L-4 TFM2 Cost-Price Mapping Matrix_Amendment-1_ 2016-08-19.xlsx
XLSX spreadsheet 68 KB Posted
- Attached to
- Traffic Flow Management 2 (TFM2)- Request for Offer-SIR Federal contract opportunity
- Solicitation number
- DTFAWA-16-R-00010
About this file
L-4 TFM2 Cost-Price Mapping Matrix_Amendment-1_ 2016-08-19 (xlsx)
View the file
Other files for this federal contract opportunity
Show all 50
Traffic Flow Management 2 (TFM2)- Request for Offer-SIR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L-4 CLIN 1 Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. If more than one PWBS number is applicable to a SOW section, the Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below -- do not need to duplicate labor category breakdown provided in L-3). Offerors must add and complete a separate table/sheet for each corresponding CLIN (1.1 through 1.12) L-3 TAB B CLIN Sheet completed.Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 1.1 | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.4.2 | Operations Support | |||||
| C.8 | Implementation | |||||
| C.9 | Training | |||||
| C.9.4 | First Level maintenance Training | |||||
| C.9.5 | Training Updates for System Refreshes and Upgrades | |||||
| C.10.1 | First-Level Support (optional CLIN-1) | |||||
| C.10.1.1 | Help Desk | |||||
| C.10.1.2 | Daily Service Reviews |
TFM-2
SIR DTFAWA-16-R-00010 Amendment 1 L-4 CLIN 1 Cost Price Mapping Matrix
L-4 CLIN 2 Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. If more than one PWBS number is applicable to a SOW section, the Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below -- do not need to duplicate labor category breakdown provided in L-3). Offerors must add and complete a separate table/sheet for each corresponding CLIN (2.1 through 2.12) L-3 TAB B CLIN Sheet completed. Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 2.1 | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.4.2 | Operations Support | |||||
| C.5 | Engineering, Design & Development | |||||
| C.5.2 | Requirements Analysis & Development | |||||
| C.5.3 | System-level Design | |||||
| C.5.4 | Detailed Design | |||||
| C.5.5 | Development | |||||
| C.5.6 | Human Factors | |||||
| C.7 | Test & Evaluation | |||||
| C.7.1 | Test Tools | |||||
| C.7.2.1 | WJHC System Acceptance Test (WSAT) | |||||
| C.7.2.2 | Support Government Test Activities | |||||
| C.7.2.3 | Key Site Acceptance Test (KSAT) | |||||
| C.7.2.4 | Site System Acceptance Test (SAT) | |||||
| C.8 | Implementation | |||||
| C.9 | Training | |||||
| C.9.2 | System operations Training | |||||
| C.9.3 | Second-Level Engineering Support Training | |||||
| C.9.5 | Training Updates for System Refreshes and Upgrades | |||||
| C.10.2 | Second-Level Engineering (SLE) and Support | |||||
| C.10.2.1 | SLE Meetings, Reviews, and Workgroups | |||||
| C.10.2.2 | Operations Support | |||||
| C.10.2.3 | System and Software Support | |||||
| C.10.2.4 | Adaptation | |||||
| C.10.2.5 | Root Cause Analysis (RCA) | |||||
| C.10.2.6 | Disaster Recovery Center (DRC) |
SIR DTFAWA-16-R-00010 Amendment 1 L-4 CLIN 2 Cost Price Mapping Matrix
L-4 CLIN 3 Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. If more than one PWBS number is applicable to a SOW section, the Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below -- do not need to duplicate labor category breakdown provided in L-3). Offerors must add and complete a separate table/sheet for each corresponding CLIN (3.1 through 3.12) L-3 TAB C CLIN Sheet completed. Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 3.1 | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.10.3.2 | Commercial Software Maintenance Services |
SIR DTFAWA-16-R-00010 Amendment 1 L-4 CLIN 3 Cost Price Mapping Matrix
L-4 CLIN 5A Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. If more than one PWBS number is applicable to a SOW section, the Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below -- do not need to duplicate labor category breakdown provided in L-3). Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 5A | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.2 | Contract Transition | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Post - Award Conference (PAC) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.4.2 | Operations Support | |||||
| C.5 | Engineering, Design & Development | |||||
| C.7 | Test & Evaluation | |||||
| C.10.1 | First-Level Support (optional CLIN-1) | |||||
| C.10.1.1 | Help Desk | |||||
| C.10.1.2 | Daily Service Reviews | |||||
| C.10.2 | Second-Level Engineering (SLE) and Support | |||||
| C.10.2.1 | SLE Meetings, Reviews, and Workgroups | |||||
| C.10.2.2 | Operations Support | |||||
| C.10.2.3 | System and Software Support | |||||
| C.10.2.4 | Adaptation | |||||
| C.10.2.6 | Disaster Recovery Center (DRC) |
SIR DTFAWA-16-R-00010 Amendment 1 L-4 CLIN 5A Cost Price Mapping Matrix
L-4 CLIN 9A Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. If more than one PWBS number is applicable to a SOW section, the Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below -- do not need to duplicate labor category breakdown provided in L-3). Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 9A | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.5 | Engineering, Design & Development | |||||
| C.5.2 | Requirements Analysis & Development | |||||
| C.5.3 | System-level Design | |||||
| C.5.4 | Detailed Design | |||||
| C.5.5 | Development | |||||
| C.7 | Test & Evaluation | |||||
| C.7.1 | Test Tools | |||||
| C.7.2.1 | WJHC System Acceptance Test (WSAT) | |||||
| C.7.2.2 | Support Government Test Activities | |||||
| C.7.2.3 | Key Site Acceptance Test (KSAT) | |||||
| C.7.2.4 | Site System Acceptance Test (SAT) | |||||
| C.7.2.5 | Development Problem Trouble Report (PTR) | |||||
| C.8 | Implementation | |||||
| C.9 | Training | |||||
| C.9.1 | Test and Evaluation Training Program Requirements | |||||
| C.9.2 | System operations Training | |||||
| C.9.3 | Second-Level Enginering Support Training | |||||
| C.9.4 | First Level maintenance Training | |||||
| C.9.5 | Training Updates for System Refreshes and Upgrades | |||||
| C.11.2 | TFMS Remote Sites (TRS) |
SIR DTFAWA-16-R-00010 Amendment 1 L-4 CLIN 9A Cost Price Mapping Matrix
L-4 CLIN 11 Matrix
| Important: Offerors must comply with requirements stated in Section L 7.3.1.5 when completing the Cost Price Mapping Matrix below. If more than one PWBS number is applicable to a SOW section, the Contractor must add rows (but not columns) as needed to reflect the required details (all applicable CLINs and WBS activities per required SOW reference provided below -- do not need to duplicate labor category breakdown provided in L-3). Offerors must add and complete a separate table/sheet for each corresponding CLIN (11A through 11C) L-3 TAB B CLIN Sheet completed.Offeror's subcontractors must use same format for Mapping Matrix if providing separate BOE for their Cost/Price information. Offerors must use Attachment J-8 for Program WBS definitions. | ||||||
| CLIN 11A | ||||||
| SOW Section # | SOW Section Title | CWBS(s) | PWBS(s) | Basis of Estimate (BOE) Section Title (if applicable) | BOE Page Number(s) | Notes |
| C.3 | Program Management | |||||
| C.3.1 | Program Management Organization | |||||
| C.3.3 | Program Management Plan (PMP) | |||||
| C.3.4 | Meetings, Reviews, Conferences, and Evaluations | |||||
| C.3.4.1 | Meeting Logistics and Action Tracking | |||||
| C.3.4.2 | Program Management Review (PMR) | |||||
| C.3.4.3 | Other Meetings | |||||
| C.3.5 | Program Control | |||||
| C.3.5.1 | Contract Work Breakdown Structure (CWBS) | |||||
| C.3.5.2 | Earned Value Management System (EVMS) | |||||
| C.3.5.3 | Integrated Baseline Review | |||||
| C.3.5.4 | Performance Measurement | |||||
| C.3.5.5 | Quality Assurance | |||||
| C.3.5.6 | Configuration Management (CM) | |||||
| C.4.1 | General | |||||
| C.5 | Engineering, Design & Development | |||||
| C.5.2 | Requirements Analysis & Development | |||||
| C.5.3 | System-level Design | |||||
| C.5.4 | Detailed Design | |||||
| C.5.5 | Development | |||||
| C.5.6 | Human Factors | |||||
| C.7 | Test & Evaluation | |||||
| C.7.1 | Test Tools | |||||
| C.7.2.1 | WJHC System Acceptance Test (WSAT) | |||||
| C.7.2.2 | Support Government Test Activities | |||||
| C.7.2.3 | Key Site Acceptance Test (KSAT) | |||||
| C.7.2.4 | Site System Acceptance Test (SAT) | |||||
| C.7.2.5 | Development Problem Trouble Report (PTR) | |||||
| C.8 | Implementation | |||||
| C.9 | Training | |||||
| C.9.1 | Test and Evaluation Training Program Requirements | |||||
| C.9.2 | System operations Training | |||||
| C.9.3 | Second-Level Enginering Support Training | |||||
| C.9.4 | First Level maintenance Training | |||||
| C.9.5 | Training Updates for System Refreshes and Upgrades |
SIR DTFAWA-16-R-00010 Amendment 1 L-4 CLIN 11 Cost Price Mapping Matrix