B-TOC - Table of Contents
| Part I: Section B: Supplies or Services and Prices and/or Costs |
| Table of Contents |
| Document Section Title | Excel Worksheet Location |
| Overview & Contract Structure Summary Tab B-1 Overview & Structure | |
| B.1 General | | See Tab B-1 |
| B.1.1. Description | See Tab B-1 |
| B.1.2. Type of Contract | See Tab B-1 |
| B.1.2.1 Hybrid Contract | See Tab B-1 |
| B.1.2.2 Cost Reimbursable | See Tab B-1 |
| B.1.2.3 Reserved | |
| B.1.2.4 Options | See Tab B-1 |
| B.1.3 NAIC Code | |
| B.2 Period of Performance | | See Tab B-1 |
| B.3 Obligation of Funding and Financial Limitations | | See Tab B-1 |
| B.4 Travel Costs | | See Tab B-1 |
| B.5 Productive Labor Hours | | See Tab B-1 |
| B.6 Contract TEPV and Ceiling | | See Tab B-1 |
| B.6.1 Contract TEPV | See Tab B-1 |
| B.6.2 Ceiling Price | See Tab B-1 |
| B.7 Labor Categories and Rates | | See Tab B-1 |
| B.8 Contract CLIN Structure and Schedule of Prices | | See Tab B-1 |
| B.8.1 Contract CLIN Structure | See Tab B-1 |
| B.8.2 Schedule of Costs/Prices | See Tab B-1 |
| | See Tab B-1 |
| CLIN(s) Details | Tab B-2 - CLIN(s) Detail |
| B.9 CLIN Details | See Tab B-2 |
Appendix A - SOW - CLIN Mapping Tab B-3 - Appendix A
Appendix B - Acronyms Tab B-4 - Appendix B
&K000000TFM2&KFF0000
SIR DTFAWA-16-R-00010&K000000 Amendment 2
Table of Contents
B-1 Overview & Structure
PART I -- SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 General B.1.1 Description This section includes all pricing for all required computer hardware, software, professional, technical, engineering, and support services as well as supplies, materials, data, and facilities required to execute this contract, in support of the Traffic Flow Management System (TFMS) in accordance with all TFM2 contract terms and conditions.
B.1.2 Type of Contract
B.1.2.1 Hybrid Contract This is a hybrid contract which includes a combination of the following contract types and pricing arrangements: 1) Cost Reimbursable (CR) - Cost Plus Fixed Fee (CPFF), Cost Plus Incentive Fee (CPIF); 2) Firm-Fixed Price (FFP); 3) Time & Materials (T&M); and 4) undefinitized CLINs.
B.1.2.2 Cost Reimbursement CPFF CLINS included in this contract are Level of Effort (LOE) Completion Form. The performance targets and requirements are identified in Section C. SOW and attachments identified in Section C. If the work cannot be completed within the estimated cost, the government reserves the right to require more effort; however the fee will remain fixed as negotiated at the inception of the award of the contract, or upon definitization of an undefinitized optional CLIN.
CPIF Incentive Fee(s) included in this contract are payable in accordance with the formulas established in Section H.10, Incentive Fees. Fee structures on this contract may include multiple incentive arrangements including, but not limited to, a combination of cost, performance, and delivery. At the discretion of the government, negative incentives may also be negotiated into the fee structure.
B.1.2.3 RESERVED
B.1.2.4 Options This contract includes a base period of four (4) years and eight (8) option years for a total of 12 years if all options are exercised, as identified in Section F. Exercise of a contract "option year" does not constitute or guarantee award of any CLIN within that option year. Optional CLINs may be awarded at any time during the contract period of performance. Within the contract period of performance, each CLIN will maintain an independent period of performance which aligns with the required work effort as shown in table B.8-1 below.
For all optional CLINs, including undefinitized options, all terms and conditions of this contract apply. For undefinitized options, the prices/costs will not be agreed to until definitized, negotiated, and exercised. Optional CLINs will be awarded only as authorized by the Contracting Officer.
B.1.3 North American Industry Classification System (NAICS) Code The principal (NAICS) code for this requirement is 541512, Computer Systems Integration Design Services. The applicable Size Standard is $27.5M.
B.3 Obligation of Funding and Financial Limitations Funding may be obligated directly against the Contract Line Items (CLINs) or via award of Task Orders as described in Section G. The Contractor must receive authorization from the Contracting Officer before initiating work on any CLIN.
B.4 Travel Costs Authorized travel costs will be reimbursed in accordance with AMS Clause 3.3.2-2, Reimbursement for Travel and Subsistence. This clause is included by reference in Section I.
B.5 Productive Labor Hours For purposes of this contract, the Government will pay only for productive direct labor hours, which are those hours expended by Contractor personnel in performing work under the scope of this contract. This does not include sick leave, vacation, holidays, jury duty, military leave, or any other kind of administrative leave. “Productive direct labor hours” include hours expended by the Contractor on matters related to contract management and administration only to the extent those such hours are specifically excluded from indirect rates in accordance with the Contractor’s usual accounting practices.
B.6 Contract Total Estimated Potential Value (TEPV) and Ceiling
B.6.1 Contract TEPV The term TEPV is the sum of all CLINs, both definitized and undefinitized, and represents an estimated value of the entire contract inclusive of all options if exercised. TEPV for this contract is $ [fill in at time of award].
B.6.2 Ceiling Price
The terms “ceiling” applies to the negotiated contract ceiling at award. Ceiling includes only the definitized CLINs. Ceilings are applied at the contract level, as well as the CLIN level as identified in B.8.2 below. Ceilings will be modified throughout the contract period of performance when, and if, the government decides to authorize and award any optional work.
The contractor may not exceed the negotiated ceiling price (except at its own risk) without Contracting Officer prior approval. This section will be modified at contract award to insert the actual initial ceiling value.
The total initial negotiated contract ceiling for this contract is $ [fill in at contract award]
B.7 T&M Labor Categories and Rates The T&M labor rates identified in Tab B-2, Section B.9, CLIN(s) Detail(s), are “fully burdened rates.” A fully burdened rate is defined as the direct hourly labor rate that includes wages, overhead, general and administrative expenses, profit, fringe benefits, and direct tax/labor/payroll burden. The Contractor must use these rates, which will represent the rates that the Government will accept during the life of this contract, will be used on all task orders, including subcontract labor, issued under this contract. The Contractor must use only labor categories approved by the Contracting Officer for T&M labor, as identified in Attachment J-7, Labor Category Minimum Qualifications. The Contractor is not authorized to increase rates above the year 12 prices for labor rates specified in Tab B-2, Section B.9 CLIN(s) Detail(s) for any T&M work that extends beyond the 12 year contract period inclusive of all options.
| B.8 Schedule of Prices/Costs |
| The contract CLIN structure, including schedule and prices/costs, is provided below in Section B.8.2. The schedule includes all CLINs which may be awarded at any time in the Base Period and/or any Option Year of this contract. CLIN information, in this section, is provided at a summary level; specifics of CLIN descriptions and structure are in Tab B-2, Section B.9 CLIN(s) Detail(s). |
| B.8.2 Schedule of Costs/ Prices |
| The contract structure, including schedule and prices/costs, is provided below. The Schedule includes all CLINs noted below. CLIN information, in this section, is provided at a summary level; specifics of CLIN descriptions and structure are in Tab B-2, Section B.9 CLIN(s) Detail(s). See Section F Table F.3-2, CLIN Periods of Performance, for specifc CLIN start and end dates. |
CLINs with numerical CLIN designations (for example CLIN 1.1) correspond with the contract year they may be exercised in. For example, CLIN 1.1 can be exercised anytime within year one of the contract. CLINs with alphabetical designations mean they may be exercised anytime over the life of the contract.
| BASE Period | Duration | Amount $ |
| CLIN 1.1 - optional CLIN within the base period | 12 months | |
| CLIN 1.2 - optional CLIN within the base period | 12 months | |
| CLIN 1.3 - optional CLIN within the base period | 12 months | |
| CLIN 1.4 - optional CLIN within the base period | 12 months | |
| CLIN 2.1 | 12 months | |
| CLIN 2.2 | 12 months | |
| CLIN 2.3 | 12 months | |
| CLIN 2.4 | 12 months | |
| CLIN 3.1 | 12 months | |
| CLIN 3.2 | 12 months | |
| CLIN 3.3 | 12 months | |
| CLIN 3.4 | 12 months | |
| CLIN 4.A - optional CLIN within the base period | 12 months | |
| CLIN 5.A | 6 months | |
| CLIN 6.1 - optional CLIN within the base period | 12 months | |
| CLIN 6.2 - optional CLIN within the base period | 12 months | |
| CLIN 6.3 - optional CLIN within the base period | 12 months | |
| CLIN 6.4 - optional CLIN within the base period | 12 months | |
| CLIN 7.1 - optional CLIN within the base period | 12 months | |
| CLIN 7.2 - optional CLIN within the base period | 12 months | |
| CLIN 7.3 - optional CLIN within the base period | 12 months | |
| CLIN 7.4 - optional CLIN within the base period | 12 months | |
| CLIN 8.1 - optional CLIN within the base period | 12 months | |
| CLIN 8.2 - optional CLIN within the base period | 12 months | |
| CLIN 8.3 - optional CLIN within the base period | 12 months | |
| CLIN 8.4 - optional CLIN within the base period | 12 months | |
| CLIN 9.A | 18 months | |
| CLIN 11.A - optional CLIN within the base period | 24 months | |
| CLIN 11.B - optional CLIN within the base period | 30 months | |
| CLIN 11.C - optional CLIN within the base period | 25 months | |
| CLIN 11.D - optional CLIN within the base period | 25 months | |
| CLIN 11.E - optional CLIN within the base period | 25 months | |
| CLIN 11.F - optional CLIN within the base period | 25 months | |
| CLIN 11.G - optional CLIN within the base period | 25 months | |
| CLIN 11.H - optional CLIN within the base period | 25 months | |
| BASE PERIOD TOTAL | | $0.00 |
| Option Period 1 | | |
| CLIN 1.5 - optional within option period | 12 months | |
| CLIN 2.5 - optional within option period | 12 months | |
| CLIN 3.5 - optional within option period | 12 months | |
| CLIN 6.5 - optional within option period | 12 months | |
| CLIN 7.5 - optional within option period | 12 months | |
| CLIN 8.5 - optional within option period | 12 months | |
| CLIN 10.A - optional within option period | 21 months | |
| CLIN 11.I - optional within option period | 25 months | |
| CLIN 11.J - optional within option period | 25 months | |
| Option Period 1 TOTAL | | $0.00 |
| Option Period 2 | | |
| CLIN 1.6 - optional within option period | 12 months | |
| CLIN 2.6 - optional within option period | 12 months | |
| CLIN 3.6 - optional within option period | 12 months | |
| CLIN 6.6 - optional within option period | 12 months | |
| CLIN 7.6 - optional within option period | 12 months | |
| CLIN 8.6 - optional within option period | 12 months | |
| CLIN 11.K - optional within option period | 25 months | |
| CLIN 11.L - optional within option period | 25 months | |
| Option Period 2 TOTAL | | $0.00 |
| Option Period 3 | | |
| CLIN 1.7 - optional within option period | 12 months | |
| CLIN 2.7 - optional within option period | 12 months | |
| CLIN 3.7 - optional within option period | 12 months | |
| CLIN 4.B - optional within option period | 12 months | |
| CLIN 6.7 - optional within option period | 12 months | |
| CLIN 7.7 - optional within option period | 12 months | |
| CLIN 8.7 - optional within option period | 12 months | |
| CLIN 9.B - optional within option period | 19 months | |
| CLIN 11.M - optional within option period | 25 months | |
| CLIN 11.N - optional within option period | 25 months | |
| Option Period 3 TOTAL | | $0.00 |
| Option Period 4 | | |
| CLIN 1.8 - optional within option period | 12 months | |
| CLIN 2.8 - optional within option period | 12 months | |
| CLIN 3.8 - optional within option period | 12 months | |
| CLIN 6.8 - optional within option period | 12 months | |
| CLIN 7.8 - optional within option period | 12 months | |
| CLIN 8.8 - optional within option period | 12 months | |
| CLIN 11.O - optional within option period | 25 months | |
| CLIN 11.P - optional within option period | 25 months | |
| Option Period 4 TOTAL | | $0.00 |
| Option Period 5 | | |
| CLIN 1.9 - optional within option period | 12 months | |
| CLIN 2.9 - optional within option period | 12 months | |
| CLIN 3.9 - optional within option period | 12 months | |
| CLIN 6.9 - optional within option period | 12 months | |
| CLIN 7.9 - optional within option period | 12 months | |
| CLIN 8.9 - optional within option period | 12 months | |
| CLIN 11.Q - optional within option period | 25 months | |
| CLIN 11.R - optional within option period | 25 months | |
| Option Period 5 TOTAL | | $0.00 |
| Option Period 6 | | |
| CLIN 1.10 - optional within option period | 12 months | |
| CLIN 2.10 - optional within option period | 12 months | |
| CLIN 3.10 - optional within option period | 12 months | |
| CLIN 6.10 - optional within option period | 12 months | |
| CLIN 7.10 - optional within option period | 12 months | |
| CLIN 8.10 - optional within option period | 12 months | |
| Option Period 6 TOTAL | | $0.00 |
| Option Period 7 | | |
| CLIN 1.11 - optional within option period | 12 months | |
| CLIN 2.11 - optional within option period | 12 months | |
| CLIN 3.11 - optional within option period | 12 months | |
| CLIN 6.11 - optional within option period | 12 months | |
| CLIN 7.11 - optional within option period | 12 months | |
| CLIN 8.11 - optional within option period | 12 months | |
| Option Period 7 TOTAL | | $0.00 |
| Option Period 8 | | |
| CLIN 1.12 - optional within option period | 6 months | |
| CLIN 2.12 - optional within option period | 6 months | |
| CLIN 3.12 - optional within option period | 6 months | |
| CLIN 5.B | 6 months | |
| CLIN 6.12 - optional within option period | 12 months | |
| CLIN 7.12 - optional within option period | 12 months | |
| CLIN 8.12 - optional within option period | 12 months | |
| Option Period 8 TOTAL | | $0.00 |
TOTAL $0.00
&"-,Bold"TFM-2 &KFF0000PROCUREMENT SENSITIVE &"-,Bold"DRAFT SIR DTFAWA-16-R-00010 &"Times New Roman,Bold"&K000000Section B&"Times New Roman,Regular"
&"Times New Roman,Regular"&K000000Draft TFM2
SIR #
&"Times New Roman,Regular"&K000000Draft TFM2
SIR #
&"-,Bold"TFM-2 &"-,Bold"&10DRAFT SIR DTFAWA-16-R-00010 Amendment 2 Section B- Part I - Supplies or Services and Prices/Costs Overview and Contract Structure Summary
&"Times New Roman,Bold"B1 - &P
&"Times New Roman,Bold"B1 - &P
&"Times New Roman,Bold"B1 - &P
&"Times New Roman,Bold"Tab B-1 - &P
B-2 - CLIN(s) Detail
| PART I -- SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS |
| B.9 CLIN(s) Detail(s) |
Descriptions and Details of CLIN(s) on this contract are as follows:
| CLIN 1 - First Level Support (CPFF-LOE Completion Form) CLINs 1.1 through 1.12 comprise all first level operations and maintenance services as described in the SOW and attachments. Refer to Tab B-3 for the applicable SOW sections. The Government will not consider award of CLIN 1 unless the contractor has successfully completed all requirements of CLIN 5A. | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 1.1 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.2 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.3 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.4 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| CLIN 1 -- continued | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 1.5 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.6 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.7 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.8 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.9 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.10 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.11 - Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 1.12 -- Optional 6 month POP. | 1 | EA | EC | |
| $ | | |
| FF | $ |
| Travel | $ |
| Total | $ |
| CLIN 1 Total (including all options, if exercised) | | $ |
| CLIN 2 Second Level Engineering (SLE) (CPFF-LOE Completion Form) CLINs 2.1 through 2.12 comprise all required SLE and support services as described in the SOW and attachments. Refer to Tab B-3 for the applicable SOW sections. The Government will not consider award of CLIN 2 unless the contractor has successfully completed all requirements of CLIN 5A. | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 2.1 -- 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.2 -- 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.3 -- 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.4 -- 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.5 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.6 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.7 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| CLIN 2 -- continued | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 2.8 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.9 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.10 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.11 -- Optional 12 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF | $ |
| | | Travel | $ |
| | | Total | $ |
| 2.12 -- Optional 6-month POP. | 1 | EA | EC | |
| $ | | |
| FF | $ |
| Travel | $ |
| Total | $ |
| CLIN 2 Total (including all options, if exercised) | | $ |
| CLIN 3 - Recurring Commercial Software Cost (CPFF) CLINs 3.1 through 3.12 comprise all required recurring commercial software license and vendor maintenance support costs and fees as required to sustain services described in the SOW and attachments. This CLIN is not intended for labor -- the Contractor must include all labor cost associated with procurement and maintenance of the required software/licenses under CLIN 2. Refer to Tab B-3 for the applicable SOW sections. The Government will not consider award of CLIN 3 unless the contractor has successfully completed all requirements of CLIN 5A. | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 3.1 -- 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.2 -- 12 month POP . | 1 | EA | EC | $ |
| | | Total | $ |
| 3.3 -- 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.4 -- 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.5 -- Optional 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.6 -- Optional 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.7 -- Optional 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.8 -- Optional 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.9 -- Optional 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| CLIN 3 -- continued | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 3.10 -- Optional 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.11 -- Optional 12 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| 3.12 -- Optional 6 month POP | 1 | EA | EC | $ |
| | | FF | $ |
| | | Total | $ |
| CLIN 3 Total (including all options, if exercised) | | | | $ |
| CLIN 4 Large Display Refresh (FFP) CLINs 4.A and 4.B, comprise all necessary equipment, and labor, and ODCs necessary to replace existing commercial large information displays as described in the SOW and attachments. Refer to Tab B-3 for the applicable SOW sections. | | | |
| CLIN POP | QTY | Unit | Amount |
| 4.A -- Optional 12 month POP | 1 | EA | $ |
| 4.B -- Optional 12 month POP | 1 | EA | $ |
| CLIN 4 Total (including all options, if exercised) | | | $ |
| CLIN 5 Contract Transition (CPFF - completion form) CLINs 5.A and 5.B comprise all products and services required for transition of maintenance and development work from the previous contract "phase in", or to a new contract "phase-out" in accordance with the SOW and attachments. Refer to Tab B-3 for the applicable SOW sections. | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 5.A (Phase-In)-- Starts at Contract Award (CA) and 6 month POP. | 1 | EA | EC | |
| $ | | | | |
| | | FF COTS | $ |
| | | FF labor | $ |
| | | Travel | $ |
| | | Total | $ |
| 5.B (Phase-Out) -- 6 month POP | 1 | EA | EC | |
| FF labor | |
| Travel | |
| Total | $ |
| CLIN 5 Total (including all options, if exercised) | | $ |
| CLIN(s) 6, 7, & 8 - Engineering Services (T&M) | |
| T&M Rates: The following rates apply to all T&M CLINs on this contract. Fully loaded/burdened labor rates are identified for each Labor Category, and each year of the potential 12-year contract period of performance. These rates apply to all labor ordered under T&M Task Orders including subcontract labor. Labor category definitions and minimum qualification requirements are identified in Section J-7. Ordering procedures are identified in Section G.8, Ordering Procedures. | |
| Labor Category | Rates - Fully Burdened/Loaded |
(Number designation corresponds to contract year)
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| Business/Contracts Manager | | | | | | | | | | | | |
| Configuration Management Analyst -- Senior | | | | | | | | | | | | |
| Configuration Management Analyst -- Intermediate Level | | | | | | | | | | | | |
| Configuration Management Analyst -- Junior Level | | | | | | | | | | | | |
| Hardware Engineer – Senior | | | | | | | | | | | | |
| Hardware Engineer – Intermediate Level | | | | | | | | | | | | |
| Hardware Engineer – Junior Level | | | | | | | | | | | | |
| ILS Engineer – Senior | | | | | | | | | | | | |
| ILS Engineer – Intermediate Level | | | | | | | | | | | | |
| ILS Engineer – Junior Level | | | | | | | | | | | | |
| Operations Manager | | | | | | | | | | | | |
| Program Control Analyst -- Senior | | | | | | | | | | | | |
| Program Control Analyst -- Intermediate Level | | | | | | | | | | | | |
| Program Control Analyst -- Junior Level | | | | | | | | | | | | |
| Program Manager | | | | | | | | | | | | |
| Deputy Program Manager | | | | | | | | | | | | |
| Quality Control Analyst -- Senior | | | | | | | | | | | | |
| Quality Control Analyst -- Intermediate Level | | | | | | | | | | | | |
| Quality Control Analyst -- Junior Level | | | | | | | | | | | | |
| Software Engineer -- Manager | | | | | | | | | | | | |
| Software Engineer -- Senior | | | | | | | | | | | | |
| Software Engineer – Intermediate Level | | | | | | | | | | | | |
| Software Engineer – Junior Level | | | | | | | | | | | | |
| Support Staff | | | | | | | | | | | | |
| System Architect | | | | | | | | | | | | |
| System Engineer -- Manager | | | | | | | | | | | | |
| System Engineer – Senior | | | | | | | | | | | | |
| System Engineer – Intermediate Level | | | | | | | | | | | | |
| System Engineer – Junior Level | | | | | | | | | | | | |
| System Engineer – Chief Principal | | | | | | | | | | | | |
| Test Engineer -- Manager | | | | | | | | | | | | |
| Test Engineer – Senior | | | | | | | | | | | | |
| Test Engineer – Intermediate Level | | | | | | | | | | | | |
| Test Engineer --Junior Level | | | | | | | | | | | | |
| Training Specialist/Instructor -- Senior | | | | | | | | | | | | |
| Training Specialist/Instructor – Intermediate Level | | | | | | | | | | | | |
| CLIN 6 - System Engineering Services (T&M) CLINs 6.1 through 6.12 comprise required system engineering services in accordance with the SOW and attachments. Refer to Tab B-3 for the applicable SOW sections. | | | |
| CLIN POP | POP | CLIN Value | |
| CLIN 6.1 | 12 Months | $ | |
| CLIN 6.2 | 12 Months | $ | |
| CLIN 6.3 | 12 Months | $ | |
| CLIN 6.4 | 12 Months | $ | |
| CLIN 6.5 | 12 Months | $ | |
| CLIN 6.6 | 12 Months | $ | |
| CLIN 6.7 | 12 Months | $ | |
| CLIN 6.8 | 12 Months | $ | |
| CLIN 6.9 | 12 Months | $ | |
| CLIN 6.10 | 12 Months | $ | |
| CLIN 6.11 | 12 Months | $ | |
| CLIN 6.12 | 12 Months | $ | |
| CLINs 6.1-12 Total (including all options, if exercised) | | | $0.00 |
| CLIN 7 - Software Engineering Services (T&M) CLINs 7.1 through 7.12 comprise software engineering services in accordance with the SOW and attachments. Refer to Tab B-3 for the applicable SOW sections. | | | |
| CLIN POP | POP | CLIN Value | |
| CLIN 7.1 | 12 Months | $ | |
| CLIN 7.2 | 12 Months | $ | |
| CLIN 7.3 | 12 Months | $ | |
| CLIN 7.4 | 12 Months | $ | |
| CLIN 7.5 | 12 Months | $ | |
| CLIN 7.6 | 12 Months | $ | |
| CLIN 7.7 | 12 Months | $ | |
| CLIN 7.8 | 12 Months | $ | |
| CLIN 7.9 | 12 Months | $ | |
| CLIN 7.10 | 12 Months | $ | |
| CLIN 7.11 | 12 Months | $ | |
| CLIN 7.12 | 12 Months | $ | |
| CLINs 7A-L Total (including all options, if exercised) | | | $0.00 |
| CLINs 8-- Engineering Services -- Other (T&M) CLINs 8.1 through 8.12 are comprised of TFMS-related engineering tasking allocated by other FAA programs. Refer to Tab B-3 for the applicable SOW sections. | | | |
| CLIN POP | POP | CLIN Value | |
| CLIN 8.1 | 12 Months | $ | |
| CLIN 8.2 | 12 Months | $ | |
| CLIN 8.3 | 12 Months | $ | |
| CLIN 8.4 | 12 Months | $ | |
| CLIN 8.5 | 12 Months | $ | |
| CLIN 8.6 | 12 Months | $ | |
| CLIN 8.7 | 12 Months | $ | |
| CLIN 8.8 | 12 Months | $ | |
| CLIN 8.9 | 12 Months | $ | |
| CLIN 8.10 | 12 Months | $ | |
| CLIN 8.11 | 12 Months | $ | |
| CLIN 8.12 | 12 Months | $ | |
| CLINs 8A-L Total (including all options, if exercised) | | | $0.00 |
| CLIN 9 -- Remote Site Technical Refresh (CPIF) CLIN 9.A and 9.B comprises all required products and services for technical refresh of all TFMS Remote Sites to replace/update commercial HW and SW components (except DSP and large displays also known as ESIS or TVLD) in accordance with the SOW. | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 9.A -- Optional 18-month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 9.B -- Optional 19 month POP | 1 | EA | TC | |
| TF | |
| SI | |
| QI | |
| Travel | |
| Total | $ |
| CLIN 9 Total (including all options, if exercised) | | $ |
| CLIN 10 -- TFM Production Centers Technical Refresh (CPIF/CPFF/FFP) CLIN 10 comprises all required products and services for technical refresh of the TFM Production Centers to replace/update commercial HW and SW components in accordance with the SOW. The government reserves to choose the appropriate contract type for this undefinitized CLIN prior to award of the option. | | | | |
| CLIN POP | QTY | Unit | | Amount |
| 10.A -- Optional 21 month POP | 1 | EA | EC | |
| $ | | |
| FF COTS | |
| FF labor | $ |
| Travel | $ |
| Total | $ |
| CLIN 10 Total (including all options, if exercised) | | $ |
| CLIN 11 -- TFMS Development and Future Enhancements (CPIF/CPFF/FFP) These CLINs include all required support for detailed design, development, integration, test and deployment of future enhancements to the TFMS in accordance with the SOW and attachments. Refer to Tab B-3 for the applicable SOW sections. CLIN start dates depend on the Contractors successful completion of System Design Review (SDR) for each known and future enhancement. | | | | |
| CLIN POP | | QTY | Unit | Amount |
| 11.A (CPIF) -- Terminal Flight Data Manager (TFDM) Build 1 requirements allocated to TFMS | | | | |
| Optional 24 month POP | | 1 | EA | TC | |
| $ | | | | | |
| | | | | TF | $ |
| | | | | SI | $ |
| | | | | QI | $ |
| | | | | Travel | $ |
| | | | | Total | $ |
| 11.B (CPIF) -- Improving Demand Predication (IDP) | | | | | |
| Optional 30 month POP | | 1 | EA | TC | | |
| $ | | | | | |
| | | | | TF | $ |
| | | | | SI | $ |
| | | | | QI | $ |
| | | | | Travel | $ |
| | | | | Total | $ |
| 11.C (CPIF) -- Integrated Departure Route Planning (IDRP) | | | | | |
| Optional 25 month POP | | 1 | EA | TC | | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.D - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.E - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.F - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.G - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.H - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.I - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.J - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.K - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.L - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.M - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.N - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.O - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.P - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.Q - Optional 25 month POP | 1 | EA | TC | |
| $ | | | | |
| | | TF | $ |
| | | SI | $ |
| | | QI | $ |
| | | Travel | $ |
| | | Total | $ |
| 11.R - Optional 25 month POP | 1 | EA | TC | |
| $ | | |
| TF | $ |
| SI | $ |
| QI | $ |
| Travel | $ |
| Total | $ |
| CLIN 11 Total (including all options, if exercised) | | $ |
| End of Tab B-2 CLIN(s) Details | | |
&"-,Bold"TFM-2 &KFF0000PROCUREMENT SENSITIVE &"-,Bold"DRAFT SIR DTFAWA-16-R-00010 &"-,Bold"Section B&"-,Regular"
Draft TFM2
SIR #
Draft TFM2
SIR #
&"-,Bold"TFM-2 &"-,Bold" SIR DTFAWA-16-R-00010 Amendment 2 &"-,Bold"Section B- Part I - Supplies or Services and Prices/Costs B-2 - CLINs/Sub CLINs Details
&"Times New Roman,Bold"B2 -&P
&"Times New Roman,Bold"B2 -&P
&"Times New Roman,Bold"B2 -&P
&"Times New Roman,Bold"Tab B-2 -&P
B-3 - Appx.A- SOW-CLIN Map
| PART I -- SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS, Appendix A-- SOW to CLIN Mapping | | | | | | | | | | | |
| This mapping matrix indicates the applicability of Statement of Work (SOW) scope to CLINs. | | | | | | | | | | | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| C.3 Program Management | X | X | | X | X | X | X | X | X | X | X |
| C.3.1 Program Management Organization | X | X | | X | X | X | X | X | X | X | X |
| C.3.2 Contract Transition | | | | | X | | | | | | |
| C.3.3 Program Management Plan (PMP) | X | X | | X | X | X | X | X | X | X | X |
| C.3.4 Meetings, Reviews, Conferences, and Evaluations | X | X | | X | X | X | X | X | X | X | X |
| C.3.4.1 Meeting Logistics and Action Tracking | X | X | | X | X | X | X | X | X | X | X |
| C.3.4.2 Program Management Review (PMR) | X | X | | X | X | X | X | X | X | X | X |
| C.3.4.3 Post - Award Conference (PAC) | | | | | X | | | | | | |
| C.3.4.3 Other Meetings | X | X | | X | X | X | X | X | X | X | X |
| C.3.5 Program Control | X | X | | X | X | X | X | X | X | X | X |
| C.3.5.1 Contract Work Breakdown Structure (CWBS) | X | X | | X | X | X | X | X | X | X | X |
| C.3.5.2 Earned Value Management System (EVMS) | X | X | | X | X | X | X | X | X | X | X |
| C.3.5.3 Integrated Baseline Review | X | X | | X | X | X | X | X | X | X | X |
| C.3.5.4 Performance Measurement | X | X | | X | X | X | X | X | X | X | X |
| C.3.5.5 Quality Assurance | X | X | | X | X | X | X | X | X | X | X |
| C.3.5.6 Configuration Management (CM) | X | X | | X | X | X | X | X | X | X | X |
| C.4 Security (heading only) | | | | | | | | | | | |
| C.4.1 General | X | X | | X | X | X | X | X | X | X | X |
| C.4.2 Operations Support | X | X | | | X | | | | | | |
| C.5 Engineering, Design & Development | | X | | X | X | X | X | X | X | X | X |
| C.5.1 Engineering Services | | | | | | X | X | X | | | |
| C.5.2 Requirements Analysis & Development | | X | | X | | X | X | X | X | X | X |
| C.5.3 System-level Design | | X | | X | | X | X | X | X | X | X |
| C.5.4 Detailed Design | | X | | | | | X | | X | X | X |
| C.5.5 Development | | X | | | | | X | | X | X | X |
| C.5.6 Human Factors | | X | | | | | X | | | | X |
| C.6 Reserved | | | | | | | | | | | |
| C.7 Test & Evaluation | | X | | X | X | | X | | X | X | X |
| C.7.1 Test Tools | | X | | X | | | X | | X | X | X |
| C.7.2 Test Activities (heading only) | | | | | | | | | | | |
| C.7.2.1 WJHC System Acceptance Test (WSAT) | | X | | X | | | X | | X | X | X |
| C.7.2.2 Support Government Test Activities | | X | | X | | | X | | X | X | X |
| C.7.2.3 Key Site Acceptance Test (KSAT) | | X | | X | | | X | | X | X | X |
| C.7.2.4 Site System Acceptance Test (SAT) | | X | | X | | | X | | X | X | X |
| C.7.2.5 Development Problem Trouble Report (PTR) | | | | | | | X | | X | X | X |
| C.8 Implementation | X | X | | X | | | X | | X | X | X |
| C.9 Training | X | X | | X | | | X | | X | X | X |
| C.9.1 Test and Evaluation Training Program Requirements | | | | | | | X | | X | X | X |
| C.9.2 System operations Training | | X | | X | | | X | | X | X | X |
| C.9.3 Second-Level Enginering Support Training | | X | | X | | | X | | X | X | X |
| C.9.4 First Level maintenance Training | X | | | | | | X | | X | X | X |
| C.9.5 Training Updates for System Refreshes and Upgrades | X | X | | X | | | X | | X | X | X |
| C.10 Operations and Maintenance (heading only) | | | | | | | | | | | |
| C.10.1 First-Level Support (optional CLIN-1) | X | | | | X | | | | | | |
| C.10.1.1 Help Desk | X | | | | X | | | | | | |
| C.10.1.2 Daily Service Reviews | X | | | | X | | | | | | |
| C.10.2 Second-Level Engineering (SLE) and Support | | X | | | X | | | | | | |
| C.10.2.1 SLE Meetings, Reviews, and Workgroups | | X | | | X | | | | | | |
| C.10.2.2 Operations Support | | X | | | X | | | | | | |
| C.10.2.3 System and Software Support | | X | | | X | | | | | | |
| C.10.2.4 Adaptation | | X | | | X | | | | | | |
| C.10.2.5 Root Cause Analysis (RCA) | | X | | | | | | | | | |
| C.10.2.6 Disaster Recovery Center (DRC) | | X | | | X | | | | | | |
| C.10.3 Logistics Support (heading only) | | | | | | | | | | | |
| C.10.3.1 Commercial Hardware Maintenance Services | | | | | | X | | | | | |
| C.10.3.2 Commercial Software Maintenance Services | | | X | | | | | | | | |
| C.11 Technical Refresh (heading only) | | | | | | | | | | | |
| C.11.1 Large Displays | | | | X | | | | | | | |
| C.11.2 TFMS Remote Sites (TRS) | | | | | | | | | X | | |
| C.11.3 Production Centers | | | | | | | | | | X | |
&"-,Bold"TFM-2&KFF0000 PROCUREMENT SENSITIVE &"-,Bold"DRAFT SIR DTFAWA-16-R-00010 &"Times New Roman,Bold"Section B&"Times New Roman,Regular"
&"Times New Roman,Regular"Draft TFM2
SIR#
&"Times New Roman,Regular"Draft TFM2
SIR#
&"-,Bold"TFM-2&KFF0000 &"-,Bold"DRAFT SIR DTFAWA-16-R-00010 Amendment 2 &"Times New Roman,Bold"Section B&"Times New Roman,Regular" Appendix A
&"Times New Roman,Bold"B3 - &P
&"Times New Roman,Bold"B3 - &P
&"Times New Roman,Bold"B3 - &P
Tab B-3 -&P
CLIN
SOW
B-4 - Appx.B Acronyms Def.
| PART I -- SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS, Appendix B |
| Definition of Acronyms used in CLIN Descriptions |
| Acronym | Definition of Acronym |
| EC | Estimated Cost |
| FF | Fixed Fee |
| QI | Quality Incentive (post deployment) |
| SI | Schedule Incentive |
| TC | Target Cost |
| TF | Target Fee |
TFM-2 DTFAWA-16-R-00010 Amendment 2 Section B Appendix B