DTFAWA-16-R-00010_ Amendment 0003_SF-30 103116.pdf

PDF 323 KB Posted

Attached to
Traffic Flow Management 2 (TFM2)- Request for Offer-SIR
Solicitation number
DTFAWA-16-R-00010
Issued by

About this file

DTFAWA-16-R-00010_ Amendment 0003_SF-30 103116 (pdf)

View the file

Other files

File Type Posted
J-5.E07-SRS-CDRL-DID_Amendment-1.pdf PDF
TFM2_SIR-RFO_Industry_Comment_Responses_9-13-2016.pdf PDF
J5_L05-CtrDevManuals-CDRL-DID_Amend-2.pdf PDF
F_TFM2_Amend-1_2016-08-25.pdf PDF
L_TFM2_Amend-3_2016-10-31.pdf PDF
A_TFM2_2016-08-03.pdf PDF
J-4A TFMS Site Equipment List.xlsx XLSX spreadsheet
L-2C Past Performance Survey TFM2 Amend 1 2016-09-08_clean.pdf PDF
J-6.zip ZIP file
DTFAWA-16-R-00010 Amendment 002 SF-30 100316.pdf PDF
M_TFM2_Amend-2_2016-09-27.pdf PDF
D_TFM2_2016-05-11.pdf PDF
I_TFM2_Amend-1_2016-08-23.pdf PDF
K_TFM2_2016-05-20.pdf PDF
C_TFM2_Amend-2_2016-09-27.pdf PDF
J-3 (1 of 2).1 of 2 —
TFM2_SIR-RFO_Amend-1_Industry_Comment_Responses_10-3-2016.pdf PDF
J6I sample ASDEX airport map PVD.zip ZIP file
L-2C Past Performance Survey TFM2 Amend 1 2016-09-08_markup.pdf PDF
J-3Z Adaptation Files (1of2).1of2 —
L-2A Past Performance References TFM2 2016-06-10.pdf PDF
J-3 (2 of 2).2 of 2 —
E_TFM2_2016-06-16.pdf PDF
H_TFM2_Amend-1_2016-08-25.pdf PDF
DTFAWA-16-R-00010 Amendment 001 SF-30 091316.pdf PDF
J-1_TFM2_Abbreviations.pdf PDF
L-1_size-scope-complexity-summary_Amend-2_2016-09-23.pdf PDF
J-3.T through J-3.Y.zip ZIP file
J6A_TFDM_TFMS_SSD_Amend-1.pdf PDF
L-3 TFM2 Cost-Price Workbook Amend-2_2016-09-22.xlsx XLSX spreadsheet
J-4B TFMS Commercial Software List Amend-1 2016-09-08.xlsx XLSX spreadsheet
J-9 Task Order TFDM SE Amendment-1.pdf PDF
J-5.zip ZIP file
L-2B Past Performance Survey Record TFM2 2016-06-10.pdf PDF
TFM2_SIR-RFO_Amendment 003_Industry_Comment_Response_10-31-2016.pdf PDF
J-3Z Adaptation Files (2of2).2of2 —
L-4 TFM2 Cost-Price Mapping Matrix_Amendment-1_ 2016-08-19.xlsx XLSX spreadsheet
J-2.zip ZIP file
J-7 Labor Category Min Qualifications_2016-08-02.pdf PDF
G_TFM2_2016-07-11.pdf PDF
J-8 TFM2 Program WBS 2015-10-22.pdf PDF
J Attachment List Amend-2_2016-09-22.pdf PDF
B_TFM2_Amend-2_2016-09-22.xlsx XLSX spreadsheet
J5_L03-TMML-CDRL-DID_Amend-2.pdf PDF
L-2A Past Performance References TFM2 2016-06-10.pdf PDF
J-3 (1 of 2).1 of 2 —
C_TFM2_Amend-2_2016-09-27.pdf PDF
L-4 TFM2 Cost-Price Mapping Matrix_Amendment-1_ 2016-08-19.xlsx XLSX spreadsheet
J-3Z Adaptation files (2of2).2of2 —
L-3 TFM2 Cost-Price Workbook Amend-2_2016-09-22.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 340 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

(SF-30) FAA Template No. 11 (8/97)

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

OMB Control No. 2120-0595

p. 1

Sharonda Holmes

1) Amendment 003 is issued to address a question submitted from Industry and to implement changes to RFO. Specifics of changes are identified in item 4, on the attached continuation pages for block 14.

2) Section L is hereby revised as noted in item 4; the revised document replaces the original version in its entirety.

3) FAA response to Industry question is hereby provided as noted in the attached "TFM2_SIR-RFO_Amendment 003_Industry_Comment_Responses_10-31-2016"

AWA

AAQ-250 Decision Support Systems Orville Wright Bldg. (FOB10A) FAA National Headquarters 800 Independence Ave., SW Washington DC 20591

FAA AWA

800 Independence Avenue, S.W.

Washington DC 20591

DTFAWA-16-R-00010

1 2

10/31/2016

08/02/2016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE(s)

DTFAWA-16-R-00010

Amendment 0003

Item 4: Details of SIR/RFO changes executed by Amendment 003 are as follows:

1. Section L:

• Section L.3- Hand Delivery instructions have been revised to change the point of contact information from Jamie Mosko to Frank Whalen.

• L.9.2 Part B -- Solicitation, Offer & Award form, SF-33 has been revised to clarify the submission requirements for the Model contract. The first paragraph is revised as follows:

From:

Model Contract: The Offer must include a signed copy of the Model Contract, Sections A through K. The Offer must be signed by an official, who is legally authorized to bind the Offeror to a contact by affixing his/her signature on the SF-33.

To:

Model Contract: The Offer must include a signed copy of the Model Contract, Sections A through K. Section J shall consist only of the “Part III- Section J: List of Attachments” document.

Section J Attachments J-1 through J-9 must be included with the model contract in electronic format (CD/DVD) due to documents size. The Offer must be signed by an official, who is legally authorized to bind the Offeror to a contact by affixing his/her signature on the

SF-33.

Amend 003 SF-30
DTFAWA-16-R-00010 Amend-3 SF-30_Pg 2_draft_10-31-2016

File details come from the government source that posted it. Updated .