L-3 TFM2 Cost-Price Workbook Amend-2_2016-09-22.xlsx

XLSX spreadsheet 146 KB Posted

Attached to
Traffic Flow Management 2 (TFM2)- Request for Offer-SIR
Solicitation number
DTFAWA-16-R-00010
Issued by

About this file

L-3 TFM2 Cost-Price Workbook Amend-2_2016-09-22 (xlsx)

View the file

Other files

File Type Posted
J-5.E07-SRS-CDRL-DID_Amendment-1.pdf PDF
TFM2_SIR-RFO_Industry_Comment_Responses_9-13-2016.pdf PDF
DTFAWA-16-R-00010_ Amendment 0003_SF-30 103116.pdf PDF
J5_L05-CtrDevManuals-CDRL-DID_Amend-2.pdf PDF
F_TFM2_Amend-1_2016-08-25.pdf PDF
L_TFM2_Amend-3_2016-10-31.pdf PDF
A_TFM2_2016-08-03.pdf PDF
J-4A TFMS Site Equipment List.xlsx XLSX spreadsheet
L-2C Past Performance Survey TFM2 Amend 1 2016-09-08_clean.pdf PDF
J-6.zip ZIP file
DTFAWA-16-R-00010 Amendment 002 SF-30 100316.pdf PDF
M_TFM2_Amend-2_2016-09-27.pdf PDF
D_TFM2_2016-05-11.pdf PDF
I_TFM2_Amend-1_2016-08-23.pdf PDF
K_TFM2_2016-05-20.pdf PDF
C_TFM2_Amend-2_2016-09-27.pdf PDF
J-3 (1 of 2).1 of 2 —
TFM2_SIR-RFO_Amend-1_Industry_Comment_Responses_10-3-2016.pdf PDF
J6I sample ASDEX airport map PVD.zip ZIP file
L-2C Past Performance Survey TFM2 Amend 1 2016-09-08_markup.pdf PDF
J-3Z Adaptation Files (1of2).1of2 —
L-2A Past Performance References TFM2 2016-06-10.pdf PDF
J-3 (2 of 2).2 of 2 —
E_TFM2_2016-06-16.pdf PDF
H_TFM2_Amend-1_2016-08-25.pdf PDF
DTFAWA-16-R-00010 Amendment 001 SF-30 091316.pdf PDF
J-1_TFM2_Abbreviations.pdf PDF
L-1_size-scope-complexity-summary_Amend-2_2016-09-23.pdf PDF
J-3.T through J-3.Y.zip ZIP file
J6A_TFDM_TFMS_SSD_Amend-1.pdf PDF
J-4B TFMS Commercial Software List Amend-1 2016-09-08.xlsx XLSX spreadsheet
J-9 Task Order TFDM SE Amendment-1.pdf PDF
J-5.zip ZIP file
L-2B Past Performance Survey Record TFM2 2016-06-10.pdf PDF
TFM2_SIR-RFO_Amendment 003_Industry_Comment_Response_10-31-2016.pdf PDF
J-3Z Adaptation Files (2of2).2of2 —
L-4 TFM2 Cost-Price Mapping Matrix_Amendment-1_ 2016-08-19.xlsx XLSX spreadsheet
J-2.zip ZIP file
J-7 Labor Category Min Qualifications_2016-08-02.pdf PDF
G_TFM2_2016-07-11.pdf PDF
J-8 TFM2 Program WBS 2015-10-22.pdf PDF
J Attachment List Amend-2_2016-09-22.pdf PDF
B_TFM2_Amend-2_2016-09-22.xlsx XLSX spreadsheet
J5_L03-TMML-CDRL-DID_Amend-2.pdf PDF
L-2A Past Performance References TFM2 2016-06-10.pdf PDF
J-3 (1 of 2).1 of 2 —
C_TFM2_Amend-2_2016-09-27.pdf PDF
L-4 TFM2 Cost-Price Mapping Matrix_Amendment-1_ 2016-08-19.xlsx XLSX spreadsheet
J-3Z Adaptation files (2of2).2of2 —
L-3 TFM2 Cost-Price Workbook Amend-2_2016-09-22.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 340 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L-3 TAB A TEP Template

Total Evaluated Price (TEP) Template
Important:

Offerors must comply with requirements stated in Section L.7.3.1 when providing detail for L-4 TAB A, Total Evaluated Price (TEP) Template. Totals for each CLIN to be priced are listed below. Except for those CLINs where the FAA has provided an estimated value, all CLINs listed below must be populated with Offeror's proposed price and match the cost data provided by the Offeror. Offerors are to refer to Section F.3 for CLIN Period of Performance for projected start dates and CLIN durations. Gray shading indicates values specified by the FAA.

`
CLIN 1 First Level Support. As ordered on a CPFF basis the contractor will perform operations and sustainment services (e.g., monitoring and maintaining systems products and services, responding to user help requests, and supporting deployments) as described in the SOW and attachments.
CLIN 1.1
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$4,539
CLIN 1.1TOTAL$4,539
CLIN 1.2
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$4,630
CLIN 1.2TOTAL$4,630
CLIN 1.3
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$4,723
CLIN 1.3TOTAL$4,723
CLIN 1.4
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$4,817
CLIN 1.4TOTAL$4,817
CLIN 1.5
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$4,913
CLIN 1.5TOTAL$4,913
CLIN 1.6
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$5,012
CLIN 1.6TOTAL$5,012
CLIN 1.7
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$5,112
CLIN 1.7TOTAL$5,112
CLIN 1.8
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$5,214
CLIN 1.8TOTAL$5,214
CLIN 1.9
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$5,318
CLIN 1.9TOTAL$5,318
CLIN 1.10
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$5,425
CLIN 1.10TOTAL$5,425
CLIN 1.11
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
TravelFAA estimate$5,533
CLIN 1.11TOTAL$5,533
CLIN 1.12
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0
TravelFAA estimate$5,644
CLIN 1.12TOTAL$5,644
CLIN 1 Grand Total$60,880
CLIN 2 Second Level Engineering. As ordered, on a CPFF basis, the contractor will perform the engineering services (system performance analysis, problem resolution, and recurring adaptation updates) as described in the SOW and attachments.
CLIN 2.1
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG SubscriptionTotal
TravelFAA estimate$37,889
CLIN 2.1TOTAL$37,889
CLIN 2.2
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$38,657
CLIN 2.2TOTAL$38,657
CLIN 2.3
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$39,430
CLIN 2.3TOTAL$39,430
CLIN 2.4
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$40,219
CLIN 2.4TOTAL$40,219
CLIN 2.5
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$41,023
CLIN 2.5TOTAL$41,023
CLIN 2.6
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$41,844
CLIN 2.6TOTAL$41,844
CLIN 2.7
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$42,681
CLIN 2.7TOTAL$42,681
CLIN 2.8
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$43,534
CLIN 2.8TOTAL$43,534
CLIN 2.9
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$44,405
CLIN 2.9TOTAL$44,405
CLIN 2.10
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$45,293
CLIN 2.10TOTAL$45,293
CLIN 2.11
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$46,199
CLIN 2.11TOTAL$46,199
CLIN 2.12
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
WSI and OAG data subscriptionsTotal
TravelFAA estimate$47,123
CLIN 2.12TOTAL$47,123
CLIN 2 Grand Total$508,296
CLIN 3 -- Recurring Commercial Software. As ordered, on a CPFF basis by the CO, the contractor will provide recurring commercial software license and vendor maintenance support costs as required to sustain services described in the SOW and attachments.
CLIN 3.1
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.1Total$0.00
CLIN 3.2
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.2$0.00
CLIN 3.3
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.3Total$0.00
CLIN 3.4
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.4Total$0.00
CLIN 3.5$0.00
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.5Total$0.00
CLIN 3.6
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.6$0.00
CLIN 3.7
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.7Total$0.00
CLIN 3.8
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.8Total$0.00
CLIN 3.9
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.9Total$0.00
CLIN 3.10
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.10Total$0.00
CLIN 3.11
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.11$0.00
CLIN 3.12
ODCsTotal$0.00
Fixed Fee
Total$0.00
CLIN 3.12Total$0.00
CLIN 3 Grand Total$0.00
CLIN 4 Large Display Refresh. As ordered, on a FFP basis by the CO, the contractor will be required to procure and replace existing commercial large information displays as described in the SOW and attachments.
CLIN 4.A Large Display RefreshFAA estimate$3,959,422
CLIN 4.B Large Display RefreshFAA estimate$4,307,931
CLIN 4 Grand Total$8,267,353
CLIN 5 Contract Transition. As ordered, on a CPFF basis, the contractor will perform the transition of maintenance and development work to the new contract in accordance with the SOW and attachments. CLIN 5 includes all costs associated with the contractor-acquired GFP needed to ensure the contractor has the appropriate development and test platforms to allow for development, test, and implementation activities.
CLIN 5.A
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0.00
Fixed Fee
Total$0.00
Sub-TotalTotal$0.00
Commercial Hardware/ SoftwareTotal
TravelFAA estimate$18,629
CLIN 5.ATOTAL$18,629
CLIN 5.BFAA estimate$1,892,703
CLIN 5 Grand Total$1,911,332
CLIN 6 Engineering Services. As ordered, on a T&M basis via Task Orders, the contractor will perform engineering services in accordance with the SOW and attachments. The government reserves the right to negotiate and issue Task Orders under this CLIN.
CLIN 6.1Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$33,751
CLIN 6.1Total$33,751
CLIN 6.2Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$34,426
CLIN 6.2Total$34,426
CLIN 6.3Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$35,114
CLIN 6.3Total$35,114
CLIN 6.4Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$35,817
CLIN 6.4Total$35,817
CLIN 6.5Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$36,533
CLIN 6.5Total$36,533
CLIN 6.6Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$37,264
CLIN 6.6Total$37,264
CLIN 6.7Total
Labor CostTotal
ODC & TravelFAA estimate$38,009`
CLIN 6.7Total$38,009
CLIN 6.8Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$38,769
CLIN 6.7Total$38,769
CLIN 6.9Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$39,545
CLIN 6.9Total$39,545
CLIN 6.10Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$40,335
CLIN 6.10Total$40,335
CLIN 6.11Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$41,142
CLIN 6.11Total$41,142
CLIN 6.12Total
Labor CostTotal$0.00
ODC & TravelFAA estimate$41,965
CLIN 6.12Total$41,965
CLIN 6 Grand Total$452,670
CLIN 7 Software Engineering Services. As ordered, on a T&M basis via Task Orders, the contractor will perform engineering services in accordance with the SOW and attachments. The government reserves the right to negotiate and issue task orders under this CLIN.
CLIN 7.1Total
Labor CostTotal$0
ODC & TravelFAA estimate$10,542
CLIN 7.1Total$10,542
CLIN 7.2Total
Labor CostTotal$0
ODC & TravelFAA estimate$10,753
CLIN 7.2Total$10,753
CLIN 7.3Total
Labor CostTotal$0
ODC & TravelFAA estimate$10,968
CLIN 7.3Total$10,968
CLIN 7.4Total
Labor CostTotal$0
ODC & TravelFAA estimate$11,188
CLIN 7.4Total$11,188
CLIN 7.5Total
Labor CostTotal$0
ODC & TravelFAA estimate$11,411
CLIN 7.5Total$11,411
CLIN 7.6Total
Labor CostTotal$0
ODC & TravelFAA estimate$11,640
CLIN 7.6Total$11,640
CLIN 7.7Total
Labor CostTotal$0
ODC & TravelFAA estimate$11,872
CLIN 7.7Total$11,872
CLIN 7.8Total
Labor CostTotal$0
ODC & TravelFAA estimate$12,110
CLIN 7.8Total$12,110
CLIN 7.9Total
Labor CostTotal$0
ODC & TravelFAA estimate$12,352
CLIN 7.9Total$12,352
CLIN 7.10Total
Labor CostTotal$0
ODC & TravelFAA estimate$12,599
CLIN 7.10Total$12,599
CLIN 7.11Total
Labor CostTotal$0
ODC & TravelFAA estimate$12,851
CLIN 7.11Total$12,851
CLIN 7.12Total
Labor CostTotal$0
ODC & TravelFAA estimate$13,108
CLIN 7.12Total$13,108
CLIN 7 Grand Total$141,396
CLIN 8 -- Engineering Services -- Other. As ordered, on a T&M basis via Task Orders, the contractor will perform the engineering services, in accordance with the SOW and attachments. This CLIN will primarily be for TFMS-related engineering tasking sponsored by other FAA programs. The government reserves the right to negotiate and issue task orders under this CLIN.
CLIN 8.1Total
Labor CostTotal$0
ODC & TravelFAA estimate$10,542
CLIN 8.1Total$10,542
CLIN 8.2Total
Labor CostTotal$0
ODC & TravelFAA estimate$10,753
CLIN 8.2Total$10,753
CLIN 8.3Total
Labor CostTotal$0
ODC & TravelFAA estimate$10,968
CLIN 8.3Total$10,968
CLIN 8.4Total
Labor CostTotal$0
ODC & TravelFAA estimate$11,188
CLIN 8.4Total$11,188
CLIN 8.5Total
Labor CostTotal$0
ODC & TravelFAA estimate$11,411
CLIN 8.5Total$11,411
CLIN 8.6Total
Labor CostTotal$0
ODC & TravelFAA estimate$11,640
CLIN 8.6Total$11,640
CLIN 8.7Total
Labor CostTotal$0
ODC & TravelFAA estimate$11,872
CLIN 8.7Total$11,872
CLIN 8.8Total
Labor CostTotal$0
ODC & TravelFAA estimate$12,110
CLIN 8.8Total$12,110
CLIN 8.9Total
Labor CostTotal$0
ODC & TravelFAA estimate$12,352
CLIN 8.9Total$12,352
CLIN 8.10Total
Labor CostTotal$0
ODC & TravelFAA estimate$12,599
CLIN 8.10Total$12,599
CLIN 8.11Total
Labor CostTotal$0
ODC & TravelFAA estimate$12,851
CLIN 8.11Total$12,851
CLIN 8.12Total
Labor CostTotal$0
ODC & TravelFAA estimate$13,108
CLIN 8.12Total$13,108
CLIN 8 Grand Total$141,396
CLIN 9 -- Remote Site Technical Refresh. As ordered, on a CPIF basis by the CO, the contractor will perform technical refresh of all TFMS Remote Sites to replace/update commercial HW and SW components (except DSP) in accordance with the SOW and attachments. Software work is limited to COTS updates (e.g. OS) and ensuring any compatibility issues with TFMS apps are resolved prior to start of formal Govt acceptance test. All significant user interface change requirements will be specifically identified as they are negotiated and definitized under optional CLINs.
CLIN 9.AEC
$
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0
Target FeeTotal
Schedule IncentiveTotal
Post-Deployment Quality IncentiveTotal
Commercial Hardware & SoftwareTotal
TravelFAA estimate$188,884
Total CPIFTotal$188,884
Maximum Cost Incentive$0
Minimum Cost Incentive0%$0
Share Ratio Contractor Government/ContractorX/X$0
CLIN 9.ATotal$188,884
CLIN 9.BFAA estimate$26,732,370
CLIN 9 Grand Total$26,921,254

CLIN 10.A TFM Production Centers Technical Refresh. As ordered, the contractor will perform technical refresh of the TFM Production Centers to replace/update commercial HW and SW components in accordance with the SOW and attachments. FAA estimate $36,524,591

CLIN 11 -- TFM Development and Future Enhancements. As ordered, the contractor will perform engineering and development services to build new functionality for the TFM System and subsequently produce and deploy the new functionality. The government may request proposals from the contractor for adding additional functionality to the TFM System. The noted SOW sections in Section B SOW-CLIN mapping apply to the CLINs negotiated under this CLIN. The Government reserves the right to negotiate and add CLINs on a Cost Reimbursable or CPIF basis under this CLIN for additional TFM functionality.
CLIN 11.AEC
$
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0
Target FeeTotal
Schedule IncentiveTotal
Post-Deployment Quality IncentiveTotal
TravelFAA estimate$35,530
Total CPIFTotal$35,530
Maximum Cost Incentive$0
Minimum Cost Incentive0%$0
Share Ratio Contractor Government/ContractorX/X$0
CLIN 11.A Total$35,530
CLIN 11.BEC
$
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0
Target FeeTotal
Schedule IncentiveTotal
Post-Deployment Quality IncentiveTotal
TravelFAA estimate$35,530
Total CPIFTotal$35,530
Maximum Cost Incentive$0
Minimum Cost Incentive0%$0
Share Ratio Contractor Government/ContractorX/X$0
CLIN 11.B Total$35,530
CLIN 11.CEC
$
Direct LaborTotal
SubcontractsTotal
ODCs (other than subcontracts)Total
Indirect CostsTotal
Sub-TotalTotal$0
Target FeeTotal
Schedule IncentiveTotal
Post-Deployment Quality IncentiveTotal
TravelFAA estimate$36,240
Total CPIFTotal$36,240
Maximum Cost Incentive$0
Minimum Cost Incentive0%$0
Share Ratio Contractor Government/ContractorX/X$0
CLIN 11C Total$36,240
CLIN 11.DFAA estimate$21,791,648
CLIN 11.EFAA estimate$23,416,860
CLIN 11.FFAA estimate$23,571,268
CLIN 11.GFAA estimate$23,669,660
CLIN 11.HFAA estimate$23,825,485
CLIN 11.IFAA estimate$23,925,161
CLIN 11.JFAA estimate$24,083,000
CLIN 11.KFAA estimate$24,183,374
CLIN 11.LFAA estimate$24,342,911
CLIN 11.MFAA estimate$24,444,189
CLIN 11.NFAA estimate$24,605,179
CLIN 11.OFAA estimate$24,707,566
CLIN 11PFAA estimate$24,870,432
CLIN 11.QFAA estimate$24,973,766
CLIN 11.RFAA estimate$25,138,346
CLIN 11 Grand Total$361,656,146
Total Evaluated Price Summary
CLIN 1 Total$60,880
1.1$4,539
1.2$4,630
1.3$4,723
1.4$4,817
1.5$4,913
1.6$5,012
1.7$5,112
1.8$5,214
1.9$5,318
1.10$5,425
1.11$5,533
1.12$5,644
CLIN 2 Total$508,296
2.1$37,889
2.2$38,657
2.3$39,430
2.4$40,219
2.5$41,023
2.6$41,844
2.7$42,681
2.8$43,534
2.9$44,405
2.10$45,293
2.11$46,199
2.12$47,123
CLIN 3 Total$0
3.1$0
3.2$0
3.3$0
3.4$0
3.5$08
3.6$0
3.7$0
3.8$0
3.9$0
3.10$0
3.11$0
3.12$0
CLIN 4 Total$8,267,353
4.A$3,959,422
4.B$4,307,931
CLIN 5 Total$1,911,332
5.A$18,629
5.B$1,892,703
CLIN 6 Total$452,670
6.1$33,751
6.2$34,426
6.3$35,114
6.4$35,817
6.5$36,533
6.6$37,264
6.7$38,009
6.8$38,769
6.9$39,545
6.10$40,335
6.11$41,142
6.12$41,965
CLIN 7 Total$141,396
7.1$10,542
7.2$10,753
7.3$10,968
7.4$11,188
7.5$11,411
7.6$11,640
7.7$11,872
7.8$12,110
7.9$12,352
7.10$12,599
7.11$12,851
7.12$13,108
CLIN 8 Total$141,396
8.1$10,542
8.2$10,753
8.3$10,968
8.4$11,188
8.5$11,411
8.6$11,640
8.7$11,872
8.8$12,110
8.9$12,352
8.10$12,599
8.11$12,851
8.12$13,108
CLIN 9 Total$26,921,254
9.A$188,884
9.B$26,732,370
CLIN 10.A$36,524,591
CLIN 11 Total$361,656,146
11.A$35,530
11.B$35,530
11.C$36,240
11.D$21,791,648
11.E$23,416,860
11.F$23,571,268
11.G$23,669,660
11.H$23,825,485
11.I$23,925,161
11.J$24,083,000
11.K$24,183,374
11.L$24,342,911
11.M$24,444,189
11.N$24,605,179
11.O$24,707,566
11.P$24,870,432
11.Q$24,973,766
11.R$25,138,346
Grand Total$436,585,314

&"Times New Roman,Regular"TFM-2 Procurement Sensitive &"Times New Roman,Regular"DRAFT SIR DTFAWA-16-R-00010 &"Times New Roman,Regular"Section L-4.A Total Evaluated Price Template

Procurement Sensitive &"Times New Roman,Regular"DRAFT SIR DTFAWA-16-R-00010 &"Times New Roman,Regular"Section L-4.A Total Evaluated Price Template

Draft TFM2

SIR #

Draft TFM2

SIR #

&"Times New Roman,Regular" SIR DTFAWA-16-R-00010 Amendment 2 &"Times New Roman,Regular"Section L-3.A Total Evaluated Price Template

&P of &N

&P of &N

&"Times New Roman,Bold"B2 -&P

&"Times New Roman,Bold"B2 -&P

&P of &N

L-3 TAB B Cost CLIN 1 Summary

Cost Type CLIN Summary
Important:

Offerors must comply with requirements stated in Section L 7.3.1 when providing detail for each Cost CLIN Summary. Offerors must add rows as needed to reflect all applicable labor categories and cost elements needed to meet the applicable SOW requirements for each CLIN, use SOW to CLIN map in Section B, Appendix A (Tab B-3). Offerors may add columns provided the existing ones are not modified. Offerors must add and complete a separate tab/sheet for each CLIN (1.1 through 1.12) and its corresponding period of performance stated in Section F.3.2. Offerors must use Attachment J-8 for Program WBS definitions. If subcontract type is cost reimbursement, Offeror's subcontractors are also required to use this summary template if submitting their cost separately from the Prime.

Format for CPFF CLINs
CLIN 1.1
SOWLabor CategoryDirect Labor RateHoursTotal Dollars
C.3.1Sample Labor Category: Program Manager$0.00$0.00

Total Direct Labor $0.00

Cost BaseRateTotal
Labor Fringe$0.000.00%$0.00
Labor Overhead$0.000.00%$0.00
Labor G&A$0.000.00%$0.00
Total
ODC -- misc. materials$0.00
ODC -- other$0.00
ODC -- subcontractor (break out subcontractor cost(s) below as applicable -- add rows if needed)$0.00
Subcontractor 1 Total$0.00
Subcontractor 2 Total$0.00
Subcontractor 3 Total$0.00
Cost BaseRateTotal
Material/Sub Handling$0.000.00%$0.00
G&A$0.000.00%$0.00
Cost BaseRateTotal
FCCM$0.000.00%$0.00
Cost BaseRateTotal
FIXED FEE$0.000.00%$0.00
CLIN 1.1 TOTAL CPFF$0.00

TFM- 2

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 1 Summary

TFM- 2

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 1 Summary

TFM- 2

SIR DTFAWA-16-R-00010 Amendment 2 Section L-3.B Cost CLIN 1 Summary

&P of &N

&P of &N

&P of &N

L-3 TAB B Cost CLIN 2 Summary

Cost Type CLIN Summary
Important:

Offerors must comply with requirements stated in Section L 7.3.1 when providing detail for each Cost CLIN Summary. Offerors must add rows as needed to reflect all applicable labor categories and cost elements needed to meet the applicable SOW requirements for each CLIN, use SOW to CLIN map in Section B, Appendix A (Tab B-3). Offerors may add columns provided the existing ones are not modified. Offerors must add and complete a separate tab/sheet for each CLIN (2.1 through 2.12) and its corresponding period of performance stated in Section F.3.2. Offerors must use Attachment J-8 for Program WBS definitions. If subcontract type is cost reimbursement, Offeror's subcontractors are also required to use this summary template if submitting their cost separately from the Prime.

Format for CPFF CLINs
CLIN 2.1
SOWLabor CategoryDirect Labor RateHoursTotal Dollars
C.3.1Sample Labor Category: Program Manager$0.00$0.00

Total Direct Labor $0.00

Cost BaseRateTotal
Labor Fringe$0.000.00%$0.00
Labor Overhead$0.000.00%$0.00
Labor G&A$0.000.00%$0.00
Total
WSI and OAG data subscriptions$0.00
ODC -- misc. materials$0.00
ODC -- other$0.00
ODC -- subcontractor (break out subcontractor cost(s) below as applicable -- add rows if needed)$0.00
Sub-Contractor 1$0.00
Sub-Contractor 2$0.00
Sub-Contractor 3$0.00
Cost BaseRateTotal
Material/Sub Handling$0.000.00%$0.00
G&A$0.000.00%$0.00
Cost BaseRateTotal
FCCM$0.000.00%$0.00
Cost BaseRateTotal
FIXED FEE$0.000.00%$0.00
CLIN 2.1 TOTAL CPFF$0.00

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 2 Summary

TFM- 2

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 2 Summary

TFM- 2

SIR DTFAWA-16-R-00010 Amendment 2 Section L-3.B Cost CLIN 2 Summary

&P of &N

&P of &N

&P of &N

L-3 TAB B Cost CLIN 5A Summary

Cost Type CLIN Summary
Important:

Offerors must comply with requirements stated in Section L 7.3.1 when providing detail for each Cost CLIN Summary. Offerors must add rows as needed to reflect all applicable labor categories and cost elements needed to meet the applicable SOW requirements for each CLIN, use SOW to CLIN map in Section B, Appendix A (Tab B-3). Offerors may add columns provided the existing ones are not modified. See Section F.3.2 for CLIN period of performance definitions. Offerors must use Attachment J-8 for Program WBS definitions. If subcontract type is cost reimbursement, Offeror's subcontractors are also required to use this summary template if submitting their cost separately from the Prime.

Format for CPFF CLINs
CLIN 5A
SOWLabor CategoryDirect Labor RateHoursTotal Dollars
C.3.1Sample Labor Category: Program Manager$0.00$0.00

Total Direct Labor $0.00

Cost BaseRateTotal
Labor Fringe$0.000.00%$0.00
Labor Overhead$0.000.00%$0.00
Labor G&A$0.000.00%$0.00
Total
Commercial hardware & software$0.00
ODC -- misc. materials$0.00
ODC -- other$0.00
ODC -- subcontractor (break out subcontractor cost(s) below as applicable -- add rows if needed)$0.00
Subcontractor 1$0.00
Subcontractor 2$0.00
Subcontractor 3$0.00
Cost BaseRateTotal
Material/Sub Handling$0.000.00%$0.00
G&A$0.000.00%$0.00
Cost BaseRateTotal
FCCM$0.000.00%$0.00
Cost BaseRateTotal
FIXED FEE$0.000.00%$0.00
CLIN 5A TOTAL CPFF$0.00

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 5 Summary

TFM- 2

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 5 Summary

TFM- 2

SIR DTFAWA-16-R-00010 Amendment 2 Section L-3.B Cost CLIN 5A Summary

&P of &N

&P of &N

&P of &N

L-3 TAB B Cost CLIN 9A Summary

Cost Type CLIN Summary
Important:

Offerors must comply with requirements stated in Section L 7.3.1 when providing detail for each Cost CLIN Summary. Offerors must add rows as needed to reflect all applicable labor categories and cost elements needed to meet the applicable SOW requirements for each CLIN, use SOW to CLIN map in Section B, Appendix A (Tab B-3). Offerors may add columns provided the existing ones are not modified. See Section F.3.2 for CLIN period of performance definitions. Offerors must use Attachment J-8 for Program WBS definitions. If subcontract type is cost reimbursement, Offeror's subcontractors are also required to use this summary template if submitting their cost separately from the Prime.

Format for CPIF CLINs
CLIN 9A
SOWLabor CategoryDirect Labor RateHoursTotal Dollars
C.3.1Sample Labor Category: Program Manager$0.00$0.00
Total Direct Labor$0.00
Total Subcontractor Labor$0.00
Cost BaseRateTotal
Labor Fringe$0.000.00%$0.00
Labor Overhead$0.000.00%$0.00
Labor G&A$0.000.00%$0.00
Total
COTS hardware & software$0.00
ODC -- misc. materials$0.00
ODC -- other$0.00
ODC -- subcontractor (break out subcontractor cost(s) below as applicable -- add rows if needed)$0.00
Sub-Contractor 1$0.00
Sub-Contractor 2$0.00
Sub-Contractor 3$0.00
Cost BaseRateTotal
Material/Sub Handling$0.000.00%$0.00
G&A$0.000.00%$0.00
Cost BaseRateTotal
FCCM$0.000.00%$0.00
Cost BaseRateTotal
TARGET COST$0.000.00%$0.00
TARGET FEE$0.000.00%$0.00
CLIN 9A TOTAL CPIF$0.00

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 9 Summary

TFM- 2

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 9 Summary

TFM- 2

SIR DTFAWA-16-R-00010 Amendment 2 Section L-3.B Cost CLIN 9A Summary

&P of &N

&P of &N

&P of &N

L-3 TAB B Cost CLIN 11 Summary

Cost Type CLIN Summary
Important:

Offerors must comply with requirements stated in Section L 7.3.1 when providing detail for each Cost CLIN Summary. Offerors must add rows as needed to reflect all applicable labor categories and cost elements needed to meet the applicable SOW requirements for each CLIN, use SOW to CLIN map in Section B, Appendix A (Tab B-3). Offerors may add columns provided the existing ones are not modified. Offerors must add and complete a separate tab/sheet for each CLIN (11A through 11C) and its corresponding period of performance stated in Section F.3.2. Offerors must use Attachment J-8 for Program WBS definitions. If subcontract type is cost reimbursement, Offeror's subcontractors are also required to use this summary template if submitting their cost separately from the Prime.

Format for CPIF CLINs
CLIN 11A
SOWLabor CategoryDirect Labor RateHoursTotal Dollars
C.3.1Sample Labor Category: Program Manager$0.00$0.00

Total Direct Labor $0.00

Cost BaseRateTotal
Labor Fringe$0.000.00%$0.00
Labor Overhead$0.000.00%$0.00
Labor G&A$0.000.00%$0.00
Total
COTS hardware & software (if needed)$0.00
ODC -- misc. materials$0.00
ODC -- other$0.00
ODC -- subcontractor (break out subcontractor cost(s) below as applicable -- add rows if needed)$0.00
Sub-Contractor 1$0.00
Sub-Contractor 2$0.00
Sub-Contractor 3$0.00
Cost BaseRateTotal
Material/Sub Handling$0.000.00%$0.00
G&A$0.000.00%$0.00
Cost BaseRateTotal
FCCM$0.000.00%$0.00
Cost BaseRateTotal
TARGET COST$0.000.00%$0.00
TARGET FEE$0.000.00%$0.00
CLIN 11A TOTAL CPIF$0.00

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 11 Summary

TFM- 2

Procurement Sensitive Draft SIR DTFAWA-16-R-00010 Section L-4.B Cost CLIN 11 Summary

TFM- 2

SIR DTFAWA-16-R-00010 Amendment 2 Section L-3.B Cost CLIN 11 Summary

&P of &N

&P of &N

&P of &N

L-3 TAB C

Deleted per Amendment 1

L-3 TAB D T&M CLIN Labor Rates Important: The Offeror must fill in the T&M labor rates for the following categories. The estimated hours for these are provided for evaluation purposes only and must not be modified by the Offeror. These rates will be used for CLINs 6, 7, & 8 which make up the T&M CLINs for this contract. Separate fully loaded labor rates are must be identified for each year of the potential 12-year contract period of performance. Fully loaded rates apply to all Task Orders including subcontractor labor. The corresponding labor category definitions and minimum qualification requirements are included in contract Section J-7. For the purpose of evaluation, Offerors may propose alternate titles only for T&M labor categories; all proposed T&M Labor Categories must be equivalent to, and map to, a Labor Category listed in J-7. Alternate titles must appear in the T&M Labor Rates table below, in place of the equivalent FAA Labor Category, with a key or brief explanation included on the worksheet.

T&M Labor Rates
Labor CategoryYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12
Program Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Deputy Program Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Business/Contracts Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Operations Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Architect$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst -- Senior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst -- Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst -- Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Support Staff$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst --Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst - Junior-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst -- Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst - Junior- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer - Junior- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Training Specialist/Instructor -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Training Specialist/Instructor – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Chief Principal$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hours for CLIN 6 Engineering Services
Labor CategoryYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12
Program Manager1614084974867048698728758235501650
Deputy Program Manager1072723323244695795815835483661100
Business/Contracts Manager1573994864756888498528558045371610
Operations Manager1182993653565166376396416034031210
System Engineer -- Manager1182993653565166376396416034031210
System Architect21354165964493211511155115910907282190
Software Engineer -- Manager3007639299081315162316291634153710273080
Test Engineer -- Manager42107131128185228229230216144430
Program Control Analyst -- Senior Level1022593153084465505525545213481050
Program Control Analyst -- Intermediate Level1363454204105947347367396954641390
Program Control Analyst -- Junior Level1022593153084465505525545213481050
Support Staff5801476179817562544314031513162297319865970
Configuration Management Analyst -- Senior64162198193280346347348327219660
Configuration Management Analyst -- Intermediate-Level1112813423344845986006025663781140
Configuration Management Analyst - Junior-Level2870868412115015015114295280
Quality Control Analyst -- Senior51129158154223275276277261174520
Quality Control Analyst -- Intermediate-Level1012583143064445485505525193471040
Quality Control Analyst -- Junior- Level2564787711113713713813087260
Software Engineer -- Senior27016868836581711183614611146601470913831924027760
Software Engineer – Intermediate-Level157840134887477469158536856585938080539916220
Software Engineer – Junior Level4021023124612181764217721842192206113774140
Hardware Engineer – Senior90229279273395488490491462309930
Hardware Engineer -- Intermediate - Level72183223218316390392393370247740
Hardware Engineer -- Junior- Level18465655799898989262190
Training Specialist/Instructor -- Senior90229279273395488490491462309930
Training Specialist/Instructor – Intermediate-Level45115140136198244245246231154460
ILS Engineer – Senior3897118115167206207208195131390
ILS Engineer – Intermediate-Level3897118115167206207208195131390
ILS Engineer – Junior Level11293534496161615839120
System Engineer – Chief Principal281715871851123315221527153214419622890
System Engineer – Senior7982031247324163499432043344349408927328210
System Engineer – Intermediate-Level351892108610611537189719031910179612003600
System Engineer – Junior Level1042653223154565635655675333561070
Test Engineer – Senior5521405171116712421298929993009282918905680
Test Engineer – Intermediate-Level283720878857124215331538154314519692910
Test Engineer – Junior Level351893108810631539190019071908179912023610
Total Hours10320262443196531223452285583056018562005285035310106090
Cost for CLIN 6
Labor CategoryYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12
Program Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Deputy Program Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Business/Contracts Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Operations Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Architect$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst -- Senior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst - Intermediate Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst -- Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Support Staff$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst -- Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst -- Junior- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst -- Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst -- Junior- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer -- Intermediate- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer -- Junior- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Training Specialist/Instructor -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Training Specialist/Instructor – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Chief Principal$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
CLIN Totals$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hours for CLIN 7 Software Engineering Services
Labor CategoryYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12
Program Manager585858585858585858585551
Deputy Program Manager383838383838383838383634
Business/Contracts Manager341341341341341341341341341341323303
Operations Manager256256256256256256256256256256242227
System Engineer -- Manager256256256256256256256256256256242227
System Architect192192192192192192192192192192182171
Software Engineer -- Manager320320320320320320320320320320303285
Test Engineer -- Manager160160160160160160160160160160152142
Program Control Analyst -- Senior Level130130130130130130130130130130123115
Program Control Analyst -- Intermediate Level173173173173173173173173173173164154
Program Control Analyst -- Junior Level130130130130130130130130130130123115
Support Staff158158158158158158158158158158150141
Configuration Management Analyst -- Senior156156156156156156156156156156148139
Configuration Management Analyst - Intermediate-Level250250250250250250250250250250237222
Configuration Management Analyst -- Junior-Level626262626262626262625956
Quality Control Analyst -- Senior808080808080808080807671
Quality Control Analyst -- Intermediate-Level168168168168168168168168168168159149
Quality Control Analyst - Junior-Level727272727272727272726864
Software Engineer -- Senior407407407407407407407407407407386362
Software Engineer – Intermediate-Level2,3842,3842,3842,3842,3842,3842,3842,3842,3842,3842,2602,121
Software Engineer – Junior-Level2,9172,9172,9172,9172,9172,9172,9172,9172,9172,9172,7652,595
Hardware Engineer – Senior312312312312312312312312312312296278
Hardware Engineer -- Intermediate - Level250250250250250250250250250250237222
Hardware Engineer -- Junior- Level626262626262626262625956
Training Specialist/Instructor -- Senior156156156156156156156156156156148139
Training Specialist/Instructor – Intermediate-Level312312312312312312312312312312296278
ILS Engineer – Senior404040404040404040403836
ILS Engineer – Intermediate-Level180180180180180180180180180180171160
ILS Engineer – Junior Level404040404040404040403836
System Engineer – Chief Principal192192192192192192192192192192182171
System Engineer – Senior870870870870870870870870870870825774
System Engineer – Intermediate-Level1,0561,0561,0561,0561,0561,0561,0561,0561,0561,0561,001939
System Engineer – Junior Level971971971971971971971971971971921864
Test Engineer – Senior1,3751,3751,3751,3751,3751,3751,3751,3751,3751,3751,3041,223
Test Engineer – Intermediate-Level868868868868868868868868868868823772
Test Engineer – Junior Level294294294294294294294294294294279262
Total Hours156841568415684156841568415684156841568415684156841486813951
Cost for CLIN 7
Labor CategoryYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12
Program Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Deputy Program Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Business/Contracts Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Operations Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Architect$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer -- Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst - Senior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst -- Intermediate Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Analyst - Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Support Staff$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst -- Intermediate - Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Management Analyst -- Junior- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst -- Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Analyst -- Junior- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer -- Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hardware Engineer -- Junior- Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Training Specialist/Instructor -- Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Training Specialist/Instructor – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ILS Engineer – Junior-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Chief Principal$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
System Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Senior$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Intermediate-Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Test Engineer – Junior Level$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
CLIN Totals$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Hours for CLIN 8 Engineering Services -- Other
Labor CategoryYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12
Program Manager687784856868686868686460
Deputy Program Manager455156574545454545454340
Business/Contracts Manager189213234236188188188188188188179167
Operations Manager142160175177141141141141141141134125
System Engineer -- Manager142160175177141141141141141141134125
System Architect472531583588470470470470470470446416
Software Engineer -- Manager961081191209696969696969185
Test Engineer -- Manager161181198200160160160160160160152142
Program Control Analyst -- Senior Level931051151169393939393938882
Program Control Analyst -- Intermediate Level124140154155124124124124124124118110
Program Control Analyst -- Junior Level931051151169393939393938882
Support Staff196220242244195195195195195195185173
Configuration Management Analyst -- Senior157176193195156156156156156156148138
Configuration Management Analyst -- Intermediate - Level125141155156125125125125125125118110
Configuration Management Analyst -- Junior- Level313539393131313131313028
Quality Control Analyst -- Senior8090991008080808080807671
Quality Control Analyst -- Intermediate-Level169190208210168168168168168168159149
Quality Control Analyst -- Junior-Level728189907272727272726864
Software Engineer -- Senior2,4082,7082,9742,9982,3982,3982,3982,3982,3982,3982,2732,122
Software Engineer – Intermediate-Level219246270273218218218218218218207193
Software Engineer – Junior Level364145453636363636363432
Hardware Engineer – Senior157176193195156156156156156156148138
Hardware Engineer – Intermediate-Level667582836666666666666358
Training Specialist/Instructor -- Senior157176193195156156156156156156148138
Training Specialist/Instructor – Intermediate-Level157176193195156156156156156156148138
ILS Engineer – Senior637178796363636363636056
ILS Engineer – Intermediate-Level202325252020202020201918
ILS Engineer – Junior Level707987887070707070706662
System Engineer – Chief Principal388436479483386386386386386386366342
System Engineer – Senior504567622628502502502502502502476444