Drawings Part 1 Bldg 335.pdf

PDF 784 KB Posted

Attached to
511/23366. JLM; Alpena CRTC - Replace Generators Bldg. 490
Solicitation number
RFQ 171 260000000276 3
Issued by
Allegan County, Flint City, Michigan

About this file

This is a technical drawing document prepared by the State of Michigan Department of Technology, Management, and Budget Facilities and Business Services Administration for the Alpena Combat Readiness Training Center (CRTC), in coordination with the Department of Military and Veterans Affairs. The project involves the replacement of backup generators in Building 335 at the Alpena CRTC. The scope of work includes removal of existing 100kW and 135kW generators and associated automatic transfer switches, installation of new Cummins generators (80kW and 100kW models), replacement of automatic transfer switches (225 AMP and 400 AMP units), installation of fuel storage tanks (600-gallon and 700-gallon main tanks with 50-gallon day tanks), load bank equipment for testing purposes, surge protective devices, and associated electrical infrastructure including conduit routing, conductor installations, and control cabinets. The drawings specify demolition and new equipment plans with detailed electrical schematics, operational sequences, and fuel system piping diagrams. All installations must comply with federal, state, and local electrical codes and regulations. The contractor is responsible for cutting and patching as required, verifying existing conditions prior to bidding, and ensuring all existing equipment remains operational upon project completion.

The technical specifications require the contractor to include all costs for materials, labor, and equipment in the bid proposal. Wire sizing standards are established based on voltage and distance requirements, with 120/208V and 277/480V systems specified separately. The project requires coordination of power outages in advance with the owner, and certain demolition work may occur outside regular working hours with premium time costs included in the proposal. Contractor coordination is essential to minimize downtime for existing equipment during automatic transfer switch removal. The design team includes personnel from Sidock Group, Inc., with contact information provided for Mr. Kendziorski at (989) 657-3026. All design documents and materials are identified as exclusive property of Sidock Group, Inc., and reproduction is prohibited without prior written consent. The project drawings indicate this is preliminary construction documentation for bidding purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

SCHOOLCRAFT

MANISTEE

OCEANA

MUSKEGON

MASON

BERRIEN

GOGEBIC

DICKINSON

MENOMINEE

DELTA

ONTONAGON

IRON

BARAGA

HOUGHTON

KEWEENAW

MARQUETTE

ALGER

ST.

CLAIR

HILLSDALE

CASS ST.

JOSEPH BRANCH

LENAWEE MONROE

GLADWIN

MIDLAND

JACKSON

BARRY

VAN

BUREN

ALLEGAN

KALAMAZOO

OTTAWA

KENT

EATON

CALHOUN

IONIA CLINTON

MECOSTA

OSCEOLA

NEWAYGO

LAKE

ISABELLA

MONTCALM GRATIOT

CLARE

INGHAM

WASHTENAW

LIVINGSTON

SHIAWASSEE

GENESEE

OAKLAND

WAYNE

LAPEER

MACOMB

TUSCOLA

SAGINAW

ARENAC

BAY

SANILAC

HURON

ANTRIM

GRAND

TRAVERSE

WEXFORD

LELANAU

BENZIE

MISSAUKEE ROSCOMMON

KALKASKA CRAWFORD

OTSEGO

CHALEVOIX

EMMET

CHEBOYGAN

MACKINAC

OGEMAW IOSCO

OSCODA

MONTMORENCY

ALCONA

ALPENA

PRESQUE

ISLE

LUCE

CHIPPEWA

LOCATION MAP

NO SCALELAKE

MICHIGAN

LAKE

SUPERIOR

LAKE

ERIE

LAKE

HURON

PANELBOARD,ATS,SPD, LOAD BANK OR FUEL TANK: AS NOTED

DUPLEX RECEPTACLE

VARIABLE FREQUENCY DRIVE

POWER SYMBOLS

NOTE SYMBOLS

ELECTRICAL DEMOLITION PLAN NOTES

POWER PLAN NOTESPx

COMBINATION STARTER; SEE SCHEDULE FOR DETAILS

NONFUSED DISCONNECT; SEE SCHEDULE FOR DETAILS

FUSED DISCONNECT; SEE SCHEDULE FOR DETAILS

DUPLEX RECEPTACLE, GROUND FAULT CIRCUIT INTERRUPTGFI

SPECIAL RECEPTACLE; SEE DRAWINGS

JUNCTION BOXJ

NOT ALL SYMBOLS MAY BE USED

Dx

LIGHTING PLAN NOTESLx

TECHNOLOGY PLAN NOTESTx

A

AFF

AFG

C

EMT

EF

FMC

GFCI

AMPERE

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

CONDUIT

ELECTRICAL METALLIC TUBING

EXHAUST FAN

FLEXIBLE METALLIC TUBING

GROUND FAULT CIRCUIT INTERRUPTER

GRC

IG

PVC

R

WP

GALVANIZED RIGID CONDUIT

ISOLATED GROUND

CONDUIT

REMOVE

WEATHERPROOF

ABBREVIATIONS

GENERAL NOTES - APPLY TO ALL SHEETS:

• INSTALLATIONS SHALL CONFORM WITH FEDERAL, STATE, AND LOCAL LAWS,

CODES, ORDINANCES, RULES, AND REGULATIONS WHICH ARE HEREBY MADE A

PART OF THESE CONTRACT DOCUMENTS THE SAME AS IF REPEATED HEREIN.

• CONTRACTOR SHALL INCLUDE IN BID/PROPOSAL COST REQUIRED TO

COMPLETELY AND PROPERLY INSTALL WORK REQUIRED FOR THE PROJECT.

• CONTRACTOR SHALL INCLUDE IN BID/PROPOSAL COST FOR CUTTING AND

PATCHING AS REQUIRED TO INSTALL NEW OR EXISTING WORK, EQUIPMENT OR

SYSTEMS.

• CLEARANCES INDICATED ARE BASED ON BEST AVAILABLE INFORMATION.

CONTRACTOR SHALL VERIFY PIPING, DUCTWORK, ROUTING, AND STRUCTURAL

DETAILS PRIOR TO SUBMITTING A BID/PROPOSAL AND INCLUDE SUCH COSTS

AS REQUIRED TO INSTALL WORK AS SHOWN AND INTENDED.

• ALL POWER OUTAGES SHALL BE COORDINATED AND SCHEDULED IN ADVANCE

WITH THE OWNER.

• WHEREAS PLANS GENERALLY SHOW INDIVIDUAL HOME RUN SINGLE PHASE

BRANCH CIRCUITS, CONTRACTOR MAY RUN UP TO THREE (3) SUCH CIRCUITS IN

A RACEWAY.

• WIRE SIZES: BRANCH CIRCUIT WIRE SIZES SHALL BE BASED ON THE VALUES

INDICATED BELOW

1. 120/208V CABLING FROM PANEL TO THE ELECTRICAL LOAD SHALL BE

ADJUSTED AS FOLLOWS UNLESS SPECIFICALLY NOTED OTHERWISE.

A. 0 TO 100FT: #12AWG MINIMUM

B. 100 TO 200FT: #10AWG MINIMUM

C. 200 TO 250FT: #8AWG MINIMUM

2. 277/480V CABLING FROM PANEL TO THE ELECTRICAL LOAD SHALL BE

ADJUSTED AS FOLLOWS UNLESS SPECIFICALLY NOTED OTHERWISE.

A. 0 TO 150FT: #12AWG MINIMUM

B. 150 TO 250FT: #10AWG MINIMUM

C. 250 TO 350FT: #8AWG MINIMUM

• CIRCUIT NUMBERS SHOWN FOR EXISTING PANELS ARE BASED ON EXISTING

DRAWINGS, SCHEDULES, AND FIELD SURVEY. FIELD VERIFY AS REQUIRED.

• CONTRACT DOCUMENTS CONSIST OF BOTH PROJECT MANUAL AND DRAWINGS

AND BOTH ARE MEANT TO BE COMPLEMENTARY. ANYTHING APPEARING ON

EITHER MUST BE EXECUTED THE SAME AS IF SHOWN ON BOTH.

• SOME ELECTRICAL WORK MAY BE REQUIRED TO BE PERFORMED OFF REGULAR

WORK HOURS. COST FOR PREMIUM TIME SHALL BE INCLUDED IN THE

BID/PROPOSAL.

• ALL EXISTING EQUIPMENT THAT IS TO REMAIN IS INTENDED TO BE

OPERATIONAL AT THE COMPLETION OF THE JOB. THIS CONTRACTOR SHALL

RECIRCUIT WHERE NECESSARY TO ENSURE THIS CONTINUED OPERATION.

FOR SITE OWNED UTILITIES

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF

SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,

COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR

WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH

EE

T

TI

TL

E:

SH

EE

T

ID

EN

TI

FI

CA

TI

O N

NO

PR

O

JE

C

T N

O

FI

LE

N O

./I N

D

EX

C O

D E:

IS

SU

ED

F

O R:

PR

EL

IM

IN

AR

Y

C O

N

ST

R U

C

TI

O N

FI

N

AL

R

EC

O

R D

DA

TE

D R

AW

N

D

ES

IG

N

ED

C H

EC

KE

D

AP

PR

O

VE

D

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, M

AN

AG

EM

EN

T, A N

D B

U D

G

ET

FA

C

IL

IT

IE

S

AN

D

B U

SI

N

ES

S

SE

R

VI

C

ES

A

D M

IN

IS

TR

AT

IO

N

AD

AM

P . L

AR

C

H , R

.A

D

IR

EC

TO

R

DE

SI

G

N

AN

D

CO

NS

TR

UC

TI

O N

DI

VI

SI

O

N

CALL:

PH:

MR. KENDZIORSKI

(989) 657-3026

ALPENA CRTC ENGINEERING

1/

.J

LM

X C

S0

C O

VE

R

S H

EE

T

-B U

IL

D

IN

G

AL

PE

NA

C.

R.

T.

C.

M

UL

TI

PL

E

BL

DG

S- G

EN

ER

AT

O

R

RE

PL

AC

EM

EN

T D

EP

AR

TM

EN

T O

F M

IL

IT

AR

Y

AN

D

V

ET

ER

AN

S

AF

FA

IR

S

AL

PE

N

A C

.R .T

.C

AL

PE

N A, M I

M

RI

M

RI

LR M

RI

-2 9-

REPLACEMENT OF BACKUP GENERATORS

BUILDING 335

ALPENA C.R.T.C.

MICHIGAN AIR NATIONAL GUARD

ALPENA, MICHIGAN

Sheet List Sheet Number Sheet Name

CS000 COVER SHEET - BUILDING 335

E100 DEMOLITION PLAN - BUILDING 335

E200 NEW EQUIPMENT PLAN - BUILDING 335

E300 OPERATIONAL DETAILS - BUILDING 335

Alpena CRTC

Site

ATS

ATS

DP-2

MAIN DISC

LP-2

100KW ATS

135KW ATS

DP-1

100KW

GENERATOR

135KW

GENERATOR

D1

D2

D1

D2

D3

D4

D5

D5

D6 D6

100KW

A.T.S

EXIST.

PANEL

'DP-1'

1000A M.L.O.

100KW

GENERATOR #1

BLDG 319

EXIST.

PANEL

'LP-1'

135KW

GENERATOR #2

EXIST.

MAIN

DISC

FROM

TRANSFORMER

135KW

A.T.S

EXIST.

PANEL

'DP-2'

BLDG 30

FIRE STATION

MAINTAIN CONDUIT AND CONDUCTORS FOR REUSE IF POSSIBLE

120/208V

3PH,4W 120/208V

3PH,4W

120/208V

3PH,4W

ALL EQUIPMENT SHOWN ON THIS SHEET IS EXISTING.

DASHED LINES INDICATE EXISTING EQUIPMENT TO BE

REMOVED. SOLID LINES INDICATE EXISTING EQUIPMENT TO

REMAIN.

EXISTING EQUIPMENT THAT IS TO REMAIN IS INTENDED TO BE

OPERATIONAL AT THE COMPLETION OF THE PROJECT.

RECIRCUIT WHERE NECESSARY TO ENSURE CONTINUED

OPERATION.

EXISTING EQUIPMENT SHOWN ON DRAWINGS IS BELIEVED TO

BE A REASONABLE INDICATION OF THE EXISTING LAYOUT.

EXACT QUANTITY AND LOCATION SHALL BE DETERMINED AT

THE JOB SITE. THE EXISTING DRAWINGS ARE FOR

CONVENIENCE ONLY AND NOT FOR THE BASIS OF BIDDING.

• REMOVE ABANDONED WIRE COMPLETELY TO ITS SOURCE UNLESS NOTED

OTHERWISE. REMOVE ABANDONED RACEWAY WITHIN THE PROJECT AREA AND CAP

STUBS THAT REMAIN. SEAL PENETRATIONS THROUGH FLOORS AND WALLS.

• EXISTING EQUIPMENT THAT REMAINS IS INTENDED TO BE OPERATIONAL AT THE

COMPLETION OF THE JOB. RECIRCUIT WHERE NECESSARY TO ENSURE THIS

CONTINUED OPERATION.

• THE EXISTING EQUIPMENT SHOWN ON THE DRAWINGS IS BELIEVED TO BE A

REASONABLE INDICATION OF THE PRESENT LAYOUT. DETERMINE EXACT QUANTITY

AND LOCATION AT THE JOB SITE. THE EXISTING DRAWINGS ARE FOR CONVENIENCE

ONLY AND NOT FOR THE BASIS OF BIDDING.

• VERIFY ALL DEMOLITION WORK PRIOR TO SUBMITTING A BID/PROPOSAL.

• DETERMINE AND MAINTAIN TRANSIENT SERVICES THROUGH PROJECT AREA AS

REQUIRED.

• SOME REQUIRED DEMOLITION WORK MAY NOT BE INDICATED ON THESE DRAWINGS.

• EXISTING RACEWAYS AND BOXES MAY BE REUSED WHERE FOUND TO BE SUITABLE.

INCLUDE IN BID/PROPOSAL COSTS FOR CUTTING AND PATCHING AS REQUIRED TO

INSTALL NEW OR EXISTING WORK, EQUIPMENT, OR SYSTEMS.

FOR SITE OWNED UTILITIES

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF

SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,

COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR

WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH

EE

T

TI

TL

E:

SH

EE

T

ID

EN

TI

FI

CA

TI

O N

NO

PR

O

JE

C

T N

O

FI

LE

N O

./I N

D

EX

C O

D E:

IS

SU

ED

F

O R:

PR

EL

IM

IN

AR

Y

C O

N

ST

R U

C

TI

O N

FI

N

AL

R

EC

O

R D

DA

TE

D R

AW

N

D

ES

IG

N

ED

C H

EC

KE

D

AP

PR

O

VE

D

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, M

AN

AG

EM

EN

T, A N

D B

U D

G

ET

FA

C

IL

IT

IE

S

AN

D

B U

SI

N

ES

S

SE

R

VI

C

ES

A

D M

IN

IS

TR

AT

IO

N

AD

AM

P . L

AR

C

H , R

.A

D

IR

EC

TO

R

DE

SI

G

N

AN

D

CO

NS

TR

UC

TI

O N

DI

VI

SI

O

N

CALL:

PH:

MR. KENDZIORSKI

(989) 657-3026

ALPENA CRTC ENGINEERING

1/

.J

LM

X E1

D

EM

O

LI

TI

O

N P

LA

N

BU

IL

D

IN

G

AL

PE

NA

C.

R.

T.

C.

M

UL

TI

PL

E

BL

DG

S- G

EN

ER

AT

O

R

RE

PL

AC

EM

EN

T D

EP

AR

TM

EN

T O

F M

IL

IT

AR

Y

AN

D

V

ET

ER

AN

S

AF

FA

IR

S

AL

PE

N

A C

.R .T

.C

AL

PE

N A, M I

M

RI

M

RI

LR M

RI

-2 9-

1/2" = 1'-0"

EXISTING/DEMOLITION PLAN - BUILDING 335

N.T.S.

PHOTO - 100KW GENERATOR

N.T.S.

PHOTO - 100KW ATS

N.T.S.

PHOTO - 135KW GENERATOR

N.T.S.

PHOTO - 135KW ATS

SHEET SPECIFIC ELECTRICAL DEMOLITION PLAN NOTES

D1 REMOVE EXISTING GENERATOR AND ASSOCIATED ACCESORIES ENTIRELY. REMOVE AND PATCH ANY LOCATIONS OF ANCHOR BOLTS WHICH ARE NOT SUITABLE FOR REUSE WITH

NEW EQUIPMENT.

D2 REMOVE EXISTING AUTOMATIC TRANSFER SWITCH ENTIRELY. COORDINATE REMOVAL WITH OWNER TO MINIMIZE ANY DOWNTIME FOR EQUIPMENT ASSOCIATED WITH THIS A.T.S.

D3 REMOVE EXISTING CONDUITS FROM GENERATOR TO A.T.S. ENTIRELY.

D4 RETAIN EXISTING UNDERGROUND CONDUITS FROM GENERATOR TO A.T.S. FOR POSSIBLE REUSE. REMOVE CONDUCTORS.

D5 REMOVE HOUSEKEEPING PAD ENTIRELY. NEW CONTINUOUS PAD TO BE POURED TO REPLACE IT.

D6 REMOVE EXISTING NATURAL GAS LINE BACK TO NEAREST METER POINT AND CAP.

N.T.S.

EXISTING RISER DIAGRAM

N.T.S.

EXISTING NOTES

N.T.S.

DEMOLITION NOTES - APPLY TO ALL DEMOLITION SHEETS

DP-2

MAIN DISC

LP-2

DP-1

NEW 100KW

GENERATOR

NEW 80KW

GENERATOR

P1

NEW 400 AMP

A.T.S #1

NEW 225 AMP

A.T.S. #2

NEW S.P.D. NEW S.P.D.

NEW S.P.D.

100KW

LOAD BANK

80KW

LOAD BANK

LOAD BANK/

PORT. GEN.

CONNECTION

CABINET

LOAD BANK/

PORT. GEN.

CONNECTION

CABINET

P4

P6

P5

P7

P8

P10

P11 600 GALLON

FUEL TANK

700 GALLON

FUEL TANK

P10

P9 P8

P7

P6

P2

P3

E

(EXISTING) (EXISTING)

(EXISTING)

(EXISTING)

P12

50 GAL.

DAY

TANK

50 GAL.

DAY

TANK

P13

P14

P15

LOAD BANK CONTROL PANEL

LOAD BANK CONTROL PANEL

DUPLEX

PUMPS

DUPLEX

PUMPS

P9

NEW

100KW

A.T.S

EXIST.

PANEL

'DP-1'

1000A M.L.O.

NEW 100KW

GENERATOR

BLDG 319

EXIST.

PANEL

'LP-1'

NEW 80KW

GENERATOR

MAIN

DISC

FROM

TRANSFORMER

NEW

80KW

A.T.S

EXIST.

PANEL

'DP-2'

BLDG 30

FIRE STATION

MAINTAIN CONDUIT AND CONDUCTORS IF POSSIBLE FOR REUSE

REPLACE CONDUCTORS IF NECESSARY DUE TO LENGTH, DO NOT SPLICE!

NEW

LOAD

BANK/

PORT.

GEN.

CNTRL.

NEW

LOAD

BANK/

PORT.

GEN.

CNTRL.

NEW

LOAD

BANK

NEW

LOAD

BANK

2-1/2" C. - (4) - 350 MCM + #2 GRD.2-1/2" C. - (4) - 350 MCM + #2 GRD.

(1) 3" C. - (4) - 500MCM CU + 1/0 GRD.

(1) 3" C. - (4) - 500MCM CU + 1/0 GRD.

2-1/2" C. - (3) - 350 MCM + #4 GRD.

120/208V

3PH, 4W

120/208V

3PH, 4W

120/208V

3PH, 4W

NEW

S.P.D NEW

S.P.D

NEW

S.P.D

SURGE PROTECTIVE DEVICE TPD MODEL TK-TTLP-3Y208FL (GENERATOR SIDE)

INSTALL WITH SHORTEST CONDUCTOR LENGTH POSSIBLE.

SURGE PROTECTIVE DEVICE TPD MODEL TK-TTLP-3Y208FL (GENERATOR SIDE)

INSTALL WITH SHORTEST CONDUCTOR LENGTH POSSIBLE.

SURGE PROTECTIVE DEVICE TPD MODEL TK-TTLP-3Y208FL

INSTALL WITH SHORTEST CONDUCTOR LENGTH POSSIBLE.

REDUCE FUSE SIZE TO 300A

REPLACES OVERSIZED 135KW GENERATOR

50 GAL

TANK

LARGE EXTERNAL

TANK (SIZE VARIES)

FUEL VENT

ONLY (1) FUEL LINE SHOWN AS EXAMPLE.

(2) LINES (SUPPLY & RETURN REQUIRED)

PLUS (2) CONDUITS, POWER & CONTROLS

ELEVATION VIEW - TYPICAL FOR BOTH UNITS

CEILING

GRADE

ELECTRICAL TO BE RAN 2' BELOW GRADE

SUSPEND FROM CEILING AS REQUIRED TO AVOID

EXISTING CONDUITS,ETC.

FOR SITE OWNED UTILITIES

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF

SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,

COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR

WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH

EE

T

TI

TL

E:

SH

EE

T

ID

EN

TI

FI

CA

TI

O N

NO

PR

O

JE

C

T N

O

FI

LE

N O

./I N

D

EX

C O

D E:

IS

SU

ED

F

O R:

PR

EL

IM

IN

AR

Y

C O

N

ST

R U

C

TI

O N

FI

N

AL

R

EC

O

R D

DA

TE

D R

AW

N

D

ES

IG

N

ED

C H

EC

KE

D

AP

PR

O

VE

D

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, M

AN

AG

EM

EN

T, A N

D B

U D

G

ET

FA

C

IL

IT

IE

S

AN

D

B U

SI

N

ES

S

SE

R

VI

C

ES

A

D M

IN

IS

TR

AT

IO

N

AD

AM

P . L

AR

C

H , R

.A

D

IR

EC

TO

R

DE

SI

G

N

AN

D

CO

NS

TR

UC

TI

O N

DI

VI

SI

O

N

CALL:

PH:

MR. KENDZIORSKI

(989) 657-3026

ALPENA CRTC ENGINEERING

1/

.J

LM

X E2

N

EW

E Q

U

IP

M

EN

T

PL

AN

BU

IL

D

IN

G

AL

PE

NA

C.

R.

T.

C.

M

UL

TI

PL

E

BL

DG

S- G

EN

ER

AT

O

R

RE

PL

AC

EM

EN

T D

EP

AR

TM

EN

T O

F M

IL

IT

AR

Y

AN

D

V

ET

ER

AN

S

AF

FA

IR

S

AL

PE

N

A C

.R .T

.C

AL

PE

N A, M I

M

RI

M

RI

LR M

RI

-2 9-

1/2" = 1'-0"E200

1 NEW EQUIPMENT PLAN - BUILDING 335

SHEET SPECIFIC NEW EQUIPMENT PLAN NOTES

P1 PROVIDE NEW 6" THICK HOUSEKEEPING PAD WITH DIMENSIONS EXCEEDING GENERATOR PLUS DAY TANK BY 2" ON ALL SIDES.

P2 PROVIDE AND INSTALL CUMMINS C80D6C GENERATOR OR APPROVED ALTERNATE AT THIS LOCATION. POSITION TO ALINE WITH EXISTING WALL LOUVER.

P3 PROVIDE AND INSTALL CUMMINS C100D6C GENERATOR OR APPROVED ALTERNATE AT THIS LOCATION. POSITION TO ALINE WITH EXISTING WALL LOUVER.

P4 PROVIDE AND INSTALL CUMMINS BTPCB, 225 AMP, 4 POLE AUTOMATIC TRANSFER SWITCH OR APPROVED EQUAL P5 PROVIDE AND INSTALL CUMMINS BTPCC, 400 AMP, 4 POLE AUTOMATIC TRANSFER SWITCH OR APPROVED EQUAL

P6 PROVIDE NEW PAD WITH DIMENSIONS EXCEEDING DIESEL TANK BY 2" ON ALL SIDES.

P7 PROVIDE TRENCH MINIMUM OF 2' DEEP FROM LOAD BANK TO CONNECTION CABINET FOR CONDUITS FOR POWER AND MONITORING EQUIPMENT.

P8 FUEL LINES TO BE RAN AT GRADE, NOT BURIED.

P9 ROUTE FUEL LINES AT OR NEAR CEILING IN AN ORDERLY FASHION TO AVOID EXISTING CONDUITS, LIGHTS,ETC.

P10 PROVIDE AND INSTALL FOXFAB FFIS-C3-400-TM-U3-GL-ALU-LB CABINET OR APPROVED EQUAL AT THIS LOCATION.

P11 PROVIDE AND INSTALL SHEET METAL TRANSITION FROM GENERATOR TO EXISTING THRU-THE-WALL-LOUVER. UTILIZE DUCT-MATE SILICON PROFLEX OR APPROVED EQUAL FOR TRANSITION TO SHEET METAL TO

ELIMINATE VIBRATION TRANSMISSION.

P12 PROVIDE AND INSTALL 50 GALLON DAY TANK. CONFIRM EXACT ORIENTATION WITH SUPPLIER PRIOR TO BEGINNING WORK.

P13 PROVIDE AND INSTALL (4) 20 AMP, SINGLE POLE BREAKERS IN EXISTING SPACES TO POWER (2) FUEL SYSTEMS AND (2) LOAD BANK/PORTABLE GENERATOR CONTROL CABINETS.

P14 PROVIDE NEW PAD WITH DIMENSIONS EXCEEDING LOAD BANK BY 2" ON ALL SIDES. PROVIDE AND INSTALL AFTRON LOAD BANK MODEL 4100 100KW LOAD BANK OR APPROVED EQUAL WITH MANUAL LOAD

CONTROL PANEL AS SHOWN.

P15 PROVIDE NEW PAD WITH DIMENSIONS EXCEEDING LOAD BANK BY 2" ON ALL SIDES. PROVIDE AND INSTALL AFTRON LOAD BANK MODEL 4100 75KW LOAD BANK OR APPROVED EQUAL WITH MANUAL LOAD

CONTROL PANEL AS SHOWN.

N.T.S.E200

2 NEW EQUIPMENT RISER DIAGRAM

NOTE: LOAD BANK NOT

SHOWN FOR CLARITY ONLY

1/2" = 1'-0"E200 3 Section 1

600A 3P

400A 3P

DP-1

1000A 120/208V 3P 4W

FROM

TRANSFORMER

3P LOAD

BANK

PORTABLE GENERATOR LUGS

3P

80KW

120/208V

3PH, 4W

GENERATOR

GENERATOR BREAKER

LOAD BANK CONTROL

PANEL

LOAD BANK/

PORT. GEN.

CONNECTION

CABINET

200A 3P

200A 3P

DP-2

400A 120/208V 3P 4W

100A 3P

3P LOAD

BANK

PORTABLE GENERATOR LUGS

3P

100KW

120/208V

3PH, 4W

GENERATOR

GENERATOR BREAKER

LOAD BANK CONTROL

PANEL

LOAD BANK/

PORT. GEN.

CONNECTION

CABINET

EXISTING

TO

FIRE DEPT.

BLDG. 370

SEQUENCES OF OPERATION

AUTOMATIC TRANSFER SWITCH

1. NORMAL - UTILITY POWER AVAILABLE. NORMAL SWITCH IN CLOSED POSITION, EMERGENCY SWITCH OPEN AND UTILITY POWERS LOADS. BYPASS SWITCHES OPEN.

2. EMERGENCY - UTILITY POWER UNAVAILABLE. GENERATOR IS POWERED UP, NORMAL SWITCH OPENED AND EMERGENCY SWITCH CLOSED

EMERGENCY GENERATOR POWERS LOADS. BYPASS SWITCHES OPEN.

3. BYPASS - AUTOMATIC TRANSFER SWITCH CONTACTS DISCONNECTED (DRAWN OUT). MANUAL BYPASS SWITCH IS ENERGIZED. AUTOMATIC SWITCH DE-ENERGIZED

FOR TESTING OR SERVICE.

LOAD BANK/PORTABLE GENERATOR CONNECTION CABINET OPERATION

SEQUENCE OF OPERATION (NORMAL LOAD BANK TEST)

1. MAIN CABINET BREAKER OFF. SYSTEM COLD

2. GENERATOR STARTED MANUALLY FROM GENERATOR PANEL.

3. MAIN BREAKER TURNED ON. SYSTEM POWERS UP AND STATUS SHOWN ON CONTROLLER.

4. SYSTEM ARMED AND TIMED OR CONTINUOUS TEST IS SELECTED.

5. OPERATOR STARTS LOAD TEST VIA "START LOAD TEST" PUSHBUTTON.

6. TEST LOAD IS MODULATED AT LOAD BANK CONTROL PANEL.

7. TEST RUNS UNTIL OPERATOR STOPS OR UNIT TIMES OUT (AUTO TEST MODE.)

8. MAIN BREAKER IS SHUT OFF AND SYSTEM IS COLD AND TEST COMPLETE.

9. IF DURING TEST, UTILITY POWER IS LOST, MAIN BREAKER DISENGAGED INSTANTLY AND FULL GENERATOR POWER OUTPUT AVAILABLE TO BUILDING.

SEQUENCE OF OPERATION (PORTABLE GENERATOR CONNECTION)

1. MAIN CABINET BREAKER OFF. SYSTEM COLD. PORTABLE GENERATOR PLUGGED INTO RECEPTACLE.

2. MAIN GENERATOR BREAKER LOCKED OFF.

3. SELECTOR SWITCH TURNED TO "BACK-UP-POWER" MODE.

4. PORTABLE GENERATOR STARTED.

5. MAIN CABINET BREAKER TURNED ON.

BYPASS ISOLATION

TRANSFER SWITCH

BYPASS ISOLATION

TRANSFER SWITCH

4P SW

4P SW

A.T.S.

B.T.S.

4P SW

4P SW

A.T.S.

B.T.S.

E

N

L

E

N

L

PIPE SIZES

3/8" NPT

1/2" NPT

3/4" NPT

1" NPT

1-1/4" NPT

1-1/2" NPT

2" NPT

3" NPT

A B C D E F G H

B D

C

D D B G

B G H

G

H A

A

ENGINE

1" 24 VDC

1" RETURN

FROM ENGINE

1" SUPPLY

TO ENGINE

SPIN-ON REPLACEABLE

ELEMENT 30 MICRON

FILTER

LEVEL CONTROLLER

DAY TANK

(DOUBLE WALLED)

2" STD VENT

3" EMERGENCY VENT

1" NPT FOOT VALVE IN MAIN STORAGE

MAIN TANK

(DOUBLE WALLED)

FUEL RETURN

FUEL SUPPLY1"

1"

CHECK VALVE

SOLENOID VALVE

BALL VALVE

UNION

NOTE: ABOVE DIAGRAM INDICATES THE MAJOR PIPING ELEMENTS IN THE FUEL SYSTEM FOR REMOTE TANKS.

IT IS NOT MEANT TO DETAIL ALL OF THE INSPECTION PORTS, MONITORING OR CONTROL LOCATIONS.

FOR SITE OWNED UTILITIES

THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF

SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,

COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR

WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH

EE

T

TI

TL

E:

SH

EE

T

ID

EN

TI

FI

CA

TI

O N

NO

PR

O

JE

C

T N

O

FI

LE

N O

./I N

D

EX

C O

D E:

IS

SU

ED

F

O R:

PR

EL

IM

IN

AR

Y

C O

N

ST

R U

C

TI

O N

FI

N

AL

R

EC

O

R D

DA

TE

D R

AW

N

D

ES

IG

N

ED

C H

EC

KE

D

AP

PR

O

VE

D

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, M

AN

AG

EM

EN

T, A N

D B

U D

G

ET

FA

C

IL

IT

IE

S

AN

D

B U

SI

N

ES

S

SE

R

VI

C

ES

A

D M

IN

IS

TR

AT

IO

N

AD

AM

P . L

AR

C

H , R

.A

D

IR

EC

TO

R

DE

SI

G

N

AN

D

CO

NS

TR

UC

TI

O N

DI

VI

SI

O

N

CALL:

PH:

MR. KENDZIORSKI

(989) 657-3026

ALPENA CRTC ENGINEERING

1/

.J

LM

X E3

O

PE

R

AT

IO

N

AL

D

ET

AI

LS

BU

IL

D

IN

G

AL

PE

NA

C.

R.

T.

C.

M

UL

TI

PL

E

BL

DG

S- G

EN

ER

AT

O

R

RE

PL

AC

EM

EN

T D

EP

AR

TM

EN

T O

F M

IL

IT

AR

Y

AN

D

V

ET

ER

AN

S

AF

FA

IR

S

AL

PE

N

A C

.R .T

.C

AL

PE

N A, M I

M

RI

M

RI

LR M

RI

-2 9-

N.T.S.E300

1 OPERATIONAL ONE LINE DIAGRAM BUILDING 335

N.T.S.E300

2 FUEL SYSTEM PIPING DIAGRAM

Sheets
CS000 - COVER SHEET - BUILDING 335
23452 - CRTC Generator Replacements - Bldg 335 - Sheet - E100 - DEMOLITION PLAN - BUILDING 335.pdf
Sheets
CS000 - COVER SHEET - BUILDING 335
E100 - DEMOLITION PLAN - BUILDING 335
E200 - NEW EQUIPMENT PLAN - BUILDING 335
E300 - OPERATIONAL DETAILS - BUILDING 335
23452 - CRTC Generator Replacements - Bldg 335 - Sheet - E200 - NEW EQUIPMENT PLAN - BUILDING 335.pdf
Sheets
CS000 - COVER SHEET - BUILDING 335
E100 - DEMOLITION PLAN - BUILDING 335
E200 - NEW EQUIPMENT PLAN - BUILDING 335
E300 - OPERATIONAL DETAILS - BUILDING 335
23452 - CRTC Generator Replacements - Bldg 335 - Sheet - E300 - OPERATIONAL DETAILS - BUILDING 335.pdf
Sheets
CS000 - COVER SHEET - BUILDING 335
E100 - DEMOLITION PLAN - BUILDING 335
E200 - NEW EQUIPMENT PLAN - BUILDING 335
E300 - OPERATIONAL DETAILS - BUILDING 335

File details come from the government source that posted it. Updated .