DRAWINGS SCCF Temp Chiller Docking Station SCHENDT ENG 120816.pdf

PDF 2 MB Posted

Attached to
CTF SCCF Temp Chiller Docking Station 97439
Solicitation number
DQ1 CAAA 2017001145 2
Issued by
Ouray County, Colorado

About this file

This is a technical drawing set for the San Carlos Correctional Facility Temporary Chiller Docking Station project prepared by SECE Engineering for the Colorado Department of Corrections. The project, numbered 16185, was designed and dated December 8, 2016. The drawing package includes a cover sheet, site plan, mechanical legend, mechanical demolition plan, mechanical new work plan, mechanical insulation schedule, and electrical plans for Phase 1 of the chiller docking station. The drawings encompass demolition work, new mechanical systems installation including ductwork, heating, valves and fittings, refrigeration piping, plumbing, and temperature controls. Electrical work includes power systems, life safety branch circuitry, lightning protection and grounding, and a one-line diagram with feeder schedules for the power panel and main distribution panel (MDP), along with a fault study summary.

The document contains detailed specifications for insulation requirements on piping and ductwork systems, with schedules indicating temperature ranges, material types, density ratings, and R-values. The electrical new work for Phase 1 of the chiller docking station is depicted through keynoted plans and a partial single line diagram. No pricing, set-asides, incumbents, funding sources, or contract terms are specified within this technical drawing set, as the file serves exclusively as the engineering design documentation for the mechanical and electrical infrastructure improvements at the correctional facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TBS

TEC

TBS

COVER

SHEET

G0.01

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H

9)

-8

F

A X

9)

-0 se c@ se ce ng r.

co m

B

E A

C O

N S

T.

C

O

LO

R A

D O

S P

R

IN

G S

, C O

O N

S U

L T

IN

G

N

IN

E E

R S

O R

P O

R A

T

IO

N N

G

IN

E E

R

IN

G

C H

E N

D T

S E

C E

C O

LO

R

A D

O D

.O .C

S

A N

C A

R

LO

S C

O R

R E

C

TI

O N

A L

FA

C

IL

IT

Y

TE

M P

O R

A R

Y C

H

IL

LE

R

D O

C K

IN

G

S

TA

TI

O

N

16185

12/08/2016

COLORADO DEPT. OF CORRECTIONS

SAN CARLOS CORRECTIONAL FACILITY

TEMPORARY CHILLER DOCKING STATION

PROJECT NUMBER: 16185

DECEMBER 08, 2016

SITE PLAN

TBS

MECHANICAL

LEGEND

M0.01

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

H

9)

-8

F

A X

9)

-0 se c@ se ce ng r.

co m

B

E A

C O

N S

T.

C

O

LO

R A

D O

S P

R

IN

G S

, C O

O N

S U

L T

IN

E E

R S

O R

P O

R A

T

IO

N N

G

IN

E E

R

IN

G

C H

E N

D T

S E

C E

C O

LO

R

A D

O D

.O .C

S

A N

C A

R

LO

S C

O R

R E

C

TI

O N

A L

FA

C

IL

IT

Y

TE

M P

O R

A R

Y C

H

IL

LE

R

D O

C K

IN

G

S

TA

TI

O

N

16185

12/08/2016

DUCTWORKHEATINGVALVES & FITTINGS

MISCELLANEOUS SYMBOLS

TEMPERATURE CONTROLS

MISCELLANEOUS PIPINGREFRIGERATION

PLUMBING

ABBREVIATIONS

GENERAL NOTES:

SAN CARLOS CORRECTIONAL FACILITY CENTRAL PLANT PLAN

TEC

TBS

MECHANICAL

DEMOLITION

MD1.01

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

H

9)

-8

F

A X

9)

-0 se c@ se ce ng r.

co m

B

E A

C O

N S

T.

C

O

LO

R A

D O

S P

R

IN

G S

, C O

O N

S U

L T

IN

E E

R S

O R

P O

R A

T

IO

N N

G

IN

E E

R

IN

G

C H

E N

D T

S E

C E

C O

LO

R

A D

O D

.O .C

S

A N

C A

R

LO

S C

O R

R E

C

TI

O N

A L

FA

C

IL

IT

Y

TE

M P

O R

A R

Y C

H

IL

LE

R

D O

C K

IN

G

S

TA

TI

O

N

16185

12/08/2016

GENERAL DEMOLITION NOTES

DEMOLITION KEYNOTES

SAN CARLOS CORRECTIONAL FACILITY CENTRAL PLANT PLAN TBS

TBS

MECHANICAL

NEW WORK

M1.01

GENERAL NEW WORK NOTES

NEW WORK KEYNOTES

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

H

9)

-8

F

A X

9)

-0 se c@ se ce ng r.

co m

B

E A

C O

N S

T.

C

O

LO

R A

D O

S P

R

IN

G S

, C O

O N

S U

L T

IN

E E

R S

O R

P O

R A

T

IO

N N

G

IN

E E

R

IN

G

C H

E N

D T

S E

C E

C O

LO

R

A D

O D

.O .C

S

A N

C A

R

LO

S C

O R

R E

C

TI

O N

A L

FA

C

IL

IT

Y

TE

M P

O R

A R

Y C

H

IL

LE

R

D O

C K

IN

G

S

TA

TI

O

N

16185

12/08/2016

MECHANICAL INSULATION SCHEDULE

TEMPERATURE MEAN RATING INSULATION VAPOR

RANGE PIPE OR DUCT INSULATION INSULATION DENSITY CONDUCTIVITY TEMPERATURE THICKNESS R-VALUE BARRIER

MECHANICAL SYSTEMS TO BE INSULATED (°F) SIZE MATERIAL FORM (LB/FT3) (BTU-IN/HR-FT2-°F) (°F) (INCHES) (BTU/HR-SF-°F) REQUIRED REMARKS

PIPING SYSTEM

EXISTING PIPING, DUCTWORK AND EQUIPMENT INSULATION

REMARKS:

ONE - LINE SYMBOLS ABBREVIATIONSGENERAL DEMOLITION NOTES

GENERAL SYMBOLS

CIRCUITING SYMBOLS

POWER SYMBOLS

TELECOM & DATA SYMBOLS

GENERAL NOTES

LIFE SAFETY

BRANCH CIRCUIT PANELBOARDS

POWER SYSTEMS

LIGHTNING PROTECTION & GROUNDING

JCP

MES

JCP

ELECTRICAL

LEGEND

PHASE 1 CHILLER

DOCKING STATION

E0.01

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

H

9)

-8

F

A X

9)

-0 se c@ se ce ng r.

co m

B

E A

C O

N S

T.

C

O

LO

R A

D O

S P

R

IN

G S

, C O

O N

S U

L T

IN

E E

R S

O R

P O

R A

T

IO

N N

G

IN

E E

R

IN

G

C H

E N

D T

S E

C E

C O

LO

R

A D

O D

.O .C

S

A N

C A

R

LO

S C

O R

R E

C

TI

O N

A L

FA

C

IL

IT

Y

TE

M P

O R

A R

Y C

H

IL

LE

R

D O

C K

IN

G

S

TA

TI

O

N

16185

12/08/2016

ELECTRICAL NEW WORK - PHASE I CHILLER DOCKING STATION

JCP

MES

JCP

ELECTRICAL

NEW WORK

PHASE 1 CHILLER

DOCKING STATION

E1.01

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

H

9)

-8

F

A X

9)

-0 se c@ se ce ng r.

co m

B

E A

C O

N S

T.

C

O

LO

R A

D O

S P

R

IN

G S

, C O

O N

S U

L T

IN

E E

R S

O R

P O

R A

T

IO

N N

G

IN

E E

R

IN

G

C H

E N

D T

S E

C E

C O

LO

R

A D

O D

.O .C

S

A N

C A

R

LO

S C

O R

R E

C

TI

O N

A L

FA

C

IL

IT

Y

TE

M P

O R

A R

Y C

H

IL

LE

R

D O

C K

IN

G

S

TA

TI

O

N

16185

12/08/2016

KEYNOTES

JCP

MES

JCP

ELECTRICAL

ONE LINE DIAGRAM

PHASE I CHILLER

DOCKING STATION

E2.01

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

H

9)

-8

F

A X

9)

-0 se c@ se ce ng r.

co m

B

E A

C O

N S

T.

C

O

LO

R A

D O

S P

R

IN

G S

, C O

O N

S U

L T

IN

E E

R S

O R

P O

R A

T

IO

N N

G

IN

E E

R

IN

G

C H

E N

D T

S E

C E

C O

LO

R

A D

O D

.O .C

S

A N

C A

R

LO

S C

O R

R E

C

TI

O N

A L

FA

C

IL

IT

Y

TE

M P

O R

A R

Y C

H

IL

LE

R

D O

C K

IN

G

S

TA

TI

O

N

16185

12/08/2016

FEEDER SCHEDULE

PARTIAL SINGLE LINE DIAGRAM

POWER PANEL MDP

FAULT STUDY SUMMARY

FEEDER SCHEDULE

(CONTINUED)

16185-G0.01
16185-M0.01
16185-MD1.01
16185-M1.01
16185-E0.01
16185-E1.01
16185-E2.01

File details come from the government source that posted it. Updated .