About this file
This is a technical drawing set for the San Carlos Correctional Facility Temporary Chiller Docking Station project prepared by SECE Engineering for the Colorado Department of Corrections. The project, numbered 16185, was designed and dated December 8, 2016. The drawing package includes a cover sheet, site plan, mechanical legend, mechanical demolition plan, mechanical new work plan, mechanical insulation schedule, and electrical plans for Phase 1 of the chiller docking station. The drawings encompass demolition work, new mechanical systems installation including ductwork, heating, valves and fittings, refrigeration piping, plumbing, and temperature controls. Electrical work includes power systems, life safety branch circuitry, lightning protection and grounding, and a one-line diagram with feeder schedules for the power panel and main distribution panel (MDP), along with a fault study summary.
The document contains detailed specifications for insulation requirements on piping and ductwork systems, with schedules indicating temperature ranges, material types, density ratings, and R-values. The electrical new work for Phase 1 of the chiller docking station is depicted through keynoted plans and a partial single line diagram. No pricing, set-asides, incumbents, funding sources, or contract terms are specified within this technical drawing set, as the file serves exclusively as the engineering design documentation for the mechanical and electrical infrastructure improvements at the correctional facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TBS
TEC
TBS
COVER
SHEET
G0.01
H
G
F
E
2 3 4
D
C
B
A
1 2 3 4
5 6 7 8
SHEET
SHEET TITLE
DESIGNED BY
PROJECT NO.
DRAWN BY
DATE
CHECKED BY
REVISIONS
5 6 7
C * P
H
9)
-8
F
A X
9)
-0 se c@ se ce ng r.
co m
B
E A
C O
N S
T.
C
O
LO
R A
D O
S P
R
IN
G S
, C O
O N
S U
L T
IN
G
N
IN
E E
R S
O R
P O
R A
T
IO
N N
G
IN
E E
R
IN
G
C H
E N
D T
S E
C E
C O
LO
R
A D
O D
.O .C
S
A N
C A
R
LO
S C
O R
R E
C
TI
O N
A L
FA
C
IL
IT
Y
TE
M P
O R
A R
Y C
H
IL
LE
R
D O
C K
IN
G
S
TA
TI
O
N
16185
12/08/2016
COLORADO DEPT. OF CORRECTIONS
SAN CARLOS CORRECTIONAL FACILITY
TEMPORARY CHILLER DOCKING STATION
PROJECT NUMBER: 16185
DECEMBER 08, 2016
SITE PLAN
TBS
MECHANICAL
LEGEND
M0.01
H
G
F
E
2 3 4
D
C
B
A
1 2 3 4
5 6 7 8
SHEET
SHEET TITLE
DESIGNED BY
PROJECT NO.
DRAWN BY
DATE
CHECKED BY
H
9)
-8
F
A X
9)
-0 se c@ se ce ng r.
co m
B
E A
C O
N S
T.
C
O
LO
R A
D O
S P
R
IN
G S
, C O
O N
S U
L T
IN
E E
R S
O R
P O
R A
T
IO
N N
G
IN
E E
R
IN
G
C H
E N
D T
S E
C E
C O
LO
R
A D
O D
.O .C
S
A N
C A
R
LO
S C
O R
R E
C
TI
O N
A L
FA
C
IL
IT
Y
TE
M P
O R
A R
Y C
H
IL
LE
R
D O
C K
IN
G
S
TA
TI
O
N
16185
12/08/2016
DUCTWORKHEATINGVALVES & FITTINGS
MISCELLANEOUS SYMBOLS
TEMPERATURE CONTROLS
MISCELLANEOUS PIPINGREFRIGERATION
PLUMBING
ABBREVIATIONS
GENERAL NOTES:
SAN CARLOS CORRECTIONAL FACILITY CENTRAL PLANT PLAN
TEC
TBS
MECHANICAL
DEMOLITION
MD1.01
H
G
F
E
2 3 4
D
C
B
A
1 2 3 4
5 6 7 8
SHEET
SHEET TITLE
DESIGNED BY
PROJECT NO.
DRAWN BY
DATE
CHECKED BY
H
9)
-8
F
A X
9)
-0 se c@ se ce ng r.
co m
B
E A
C O
N S
T.
C
O
LO
R A
D O
S P
R
IN
G S
, C O
O N
S U
L T
IN
E E
R S
O R
P O
R A
T
IO
N N
G
IN
E E
R
IN
G
C H
E N
D T
S E
C E
C O
LO
R
A D
O D
.O .C
S
A N
C A
R
LO
S C
O R
R E
C
TI
O N
A L
FA
C
IL
IT
Y
TE
M P
O R
A R
Y C
H
IL
LE
R
D O
C K
IN
G
S
TA
TI
O
N
16185
12/08/2016
GENERAL DEMOLITION NOTES
DEMOLITION KEYNOTES
SAN CARLOS CORRECTIONAL FACILITY CENTRAL PLANT PLAN TBS
TBS
MECHANICAL
NEW WORK
M1.01
GENERAL NEW WORK NOTES
NEW WORK KEYNOTES
H
G
F
E
2 3 4
D
C
B
A
1 2 3 4
5 6 7 8
SHEET
SHEET TITLE
DESIGNED BY
PROJECT NO.
DRAWN BY
DATE
CHECKED BY
H
9)
-8
F
A X
9)
-0 se c@ se ce ng r.
co m
B
E A
C O
N S
T.
C
O
LO
R A
D O
S P
R
IN
G S
, C O
O N
S U
L T
IN
E E
R S
O R
P O
R A
T
IO
N N
G
IN
E E
R
IN
G
C H
E N
D T
S E
C E
C O
LO
R
A D
O D
.O .C
S
A N
C A
R
LO
S C
O R
R E
C
TI
O N
A L
FA
C
IL
IT
Y
TE
M P
O R
A R
Y C
H
IL
LE
R
D O
C K
IN
G
S
TA
TI
O
N
16185
12/08/2016
MECHANICAL INSULATION SCHEDULE
TEMPERATURE MEAN RATING INSULATION VAPOR
RANGE PIPE OR DUCT INSULATION INSULATION DENSITY CONDUCTIVITY TEMPERATURE THICKNESS R-VALUE BARRIER
MECHANICAL SYSTEMS TO BE INSULATED (°F) SIZE MATERIAL FORM (LB/FT3) (BTU-IN/HR-FT2-°F) (°F) (INCHES) (BTU/HR-SF-°F) REQUIRED REMARKS
PIPING SYSTEM
EXISTING PIPING, DUCTWORK AND EQUIPMENT INSULATION
REMARKS:
ONE - LINE SYMBOLS ABBREVIATIONSGENERAL DEMOLITION NOTES
GENERAL SYMBOLS
CIRCUITING SYMBOLS
POWER SYMBOLS
TELECOM & DATA SYMBOLS
GENERAL NOTES
LIFE SAFETY
BRANCH CIRCUIT PANELBOARDS
POWER SYSTEMS
LIGHTNING PROTECTION & GROUNDING
JCP
MES
JCP
ELECTRICAL
LEGEND
PHASE 1 CHILLER
DOCKING STATION
E0.01
H
G
F
E
2 3 4
D
C
B
A
1 2 3 4
5 6 7 8
SHEET
SHEET TITLE
DESIGNED BY
PROJECT NO.
DRAWN BY
DATE
CHECKED BY
H
9)
-8
F
A X
9)
-0 se c@ se ce ng r.
co m
B
E A
C O
N S
T.
C
O
LO
R A
D O
S P
R
IN
G S
, C O
O N
S U
L T
IN
E E
R S
O R
P O
R A
T
IO
N N
G
IN
E E
R
IN
G
C H
E N
D T
S E
C E
C O
LO
R
A D
O D
.O .C
S
A N
C A
R
LO
S C
O R
R E
C
TI
O N
A L
FA
C
IL
IT
Y
TE
M P
O R
A R
Y C
H
IL
LE
R
D O
C K
IN
G
S
TA
TI
O
N
16185
12/08/2016
ELECTRICAL NEW WORK - PHASE I CHILLER DOCKING STATION
JCP
MES
JCP
ELECTRICAL
NEW WORK
PHASE 1 CHILLER
DOCKING STATION
E1.01
H
G
F
E
2 3 4
D
C
B
A
1 2 3 4
5 6 7 8
SHEET
SHEET TITLE
DESIGNED BY
PROJECT NO.
DRAWN BY
DATE
CHECKED BY
H
9)
-8
F
A X
9)
-0 se c@ se ce ng r.
co m
B
E A
C O
N S
T.
C
O
LO
R A
D O
S P
R
IN
G S
, C O
O N
S U
L T
IN
E E
R S
O R
P O
R A
T
IO
N N
G
IN
E E
R
IN
G
C H
E N
D T
S E
C E
C O
LO
R
A D
O D
.O .C
S
A N
C A
R
LO
S C
O R
R E
C
TI
O N
A L
FA
C
IL
IT
Y
TE
M P
O R
A R
Y C
H
IL
LE
R
D O
C K
IN
G
S
TA
TI
O
N
16185
12/08/2016
KEYNOTES
JCP
MES
JCP
ELECTRICAL
ONE LINE DIAGRAM
PHASE I CHILLER
DOCKING STATION
E2.01
H
G
F
E
2 3 4
D
C
B
A
1 2 3 4
5 6 7 8
SHEET
SHEET TITLE
DESIGNED BY
PROJECT NO.
DRAWN BY
DATE
CHECKED BY
H
9)
-8
F
A X
9)
-0 se c@ se ce ng r.
co m
B
E A
C O
N S
T.
C
O
LO
R A
D O
S P
R
IN
G S
, C O
O N
S U
L T
IN
E E
R S
O R
P O
R A
T
IO
N N
G
IN
E E
R
IN
G
C H
E N
D T
S E
C E
C O
LO
R
A D
O D
.O .C
S
A N
C A
R
LO
S C
O R
R E
C
TI
O N
A L
FA
C
IL
IT
Y
TE
M P
O R
A R
Y C
H
IL
LE
R
D O
C K
IN
G
S
TA
TI
O
N
16185
12/08/2016
FEEDER SCHEDULE
PARTIAL SINGLE LINE DIAGRAM
POWER PANEL MDP
FAULT STUDY SUMMARY
FEEDER SCHEDULE
(CONTINUED)
| 16185-G0.01 |
| 16185-M0.01 |
| 16185-MD1.01 |
| 16185-M1.01 |
| 16185-E0.01 |
| 16185-E1.01 |
| 16185-E2.01 |
File details come from the government source that posted it. Updated .