Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
A003 8/20/13 AC-13-06997
6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6)
FAA, MIKE MONRONEY AERONAUTICAL CENTER
NAS CONTRACTING TEAM AMQ-210
P O BOX 25082
OKLAHOMA CITY OK 73125-4929
FOR MORE INFORMATION CONTACT:
Name: Connie Houpt Telephone No. (405) 954-7820
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
All Offerors
9A. AMENDMENT OF SOLICITATION NO.
DTFAAC-13-R-06997
9B. DATED (SEE ITEM 11)
07/25/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.
NOTE: If offers are handcarried, additional time should be allowed to access the depository facility due to heightened security requirements.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a)
By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.
AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The Request for Offer referenced in Item 9A above for HQ Building Entrance Renovation and Parking is amended as follows:
• See Page 2.
Reference Item 11 above. Acknowledge receipt of this amendment to:
FAA Bid & Proposal Officer (AMQ-100) Room 313, Multi-Purpose Building 6500 South MacArthur Boulevard (P.O. Box 25082, Zip 73125-4933) Oklahoma City, OK 73169-4933
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign)
BY
(Signature of Contracting Officer)
Amendment A003
SIR/RFO DTFAAC-13-R-06997
Block #14—continued
Amendment continues as follows:
1. Page 2 of the SIR/RFO is replaced by Page 2R to add a Unit Price CLIN for drilling of pier excavations.
Due date for receipt of proposals has not been changed. Proposals are due by 2:00 p.m. CST on August 22, 2013.
SIR No. DTFAAC-13-R-06997
Page 2R
CONTINUATION SHEET
PART I - SECTION B
SUPPLIES/SERVICES & PRICE/COST
The contractor shall furnish all labor, tools, materials, equipment, and supplies, necessary to accomplish the construction project; HQB Entrance Renovation and Parking, at the Mike Monroney Aeronautical Center, Oklahoma City, OK, set forth below in accordance with the attached project manual, drawings, and the other terms, conditions, and provisions as set forth herein.
ITEM NO. DESCRIPTION TOTAL AMOUNT
0001 PHASE A $
Phase A work consists of:
1. Mobilization: Contractor to mobilize in northwest parking lot as indicated on drawings.
2. Complete north vestibule work in its entirety before starting the west vestibule and canopy and the plaza area/parking portions of the project.
3. Complete crosswalks/signage north of SW 63rd Street and South of SW 64th Street
0002 PHASE B $
Phase B work consists of the HQB west entrance and canopy and the plaza area/parking portions of the project complete
0003 BID OPTION #01 $
Provide canopy, canopy structural system and canopy foundation work at amphitheater canopy
0004 BID OPTION #02 (ALLOWANCE #1) $ 60,000.00
Provide Globe Sculpture, including installation (NOT TO EXCEED)
0005 BID OPTION #03 (ALLOWANCE #2) $ 10,000.00
Provide plaque stands/bases, including installation (NOT TO EXCEED)
UNIT PRICES
In accordance with Section 01220, paragraph 1.3 "Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
0006 Drilling of Pier Excavations $ per LINEAR FEET