About this file

Addendum Four (pdf)

View the file

Other files

File Type Posted
Addendum Two.pdf PDF
SIR.pdf PDF
Amendment A003.pdf PDF
Addendum One Drawings.pdf PDF
Amendment A002.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
Amendment A001.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
SF25.pdf PDF
SPECIFICATIONS.pdf PDF
Amendment A004.pdf PDF
Sign-in Sheet.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
BUSINESS DECLARATION FORM.doc DOC document
SF25A.doc DOC document
WAGE DETERMINATION.pdf PDF
Addendum One.pdf PDF
Addendum Two.pdf PDF
SIR.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
Addendum One Drawings.pdf PDF
Amendment A003.pdf PDF
SF25A.doc DOC document
SF25.pdf PDF
Addendum One.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
SPECIFICATIONS.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
Amendment A002.pdf PDF
BUSINESS DECLARATION FORM.doc DOC document
WAGE DETERMINATION.pdf PDF
Sign-in Sheet.pdf PDF
Amendment A001.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
WAGE DETERMINATION.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
Sign-in Sheet.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
Addendum One Drawings.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
Addendum Two.pdf PDF
SF25.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
SIR.pdf PDF
Addendum One.pdf PDF
Amendment A002.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mike Monroney Aeronautical Center Contract No. DTFAAC-13-D-00013 Federal Aviation Administration Order No. 001 HQB Entrance Renovation & Parking Work Order No. 2008-010579 Amendment A004 August 20, 2013

Amendment A004 A004-1

Date: 08/20/13 Project: Headquarters Entrance Renovation and Parking Solicitation No.: DTFAAC-13-R-06997 Reference: Clarifications to Construction Documents

This clarification shall modify the original Drawings and Specifications and is hereby made a part of the Contract Documents for the above referenced Project. Refer to attached Signature and Seal sheet for architectural and engineering seals.

There are no revised drawings attached to this Amendment A004.

Changes to Drawings:

1. Electrical: Sheet E-701: Changes are described in narrative only. Replacement sheet not provided as part of A004. Modify the following:

A. Revise General Note 3 for Detail 1 and 2. General Note 3 shall read “Final termination and programming of security system shall be done by the government under a separate contract. All other security work is to be completed as shown.”

Changes to Project Manual: 4

1. There are no specification changes associated with A004.

Substitution Requests:

1. Refer to 01600, MATERIAL AMD EQUIPMENT, paragraph 1.6,A: “PREAPPROVAL OF

PRODUCT SUBSTITUTIONS DURING BIDDING IS NOT ALLOWED. CONTRACTOR TO

SUBMIT SUBSTITUTION REQUESTS IN ACCORDANCE WITH PROJECT REQUIREMENTS

AFTER AWARD AT HIS OWN RISK.”

2. There are no substitution requests for A004.

Clarifications:

1. There are no bidder clarification questions as of this date.

Attachments:

1. Signature and Seal Sheet

Drawing Sketch Attachments:

1. There are no sketches issues as part of A004.

Drawing Attachments:

1. There are no Drawing Attachments associated with A004.

Project Manual Attachments:

1. No specification section replacements, deletions or additions as part of Amendment A004.

MIKE MONRONEY AERONAUTICAL CENTER

HQB ENTRANCE RENOVATION AND PARKING

OKLAHOMA CITY, OKLAHOMA #OK70115-001

Signature and Seal Amendment A004

Not required as part of this Amendment A004

Architect

Mechanical Engineer

Electrical Engineer

Landscape Architect

Structural Engineer

Civil Engineer

Fire Protection Engineer

File details come from the government source that posted it. Updated .