About this file

Amendment A002 (pdf)

View the file

Other files

File Type Posted
Addendum Two.pdf PDF
SIR.pdf PDF
Amendment A003.pdf PDF
Addendum One Drawings.pdf PDF
Amendment A002.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
Amendment A001.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
SF25.pdf PDF
Addendum Four.pdf PDF
SPECIFICATIONS.pdf PDF
Amendment A004.pdf PDF
Sign-in Sheet.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
BUSINESS DECLARATION FORM.doc DOC document
SF25A.doc DOC document
WAGE DETERMINATION.pdf PDF
Addendum One.pdf PDF
Addendum Two.pdf PDF
SIR.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
Addendum One Drawings.pdf PDF
Amendment A003.pdf PDF
SF25A.doc DOC document
SF25.pdf PDF
Addendum One.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
SPECIFICATIONS.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
BUSINESS DECLARATION FORM.doc DOC document
WAGE DETERMINATION.pdf PDF
Sign-in Sheet.pdf PDF
Amendment A001.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
WAGE DETERMINATION.pdf PDF
OPERATIONAL CONTROL DOCUMENTS-EMS.pdf PDF
Sign-in Sheet.pdf PDF
PAST PERFORMANCE SURVEY.pdf PDF
Addendum One Drawings.pdf PDF
OPERATIONAL CONTROL DOCUMENTS.pdf PDF
ORGANIZATIONAL EXPERIENCE FORM.pdf PDF
Addendum Two.pdf PDF
SF25.pdf PDF
CONTRACTOR'S RELEASE.doc DOC document
SIR.pdf PDF
Addendum One.pdf PDF
Amendment A002.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

A002 8/19/13 AC-13-06997

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6)

FAA, MIKE MONRONEY AERONAUTICAL CENTER

NAS CONTRACTING TEAM AMQ-210

P O BOX 25082

OKLAHOMA CITY OK 73125-4929

FOR MORE INFORMATION CONTACT:

Name: Connie Houpt Telephone No. (405) 954-7820

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

All Offerors

9A. AMENDMENT OF SOLICITATION NO.

DTFAAC-13-R-06997

9B. DATED (SEE ITEM 11)

07/25/2013

10A. MODIFICATION OF CONTRACT/ORDER NO.

*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.

NOTE: If offers are handcarried, additional time should be allowed to access the depository facility due to heightened security requirements.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a)

By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.

AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The Request for Offer referenced in Item 9A above for HQ Building Entrance Renovation and Parking is amended as follows:

• See Page 2.

Reference Item 11 above. Acknowledge receipt of this amendment to:

FAA Bid & Proposal Officer (AMQ-100) Room 313, Multi-Purpose Building 6500 South MacArthur Boulevard (P.O. Box 25082, Zip 73125-4933) Oklahoma City, OK 73169-4933

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign)

BY

(Signature of Contracting Officer)

Amendment A002

SIR/RFO DTFAAC-13-R-06997

Block #14—continued

Amendment continues as follows:

1. Page 31R of the SIR/RFO is replaced by Page 31R(a) to add Addendum Two as an attachment.

2. Addendum Two is added as an attachment to provide clarification to original Drawings and Specifications to provide answers to vendor questions.

3. Following answers provided to vendor questions:

Question: Are there any liquidated damages for this project?

Answer: Liquidated damages were not included in the solicitation.

Question: What is the required period of performance?

Answer: Performance and completion information can be found in clause 3.2.2.3-71, on page 15 of the SIR.

(c) complete the entire work for Phase A ready for use not later than 90 calendar days after receipt of notice to proceed. Phase B shall be completed ready for use not later than 270 calendar days after completion of Phase A. The time allowed for completion must include final cleanup of the premises.

Due date for receipt of proposals has not been changed. Proposals are due by 2:00 p.m. CST on August 22, 2013.

SIR No. DTFAAC-13-R-06997

Page 3R

PART III - SECTION J

LIST OF ATTACHMENTS

ATTACHMENT TITLE DATE NO. OF PAGES

1 Project Specifications, “HQB Entrance 07/16/13 556 Renovation and Parking”, # OK70115-001

2 Drawings titled “HQ Entrance Renovation” 07/16/13 73 Work Order 2008010579

3 Standard Form 25, Performance Bond 05/96 2

4 Standard Form 25A, Payment Bond 08/97 2

5 Contractor’s Release 05/05 1

6 Wage Rate Decision, 07/05/13 7 General Decision No. OK130049, Construction Type: Building

7 Operational Control Documents

AMP400-CCOCD-1 10/04/12 2

AMP400-CCOCD-2 10/04/12 2

AMP400-CCOCD-3 04/23/13 2

AMP400-OC-CCEMS 10/10/12 3

8 Business Declaration Form 10/08 1

9 Organizational Experience Form undated 1

10 Past Performance Survey undated 3

*Note – Attachments 8 through 10 will not be physically included in any resultant contract; however, Attachment 8 will be considered to be incorporated by reference.

11 Addendum One 8/14/13 5 Drawings 4

12 Addendum Two 8/19/13 2

File details come from the government source that posted it. Updated .