$

7,195.32$ 22,000.00$

12,210.10$ 8,050.00$

7,358.85$ 22,500.00$

2,616.48$ 5,000.00$

11,792.20$ 10,000.00$

53,960.00$ 50,000.00$ 53.96$ 50.00$

589.61$ 500.00$

2,616.48$ 5,000.00$

163.53$ 500.00$

174.43$ 115.00$

163.53$ 500.00$

21.80$ 27.00$

23.98$ 25.00$

381.57$ 2,000.00$

196.24$ 600.00$

654.11$ 1,000.00$

13,081.40$ 6,500.00$

9,811.80$ 6,000.00$

12/2/2015 Page 29 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

61505-1000 Line A1840 23 EACH

61701-1800 Line A1860 3,100 LNFT

61702-0800 Line A1880 14 EACH

61703-2000 Line A1900 2 EACH

61901-2250 Line A1920 420 LNFT

61902-0900 Line A1940 3 EACH

61904-0000 Line A1960 6 EACH

62201-0200 Line A1980 20 HOUR

62201-0550 Line A2000 20 HOUR

62201-0900 Line A2020 20 HOUR

62201-1150 Line A2040 20 HOUR

62201-1300 Line A2060 20 HOUR

62201-2750 Line A2080 20 HOUR

GATE, METAL

BOLLARD POST

DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACIT

BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA

WHEEL LOADER, 2 CUBIC YARD MINIMUM RATE

BULLDOZER, 70HP MINIMUM FLYWHEEL POWER

ACCESSIBILITY RAMP, CONCRETE

GUARDRAIL SYSTEM G4, TYPE 4, CLASS A STEE

TERMINAL SECTION TYPE TANGENT

TERMINAL END, TYPE ROUND END SECTION

FENCE, RAIL

BULLDOZER, 160HP MINIMUM FLYWHEEL POWE

MOTOR GRADER

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

75,223.80$ 23,000.00$

129,425.00$ 62,000.00$

73,032.54$ 35,000.00$

10,433.22$ 4,600.00$

54,944.40$ 48,300.00$

7,195.32$ 6,000.00$

5,232.96$ 3,000.00$

2,834.60$ 2,200.00$

2,398.40$ 2,100.00$

5,015.00$ 3,000.00$

5,287.40$ 3,600.00$

7,140.80$ 5,500.00$

6,541.20$ 3,000.00$ 327.06$ 150.00$

357.04$ 275.00$

264.37$ 180.00$

250.75$ 150.00$

119.92$ 105.00$

141.73$ 110.00$

872.16$ 500.00$

2,398.44$ 2,000.00$

130.82$ 115.00$

5,216.61$ 2,300.00$

5,216.61$ 2,500.00$

41.75$ 20.00$

3,270.60$ 1,000.00$

12/2/2015 Page 30 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

62201-3350 Line A2100 20 HOUR

62202-1000 Line A2120 ALL LPSM

62301-0000 Line A2140 40 HOUR

62302-1000 Line A2160 40 HOUR

62302-1100 Line A2180 40 HOUR

63301-0000 Line A2200 90 EACH

63308-3000 Line A2220 30 EACH

63309-0100 Line A2240 70 EACH

63313-0000 Line A2260 15,000 LNFT

63316-1000 Line A2280 60 EACH

63403-0400 Line A2300 1,700 SQFT

63404-0400 Line A2320 650 GAL

63405-0050 Line A2340 110 EACH

SPECIAL LABOR, HIRED SURVEY SERVICES

SIGN SYSTEM

OBJECT MARKER, TYPE 3

DELINEATOR, TYPE 1

RUMBLE STRIP

REMOVE AND RESET SIGN

HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU

MATERIALS TRANSFER VEHICLE

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

PAVEMENT MARKINGS, TYPE D

PAVEMENT MARKINGS, TYPE D

PAVEMENT MARKINGS, SYMBOLS

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

6,332.20$ 3,800.00$

65,412.00$ 75,000.00$

4,012.00$ 2,000.00$

5,232.80$ 7,000.00$

7,849.60$ 7,000.00$

180,046.80$ 47,250.00$

7,576.80$ 9,600.00$

9,921.10$ 2,800.00$

5,250.00$ 3,000.00$

81,765.00$ 21,000.00$

44,948.00$ 8,075.00$

226,759.00$ 42,250.00$

56,963.50$ 11,000.00$ 517.85$ 100.00$

348.86$ 65.00$

26.44$ 4.75$

1,362.75$ 350.00$

0.35$ 0.20$

141.73$ 40.00$

252.56$ 320.00$

2,000.52$ 525.00$

196.24$ 175.00$

130.82$ 175.00$

100.30$ 50.00$

65,412.00$ 75,000.00$

316.61$ 190.00$

12/2/2015 Page 31 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

63501-1000 Line A2360 ALL LPSM

63501-2000 Line A2380 ALL LPSM

63502-0700 Line A2400 655 EACH

63502-1300 Line A2420 815 EACH

63502-1700 Line A2440 50 EACH

63503-0300 Line A2460 100 LNFT

63503-0400 Line A2480 400 LNFT

63503-0500 Line A2500 400 LNFT

63504-1000 Line A2520 783 SQFT

63505-1000 Line A2540 9.0 MILE

63506-0500 Line A2560 5,000 HOUR

63506-0600 Line A2580 1,400 HOUR

63621-1000 Line A2600 16 EACH

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGH

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, CONCRETE BAR

TEMPORARY TRAFFIC CONTROL, MOVING CONC

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

TEMPORARY TRAFFIC CONTROL, TRAFFIC AND S

TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNA

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

UTILITY BOX, PULLBOX

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

135,952.30$ 165,000.00$

141,944.04$ 21,000.00$

37,066.45$ 5,240.00$

92,665.50$ 44,825.00$

1,908.00$ 20,000.00$

32,706.00$ 3,000.00$

16,352.00$ 20,000.00$

26,164.00$ 4,800.00$

13,357.98$ 7,830.00$

14,717.70$ 36,000.00$

376,100.00$ 125,000.00$

196,896.00$ 70,000.00$

10,465.92$ 40,000.00$ 654.12$ 2,500.00$

140.64$ 50.00$

75.22$ 25.00$

1,635.30$ 4,000.00$

17.06$ 10.00$

65.41$ 12.00$

40.88$ 50.00$

327.06$ 30.00$

38.16$ 400.00$

113.70$ 55.00$

56.59$ 8.00$

141,944.04$ 21,000.00$

135,952.30$ 165,000.00$

12/2/2015 Page 32 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

64620-0500 Line A2620 1 EACH

REMOVE AND RESET FLAG POLE

-8.9% 11,850,377.12$ 0.6% 13,075,547.50$

Unit Price Amount Unit Price Amount

Pace Contracting RBK Construction, Inc.

2,725.50$ 5,000.00$ 2,725.50$ 5,000.00$

12/2/2015 Page 33 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15206-0000 Line A0040 201.000 STA

15210-3000 Line A0060 182.500 STA

15214-2000 Line A0080 ALL LPSM

15215-3000 Line A0100 30 EACH

15215-6000 Line A0120 60 EACH

15215-7000 Line A0140 15 EACH

15216-2000 Line A0160 201.000 STA

15301-0000 Line A0180 ALL LPSM

15401-0000 Line A0200 ALL LPSM

15501-0000 Line A0220 ALL LPSM

15705-0100 Line A0240 14,000 LNFT

15705-1400 Line A0260 7,700 LNFT

SURVEY AND STAKING, RETAINING WALL

MOBILIZATION

SLOPE, REFERENCE, AND CLEARING AND GRUBB

CENTERLINE, VERIFICATION AND STAKING

SURVEY AND STAKING, PARKING AREA

SURVEY AND STAKING, GRADE FINISHING STAK

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, ROADWAY CROSS-SECT

SOIL EROSION CONTROL, SEDIMENT LOG

-4.3% 12,443,552.50$ 7.6% 13,996,612.00$

Unit Price Amount Unit Price Amount

1,340,000.00$ 1,399,300.00$

13,467.00$ 25,125.00$

7,482.50$ 12,775.00$

2,000.00$ 3,500.00$

10,500.00$ 18,000.00$

3,540.00$ 6,000.00$

28,500.00$ 45,000.00$

11,457.00$ 20,100.00$

200,000.00$ 120,000.00$

250,000.00$ 232,000.00$

20,000.00$ 10,000.00$

49,000.00$ 98,000.00$

61,600.00$ 69,300.00$

2,000.00$ 3,500.00$

70.00$

Hooker Creek, Inc. Meadow Valley Contractors dba ACC

350.00$ 600.00$

1,340,000.00$ 1,399,300.00$

67.00$ 125.00$

41.00$

57.00$ 100.00$

1,900.00$ 3,000.00$

59.00$ 100.00$

250,000.00$ 232,000.00$

200,000.00$ 120,000.00$

3.50$ 7.00$

20,000.00$ 10,000.00$

8.00$ 9.00$

12/2/2015 Page 34 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15705-1500 Line A0280 10,000 LNFT

15706-0200 Line A0300 22 EACH

15706-0400 Line A0320 5 EACH

15706-1600 Line A0340 2 EACH

15802-0000 Line A0360 ALL LPSM

20103-0000 Line A0380 92,000 SQYD

20301-0700 Line A0400 65 EACH

20301-0900 Line A0420 1 EACH

20301-1200 Line A0440 20 EACH

20301-1500 Line A0460 1 EACH

20301-1900 Line A0480 4 EACH

20301-2400 Line A0500 65 EACH

20301-2700 Line A0520 1 EACH

SOIL EROSION CONTROL, SEDIMENT TRAP

SOIL EROSION CONTROL, STABILIZED CONSTR

WATERING FOR DUST CONTROL

REMOVAL OF SIGN

REMOVAL OF STRUCTURE

CLEARING AND GRUBBING

REMOVAL OF DELINEATOR

REMOVAL OF FIRE HYDRANT

REMOVAL OF HEADWALL

REMOVAL OF LIGHT POLE

REMOVAL OF PIPE CULVERT

SOIL EROSION CONTROL, SEDIMENT WATTLE

SOIL EROSION CONTROL, CHECK DAM

-4.3% 12,443,552.50$ 7.6% 13,996,612.00$

Unit Price Amount Unit Price Amount

Hooker Creek, Inc. Meadow Valley Contractors dba ACC

65,000.00$ 60,000.00$

3,300.00$ 15,950.00$

9,000.00$ 12,000.00$

3,200.00$ 5,000.00$

156,000.00$ 200,000.00$

32,200.00$ 92,000.00$

1,170.00$ 5,850.00$

900.00$ 2,500.00$

4,600.00$ 44,000.00$

1,400.00$ 1,000.00$

8,000.00$ 9,600.00$

4,745.00$ 4,225.00$

820.00$ 35,000.00$

6.50$ 6.00$

1,800.00$ 2,400.00$

150.00$ 725.00$

156,000.00$ 200,000.00$

1,600.00$ 2,500.00$

18.00$ 90.00$

0.35$ 1.00$

230.00$ 2,200.00$

900.00$ 2,500.00$

2,000.00$ 2,400.00$

1,400.00$ 1,000.00$

820.00$ 35,000.00$

73.00$ 65.00$

12/2/2015 Page 35 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

20301-3400 Line A0540 15 EACH

20302-0400 Line A0560 9,300 LNFT

20302-0500 Line A0580 11,000 LNFT

20302-1200 Line A0600 1,500 LNFT (CQ)

20303-0300 Line A0620 60 SQYD

20303-1500 Line A0640 320 SQYD

20303-3200 Line A0660 220 SQYD

20304-8000 Line A0680 ALL LPSM

20402-0000 Line A0700 3,300 CUYD

20420-0000 Line A0720 35,900 CUYD

20421-0000 Line A0740 17,000 CUYD

20425-1000 Line A0760 140 LNFT

20442-0000 Line A0780 2,000 CUYD

REMOVAL OF GUARDRAIL

ROCK EXCAVATION

DITCH, EXCAVATION

SLOPE SCALING

REMOVAL OF CONCRETE

REMOVAL OF PAVED WATERWAY, STONE

REMOVAL OF SIDEWALK, CONCRETE

REMOVAL OF WINGWALL CONCRETE

SUBEXCAVATION

EMBANKMENT CONSTRUCTION

REMOVAL OF WHEELSTOP

REMOVAL OF CURB, ASPHALT

REMOVAL OF CURB, CONCRETE

-4.3% 12,443,552.50$ 7.6% 13,996,612.00$

Unit Price Amount Unit Price Amount

Hooker Creek, Inc. Meadow Valley Contractors dba ACC

300.00$ 750.00$

13,950.00$ 37,200.00$

44,000.00$ 55,000.00$

10,500.00$ 9,000.00$

3,840.00$ 2,100.00$

9,600.00$ 7,680.00$

7,920.00$ 7,920.00$

8,100.00$ 20,000.00$

184,800.00$ 125,400.00$

394,900.00$ 1,148,800.00$

289,000.00$ 595,000.00$

1,400.00$ 3,920.00$

24,000.00$ 66,000.00$

1.50$ 4.00$

20.00$ 50.00$

7.00$ 6.00$

4.00$ 5.00$

30.00$ 24.00$

64.00$ 35.00$

8,100.00$ 20,000.00$

36.00$ 36.00$

11.00$ 32.00$

56.00$ 38.00$

10.00$ 28.00$

17.00$ 35.00$

12.00$ 33.00$

12/2/2015 Page 36 of 44

Project No: NV FTNP LAKE 114(1)

Project Name: Katherine Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

20502-0000 Line A0800 6,575 SQFT

20804-0000 Line A0820 400 TON

21101-2000 Line A0840 930 SQYD

25101-3000 Line A0860 2,260 CUYD

25101-4000 Line A0880 200 CUYD

25101-6000 Line A0900 550 CUYD

25110-3000 Line A0920 25 CUYD

25125-0000 Line A0940 50 EACH

25301-1000 Line A0960 1,300 SQFT

25501-1000 Line A0980 4,700 SQFT

30303-3000 Line A1000 71,000 SQYD

30306-1500 Line A1020 75,500 SQYD

30306-3000 Line A1040 84,000 SQYD

CONTROLLED BLASTING

STRUCTURAL BACKFILL

ROADWAY OBLITERATION, METHOD 2

MECHANICALLY STABILIZED EARTH WALL, WELD

ROADWAY RECONDITIONING

PULVERIZING, 3-INCH DEPTH

PULVERIZING, 6-INCH DEPTH

PLACED RIPRAP, CLASS 3

PLACED RIPRAP, CLASS 4

PLACED RIPRAP, CLASS 6

GROUTED RIPRAP, CLASS 3

BOULDER

GABIONS, GALVANIZED OR ALUMINIZED COATE

-4.3% 12,443,552.50$ 7.6% 13,996,612.00$

Unit Price Amount Unit Price Amount

Hooker Creek, Inc. Meadow Valley Contractors dba ACC

78,900.00$ 52,600.00$

17,200.00$ 8,000.00$

1,395.00$ 13,020.00$

429,400.00$ 259,900.00$

36,00…

This is the start of the file's text. The full file is on GovTribe.