Hydraulics_Memo_LAKE114_1__Overall.pdf
PDF 2 MB Posted
- Attached to
- NV FTNP LAKE 114(1), Katherine Lake
- Solicitation number
- DTFH6815B00021
About this file
Hydraulic Report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabs_NV_FTNP_Lake_114(1)_Sch_A.pdf | ||
| Bid_Tabs_NV_FTNP_Lake_114(1)_Opt_X.pdf | ||
| NV_FTNP_LAKE_114(1)_Bid_Summary_11_19_15.xlsx | XLSX spreadsheet | |
| A001.pdf | ||
| NV_FTNP_PRA-LAKE_114(1)_Final_Geotech_Report_(100__Final).pdf | ||
| Q-A_11_4_15.pdf | ||
| IFB_DTFH6815B00021.pdf | ||
| Plans.pdf | ||
| Cross_Section.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Memorandum
Over a Century of Engineering Excellence Page 1 of 4 Memo LAKE114(1) Overall.docx
DATE: February 6, 2013
FROM: Colin Haggerty, PE, CFM
TO: Gerald Blackler;
U.S. Department of Transportation
Federal Highway Administration
COPY: Scott Hogan, PE, Ed Martinez, PE, Nathan Silberhorn, Dennis Eden, PE
SUBJECT: LAKE 114(1) HYDROLOGIC AND HYDRAULIC ANALYSIS MEMORANDUM
PB PROJECT # 31510T
Dear Mr. Blackler:
As part of the 70% design, Parsons Brinckerhoff has completed individual analysis memo’s for the proposed improvements at the existing 10’x10’ RCB and existing Low Water Crossing. This document will summarize the results of those memo’s as well as provide documentation for the remaining locations along Katherine Access Road that required further analysis. As a result of 30% design and field review, a hydrologic and hydraulic analysis has been performed at six (6) locations along the roadway alignment. The roadway stationing mentioned within this memo depicts the stationing referenced from the proposed horizontal alignment referred to as the Alternative B alignment. These six (6) locations are identified as a single cell 10’ x 10’ reinforced concrete box (RCB) culvert at approximate roadway station 2014+98, channel embankment protection areas near stations 2022+69, 2060+06 and 2066+75, Low Water Crossing (LWC) at station 2136+00, and the Katherine Landing Marina drainage improvements at approximate station 2203+56 LT. Preliminary design was completed based on the requirements of the Project Development and Design Manual (PDDM), which requires that the 50-year flood be conveyed by the cross culverts, the low water crossing remain stable during the 50-year flood, while the channel embankment protection was also analyzed for the 50-year flood. The flow rates for culverts, channels, and LWCs were determined utilizing the regression methodology guidance from Arizona Department of Transportation (ADOT) since the delineated sub-basins were greater than 65 hectare (160 acres). The delineated sub-basins are depicted in figures 1 and 2, drainage sub-basin maps.
Drainage Facilities Analysis:
Culvert D4 at station 2014+98 is an existing single cell 10’ x 10’ RCB culvert. From field reconnaissance this culvert appeared to have approximately 3’ of sediment aggradation throughout the culvert. A long-term degradation / aggradation analysis based on Clark County Regional Flood Control District (CCRFCD) criteria was performed on the upstream wash for this facility and the analysis resulted in additional aggradation likely to occur. The tributary area of
7.5 square miles (mi2) produces a peak 50-year runoff of 2,283 cubic feet per second (cfs).
Based on field verification, Basins K1A and K1B were determined to not be tributary to Basin K1 and therefore have been removed from the area tributary to basin K1. The HY-8 analysis shows that the existing culvert do not have the capacity to convey the peak flow from the 50-
Engineering Excellence Page 2 of 4 Memo LAKE114(1) Overall.docx year flood without overtopping the existing roadway. The proposed analysis included adding two additional 72” concrete pipe culverts at approximately 17 feet above the existing 10’x10’ RCB culvert invert to provide the additional capacity while keeping the existing box functioning during and after construction. The analysis assumed the 3’ of sediment aggradation will continue to be present under the proposed conditions. The existing facility will be retrofitted with culvert extensions, upstream and downstream, and new wingwalls, upstream and downstream.
The culvert extensions will utilize the existing facility’s gradient. The proposed facilities, dual 72” pipes RCP, are aligned more directly with the existing wash and the inverts placed at an elevation which prevents the 50-year flow from overtopping the roadway. The Hw/D determined under the proposed conditions resulted in ratios of 1.03 for the proposed facilities and 2.34 for the existing facility, with the three facilities used for conveyance. Based on these flow rates, a riprap basin a d50 size of 22” will prevent future erosion of the downstream embankment during the 50-year flood. The riprap basin’s dimensions and revetment were based on dimensions for the proposed slope. Riprap will not be provided on the existing facility due to the existing sediment load in the structure. The drainage facilities’ upstream embankment is proposed to be protected from erosion using Class III revetment to prevent scouring during larger storm events.
In addition to the proposed dual 72” RCPs, a dual 138” CSP, a single 192” CSP, and a single 20’ x 10’ CON/SPAN arch were reviewed to determine the most cost efficient solution. Further discussion with the park service will be needed to finalize design based on the conveyance, cost, and durability.
Between station 2022+69 and 2054+66, the channel section has begun to erode the bank and could potentially impact the roadway. This channel area has been eroded by runoff to the extent that erosion has begun to deteriorate the side slope and undermine the roadway’s embankment. The channel is a trapezoidal shape with 1:1 (H:V) to 1.7:1 (H:V) side slopes and an average bottom width of approximately 36’. Utilizing ADOT regression equations, the tributary area of 0.6 mi2 produces a peak 50-year runoff of 430 cfs (design flow), while the peak 100-year event produces runoff of 619 cfs (maximum / check flow). Based on the design flow rate, riprap revetment of Class III riprap 12” size d50 will prevent future erosion of the roadway embankment from the 50-year flood. The revetment particle size was calculated following guidance from HEC-23, Design Guideline 4. Approximately 1.0 times the channel width upstream and 1.5 times the channel width downstream of the eroded area will be the extent of revetment protection as called out in HEC-11. Bendway weirs were also analyzed as a possible solution for channel realignment to prevent future erosion of the channel, but were deemed inadequate because they could cause channel realignment which would potentially shift the erosion.
The channel section near station 2060+10 is also an area where erosion is a concern. This portion of the channel is currently protected from erosion by gabion baskets. The gabions are beginning to fail and several options were discussed to remediate the problem. Both loose riprap revetment and gabion baskets have been reviewed. The channel is a trapezoidal shape with approximately 1.6:1 (H:V) side slopes and an average bottom width of approximately 17’.
Utilizing ADOT regression equations, the tributary area of 0.27 mi2 produces a peak 50-year runoff of 244 cfs (design flow), while the peak 100-year event produces runoff of 342 cfs (maximum / check flow). Based on the design flow rate, constructability, and ability to match the surrounding improvements, a new row of gabion baskets is proposed to toe into the existing
Engineering Excellence Page 3 of 4 Memo LAKE114(1) Overall.docx slope and prevent further undermining of the existing gabion baskets from the 50-year flood.
Similar to the existing gabion baskets on the site, the new baskets will follow guidance in HEC- 23, Design Guideline 10. The size and dimension has been set to match the existing facilities.
The final location where erosion is a concern is the channel section near station 2066+75. This channel has been eroded by runoff to the extent that the side slope has deteriorated and began to undermine the roadway’s embankment. The channel is a trapezoidal shape with 1:1 (H:V) and 1:2 (H:V) side slopes and an average bottom width of 11’. Utilizing ADOT regression equations, the tributary area of 0.25 mi2 produces a peak 50-year runoff of 233 cfs (design flow), while the peak 100-year event produces runoff of 325 cfs (maximum / check flow). The proposed conditions for this channel section will recreate the channel bank with a 2:1 (H:V) side slope which will extend up to the proposed roadway section. To prevent potential erosion of the roadway section, the proposed alignment has been shifted to the east. The existing channel’s geometry will be maintained while protecting the proposed improvements. Based on the design flow rate, riprap revetment of Class IV riprap 15” size d50 will prevent future erosion of the roadway embankment from the 50-year flood. Similar to the previous location the revetment particle size was calculated following guidance from HEC-23, Design Guideline 4.
Approximately 1.0 times the channel width upstream and 1.5 times the channel width downstream of the eroded area will be protected as called out in HEC-11.
The existing informal Low Water Crossing (LWC) D20 near station 2136+00 is an area where the peak 25-year runoff exceeds the ditch capacity and crosses the roadway, eventually impacting the Entrance Station. The attached analysis concentrated on controlling runoff conveyed to the existing undefined Low Water Crossing (LWC) using a combination of a culvert to release low flows while allowing higher flows to overtop the roadway. From field reconnaissance the existing crossing roadway design appears to pond near the intersection of Katherine Mine Road and Katherine Access Road and eventually overtops the roadway. The tributary area of Basin K17 is 0.13 square miles (mi2) which produces a peak 50-year runoff of
151.9 cubic feet per second (cfs). Numerous alternatives were investigated to provide the required conveyance and safety. The alternative that provides the level of protection requested by CFL is the construction of a 24” pipe with a new roadway design. The new roadway design will control the flow depth over the roadway to 0.87 feet and will prevent overflows from impacting the entrance stations. The Technical Memo for this location goes into additional detail on the design process.
The final location documented in this memo is at the Katherine Landing Marina near approximate station 2203+56 LT. In this location stormwater runoff is conveyed overland through a drive aisle adjacent to the marina’s boat ramp travel lanes and eventually to Lake Mohave. Because of a high point in the drive aisle the stormwater drops sediment on the pavement creating a maintenance problem which warrants a conveyance solution. The previous analysis conducted during the 15% and 30% design stages consisted of three alternatives to safely convey the peak 10-year runoff of 362 cfs (design flow), while a fourth alternative consisted of sediment control facility. The improvements analyzed to convey the 10-year flood included an 8’ x 4’ RCB proposed on two different horizontal alignments, while the third alternative proposed an 8’ x 4’ open concrete channel system to convey the runoff safely.
The fourth alternative consisted of utilizing a sediment detention facility to contain a portion of
Engineering Excellence Page 4 of 4 Memo LAKE114(1) Overall.docx the deposited sediment from the Marina vicinity, which wasn’t specifically sized for the tributary area but rather the available topography. The preferred alternative was the 8’ x 4’ open concrete channel system conveyance facility. However, during the 30% field review it was requested to increase the width of the structure to 9’ to allow for maintenance using a standard sized Bobcat. The proposed facility includes a concrete wingwall and debris rack on the inlet as well as a 30’ paved waterway, type 4, concrete gutter pan, with side slopes that vary from 15:1 (left) and 8:1 (right) (H:V) to vertical at the open channel system. The open channel system was determined to be a 9’ span, 4’ rise precast reinforced concrete U-structure, open channel with metal grating.
A summary table for the areas discussed above has been included to expedite the review for this segment. Included with this memorandum are the calculations for the regression equations, riprap revetment, channel degradation / aggradation, and the HY-8 culvert analysis. The runoff regression calculations follow guidance from the Arizona Department of Transportation (ADOT) highway drainage design manual. The riprap revetment calculations follow guidance from the Hydraulic Engineering Circulars No.14 (HEC-14, section 10, and No. 23 (HEC-23), design guideline 4 and 10.
Facility ID Station Tributary Drainage
Basin Tributary
Area Flow Rate, Q10
Flow Rate, Q25
Flow Rate, Q50
Flow Rate, Q100
Hw Hw/D
(mi2) (cfs) (cfs) (cfs) (cfs) (ft) D4
(Proposed)
– Dual 72” pipes) 2014+98 K1 7.5 700 1,487 2,283 3,538 6.19 1.03 K2 – Riprap
Embankment 2023+50 K2 0.62 149 295 430 619 -- -- K2A – Riprap Embankment 2060+24 K2, K2A 0.27 88 170 244 342 -- -- K3 – Riprap
Embankment 2067+10 K2, K2A, K3 0.25 85 162 233 325 -- -- D20 –
Proposed Low Water Crossing 2136+00 K17 0.13 57 107 152 208 2.49 1.25
Katherine Landing Marina
2203+56
LT
K15, K16, K17, K18 2.60 362 744 1,119 1,679 -- --
If you need additional information or have any questions regarding this memo, please do not hesitate to contact me at (303) 390-5844.
PB AMERICAS, INC.
Colin Haggerty, PE, CFM
Engineering Excellence Memo LAKE114(1)_Appendix.docx
Appendix A
Memo – 10’x10’ RCB Improvements
(Page Intentionally Left Blank)
Engineering Excellence Page 1 of 3 Memo LAKE114(1) (72).docx
TO: Gerald Blackler;
U.S. Department of Transportation
Federal Highway Administration
COPY: Scott Hogan, PE, Ed Martinez, PE, Nathan Silberhorn, Dennis Eden, PE
SUBJECT: LAKE 114(1) HYDRAULIC ANALYSIS AT D4, DUAL 72” RCP,
PB PROJECT # 31510T (70% SUBMITTAL)
In response to Scott Hogan’s comment in the 30% submittal that requested improved inlets be analyzed on the existing culvert located at 2014+98 as well as to look at additional alternatives for the proposed culverts, Parsons Brinckerhoff has completed the following analysis.
Preliminary design was completed based on the requirements of the Project Development and Design Manual (PDDM), which requires that the 50-year flood be conveyed by the cross culverts. This analysis concentrated on reducing the calculated headwater to below the road crest elevation which, in some cases, exceeds the Headwater to Depth ratio presented in the PDDM, The flow rates for the culvert was determined utilizing the regression methodology guidance from Arizona Department of Transportation (ADOT) since the delineated sub-basins were greater than 65 hectare (160 acres). The delineated sub-basins are depicted in figure one (1), drainage sub-basin map.
Drainage Facilities Analysis:
Culvert D4 at station 2014+98 is an existing single cell 10’ x 10’ RCB culvert. From field reconnaissance this culvert appeared to have approximately 3’ of sediment aggradation throughout the culvert. A long-term degradation / aggradation analysis based on Clark County Regional Flood Control District (CCRFCD) criteria was performed on the upstream wash for this facility and the analysis resulted in additional aggradation likely to occur. The tributary area of
7.5 square miles (mi2) produces a peak 50-year runoff of 2,283 cubic feet per second (cfs). The HY-8 analysis showed that the existing culvert does not have the capacity to convey the peak flow from the 50-year flood without overtopping the existing roadway.
Our task was to look at different alternatives to compare results and determine the best overall option. As was stated above, the goal of this analysis was to prevent runoff from overtopping the roadway, which does not exactly follow the requirements of the PDDM, but may be acceptable based on requests from FHWA and the Park. Six different combinations of facilities were analyzed for the proposed improvements specified below:
Engineering Excellence Page 2 of 3 Memo LAKE114(1) (72).docx
Proposed analysis #1 consists of cleaning the existing 10’ x 10’ RCB Culvert which requires removing three (3) feet of sediment aggradation from the existing culvert.
Removing the sediment lowers the water surface elevation below the existing road however, it is guaranteed that the sediment will not re-accumulate.
Proposed analysis #2 consists of analyzing an improved Inlet on the Existing 10’ x 10’ RCB Culvert with three (3) feet of sediment remaining using a side-tapered inlet type.
The resulting analysis showed that a face width of 22 feet would be required to reduce the Headwater to less than one foot of depth over the roadway.
Proposed analysis #3 consist of adding an additional 8’ x 6’ RCB culvert at a higher elevation (invert elevation: 684.47 ft., 3 feet above the existing box culvert invert.) than the Existing 10’ x 10’ RCB Culvert in order to provide additional capacity while keeping the existing box functioning during and after construction. By adding a culvert, the resulting headwater elevation is minimized to an acceptable elevation, however it is above the allowable limit of the PDDM.
Proposed analysis #4 consists of adding two additional barrels of 10’ x 10’ RCB culvert at a higher elevation (invert elevation: 681.47 ft., 3 feet above the existing box culvert invert, but at the existing grade due to sedimentation.) than the existing 10’ x 10’ RCB Culvert, in order to provide the additional capacity while keeping the existing box functioning during and after construction. This alternative minimizes the headwater elevation and inlet control depth at its maximum flow.
Proposed analysis #5 consists of adding an additional 6’ x 6’ RCB culverts at a higher elevation (invert elevation: 693.70 ft. approximately 12 feet above the existing box culvert invert) than the existing 10’ x 10’ RCB Culvert. This option reduces the headwater to below the roadway elevation, but above the allowable headwater in the
PDDM.
Proposed analysis #6 consists of adding two additional 72” concrete pipe culverts at a higher elevation (invert elevation: 698.70ft. approximately 17 feet above the existing box culvert invert) than the existing 10’ x 10’ RCB Culvert. This option also reduces the headwater to below the roadway elevation, but above the allowable headwater in the
PDDM.
Engineering Excellence Page 3 of 3 Memo LAKE114(1) (72).docx
A summary table for the alternatives analyzed above has been included. The table shows the proposed alternative’s headwater elevation and inlet control depth at design flow.
Of the options above, the alternative that provides the level of protection requested by CFL while providing the most constructible option would be the construction of two additional 72” concrete pipe culverts at 17 feet above the existing 10’ X 10’ RCB culvert invert. By providing a relief structure, lower flows will continue to be conveyed in a historic fashion with larger, less frequent flows utilizing the upper structure as well. It should be noted that this system layout does not meet Headwater Criteria as specified in the PDDM and a Design Exception will be requested if selected.
OPTION
DESIGN FLOW
(CFS)
HEADWATER
ELEVATION (FT)
INLET
CONTROL
DEPTH
(FT)
10X10 Existing 2,283.20 708.03 26.56
10X10 Existing/Cleaned 2,863.20 700.09 21.62
10X10 Existing/Improved Inlet 2,863.20 706.42 24.95
10X10 Existing/1 extra Barrel 2,863.20 697.91 16.44
10X10 Existing/2 Extra 10’x10’ 2,863.20 690.33 8.86
10X10 Existing/Additional 6X6 2,863.20 703.05 21.58
10X10 Existing/2‐additional 72" Pipe 2,863.20 704.89 23.42
Appendix A
Memo – Existing Low Water Crossing Improvements
Engineering Excellence Page 1 of 3 Memo LAKE114(17) (LWC).docx
TO: Gerald Blackler;
U.S. Department of Transportation
Federal Highway Administration
COPY: Scott Hogan, PE, Ed Martinez, PE, Nathan Silberhorn, Dennis Eden, PE
SUBJECT: LAKE 114(17) HYDRAULIC ANALYSIS AT EXISTING LOW WATER
CROSSING (LWC)
PB PROJECT # 31510T (70% SUBMITTAL)
As part of the improvements to Katherine Access Road, the existing Low Water Crossing (LWC) along Katherine Access Road at Katherine Mine Road will be formalized to provide controlled conveyance for offsite runoff. To supplement the LWC, a low flow 24” CMP will also be added under Katherine Mine Road to convey low flows toward the existing culverts west of the LWC.
Several alternatives were reviewed in sizing of the stormwater facilities at Station 2136+00 including alternatives for reconstruction of the proposed roadway. Parsons Brinckerhoff based the requirements of this design on of the Project Development and Design Manual (PDDM), which requires that the 50-year flood be conveyed by the cross culverts, which will be followed for this LWC analysis. The goal will be to reduce flow depth over the roadway to one foot and prevent overflows from impacting the entrance station. The flow rates used for design of the LWC were determined utilizing the regression methodology guidance from Arizona Department of Transportation (ADOT). The delineated sub-basins are depicted in figures one (1) and two (2), drainage sub-basin maps. Segregate
Drainage Facilities Analysis:
This analysis concentrated on controlling the runoff conveyed to the existing undefined Low Water Crossing (LWC) at station 2136+00. This will be accomplished using a combination of a culvert to release low flows while allowing higher flows to overtop the roadway. From field reconnaissance the existing crossing roadway design appears to pond near the intersection of Katherine Mine Road and Katherine Access Road and eventually overtops the roadway. The tributary area of Basin K17 is 0.13 square miles (mi2) which produces a peak 50-year runoff of
151.9 cubic feet per second (cfs).
Our task was to look at different alternatives and compare results to determine the best overall option. As was stated above, the goal of this analysis was to reduce the depth of flow over Katherine Road to one foot while conveying low flows within a 24” culvert.
Engineering Excellence Page 2 of 3 Memo LAKE114(17) (LWC).docx
A summary of the different combinations of facilities that were analyzed for the proposed improvements are specified below:
Proposed analysis #1 was completed to determine what size a culvert would need to be to convey the 50 year storm event under Katherine Mine Road. This analysis used the existing roadway data and analyzed different pipe sizes. Due to limited cover, the sizes started at an 18” pipe and then were increased to a 24”, a 36” and a 42” pipe, in order to increase the culvert capacity. The existing layout of the road allows runoff to impact the entrance stations, therefore not only a culvert is needed but also a new roadway design.
Proposed analysis #2 was completed to determine if a new roadway design would improve the headwater capacity and reduce the depth of flow over the roadway to one foot. For this proposed analysis an 18” and a 24” pipe have been modeled in the new roadway design and results have been recorded in the table below. The new roadway design would have the lowest elevation at 916.54 feet and the highest elevation at 919.5 feet, to be able to transfer water from one side to another.
Proposed analysis #3 consists of analyzing an improved inlet on the new roadway design from proposed analysis #2. For this analysis, a slope-tapered inlet type was utilized to see and compare the differences. The analysis used a face width of 4 feet in order to reduce the headwater to one foot of depth over the roadway. This option reduces the flow depth over the roadway, but the difference among propose analysis #2 and #3 are very minimum.
A summary table for the alternatives analyzed above has been included below. The table shows the proposed alternative’s inlet elevation, headwater elevation, inlet control depth, and the depth of flow over the roadway at design flow.
OPTION
DESIGN
FLOW
(CFS)
INLET
ELEVATION
(FT)
HEADWATER
ELEVATION
(FT)
INLET
CONTROL
DEPTH
(FT)
ROAD
SURFACE
(FT)
DEPTH OF
FLOW OVER
THE
ROADWAY
(FT)
18” pipe, Existing Roadway 151.9 915 917.77 2.77 917 0.77
24” pipe, Existing Roadway 151.9 914 917.73 3.73 917 0.73
36” pipe, Existing Roadway 151.9 913 917.61 4.61 917 0.61
42” pipe, Existing Roadway 151.9 913 917.55 4.55 917 0.55
18” pipe, New Roadway design 151.9 915 917.46 2.46 916.54 0.92
24” pipe, New Roadway design 151.9 914 917.41 3.41 916.54 0.87
18” pipe, New Roadway design, Improved Inlet
151.9 915 917.43 1.57 916.54 0.89
24” pipe, New Roadway design, Improved Inlet
151.9 914 917.36 2.49 916.54 0.82
Engineering Excellence Page 3 of 3 Memo LAKE114(17) (LWC).docx
The results from the first four options show the depth of flow over the roadway to be lower than the other alternatives however, the runoff will still overtop the existing roadway and impact the entrance station. Those alternatives do not provide a controlled overflow area and therefore, do not solve the problem because the entrance station may still be impacted. The second set of options reviewed included improved inlets. Due to the limited area, these alternatives do not result in a significance difference between the non-improved inlets. The final option includes installation of a new culvert with re-grading of the proposed roadway creating a controlled overflow for large stormwater events.
Of the options discussed above, the alternative that provides the best combination of level of protection and cost is the construction of a 24” pipe with a new roadway design. The new roadway design will control the flow depth over the roadway to 0.87 feet and will prevent overflows from impacting the entrance stations.
Appendix B
Hydrology
Project: Lake Mead National Recreational Area Page 1_ of __1__ 31510T AZ-PRA-LAKE 114(1) : Katherine Access Road Created by:
Date:
Title: Runoff-Calculations (30% Submittal) Checked by:
Regression Method Date:
M. Tilko 3-Nov-10
C. Haggerty 11 Apr 11
Tab - Runoff-Regression
Regression Method Date:
Arizona Department of Transportation (ADOT)
Drainage Basin Delineated Total
Contributing Total
Contributing Mean Annual Regression - Regression - Regression - Regression - Regression - Regression - Additional Contributing
11-Apr-11 g ID Facility ID Station Basin Area g Area g Area Precipitation
Regression Flowrate , Q2
Regression Flowrate , Q5
Regression Flowrate , Q10
Regression Flowrate , Q25
Regression Flowrate , Q50
Regression Flowrate , Q100 g Drainage Basins acre acre mi2 in cfs cfs cfs cfs cfs cfs
K1 D4 2014+98 4,823.12 4,823.12 7.536 8.0 38.7 279.9 699.6 1,486.6 2,283.2 3,537.5 K1A -- -- 955.81 955.81 1.493 8.0 15.1 107.7 256.5 519.1 771.9 1,139.3 Removed from K1 K1B -- -- 982.91 982.91 1.536 8.0 15.4 109.5 261.0 528.7 786.5 1,161.8 Removed from K1
K2 -- 2022+69 134.57 399.54 0.624 8.0 9.1 64.4 149.3 294.5 430.3 618.7 K2A, K3, K4, K5, K6, K7, K8, K9, K10, K11, K12, K13, K14
K2A -- 2060+06 11 77 171 30 0 268 8 0 5 6 39 1 88 3 169 8 244 0 342 0 K3 K12 K13 K14K2A -- 2060+06 11.77 171.30 0.268 8.0 5.6 39.1 88.3 169.8 244.0 342.0 K3, K12, K13, K14 K3 -- 2066+75 46.29 159.53 0.249 8.0 5.4 37.4 84.5 162.1 232.6 325.3 K12, K13, K14 K4 -- -- 4.15 -- K5 -- -- 13.90 -- K6 -- -- 19.98 -- K7 -- -- 7.65 -- K8 -- -- 7.41 -- K9 -- -- 25.93 -- K10 -- -- 6.16 -- K11 8 49K11 -- -- 8.49 -- K12 -- -- 33.31 -- K13 -- -- 35.12 -- K14 -- -- 44.82 -- K15 D20 2136+00 972.42 972.42 1.519 8.0 15.3 108.8 259.2 525.0 780.9 1,153.1 --, K16 -- -- 35.65 -- K17 -- -- 84.43 84.43 0.132 8.0 3.7 25.7 57.0 107.2 151.9 208.4 -- K18 KLM 2203+56 LT 570.53 1,663.03 2.598 8.0 20.9 149.3 361.5 744.1 1,118.7 1,678.8 K15, K16, K17
Region 10 - Regression Equations: Where:
Q2 = 12 AREA 0.58 QT, Peak Discharge (cubic feet per second)
Q5 = 85 AREA 0.59 AREA, drainage area (square miles)
Q 200 AREA 0 62 PREC l i it ti (i h )Q10 = 200 AREA 0.62 PREC, mean annual precipitation (inches)
Q25 = 400 AREA 0.65
Q50 = 590 AREA 0.67
Q100 = 150 AREA 0.70 PREC 0.84
* Reference ADOT Highway Drainage Design Manual, Hydrology Table 10-4 Regression Constants, Coefficients and Standard Errors Flood Magnitude-Frequency Relations for The Southern Great Basin Region (R10) M A l P i it ti A i d f ADOT D i M l Fi 10 10 Mean Annual Precipitation Acquired from ADOT Drainage Manual Figure 10-10
Tab - Runoff-Regression
Appendix B
Basin Maps
Figure 1 - Katherine Access Road Drainage Sub-Basin Map
0 5,000 10,0002,500
Feet
K1
K1A
K1B
K15
K17
K16
K18
K14
K13
K12
K3
K2
K11
K10
K9
K6
K5 K4
K2A
Legend
Drainage Sub-Basins
K8
K7
Figure 2 - Katherine Access Road
Drainage Sub-Basin Map 0 1,000 2,000500
Feet
K2
K4 K5
K6
K7
K8 K9
K10
K11
K12
K2A
K13
K3
K14
K1
K16
K18
K15
Legend
Drainage Sub-Basins
Appendix C
HY-8 Calculations
- D4 10’x10’ RCB
HY-8 Culvert Analysis Report
Site Data - 10' x 10' RCB Existing
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 681.47 ft
Outlet Station: 90.38 ft
Outlet Elevation: 678.44 ft
Number of Barrels: 1
Culvert Data Summary - 10' x 10' RCB Existing
Barrel Shape: Concrete Box
Barrel Span: 10.00 ft
Barrel Rise: 7.00 ft
Barrel Material: Concrete
Embedment: 0.00 in
Barrel Manning's n: 0.0120
Culvert Type: Straight
Inlet Configuration: Square Edge (30-75º flare) Wingwall
Inlet Depression: NONE
Table 1 - Culvert Summary Table: 10' x 10' RCB Existing
Straight Culvert
Inlet Elevation (invert): 681.47 ft, Outlet Elevation (invert): 678.44 ft
Culvert Length: 90.43 ft, Culvert Slope: 0.0335
Total Discharge
(cfs) Culvert
Discharge (cfs)
Headwater Elevation
(ft) Inlet
Control Depth (ft)
Outlet Control
Depth (ft)
Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s) Tailwater Velocity
(ft/s)
1486.60 1486.60 703.26 21.789 14.784 5-S2n 3.883 7.000 5.739 1.099 25.906
1691.69 1607.94 706.37 24.897 16.622 5-S2n 4.110 7.000 5.959 1.187 26.983
1896.78 1637.12 707.15 25.680 17.085 5-S2n 4.165 7.000 6.006 1.271 27.257
2101.87 1656.10 707.67 26.198 17.391 5-S2n 4.201 7.000 6.036 1.352 27.437
2283.20 1669.37 708.03 26.563 17.607 5-S2n 4.225 7.000 6.056 1.421 27.565
2512.05 1683.29 708.42 26.949 17.836 5-S2n 4.251 7.000 6.077 1.505 27.700
2717.14 1692.90 708.69 27.218 17.994 5-S2n 4.269 7.000 6.091 1.577 27.794
2922.23 1701.29 708.92 27.453 18.134 5-S2n 4.285 7.000 6.103 1.647 27.876
3127.32 1709.09 709.14 27.673 18.264 5-S2n 4.300 7.000 6.114 1.716 27.953
3332.41 1716.34 709.35 27.879 18.385 5-S2n 4.313 7.000 6.125 1.782 28.024
3537.50 1723.14 709.54 28.072 18.500 5-S2n 4.326 7.000 6.134 1.847 28.092
Table 2 - Downstream Channel Rating Curve (Crossing: D4 - STA 2014+98 (Existing))
Tailwater Channel Data - D4 - STA 2014+98 (Existing)
Tailwater Channel Option: Trapezoidal Channel
Bottom Width: 157.00 ft
Side Slope (H:V): 1.50 (_:1)
Channel Slope: 0.0363
Channel Manning's n: 0.0350
Channel Invert Elevation: 678.44 ft
Roadway Data for Crossing: D4 - STA 2014+98 (Existing)
Roadway Profile Shape: Irregular Roadway Shape (coordinates)
Irregular Roadway Cross-Section:
Coord No. Station (ft) Elevation (ft)
0 0.00 705.00
1 125.00 708.50
2 250.00 712.00
Roadway Surface: Paved
Roadway Top Width: 26.70 ft
Flow (cfs) Water Surface Elev (ft) Depth (ft) Velocity (ft/s) Shear (psf) Froude Number
1486.60 679.54 1.10 8.53 2.49 1.44
1691.69 679.63 1.19 8.97 2.69 1.46
1896.78 679.71 1.27 9.39 2.88 1.48
2101.87 679.79 1.35 9.77 3.06 1.49
2283.20 679.86 1.42 10.10 3.22 1.50
2512.05 679.94 1.50 10.48 3.41 1.52
2717.14 680.02 1.58 10.81 3.57 1.53
2922.23 680.09 1.65 11.12 3.73 1.54
3127.32 680.16 1.72 11.42 3.89 1.55
3332.41 680.22 1.78 11.71 4.04 1.56
3537.50 680.29 1.85 11.99 4.18 1.57
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 1486.6 cfs
Design Flow: 2283.2 cfs
Maximum Flow: 3537.5 cfs
Table 3 - Summary of Culvert Flows at Crossing: D4 - STA 2014+98 (Existing)
Headwater Elevation
(ft) Total Discharge (cfs)
10' x 10' RCB Existing Discharge (cfs)
Roadway Discharge (cfs) Iterations
703.26 1486.60 1486.60 0.00 1
706.37 1691.69 1607.94 83.58 8
707.15 1896.78 1637.12 259.58 4
707.67 2101.87 1656.10 445.39 4
708.03 2283.20 1669.37 613.66 5
708.42 2512.05 1683.29 828.20 5
708.69 2717.14 1692.90 1023.83 4
708.92 2922.23 1701.29 1220.62 4
709.14 3127.32 1709.09 1417.92 4
709.35 3332.41 1716.34 1615.78 4
709.54 3537.50 1723.14 1814.09 4
708.50 1686.20 1686.20 0.00 Overtopping
Site Data - 10' x 10' RCB Existing
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 681.47 ft
Outlet Station: 90.38 ft
Outlet Elevation: 678.44 ft
Number of Barrels: 1
Culvert Data Summary - 10' x 10' RCB Existing
Barrel Shape: Concrete Box
Barrel Span: 10.00 ft
Barrel Rise: 7.00 ft
Barrel Material: Concrete
Embedment: 0.00 in
Barrel Manning's n: 0.0120
Culvert Type: Straight
Inlet Configuration: 1.5:1 Bevel (90º) Headwall
Table 1 - Culvert Summary Table: 10' x 10' RCB Existing
Straight Culvert
Inlet Elevation (invert): 681.47 ft, Outlet Elevation (invert): 678.44 ft
Culvert Length: 90.43 ft, Culvert Slope: 0.0335
Total Discharge
(cfs) Culvert
Discharge (cfs)
Headwater Elevation
(ft) Inlet
Control Depth (ft)
Outlet Control
Depth (ft)
Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s) Tailwater Velocity
(ft/s)
1486.60 1486.53 698.77 17.299 13.383 5-S2n 3.883 7.000 5.738 1.099 25.905
1691.69 1617.69 700.86 19.395 15.117 5-S2n 4.129 7.000 5.975 1.187 27.074
1896.78 1705.84 702.37 20.904 16.365 5-S2n 4.294 7.000 6.110 1.271 27.921
2101.87 1772.21 703.74 22.268 17.348 5-S2n 4.418 7.000 6.199 1.352 28.586
2283.20 1825.70 704.89 23.418 18.168 5-S2n 4.516 7.000 6.266 1.421 29.136
2512.05 1881.69 706.13 24.659 19.052 5-S2n 4.617 7.000 6.330 1.505 29.726
2717.14 1911.75 706.81 25.340 19.538 5-S2n 4.672 7.000 6.362 1.577 30.048
2922.23 1933.75 707.32 25.846 19.899 5-S2n 4.712 7.000 6.385 1.647 30.285
3127.32 1951.40 707.73 26.255 20.191 5-S2n 4.743 7.000 6.403 1.716 30.478
3332.41 1966.34 708.08 26.605 20.440 5-S2n 4.771 7.000 6.418 1.782 30.640
3537.50 1979.37 708.38 26.912 20.659 5-S2n 4.794 7.000 6.430 1.847 30.783
Site Data - 2-72" Pipe
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 698.70 ft
Outlet Station: 90.38 ft
Outlet Elevation: 697.70 ft
Number of Barrels: 2
Culvert Data Summary - 2-72" Pipe
Barrel Shape: Circular
Barrel Diameter: 6.00 ft
Barrel Material: Concrete
Embedment: 0.00 in
Barrel Manning's n: 0.0120
Culvert Type: Straight
Inlet Configuration: Grooved End Projecting
Table 2 - Culvert Summary Table: 2-72" Pipe
* Full Flow Headwater elevation is below inlet invert.
Straight Culvert
Inlet Elevation (invert): 698.70 ft, Outlet Elevation (invert): 697.70 ft
Culvert Length: 90.39 ft, Culvert Slope: 0.0111
Total Discharge
(cfs) Culvert
Discharge (cfs)
Headwater Elevation
(ft) Inlet
Control Depth (ft)
Outlet Control
Depth (ft)
Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s) Tailwater Velocity
(ft/s)
1486.60 0.00 698.77 0.130 0.0* 6-FFc 0.000 0.000 0.000 1.099 2.917
1691.69 73.92 700.86 2.166 0.639 1-S2n 1.117 1.601 1.186 1.187 9.265
1896.78 190.95 702.37 3.675 1.875 1-S2n 1.795 2.624 1.996 1.271 11.566
2101.87 329.66 703.74 5.038 3.241 1-S2n 2.407 3.492 2.732 1.352 13.154
2283.20 457.37 704.89 6.187 4.579 5-S2n 2.901 4.136 3.315 1.421 14.270
2512.05 578.55 706.13 7.428 6.633 5-S2n 3.344 4.650 3.817 1.505 15.241
2717.14 636.31 706.81 8.110 7.222 5-S2n 3.553 4.861 4.044 1.577 15.717
2922.23 675.68 707.32 8.615 7.644 5-S2n 3.696 4.992 4.193 1.647 16.030
3127.32 705.90 707.73 9.025 7.978 5-S2n 3.805 5.085 4.307 1.716 16.256
3332.41 730.60 708.08 9.375 8.258 5-S2n 3.900 5.155 4.398 1.782 16.442
3537.50 751.53 708.38 9.682 8.500 5-S2n 3.981 5.213 4.474 1.847 16.639
Table 3 - Downstream Channel Rating Curve (Crossing: Existing/2-72" Pipe)
Tailwater Channel Data - Existing/2-72" Pipe
Tailwater Channel Option: Trapezoidal Channel
Bottom Width: 157.00 ft
Side Slope (H:V): 1.50 (_:1)
Channel Slope: 0.0363
Channel Manning's n: 0.0350
Channel Invert Elevation: 678.44 ft
Roadway Data for Crossing: Existing/2-72" Pipe
Roadway Profile Shape: Irregular Roadway Shape (coordinates)
Irregular Roadway Cross-Section:
Coord No. Station (ft) Elevation (ft)
0 0.00 705.00
1 125.00 708.50
2 250.00 712.00
Roadway Surface: Paved
Roadway Top Width: 26.70 ft
Minimum Flow: 1486.6 cfs
Design Flow: 2283.2 cfs
Maximum Flow: 3537.5 cfs
Flow (cfs) Water Surface Elev (ft) Depth (ft) Velocity (ft/s) Shear (psf) Froude Number
1486.60 679.54 1.10 8.53 2.49 1.44
1691.69 679.63 1.19 8.97 2.69 1.46
1896.78 679.71 1.27 9.39 2.88 1.48
2101.87 679.79 1.35 9.77 3.06 1.49
2283.20 679.86 1.42 10.10 3.22 1.50
2512.05 679.94 1.50 10.48 3.41 1.52
2717.14 680.02 1.58 10.81 3.57 1.53
2922.23 680.09 1.65 11.12 3.73 1.54
3127.32 680.16 1.72 11.42 3.89 1.55
3332.41 680.22 1.78 11.71 4.04 1.56
3537.50 680.29 1.85 11.99 4.18 1.57
Table 4 - Summary of Culvert Flows at Crossing: Existing/2-72" Pipe
Headwater Elevation (ft)
Total Discharge (cfs)
10' x 10' RCB Existing
Discharge (cfs) 2-72" Pipe
Discharge (cfs) Roadway
Discharge (cfs) Iterations
698.77 1486.60 1486.53 0.00 0.00 21
700.86 1691.69 1617.69 73.92 0.00 5
702.37 1896.78 1705.84 190.95 0.00 4
703.74 2101.87 1772.21 329.66 0.00 4
704.89 2283.20 1825.70 457.37 0.00 4
706.13 2512.05 1881.69 578.55 51.73 6
706.81 2717.14 1911.75 636.31 168.95 4
707.32 2922.23 1933.75 675.68 312.50 4
707.73 3127.32 1951.40 705.90 469.67 4
708.08 3332.41 1966.34 730.60 635.32 5
708.38 3537.50 1979.37 751.53 806.19 5
708.50 2743.66 1984.33 759.33 0.00 Overtopping
HY-8 Calculations
- Low Water Crossing
Site Data - Proposed 24” w/ Existing Roadway Section
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 914.00 ft
Outlet Station: 110.00 ft
Outlet Elevation: 910.00 ft
Number of Barrels: 1
Culvert Data Summary - 24
Barrel Shape: Circular
Barrel Diameter: 2.00 ft
Barrel Material: Concrete
Embedment: 0.00 in
Barrel Manning's n: 0.0140
Culvert Type: Straight
Inlet Configuration: Square Edge with Headwall
Table 1 - Culvert Summary Table: 24
Straight Culvert
Inlet Elevation (invert): 914.00 ft, Outlet Elevation (invert): 910.00 ft
Culvert Length: 110.07 ft, Culvert Slope: 0.0364
Total Discharge
(cfs) Culvert
Discharge (cfs)
Headwater Elevation
(ft) Inlet
Control Depth (ft)
Outlet Control
Depth (ft)
Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s) Tailwater Velocity
(ft/s)
3.70 3.70 914.90 0.901 0.0* 1-S2n 0.404 0.669 0.404 0.168 8.314
24.17 21.03 917.07 3.072 0.0* 5-S2n 1.027 1.641 1.047 0.494 12.624
44.64 22.13 917.26 3.260 0.209 5-S2n 1.059 1.678 1.079 0.691 12.806
65.11 22.81 917.38 3.382 0.368 5-S2n 1.080 1.700 1.080 0.845 13.187
85.58 23.34 917.48 3.480 0.496 5-S2n 1.095 1.716 1.095 0.975 13.256
106.05 23.79 917.57 3.565 0.605 5-S2n 1.108 1.729 1.130 1.089 13.000
126.52 24.19 917.64 3.641 0.702 5-S2n 1.120 1.740 1.143 1.191 13.046
146.99 24.54 917.71 3.710 0.790 5-S2n 1.130 1.749 1.154 1.284 13.075
151.90 24.62 917.73 3.725 0.810 5-S2n 1.132 1.752 1.157 1.306 13.082
187.93 25.16 917.83 3.833 0.946 5-S2n 1.148 1.765 1.175 1.451 13.121
208.40 25.43 917.89 3.889 1.017 5-S2n 1.156 1.772 1.184 1.527 13.139
Table 2 - Downstream Channel Rating Curve (Crossing: K17(Existing Road w/ 24”))
Tailwater Channel Data - K17(Existing Road w/ 24”)
Tailwater Channel Option: Trapezoidal Channel
Bottom Width: 3.00 ft
Side Slope (H:V): 2.00 (_:1)
Channel Slope: 0.1000
Channel Manning's n: 0.0200
Channel Invert Elevation: 910.00 ft
Roadway Data for Crossing: K17(Existing Road w/ 24”)
Roadway Profile Shape: Irregular Roadway Shape (coordinates)
Irregular Roadway Cross-Section:
Coord No. Station (ft) Elevation (ft)
0 0.00 920.00
1 30.00 919.00
2 60.00 918.00
3 90.00 917.00
4 140.00 917.00
5 180.00 918.00
6 210.00 919.00
7 240.00 920.00
Roadway Surface: Paved
Roadway Top Width: 50.00 ft
Flow (cfs) Water Surface Elev (ft) Depth (ft) Velocity (ft/s) Shear (psf) Froude Number
3.70 910.17 0.17 6.61 1.05 2.98
24.17 910.49 0.49 12.28 3.08 3.44
44.64 910.69 0.69 14.74 4.31 3.59
65.11 910.85 0.85 16.43 5.27 3.67
85.58 910.97 0.97 17.73 6.08 3.74
106.05 911.09 1.09 18.81 6.79 3.79
126.52 911.19 1.19 19.73 7.43 3.83
146.99 911.28 1.28 20.55 8.01 3.86
151.90 911.31 1.31 20.73 8.15 3.87
187.93 911.45 1.45 21.94 9.05 3.92
208.40 911.53 1.53 22.55 9.53 3.95
Minimum Flow: 3.7 cfs
Design Flow: 151.9 cfs
Maximum Flow: 208.4 cfs
Table 3 - Summary of Culvert Flows at Crossing: K17(Existing Road w/ 24”)
(ft) Total Discharge (cfs) 24 Discharge (cfs) Roadway Discharge
(cfs) Iterations
914.90 3.70 3.70 0.00 1
917.07 24.17 21.03 2.95 18
917.26 44.64 22.13 22.34 8
917.38 65.11 22.81 42.15 6
917.48 85.58 23.34 62.09 5
917.57 106.05 23.79 82.00 4
917.64 126.52 24.19 102.21 4
917.71 146.99 24.54 122.40 4
917.73 151.90 24.62 127.20 3
917.83 187.93 25.16 162.62 3
917.89 208.40 25.43 182.95 3
917.00 20.58 20.58 0.00 Overtopping
Site Data – Proposed 24” w/ New Roadway Section
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 914.00 ft
Outlet Station: 110.00 ft
Outlet Elevation: 910.00 ft
Number of Barrels: 1
Culvert Data Summary - 24
Barrel Shape: Circular
Barrel Diameter: 2.00 ft
Barrel Material: Concrete
Embedment: 0.00 in
Barrel Manning's n: 0.0140
Culvert Type: Straight
Inlet Configuration: Beveled Edge (1.5:1)
Table 1 - Culvert Summary Table: Proposed 24” w/ New Roadway Section
Straight Culvert
Inlet Elevation (invert): 914.00 ft, Outlet Elevation (invert): 910.00 ft
Culvert Length: 110.07 ft, Culvert Slope: 0.0364
Total Discharge
(cfs) Culvert
Discharge (cfs)
Headwater Elevation
(ft) Inlet
Control Depth (ft)
Outlet Control
Depth (ft)
Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s) Tailwater Velocity
(ft/s)
3.70 3.70 914.88 0.881 0.0* 1-S2n 0.404 0.669 0.404 0.168 8.314
24.17 21.19 916.71 2.713 0.0* 5-S2n 1.032 1.647 1.052 0.494 12.654
44.64 22.96 916.93 2.928 0.154 5-S2n 1.084 1.704 1.084 0.691 13.206
65.11 23.99 917.06 3.060 0.380 5-S2n 1.114 1.734 1.136 0.845 13.017
85.58 24.76 917.16 3.163 0.556 5-S2n 1.137 1.755 1.162 0.975 13.093
106.05 25.41 917.25 3.251 0.706 5-S2n 1.155 1.772 1.183 1.089 13.138
126.52 25.96 917.33 3.327 0.837 5-S2n 1.171 1.785 1.202 1.191 13.173
146.99 26.45 917.40 3.396 0.954 5-S2n 1.186 1.796 1.219 1.284 13.205
151.90 26.56 917.41 3.412 0.981 5-S2n 1.189 1.799 1.222 1.306 13.212
187.93 27.29 917.52 3.517 1.160 5-S2n 1.210 1.815 1.246 1.451 13.267
208.40 27.66 917.57 3.571 1.253 5-S2n 1.221 1.822 1.258 1.527 13.299
Table 2 - Downstream Channel Rating Curve (Crossing: K17(New Roadway w/ 24”) )
Tailwater Channel Data - K17(New Roadway w/ 24”)
Tailwater Channel Option: Trapezoidal Channel
Bottom Width: 3.00 ft
Side Slope (H:V): 2.00 (_:1)
Channel Slope: 0.1000
Channel Manning's n: 0.0200
Channel Invert Elevation: 910.00 ft
Roadway Data for Crossing: K17(New Roadway w/ 24”)
Roadway Profile Shape: Irregular Roadway Shape (coordinates)
Irregular Roadway Cross-Section:
Coord No. Station (ft) Elevation (ft)
0 0.00 919.50
1 33.00 917.91
2 76.00 916.72
3 106.00 916.54
4 175.00 917.65
Roadway Surface: Paved
Roadway Top Width: 50.00 ft
Flow (cfs) Water Surface Elev (ft) Depth (ft) Velocity (ft/s) Shear (psf) Froude Number
3.70 910.17 0.17 6.61 1.05 2.98
24.17 910.49 0.49 12.28 3.08 3.44
44.64 910.69 0.69 14.74 4.31 3.59
65.11 910.85 0.85 16.43 5.27 3.67
85.58 910.97 0.97 17.73 6.08 3.74
106.05 911.09 1.09 18.81 6.79 3.79
126.52 911.19 1.19 19.73 7.43 3.83
146.99 911.28 1.28 20.55 8.01 3.86
151.90 911.31 1.31 20.73 8.15 3.87
187.93 911.45 1.45 21.94 9.05 3.92
208.40 911.53 1.53 22.55 9.53 3.95
Minimum Flow: 3.7 cfs
Design Flow: 151.9 cfs
Maximum Flow: 208.4 cfs
Table 3 - Summary of Culvert Flows at Crossing: K17(New Roadway)
(ft) Total Discharge (cfs) 24 Discharge (cfs) Roadway Discharge
(cfs) Iterations
914.88 3.70 3.70 0.00 1
916.71 24.17 21.19 2.94 11
916.93 44.64 22.96 21.50 9
917.06 65.11 23.99 40.87 6
917.16 85.58 24.76 60.57 5
917.25 106.05 25.41 80.55 5
917.33 126.52 25.96 100.39 4
917.40 146.99 26.45 120.47 4
917.41 151.90 26.56 125.24 3
917.52 187.93 27.29 160.43 3
917.57 208.40 27.66 180.70 3
916.54 19.68 19.68 0.00 Overtopping
Riprap Embankment Calculations
Page _1_ of __7__ 31510T Project: Arizona Project PRA-LAKE 114 (1) : Created by:
Katherine Access Road Date:
(70% Submittal) Checked by:
Date:
Spreadsheet for Riprap Revetment (CU) From HEC-23, Design Guideline 4 Design ID: K2 - Sta. 2022+69, Q50
The EM-1601 equation can be used with uniform or gradually varying flow.
Coefficients are included to account for the desired safety factor for design, specific gravity of the riprap stone, bank slope, and bendway character.
Given:
Channel Type = Trap (Natural Channels = Nat, Trapezoidal Channels = Trap) Channel Geometry = Outside (Straight Channels = Straight, Outside of Bends = Outside, Q = 430.30 Flow Rate Sg = 2.65 Specific Gravity of Riprap g = 32.2 ft/s2 Acceleration Due to Gravity Θ = 26.6 degrees Bank Angle -- (1V:1H = 45.0º, 1V:1.5H = 33.7º, 1V:2H = 26.6º, 1V:3H = 18.4º, 1V:4H = 14.0º, 1V:5H = 11.3º) Sf = 1.10 (must be > 1.0) Safety Factor
Rc = 480.0 ft Centerline Radius of Curvature of Channel Bend y = 1.19 ft Local Depth of Flow (Calculated per Haestad FlowMaster) W = 38.9 ft Width of Water Surface at Upstream End of Channel Bend (Calculation per Haestad FlowMaster)
Vavg = 9.70 ft/s Channel Cross-Sectional Average Velocity (Calculated per Haestad FlowMaster)
Calcuated:
CS = 0.300 Stability Coefficient (for Blanket Thickness = d100 or 1.5 d50, whichever is greater, and Uniformly Ratio d85 / d15 = 1.7 to 5.2)
= 0.30 for Angular Rock = 0.375 for Rounded Rock
Rc / W = 12.36
CV = 1.06 Velocity Distribution Coefficient
= 1.0 for Straight Channels or the Inside of Bends = 1.283 - 0.2 log (Rc / W) for the Outside of Bends (1.0 for Rc / W > 26)
= 1.25 Downstream from Concrete Channels = 1.25 at the Ends of Dikes
CT = 1.00 Blanket Thickness Coefficient Given as a Function of the Uniformity Ratio d85 / d15.
CT = 1 0 is Recommended Because it is Based on Very Limited Data
M. Tilko 22-Nov-10
C. Haggerty 11-Apr-11
Tab - K2 - Q50
CT = 1.0 is Recommended Because it is Based on Very Limited Data
Vdes = 9.70 ft/s Characteristic Velocity for Design, Defined as the Depth-Averaged Velocity at a
Point 20% Upslope from the Toe of the Revetment.
For Natural Channels, Vdes = Vavg (1.74 - 0.52 log (Rc / W))
Vdes = Vavg for Rc / W > 26
For Trapezoidal Channels, Vdes = Vavg (1.71 - 0.78 log (Rc / W))
Vdes = Vavg for Rc / W > 8
K1 = 0.871 Side Slope Correction Factor Equation:
d30 = 0.82 ft Particle Size for which 30% is Finer by Weight Equation:
d50 = 0.98 ft Particle Size for which 50% is Finer by Weight
50 Year -- d50 = 11.8 in (Refer to Table 4.1 for Minimum and Maximum Allowable Particle Size in Inches)
Tab - K2 - Q50
Page _2_ of __7__ 31510T
Katherine Access Road Date:
(70% Submittal) Checked by:
Date:
Spreadsheet for Riprap Revetment (CU) From HEC-23, Design Guideline 4 Design ID: K2 - Sta. 2022+69, Q100
The EM-1601 equation can be used with uniform or gradually varying flow.
Coefficients are included to account for the desired safety factor for design, specific gravity of the riprap stone, bank slope, and bendway character.
Given:
Channel Type = Trap (Natural Channels = Nat, Trapezoidal Channels = Trap) Channel Geometry = Straight (Straight Channels = Straight, Outside of Bends = Outside, Q = 618.70 Flow Rate Sg = 2.65 Specific Gravity of Riprap g = 32.2 ft/s2 Acceleration Due to Gravity Θ = 45.0 degrees Bank Angle -- (1V:1H = 45.0º, 1V:1.5H = 33.7º, 1V:2H = 26.6º, 1V:3H = 18.4º, 1V:4H = 14.0º, 1V:5H = 11.3º) Sf = 1.10 (must be > 1.0) Safety Factor
Rc = 135.0 ft Centerline Radius of Curvature of Channel Bend y = 1.75 ft Local Depth of Flow (Calculated per Haestad FlowMaster) W = 40.4 ft Width of Water Surface at Upstream End of Channel Bend (Calculation per Haestad FlowMaster)
Vavg = 4.42 ft/s Channel Cross-Sectional Average Velocity (Calculated per Haestad FlowMaster)
Calcuated:
CS = 0.300 Stability Coefficient (for Blanket Thickness = d100 or 1.5 d50, whichever is greater, and Uniformly Ratio d85 / d15 = 1.7 to 5.2)
= 0.30 for Angular Rock = 0.375 for Rounded Rock
Rc / W = 3.34
CV = 1.00 Velocity Distribution Coefficient
= 1.0 for Straight Channels or the Inside of Bends = 1.283 - 0.2 log (Rc / W) for the Outside of Bends (1.0 for Rc / W > 26)
= 1.25 Downstream from Concrete Channels = 1.25 at the Ends of Dikes
CT = 1.00 Blanket Thickness Coefficient Given as a Function of the Uniformity Ratio d85 / d15.
CT = 1 0 is Recommended Because it is Based on Very Limited Data
M. Tilko 22-Nov-10
C. Haggerty 11-Apr-11
Tab - K2 - Q100
CT = 1.0 is Recommended Because it is Based on Very Limited Data
Vdes = 5.75 ft/s Characteristic Velocity for Design, Defined as the Depth-Averaged Velocity at a
Point 20% Upslope from the Toe of the Revetment.
For Natural Channels, Vdes = Vavg (1.74 - 0.52 log (Rc / W))
Vdes = Vavg for Rc / W > 26
For Trapezoidal Channels, Vdes = Vavg (1.71 - 0.78 log (Rc / W))
Vdes = Vavg for Rc / W > 8
K1 = 0.211 Side Slope Correction Factor Equation:
d30 = 1.11 ft Particle Size for which 30% is Finer by Weight Equation:
d50 = 1.33 ft Particle Size for which 50% is Finer by Weight
100 Year -- d50 = 16.0 in (Refer to Table 4.1 for Minimum and Maximum Allowable Particle Size in Inches)
Tab - K2 - Q100
Page _3_ of __7__ 31510T
Katherine Access Road Date:
(70% Submittal) Checked by:
Date:
Spreadsheet for Riprap Revetment (CU) From HEC-23, Design Guideline 4 Design ID: K2A - Sta. 2060+06, Q50
The EM-1601 equation can be used with uniform or gradually varying flow.
Coefficients are included to account for the desired safety factor for design, specific gravity of the riprap stone, bank slope, and bendway character.
Given:
Channel Type = Trap (Natural Channels = Nat, Trapezoidal Channels = Trap) Channel Geometry = Straight (Straight Channels = Straight, Outside of Bends = Outside, Q = 244.00 Flow Rate Sg = 2.65 Specific Gravity of Riprap g = 32.2 ft/s2 Acceleration Due to Gravity Θ = 26.6 degrees Bank Angle -- (1V:1H = 45.0º, 1V:1.5H = 33.7º, 1V:2H = 26.6º, 1V:3H = 18.4º, 1V:4H = 14.0º, 1V:5H = 11.3º) Sf = 1.10 (must be > 1.0) Safety Factor
Rc = 400.0 ft Centerline Radius of Curvature of Channel Bend y = 1.27 ft Local Depth of Flow (Calculated per Haestad FlowMaster) W = 22.4 ft Width of Water Surface at Upstream End of Channel Bend (Calculation per Haestad FlowMaster)
Vavg = 9.71 ft/s Channel Cross-Sectional Average Velocity (Calculated per Haestad FlowMaster)
Calcuated:
CS = 0.300 Stability Coefficient (for Blanket Thickness = d100 or 1.5 d50, whichever is greater, and Uniformly Ratio d85 / d15 = 1.7 to 5.2)
= 0.30 for Angular Rock = 0.375 for Rounded Rock
Rc / W = 17.88
CV = 1.00 Velocity Distribution Coefficient
= 1.0 for Straight Channels or the Inside of Bends = 1.283 - 0.2 log (Rc / W) for the Outside of Bends (1.0 for Rc / W > 26)
= 1.25 Downstream from Concrete Channels = 1.25 at the Ends of Dikes
CT = 1.00 Blanket Thickness Coefficient Given as a Function of the Uniformity Ratio d85 / d15.
CT = 1 0 is Recommended Because it is Based on Very Limited Data
M. Tilko 22-Nov-10
C. Haggerty…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .