PAST PERFORMANCE SURVEY.pdf

PDF 20 KB Posted

Attached to
AMENDMENT A004-CONSTRUCTION: HQ BUILDING ENTRANCE RENOVATION AND PARKING, OKLAHOMA CITY
Solicitation number
DTFAAC-13-R-06997
Issued by

About this file

PAST PERFORMANCE SURVEY (pdf)

View the file

Other files

File Type Posted
Addendum Two.pdf PDF
SIR.pdf PDF
Amendment A003.pdf PDF
Addendum One Drawings.pdf PDF
Amendment A002.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
Amendment A001.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
SF25.pdf PDF
Addendum Four.pdf PDF
SPECIFICATIONS.pdf PDF
Amendment A004.pdf PDF
Sign-in Sheet.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
BUSINESS DECLARATION FORM.doc DOC document
SF25A.doc DOC document
WAGE DETERMINATION.pdf PDF
Addendum One.pdf PDF
Addendum Two.pdf PDF
SIR.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
Addendum One Drawings.pdf PDF
Amendment A003.pdf PDF
SF25A.doc DOC document
SF25.pdf PDF
Addendum One.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
SPECIFICATIONS.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
Amendment A002.pdf PDF
BUSINESS DECLARATION FORM.doc DOC document
WAGE DETERMINATION.pdf PDF
Sign-in Sheet.pdf PDF
Amendment A001.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
WAGE DETERMINATION.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
Sign-in Sheet.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
Addendum One Drawings.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
Addendum Two.pdf PDF
SF25.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
SIR.pdf PDF
Addendum One.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 10

PAST PERFORMANCE QUESTIONNAIRE

I. CONTRACT IDENTIFICATION

i. Name: ___________________________________

ii. Description ___________________________________

iii. Location of services under this contract ___________________________________

II. EVALUATION

A. PERFORMANCE HISTORY:

1. The contractor adhered to contract delivery schedules.

Acceptable

Unacceptable Comment:

2. The contractor submitted required reports and documentation in a timely manner.

Acceptable

3. The contractor’s reports and documentation accurate and complete.

Acceptable

4. The contractor was able to solve contract performance problems without extensive guidance from government/customer counterparts.

Acceptable

5. The contractor displayed initiative in meeting requirements.

Acceptable

6. The contractor committed adequate resources in a timely fashion to the contract to meet the requirement and to successfully solve problems.

Acceptable

7. The contractor submitted change orders and other required proposals in a timely manner.

Acceptable

8. The contractor responded positively and promptly to technical directions, contract change orders, etc.

Acceptable

9. The contractor’s maintenance and problem tracking/reporting documentation was timely, accurate, and had appropriate content.

Acceptable

10. The contractor was effective in interfacing with the customer/Government’s staff?

Acceptable

B. TERMINATION HISTORY

11. Has this contract been partially or completely terminated for default or convenience?

Yes [ Default Convenience ] No

If yes, explain (e.g., inability to meet cost, performance, or delivery schedules).

12. Are there any pending terminations?

Yes No

If yes, explain and indicate the status.

C. EXPERIENCE HISTORY

13. The contractor has been effective in identifying user requirements.

Acceptable

14. The contractor coordinated, integrated, and provided for effective subcontractor management.

Acceptable

15. The contractor provided timely technical assistance when responding to problems encountered on site.

Acceptable

16. The contractor achieved effective logistics support; e.g., supplies, materials, personnel.

Acceptable

17. Contractor’s personnel were technically qualified.

Acceptable

D. COST MANAGEMENT

18. Contractor met the proposed cost estimates.

Acceptable

19. The contractor forecast and controlled costs effectively.

Acceptable

E. NARRATIVE SUMMARY Use this section to explain additional information not included above.

File details come from the government source that posted it. Updated .