Addendum 1 Bid Drawings.pdf
PDF 754 KB Posted
- Solicitation number
- RFQ 171 260000000276 3
- Issued by
- Allegan County, Flint City, Michigan
About this file
This is an Addendum 1 Bid Drawings document prepared by Sidock Group, Inc. for the State of Michigan Department of Military and Veterans Affairs, specifically for the Alpena Combat Readiness Training Center (CRTC) Generator Replacement project. The project encompasses the repair and replacement of backup generators across three buildings: Building 751, Building 5050, and Building 6131 (Grayling Air-to-Ground Range) at the Alpena CRTC facility in Michigan. The scope of work includes demolition of existing generators, automatic transfer switches, natural gas lines, and associated equipment, followed by installation of new Cummins generators with varying capacities (60 kW for Building 751, 100 kW for Building 5050, and 100 kW for Building 6131), new automatic transfer switches, fuel systems with storage tanks, load banks, and portable generator connection cabinets. The drawings specify wire sizes based on distance from electrical panels, with detailed demolition plans identifying equipment to be removed and retained, new equipment installation plans with specific locations and dimensions, and operational diagrams outlining automatic transfer switch sequences and fuel system configurations.
The contract documents establish that contractors must verify existing conditions prior to submitting bids and include all costs for cutting, patching, and proper installation in their proposals. All work must comply with federal, state, and local laws, codes, ordinances, rules, and regulations. The design indicates 120/208V and 277/480V electrical systems with specific wire gauge requirements (minimum #12 AWG for 0-100 feet, #10 AWG for 100-200 feet, and #8 AWG for 200-250 feet distances). Some electrical work may be required outside regular work hours with premium time costs included in bids. All existing equipment intended to remain must be operational upon project completion, with contractors responsible for recircuiting as necessary. Power outages must be coordinated and scheduled in advance with the owner. The design is by Sidock Group, Inc., with Adam P. Larch, R.A., serving as Director of Design and Construction Division, and MR. Kendziorski available for project inquiries at (989) 657-3026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
SCHOOLCRAFT
MANISTEE
OCEANA
MUSKEGON
MASON
BERRIEN
GOGEBIC
DICKINSON
MENOMINEE
DELTA
ONTONAGON
IRON
BARAGA
HOUGHTON
KEWEENAW
MARQUETTE
ALGER
ST.
CLAIR
HILLSDALE
CASS ST.
JOSEPH BRANCH
LENAWEE MONROE
GLADWIN
MIDLAND
JACKSON
BARRY
VAN
BUREN
ALLEGAN
KALAMAZOO
OTTAWA
KENT
EATON
CALHOUN
IONIA CLINTON
MECOSTA
OSCEOLA
NEWAYGO
LAKE
ISABELLA
MONTCALM GRATIOT
CLARE
INGHAM
WASHTENAW
LIVINGSTON
SHIAWASSEE
GENESEE
OAKLAND
WAYNE
LAPEER
MACOMB
TUSCOLA
SAGINAW
ARENAC
BAY
SANILAC
HURON
ANTRIM
GRAND
TRAVERSE
WEXFORD
LELANAU
BENZIE
MISSAUKEE ROSCOMMON
KALKASKA CRAWFORD
OTSEGO
CHALEVOIX
EMMET
CHEBOYGAN
MACKINAC
OGEMAW IOSCO
OSCODA
MONTMORENCY
ALCONA
ALPENA
PRESQUE
ISLE
LUCE
CHIPPEWA
LOCATION MAP
NO SCALELAKE
MICHIGAN
LAKE
SUPERIOR
LAKE
ERIE
LAKE
HURON
A
AFF
AFG
C
EMT
EF
FMC
GFCI
AMPERE
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
CONDUIT
ELECTRICAL METALLIC TUBING
EXHAUST FAN
FLEXIBLE METALLIC TUBING
GROUND FAULT CIRCUIT INTERRUPTER
GRC
IG
PVC
R
WP
GALVANIZED RIGID CONDUIT
ISOLATED GROUND
CONDUIT
REMOVE
WEATHERPROOF
ABBREVIATIONS
PANELBOARD,ATS,SPD, LOAD BANK OR FUEL TANK: AS NOTED
DUPLEX RECEPTACLE
VARIABLE FREQUENCY DRIVE
POWER SYMBOLS
NOTE SYMBOLS
ELECTRICAL DEMOLITION PLAN NOTES
POWER PLAN NOTESPx
COMBINATION STARTER; SEE SCHEDULE FOR DETAILS
NONFUSED DISCONNECT; SEE SCHEDULE FOR DETAILS
FUSED DISCONNECT; SEE SCHEDULE FOR DETAILS
DUPLEX RECEPTACLE, GROUND FAULT CIRCUIT INTERRUPTGFI
SPECIAL RECEPTACLE; SEE DRAWINGS
JUNCTION BOXJ
NOT ALL SYMBOLS MAY BE USED
Dx
LIGHTING PLAN NOTESLx
TECHNOLOGY PLAN NOTESTx
GENERAL NOTES - APPLY TO ALL SHEETS:
• INSTALLATIONS SHALL CONFORM WITH FEDERAL, STATE, AND LOCAL LAWS,
CODES, ORDINANCES, RULES, AND REGULATIONS WHICH ARE HEREBY MADE A
PART OF THESE CONTRACT DOCUMENTS THE SAME AS IF REPEATED HEREIN.
• CONTRACTOR SHALL INCLUDE IN BID/PROPOSAL COST REQUIRED TO
COMPLETELY AND PROPERLY INSTALL WORK REQUIRED FOR THE PROJECT.
• CONTRACTOR SHALL INCLUDE IN BID/PROPOSAL COST FOR CUTTING AND
PATCHING AS REQUIRED TO INSTALL NEW OR EXISTING WORK, EQUIPMENT OR
SYSTEMS.
• CLEARANCES INDICATED ARE BASED ON BEST AVAILABLE INFORMATION.
CONTRACTOR SHALL VERIFY PIPING, DUCTWORK, ROUTING, AND STRUCTURAL
DETAILS PRIOR TO SUBMITTING A BID/PROPOSAL AND INCLUDE SUCH COSTS
AS REQUIRED TO INSTALL WORK AS SHOWN AND INTENDED.
• ALL POWER OUTAGES SHALL BE COORDINATED AND SCHEDULED IN ADVANCE
WITH THE OWNER.
• WHEREAS PLANS GENERALLY SHOW INDIVIDUAL HOME RUN SINGLE PHASE
BRANCH CIRCUITS, CONTRACTOR MAY RUN UP TO THREE (3) SUCH CIRCUITS IN
A RACEWAY.
• WIRE SIZES: BRANCH CIRCUIT WIRE SIZES SHALL BE BASED ON THE VALUES
INDICATED BELOW
1. 120/208V CABLING FROM PANEL TO THE ELECTRICAL LOAD SHALL BE
ADJUSTED AS FOLLOWS UNLESS SPECIFICALLY NOTED OTHERWISE.
A. 0 TO 100FT: #12AWG MINIMUM
B. 100 TO 200FT: #10AWG MINIMUM
C. 200 TO 250FT: #8AWG MINIMUM
2. 277/480V CABLING FROM PANEL TO THE ELECTRICAL LOAD SHALL BE
ADJUSTED AS FOLLOWS UNLESS SPECIFICALLY NOTED OTHERWISE.
A. 0 TO 150FT: #12AWG MINIMUM
B. 150 TO 250FT: #10AWG MINIMUM
C. 250 TO 350FT: #8AWG MINIMUM
• CIRCUIT NUMBERS SHOWN FOR EXISTING PANELS ARE BASED ON EXISTING
DRAWINGS, SCHEDULES, AND FIELD SURVEY. FIELD VERIFY AS REQUIRED.
• CONTRACT DOCUMENTS CONSIST OF BOTH PROJECT MANUAL AND DRAWINGS
AND BOTH ARE MEANT TO BE COMPLEMENTARY. ANYTHING APPEARING ON
EITHER MUST BE EXECUTED THE SAME AS IF SHOWN ON BOTH.
• SOME ELECTRICAL WORK MAY BE REQUIRED TO BE PERFORMED OFF REGULAR
WORK HOURS. COST FOR PREMIUM TIME SHALL BE INCLUDED IN THE
BID/PROPOSAL.
• ALL EXISTING EQUIPMENT THAT IS TO REMAIN IS INTENDED TO BE
OPERATIONAL AT THE COMPLETION OF THE JOB. THIS CONTRACTOR SHALL
RECIRCUIT WHERE NECESSARY TO ENSURE THIS CONTINUED OPERATION.
FOR SITE OWNED UTILITIES
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH
EE
T
TI
TL
E:
SH
EE
T
ID
EN
TI
FI
CA
TI
O N
NO
PR
O
JE
C
T N
O
FI
LE
N O
./I N
D
EX
C O
D E:
IS
SU
ED
F
O R:
PR
EL
IM
IN
AR
Y
C O
N
ST
R U
C
TI
O N
FI
N
AL
R
EC
O
R D
DA
TE
D R
AW
N
D
ES
IG
N
ED
C H
EC
KE
D
AP
PR
O
VE
D
ST
AT
E O
F M
IC
H
IG
AN
D
EP
AR
TM
EN
T
O F
TE
C
H N
O
LO
G Y, M
AN
AG
EM
EN
T, A N
D B
U D
G
ET
FA
C
IL
IT
IE
S
AN
D
B U
SI
N
ES
S
SE
R
VI
C
ES
A
D M
IN
IS
TR
AT
IO
N
AD
AM
P . L
AR
C
H , R
.A
D
IR
EC
TO
R
DE
SI
G
N
AN
D
CO
NS
TR
UC
TI
O N
DI
VI
SI
O
N
CALL:
PH:
MR. KENDZIORSKI
(989) 657-3026
ALPENA CRTC ENGINEERING
1/
.J
LM
X C
S0
C O
VE
R
S H
EE
T
AL
PE
NA
C.
R.
T.
C.
M
UL
TI
PL
E
BL
DG
S- G
EN
ER
AT
O
R
RE
PL
AC
EM
EN
T D
EP
AR
TM
EN
T O
F M
IL
IT
AR
Y
AN
D
V
ET
ER
AN
S
AF
FA
IR
S
AL
PE
N
A C
.R .T
.C
AL
PE
N A, M I
M
RI
M
RI
LR M
RI
-2 2-
Sheet List Sheet Number Sheet Name
CS000 COVER SHEET
E100A DEMOLITION PLAN - CRTC - BUILDING 751
E100B DEMOLITION PLAN - CRTC - BUILDING 5050
E100C DEMOLITION PLAN - RANGE - BUILDING 6131
E200A NEW EQUIPMENT PLAN - BUILDING 751
E200B NEW EQUIPMENT PLAN - CRTC - BUILDING 5050
E200C NEW EQUIPMENT PLAN - RANGE - BUILDING 6131
E300 OPERATIONAL DETAILS BUILDING 751,5050 & 6131
Grayling Air-to-Ground Range - Building 6131
Alpena CRTC Bldgs 731, 5050
SITE
SITE
REPAIR/REPLACE BACKUP GENERATORS
ALPENA C.R.T.C. BUILDINGS 751 & 5050
& GRAYLING AIR-TO-GROUND RANGE BUILDING 6131
MICHIGAN AIR NATIONAL GUARD
ALPENA, MICHIGAN
5"
12' - 0"
2'
- 6
"3' - 5"
100KW GEN
BATTERY CHARGER
LOAD BANK CONTROL PANEL
VENTILATION
CONTROL
PANEL
DP-7
S.P.D.
JUNCTION BOX
S.P.D.
CITEL BASE ONE
MAIN DISC SWITCH
S.P.D.
INTAKE LOUVER
EXHAUST LOUVER
D1
D2
D3
D4
D5
ATS
E200A
100KW
A.T.S #5
EXISTING 100KW
GENERATOR #5EXIST.
MAIN
DISC
FROM
TRANSFORMER
277/480V
3PH, 4W
SPD
EXISTING
TO REMAIN
LOAD
BANK
JB
TO BLDG 750
50A
MCB
120/208V
3PH, 4W
EXIST.
DP-1EXIST.
SPD
EXISTING
TO REMAIN
SPD
EXISTING
TO REMAIN
ALL EQUIPMENT SHOWN ON THIS SHEET IS EXISTING. REMOVE
ALL DEVICES ON WALLS TO BE DEMO'D. DASHED LINES
INDICATE EXISTING EQUIPMENT TO BE REMOVED. SOLID LINES
INDICATE EXISTING EQUIPMENT TO REMAIN.
EXISTING EQUIPMENT THAT IS TO REMAIN IS INTENDED TO BE
OPERATIONAL AT THE COMPLETION OF THE PROJECT.
RECIRCUIT WHERE NECESSARY TO INSURE CONTINUED
OPERATION.
EXISTING EQUIPMENT SHOWN ON DRAWINGS IS BELIEVED TO
BE A REASONABLE INDICATION OF THE EXISTING LAYOUT.
EXACT QUANTITY AND LOCATION SHALL BE DETERMINED AT
THE JOB SITE. THE EXISTING DRAWINGS ARE FOR
CONVENIENCE ONLY AND NOT FOR THE BASIS OF BIDDING.
• REMOVE ABANDONED WIRE COMPLETELY TO ITS SOURCE UNLESS NOTED
OTHERWISE. REMOVE ABANDONED RACEWAY WITHIN THE PROJECT AREA AND CAP
STUBS THAT REMAIN. SEAL PENETRATIONS THROUGH FLOORS AND WALLS.
• EXISTING EQUIPMENT THAT REMAINS IS INTENDED TO BE OPERATIONAL AT THE
COMPLETION OF THE JOB. RECIRCUIT WHERE NECESSARY TO ENSURE THIS
CONTINUED OPERATION.
• THE EXISTING EQUIPMENT SHOWN ON THE DRAWINGS IS BELIEVED TO BE A
REASONABLE INDICATION OF THE PRESENT LAYOUT. DETERMINE EXACT QUANTITY
AND LOCATION AT THE JOB SITE. THE EXISTING DRAWINGS ARE FOR CONVENIENCE
ONLY AND NOT FOR THE BASIS OF BIDDING.
• VERIFY ALL DEMOLITION WORK PRIOR TO SUBMITTING A BID/PROPOSAL.
• DETERMINE AND MAINTAIN TRANSIENT SERVICES THROUGH PROJECT AREA AS
REQUIRED.
• SOME REQUIRED DEMOLITION WORK MAY NOT BE INDICATED ON THESE DRAWINGS.
• EXISTING RACEWAYS AND BOXES MAY BE REUSED WHERE FOUND TO BE SUITABLE.
INCLUDE IN BID/PROPOSAL COSTS FOR CUTTING AND PATCHING AS REQUIRED TO
INSTALL NEW OR EXISTING WORK, EQUIPMENT, OR SYSTEMS.
FOR SITE OWNED UTILITIES
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH
EE
T
TI
TL
E:
SH
EE
T
ID
EN
TI
FI
CA
TI
O N
NO
PR
O
JE
C
T N
O
FI
LE
N O
./I N
D
EX
C O
D E:
IS
SU
ED
F
O R:
PR
EL
IM
IN
AR
Y
C O
N
ST
R U
C
TI
O N
FI
N
AL
R
EC
O
R D
DA
TE
D R
AW
N
D
ES
IG
N
ED
C H
EC
KE
D
AP
PR
O
VE
D
ST
AT
E O
F M
IC
H
IG
AN
D
EP
AR
TM
EN
T
O F
TE
C
H N
O
LO
G Y, M
AN
AG
EM
EN
T, A N
D B
U D
G
ET
FA
C
IL
IT
IE
S
AN
D
B U
SI
N
ES
S
SE
R
VI
C
ES
A
D M
IN
IS
TR
AT
IO
N
AD
AM
P . L
AR
C
H , R
.A
D
IR
EC
TO
R
DE
SI
G
N
AN
D
CO
NS
TR
UC
TI
O N
DI
VI
SI
O
N
CALL:
PH:
MR. KENDZIORSKI
(989) 657-3026
ALPENA CRTC ENGINEERING
1/
.J
LM
X E1
A
D
EM
O
LI
TI
O
N P
LA
N
C
R
TC
BU
IL
D
IN
G
AL
PE
NA
C.
R.
T.
C.
M
UL
TI
PL
E
BL
DG
S- G
EN
ER
AT
O
R
RE
PL
AC
EM
EN
T D
EP
AR
TM
EN
T O
F M
IL
IT
AR
Y
AN
D
V
ET
ER
AN
S
AF
FA
IR
S
AL
PE
N
A C
.R .T
.C
AL
PE
N A, M I
M
RI
M
RI
Ch ec ke r
Ap pr ov er
-2 2-
1/2" = 1'-0"E100A
1 BUILDING 751 DEMOLITION PLAN
N.T.S.
PHOTO - EXISTING ATS
N.T.S.
PHOTO - EXISTING GENERATOR
SHEET SPECIFIC DEMOLITION PLAN NOTES
D1 REMOVE EXISTING AUTOMATIC TRANSFER SWITCH ENTIRELY. COORDINATE REMOVAL WITH OWNER TO MINIMIZE ANY DOWNTIME FOR EQUIPMENT ASSOCIATED WITH THIS A.T.S.
D2 REMOVE EXISTING GENERATOR AND ASSOCIATED ACCESSORIES ENTIRELY. REMOVE AND PATCH ANY LOCATIONS OF ANCHOR BOLTS WHICH ARE NOT SUITABLE FOR REUSE WITH
NEW EQUIPMENT.
D3 REMOVE EXISTING NATURAL GAS LINE BACK TO NEAREST METER POINT AND CAP.
D4 RETAIN EXISTING LOAD BANK CONTROLLER AND ASSOCIATED CONDUITS AND CONDUCTORS TO JB.
D5 REMOVE CONDUCTORS FROM CONDUIT(S) BETWEEN GENERATOR AND ATS FOR EQUIPMENT REPLACEMENT. CONDUT(S) MAY REMAIN WHERE SUITABLE FOR REUSE FOR NEW
EQUIPMENT.
N.T.S.
EXISTING RISER DIAGRAM
N.T.S.
EXISTING NOTES
N.T.S.E100A
2 DEMOLITION NOTES - APPLY TO ALL DEMOLITION SHEETS
2'
- 0
2'
- 6
3'
- 0
3' - 6"
PAD
PAD
3' - 5"
D1
D2
D3
D4
D4
PANEL B
D5
D6
A.
T.
S.
GENERATOR #6
EXIST.
30KW
A.T.S #6
EXIST. 30KW
GENERATOR #6
FROM
TRANSFORMER
EXIST.
PANEL
'B'
120/240V
1PH, 3W
ALL EQUIPMENT SHOWN ON THIS SHEET IS EXISTING.
DASHED LINES INDICATE EXISTING EQUIPMENT TO BE
REMOVED. SOLID LINES INDICATE EXISTING EQUIPMENT TO
REMAIN.
EXISTING EQUIPMENT THAT IS TO REMAIN IS INTENDED TO BE
OPERATIONAL AT THE COMPLETION OF THE PROJECT.
RECIRCUIT WHERE NECESSARY TO ENSURE CONTINUED
OPERATION.
EXISTING EQUIPMENT SHOWN ON DRAWINGS IS BELIEVED TO
BE A REASONABLE INDICATION OF THE EXISTING LAYOUT.
EXACT QUANTITY AND LOCATION SHALL BE DETERMINED AT
THE JOB SITE. THE EXISTING DRAWINGS ARE FOR
CONVENIENCE ONLY AND NOT FOR THE BASIS OF BIDDING.
FOR SITE OWNED UTILITIES
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH
EE
T
TI
TL
E:
SH
EE
T
ID
EN
TI
FI
CA
TI
O N
NO
PR
O
JE
C
T N
O
FI
LE
N O
./I N
D
EX
C O
D E:
IS
SU
ED
F
O R:
PR
EL
IM
IN
AR
Y
C O
N
ST
R U
C
TI
O N
FI
N
AL
R
EC
O
R D
DA
TE
D R
AW
N
D
ES
IG
N
ED
C H
EC
KE
D
AP
PR
O
VE
D
ST
AT
E O
F M
IC
H
IG
AN
D
EP
AR
TM
EN
T
O F
TE
C
H N
O
LO
G Y, M
AN
AG
EM
EN
T, A N
D B
U D
G
ET
FA
C
IL
IT
IE
S
AN
D
B U
SI
N
ES
S
SE
R
VI
C
ES
A
D M
IN
IS
TR
AT
IO
N
AD
AM
P . L
AR
C
H , R
.A
D
IR
EC
TO
R
DE
SI
G
N
AN
D
CO
NS
TR
UC
TI
O N
DI
VI
SI
O
N
CALL:
PH:
MR. KENDZIORSKI
(989) 657-3026
ALPENA CRTC ENGINEERING
1/
.J
LM
X E1
B
D
EM
O
LI
TI
O
N P
LA
N
C
R
TC
BU
IL
D
IN
G
AL
PE
NA
C.
R.
T.
C.
M
UL
TI
PL
E
BL
DG
S- G
EN
ER
AT
O
R
RE
PL
AC
EM
EN
T D
EP
AR
TM
EN
T O
F M
IL
IT
AR
Y
AN
D
V
ET
ER
AN
S
AF
FA
IR
S
AL
PE
N
A C
.R .T
.C
AL
PE
N A, M I
M
RI
M
RI
LR M
RI
-2 2-
1/2" = 1'-0"E100B
1 DEMOLITION PLAN - BUILDING 5050
SHEET SPECIFIC ELECTRICAL DEMOLITION PLAN NOTES
D1 REMOVE EXISTING AUTOMATIC TRANSFER SWITCH AND ASSOCIATED ACCESSORIES ENTIRELY. COORDINATE REMOVAL WITH OWNER TO MINIMIZE ANY
DOWNTIME FOR EQUIPMENT ASSOCIATED WITH THIS A.T.S.
D2 REMOVE EXISTING GENERATOR ENTIRELY.
D3 REMOVE EXISTING DOUBLE THROW SWITCH AND ALL ASSOCIATED CONDUITS AND CONDUCTORS.
D4 REMOVE EXISTING PADS ENTIRELY TO PREPARE FOR INSTALLING A CONTINOUS PAD IN THEIR PLACE.
D5 REMOVE EXISTING NATURAL GAS LINE BACK TO NEAREST METER POINT AND CAP.
D6 REMOVE EXISTING CONDUITS FROM GENERATOR TO A.T.S. ENTIRELY.
N.T.S.
EXISTING RISER DIAGRAM
N.T.S.
PHOTO - EXISTING GENERATOR
N.T.S.
PHOTO - EXISTING ATS
EXISTING NOTES
GENERATOR
ROOM
96'-4" 54'-8" 15'-4"
166'-4"
33'-8"
'-0
'-0 1 _ 8"
'-0
'-4
'-0
'-1
DW
101 102
103 105 104
AT
S
ATS
CONSTRUCTION AREA
D1
D2
D3EXISTING MAIN DISCONNECT
MDP DP
D4
D5
AIR COMPRESSOR
600A A.T.S
100KW
GENERATOR #7
EXIST.
MAIN
DISC
FROM
TRANSFORMER
EXIST.
PANEL
'MDP
600A
120/240V
1PH, 3W
120/240V
1PH, 3W
600A
EXIST.
PANEL
'DP
120/240V
1PH, 3W
200A
ALL EQUIPMENT SHOWN ON THIS SHEET IS EXISTING.
DASHED LINES INDICATE EXISTING EQUIPMENT TO BE
REMOVED. SOLID LINES INDICATE EXISTING EQUIPMENT TO
REMAIN.
EXISTING EQUIPMENT THAT IS TO REMAIN IS INTENDED TO BE
OPERATIONAL AT THE COMPLETION OF THE PROJECT.
RECIRCUIT WHERE NECESSARY TO INSURE CONTINUED
OPERATION.
EXISTING EQUIPMENT SHOWN ON DRAWINGS IS BELIEVED TO
BE A REASONABLE INDICATION OF THE EXISTING LAYOUT.
EXACT QUANTITY AND LOCATION SHALL BE DETERMINED AT
THE JOB SITE. THE EXISTING DRAWINGS ARE FOR
CONVENIENCE ONLY AND NOT FOR THE BASIS OF BIDDING.
FOR SITE OWNED UTILITIES
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH
EE
T
TI
TL
E:
SH
EE
T
ID
EN
TI
FI
CA
TI
O N
NO
PR
O
JE
C
T N
O
FI
LE
N O
./I N
D
EX
C O
D E:
IS
SU
ED
F
O R:
PR
EL
IM
IN
AR
Y
C O
N
ST
R U
C
TI
O N
FI
N
AL
R
EC
O
R D
DA
TE
D R
AW
N
D
ES
IG
N
ED
C H
EC
KE
D
AP
PR
O
VE
D
ST
AT
E O
F M
IC
H
IG
AN
D
EP
AR
TM
EN
T
O F
TE
C
H N
O
LO
G Y, M
AN
AG
EM
EN
T, A N
D B
U D
G
ET
FA
C
IL
IT
IE
S
AN
D
B U
SI
N
ES
S
SE
R
VI
C
ES
A
D M
IN
IS
TR
AT
IO
N
AD
AM
P . L
AR
C
H , R
.A
D
IR
EC
TO
R
DE
SI
G
N
AN
D
CO
NS
TR
UC
TI
O N
DI
VI
SI
O
N
CALL:
PH:
MR. KENDZIORSKI
(989) 657-3026
ALPENA CRTC ENGINEERING
1/
.J
LM
X E1
C
D
EM
O
LI
TI
O
N P
LA
N
R
AN
G
E -B
U
IL
D
IN
G
AL
PE
NA
C.
R.
T.
C.
M
UL
TI
PL
E
BL
DG
S- G
EN
ER
AT
O
R
RE
PL
AC
EM
EN
T D
EP
AR
TM
EN
T O
F M
IL
IT
AR
Y
AN
D
V
ET
ER
AN
S
AF
FA
IR
S
AL
PE
N
A C
.R .T
.C
AL
PE
N A, M I
M
RI
M
RI
LR M
RI
-2 2-
1" = 30'-0"E100C
1 BLDG 6131 REFERENCE PLAN
1/2" = 1'-0"E100C
2 BLDG 6131 GENERATOR ROOM DEMOLITION PLAN
SHEET SPECIFIC ELECTRICAL DEMOLITION PLAN NOTES
D1 REMOVE EXISTING GENERATOR ENTIRELY. REMOVE AND PATCH ANY LOCATIONS OF ANCHOR BOLTS WHICH ARE NOT SUITABLE FOR REUSE WITH NEW EQUIPMENT.
D2 REMOVE EXISTING AUTOMATIC TRANSFER SWITCH ENTIRELY. COORDINATE REMOVAL WITH OWNER TO MINIMIZE ANY DOWNTIME FOR EQUIPMENT ASSOCIATED WITH THIS A.T.S
D3 REMOVE EXISTING 600 AMP, DOUBLE THROW SWITCH.
D4 REMOVE EXISTING CONDUCTORS. RETAIN EXISTING UNDERGROUND POWER CONDUITS RUNNING FROM GENERATOR TO ATS FOR REUSE WITH NEW EQUIPMENT IF SUITABLE.
D5 REMOVE EXISTING NATURAL GAS LINE BACK TO NEAREST METER POINT AND CAP.
N.T.S.
EXISTING RISER DIAGRAM
N.T.S.
PHOTO - EXISTING GENERATOR
N.T.S.
PHOTO- EXISTING A.T.S.
EXISTING NOTES
NEW A.T.S.
NEW 60KW
GENERATOR
EXISTING VENTILATION
CONTROL PANEL TO REMAIN
EXISTING S.P.D.
TO REMAIN
EXISTING MAIN
DISCONNECT SWITCH
TO REMAIN
EXISTING CITEL BASE ONE
TO REMAIN
EXISTING S.P.D.
TO REMAIN
EXISTING PANEL DP-7
TO REMAIN
EXISTING S.P.D.
TO REMAIN
NEW LOAD BANK &
PORTABLE GENERATOR
CABINET
500 GAL
FUEL TANK
P1
P2
P3
P4
P5
P6
P8
50 GAL.
DAY
TANK
P9
P10
E200A
PUMP
PACKAGE
EXISTING
LOAD BANK
CONTROL
P11
NEW
60KW
A.T.S
NEW
60KW
GENERATOR
EXIST.
MAIN
DISC
FROM
TRANSFORMER
277/480V
3PH, 4W
EXIST.
LOAD
BANK
TO BLDG 750
277/480V
3PH, 4W
NEW
LOAD BANK/
PORTABLE
GENERATOR
CONNECTION
CABINET
1-1/4" C. - (4) - #3 AWG + #8 GRD.
1-1/4" C. - (4) - #3 AWG + #8 GRD.
RECONNECT EXISTING SURGE PROTECTIVE DEVICE (GENERATOR SIDE)
INSTALL WITH SHORTEST CONDUCTOR LENGTH POSSIBLE.
EXIST.
LOAD
BANK
CNTRL.
SPD (EXISTING)
JB (EXISTING)
SPD (EXISTING)
500 GAL DIESEL
FUEL TANK
50 GAL
DAY TANK
60KW GEN.
ONLY (1) FUEL LINE SHOWN AS EXAMPLE.
(2) LINES (SUPPLY & RETURN REQUIRED)
FUEL VENT
CONCRETE PAD
6" THICK, 4000PSI
W/FIBER (REFER TO SPECS)
CONCRETE PAD
6" THICK, 4000PSI
W/FIBER (REFER TO SPECS)
(2) CONDUITS, POWER & CONTROLS
2'
- 0
SUSPEND AT OR NEAR CEILING TO AVOID INTERFERENCE WITH LIGHTS, CONDUITS,ETC.
FUEL LINES AT GRADE
FOR SITE OWNED UTILITIES
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH
EE
T
TI
TL
E:
SH
EE
T
ID
EN
TI
FI
CA
TI
O N
NO
PR
O
JE
C
T N
O
FI
LE
N O
./I N
D
EX
C O
D E:
IS
SU
ED
F
O R:
PR
EL
IM
IN
AR
Y
C O
N
ST
R U
C
TI
O N
FI
N
AL
R
EC
O
R D
DA
TE
D R
AW
N
D
ES
IG
N
ED
C H
EC
KE
D
AP
PR
O
VE
D
ST
AT
E O
F M
IC
H
IG
AN
D
EP
AR
TM
EN
T
O F
TE
C
H N
O
LO
G Y, M
AN
AG
EM
EN
T, A N
D B
U D
G
ET
FA
C
IL
IT
IE
S
AN
D
B U
SI
N
ES
S
SE
R
VI
C
ES
A
D M
IN
IS
TR
AT
IO
N
AD
AM
P . L
AR
C
H , R
.A
D
IR
EC
TO
R
DE
SI
G
N
AN
D
CO
NS
TR
UC
TI
O N
DI
VI
SI
O
N
CALL:
PH:
MR. KENDZIORSKI
(989) 657-3026
ALPENA CRTC ENGINEERING
1/
.J
LM
X E2
A
N
EW
E Q
U
IP
M
EN
T
PL
AN
BU
IL
D
IN
G
AL
PE
NA
C.
R.
T.
C.
M
UL
TI
PL
E
BL
DG
S- G
EN
ER
AT
O
R
RE
PL
AC
EM
EN
T D
EP
AR
TM
EN
T O
F M
IL
IT
AR
Y
AN
D
V
ET
ER
AN
S
AF
FA
IR
S
AL
PE
N
A C
.R .T
.C
AL
PE
N A, M I
M
RI
M
RI
Ch ec ke r
Ap pr ov er
-2 2-
1/2" = 1'-0"E200A
1 BUILDING 751 NEW EQUIPMENT PLAN
N.T.S.
NEW EQUIPMENT RISER DIAGRAM
SHEET SPECIFIC NEW EQUIPMENT PLAN NOTES
P1 PROVIDE NEW PAD 6" THICK,WITH DIMENSIONS EXCEEDING GENERATOR AND DAY TANK BY 2" ON ALL SIDES. PROVIDE & INSTALL CUMMINS C60D6C 60KW, 277/480 VOLT, 3 PHASE, 4
WIRE GENERATOR AT THIS LOCATION.
P2 PROVIDE AND INSTALL CUMMINS BTPCB 150 AMP, 4 POLE AUTOMATIC TRANSFER SWITCH AT THIS LOCATION P3 PROVIDE AND INSTALL FOXFAB FFIS-C3-200-TM-U4-GL-ALU-LA CABINET OR APPROVED EQUAL AT THIS LOCATION.
P4 PROVIDE NEW PAD WITH DIMENSIONS EXCEEDING DIESEL TANK BY 2" ON THREE SIDES AND 8" ON SIDE TOWARDS BUILDING (TO ALLOW FOR SLEEVES).
P5 PROVIDE TRENCH MINIMUM OF 2' DEEP FROM NEW TANK LOCATION TO BUILDING FOR SUPPLY AND RETURN FUEL LINES AND ELECTRICAL CONDUIT FOR MONITORING EQUIPMENT.
P6 CORE DRILL FOUNDATION AND PROVIDE SLEEVES FOR FUEL LINES AND CONDUIT.
P8 PROVIDE AND INSTALL SHEET METAL TRANSITION FROM GENERATOR TO EXISTING THRU-THE-WALL-LOUVER. UTILIZE DUCT-MATE SILICON PROFLEX OR APPROVED EQUAL FOR
TRANSITION TO SHEET METAL TO ELIMINATE VIBRATION TRANSMISSION.
P9 PROVIDE AND INSTALL 50 GALLON DAY TANK. CONFIRM EXACT ORIENTATION WITH SUPPLIER PRIOR TO BEGINNING WORK.
P10 PROVIDE AND INSTALL (2) 20 AMP, SINGLE POLE BREAKERS IN EXISTING SPACES TO POWER FUEL SYSTEM AND LOAD BANK/PORTABLE GENERATOR CONTROL CABINET.
P11 PROVIDE SLEEVES FOR STUB-UPS OF SUPPLY AND RETURN FUEL LINES AND POWER AND MONITORING CONDUITS.
1/2" = 1'-0"E200A 3 Section 1
PAD
TANK
A.T.S.
PANEL B
P1
P2
P3
P4
NEW LOAD BANK/
PORTABLE GENERATOR
CONNECTION CABINET
P5
NEW
NEW 20KW
GENERATOR
P6
PORTABLE LOAD BANK
NEW
20KW
A.T.S
NEW 20KW
GENERATOR
FROM
TRANSFORMER
EXIST.
PANEL
'B'
120/240V
1PH, 3W
S.P.D.
NEW
LOAD BANK
/PORT. GEN
CONNECTION
CABINET
NEW
PORTABLE
LOAD
BANK
NEW SURGE PROTECTIVE DEVICE TPD MODEL TK-TTLP-1S240-FL (GENERATOR SIDE)
INSTALL WITH SHORTEST CONDUCTOR LENGTH POSSIBLE.
S.P.D.
NEW SURGE PROTECTIVE DEVICE TPD MODEL TK-TTLP-1S240-FL (UTILITY SIDE)
INSTALL WITH SHORTEST CONDUCTOR LENGTH POSSIBLE.
REDUCED FROM OLD 30KW TO NEW 20KW
1" C. - 3 - #2 AWG + #8 GRD. 1" C. - 3 - #2 AWG + #8 GRD. TEMPORARY HOOKUP
WHEN TESTING
(BY OWNER)
FOR SITE OWNED UTILITIES
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH
EE
T
TI
TL
E:
SH
EE
T
ID
EN
TI
FI
CA
TI
O N
NO
PR
O
JE
C
T N
O
FI
LE
N O
./I N
D
EX
C O
D E:
IS
SU
ED
F
O R:
PR
EL
IM
IN
AR
Y
C O
N
ST
R U
C
TI
O N
FI
N
AL
R
EC
O
R D
DA
TE
D R
AW
N
D
ES
IG
N
ED
C H
EC
KE
D
AP
PR
O
VE
D
ST
AT
E O
F M
IC
H
IG
AN
D
EP
AR
TM
EN
T
O F
TE
C
H N
O
LO
G Y, M
AN
AG
EM
EN
T, A N
D B
U D
G
ET
FA
C
IL
IT
IE
S
AN
D
B U
SI
N
ES
S
SE
R
VI
C
ES
A
D M
IN
IS
TR
AT
IO
N
AD
AM
P . L
AR
C
H , R
.A
D
IR
EC
TO
R
DE
SI
G
N
AN
D
CO
NS
TR
UC
TI
O N
DI
VI
SI
O
N
CALL:
PH:
MR. KENDZIORSKI
(989) 657-3026
ALPENA CRTC ENGINEERING
1/
.J
LM
X E2
B
N
EW
E Q
U
IP
M
EN
T
PL
AN
C R
TC
BU
IL
D
IN
G
AL
PE
NA
C.
R.
T.
C.
M
UL
TI
PL
E
BL
DG
S- G
EN
ER
AT
O
R
RE
PL
AC
EM
EN
T D
EP
AR
TM
EN
T O
F M
IL
IT
AR
Y
AN
D
V
ET
ER
AN
S
AF
FA
IR
S
AL
PE
N
A C
.R .T
.C
AL
PE
N A, M I
M
RI
M
RI
LR M
RI
-2 2-
1/2" = 1'-0"E200B
1 NEW EQUIPMENT PLAN - BUILDING 5050
N.T.S.E200B
2 NEW EQUIPMENT RISER DIAGRAM
SHEET SPECIFIC NEW EQUIPMENT PLAN NOTES
P1 PROVIDE NEW HOUSEKEEPING PAD DIMENSIONED TO BE 6" THICK AND EXTENDING 3" BEYOND THE GENERATOR DIMENSIONS ON ALL SIDES.
P2 PROVIDE AND INSTALL NEW CUMMINS C20D6 20KW, 120/240 VOLT, SINGLE PHASE GENERATOR WITH 195 GALLON SUB-BASE TANK.
P3 PROVIDE AND INSTALL CUMMINS BTPCB 150 AMP, 3 POLE BYPASS ISOLATION TRANSFER SWITCH, 150 AMP RATED. ROUTE INCOMING UTILITY SUPPLY TO THIS LOCATION AND
PROVIDE FEED TO GENERATOR AND LOAD.
P4 PROVIDE AND INSTALL FOXFAB FFIS-C3-100-TM-U1-GL-ALU-LA CABINET OR APPROVED EQUAL AT THIS LOCATION.
P5 PROVIDE AND INSTALL SHEET METAL TRANSITION FROM GENERATOR TO EXISTING THRU THE WALL LOUVER. UTILIZE DUCT-MATE SILICON PROFLEX OR APPROVED EQUAL FOR
TRANSITION TO SHEET METAL TO ELIMINATE VIBRATION TRANSMISSION.
P6 PROVIDE AFTRON PORTABLE LOAD BANK MODEL 2600, 21.75KW, 120/240V LOAD BANK OR APPROVED EQUAL. UNIT TO BE STORED WHEN NOT IN USE AT OWNER'S DESCRETION.
NEW 600A A.T.S
NEW 100KW GENERATOR
EXISTING LOUVER 32" W X 53" H
16" A.F.F.
S.P.D
S.P.D.
LOAD BANK/
PORT. GEN.
CONTROLLER
LOAD BANK
GALLON
FUEL
TANK
P1
P2
P3
P4
P5
P6
P7
P8
MDP DP
50 GAL
DAY
TANK
P9
P10
LOAD BANK
CONTROL PANEL
P11
E200C
DUPLEX
PUMPS
GALLON
FUEL
TANK
P13
P14
NEW
600A A.T.S
NEW 100KW
GENERATOR
EXIST.
MAIN
DISC
FROM
TRANSFORMER
EXIST.
PANEL
'MDP
600A
120/240V
1PH, 3W
120/240V
1PH, 3W
600A
2 - 2-1/2"C, 3 - 350MCM + #2 GRD IN EA.
SPD
DEVICE
SPD
DEVICE
LOAD
BANK/
PORT.
GEN.
CNTRL.
100KW
LOAD
BANK
2- 2-1/2" C., 3 - 350MCM + #2 GRD. IN EA.
SURGE PROTECTIVE DEVICE TPD MODEL TK-TTLP-1S240-FL (GENERATOR SIDE)
INSTALL WITH SHORTEST CONDUCTOR LENGTH POSSIBLE.
SURGE PROTECTIVE DEVICE TPD MODEL TK-TTLP-1S240-FL (UTILITY)
INSTALL WITH SHORTEST CONDUCTOR LENGTH POSSIBLE.
EXIST.
PANEL
'DP
120/240V
1PH, 3W
200A
50 GALLON
DAY TANK
700 GALLON
TANK
6" THICK PAD, 4000PSI
W/FIBER REFER TO SPECIFICATIONS
SUPPLY AND RETURN LINES
RUN FUEL LINES ON GRADE
FOR SITE OWNED UTILITIES
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH
EE
T
TI
TL
E:
SH
EE
T
ID
EN
TI
FI
CA
TI
O N
NO
PR
O
JE
C
T N
O
FI
LE
N O
./I N
D
EX
C O
D E:
IS
SU
ED
F
O R:
PR
EL
IM
IN
AR
Y
C O
N
ST
R U
C
TI
O N
FI
N
AL
R
EC
O
R D
DA
TE
D R
AW
N
D
ES
IG
N
ED
C H
EC
KE
D
AP
PR
O
VE
D
ST
AT
E O
F M
IC
H
IG
AN
D
EP
AR
TM
EN
T
O F
TE
C
H N
O
LO
G Y, M
AN
AG
EM
EN
T, A N
D B
U D
G
ET
FA
C
IL
IT
IE
S
AN
D
B U
SI
N
ES
S
SE
R
VI
C
ES
A
D M
IN
IS
TR
AT
IO
N
AD
AM
P . L
AR
C
H , R
.A
D
IR
EC
TO
R
DE
SI
G
N
AN
D
CO
NS
TR
UC
TI
O N
DI
VI
SI
O
N
CALL:
PH:
MR. KENDZIORSKI
(989) 657-3026
ALPENA CRTC ENGINEERING
1/
.J
LM
X E2
C
N
EW
E Q
U
IP
M
EN
T
PL
AN
-R
AN
G
E -B
U
IL
D
IN
G
AL
PE
NA
C.
R.
T.
C.
M
UL
TI
PL
E
BL
DG
S- G
EN
ER
AT
O
R
RE
PL
AC
EM
EN
T D
EP
AR
TM
EN
T O
F M
IL
IT
AR
Y
AN
D
V
ET
ER
AN
S
AF
FA
IR
S
AL
PE
N
A C
.R .T
.C
AL
PE
N A, M I
M
RI
M
RI
LR M
RI
-2 2-
1/2" = 1'-0"E200C
1 BLDG 6131 GENERATOR ROOM NEW EQUIPMENT PLAN
N.T.S.E200C
2 NEW RISER DIAGRAM
SHEET SPECIFIC NEW EQUIPMENT PLAN NOTES
P1 PROVIDE NEW PAD WITH DIMENSIONS EXCEEDING GENERATOR AND DAY TANK BY 2" ON ALL SIDES. PROVIDE & INSTALL CUMMINS C100D6C 100KW, 120/240
VOLT, 1 PHASE, 3 WIRE GENERATOR AT THIS LOCATION.
P2 PROVIDE AND INSTALL CUMMINS BTPCC 600 AMP, 3 POLE AUTOMATIC TRANSFER SWITCH AT THIS LOCATION P3 PROVIDE AND INSTALL FOXFAB FFIS-C3-600-TM-U1-GL-ALU-LB CABINET OR APPROVED EQUAL AT THIS LOCATION.
P4 PROVIDE AND INSTALL SHEET METAL TRANSITION FROM GENERATOR TO EXISTING THRU THE WALL LOUVER.
P5 PROVIDE TRENCH MINIMUM OF 2' DEEP FROM NEW TANK LOCATION TO BUILDING FOR ELECTRICAL CONDUIT FOR MONITORING EQUIPMENT.
P6 CORE DRILL FOUNDATION AND PROVIDE SLEEVES FOR FUEL LINES AND CONDUIT.
P7 SAW CUT FLOOR AND TRENCH FROM FOUNDATION TO GENERATOR LOCATION. COORDINATE EXACT STUBUP LOCATIONS WITH MANUFACTURER.
P8 PROVIDE NEW PAD WITH DIMENSIONS EXCEEDING DIESEL TANK BY 2" ON ALL SIDES.
P9 PROVIDE AND INSTALL 25 GALLON DAY TANK. CONFIRM EXACT ORIENTATION WITH SUPPLIER PRIOR TO BEGINNING WORK.
P10 PROVIDE AND INSTALL (2) 20 AMP, SINGLE POLE BREAKERS IN EXISTING SPACES TO POWER FUEL SYSTEM AND LOAD BANK/PORTABLE GENERATOR
CONTROL CABINET.
P11 PROVIDE NEW PAD WITH DIMENSIONS EXCEEDING LOAD BANK BY 2" ON ALL SIDES. PROVIDE AND INSTALL AFTRON LOAD BANK MODEL 4100 100KW LOAD
BANK OR APPROVED EQUAL WITH MANUAL LOAD CONTROL PANEL AS SHOWN.
P13 PROVIDE AND INSTALL SUPPLY AND RETURN PIPING BETWEEN TANKS SUCH THAT DUPLEX PUMPS CAN PULL DIESEL FUEL FROM BOTH TANKS AS
REQUIRED.
P14 PROVIDE SLEEVES FOR STUB-UPS OF POWER AND MONITORING CONDUITS.
1/2" = 1'-0"E200C 3 Section 1
FROM
TRANSFORMER
3P SW
3P SW
2P LOAD
BANK
PORTABLE GENERATOR LUGS
2P
100KW
120/240V
1PH, 3W
GENERATOR
GENERATOR BREAKER
LOAD BANK CONTROL
PANEL
LOAD BANK/
PORT. GEN.
CONNECTION
CABINET
N
E
L
SEQUENCES OF OPERATION
AUTOMATIC TRANSFER SWITCH
1. NORMAL - UTILITY POWER AVAILABLE. NORMAL SWITCH IN CLOSED POSITION, EMERGENCY SWITCH OPEN AND UTILITY POWERS LOADS. BYPASS SWITCHES OPEN.
2. EMERGENCY - UTILITY POWER UNAVAILABLE. GENERATOR IS POWERED UP, NORMAL SWITCH OPENED AND EMERGENCY SWITCH CLOSED
EMERGENCY GENERATOR POWERS LOADS. BYPASS SWITCHES OPEN.
3. BYPASS - AUTOMATIC TRANSFER SWITCH CONTACTS DISCONNECTED (DRAWN OUT). MANUAL BYPASS SWITCH IS ENERGIZED. AUTOMATIC SWITCH DE-ENERGIZED
FOR TESTING OR SERVICE.
LOAD BANK/PORTABLE GENERATOR CONNECTION CABINET OPERATION
SEQUENCE OF OPERATION (NORMAL LOAD BANK TEST)
1. MAIN CABINET BREAKER OFF. SYSTEM COLD
2. GENERATOR STARTED MANUALLY FROM GENERATOR PANEL.
3. MAIN BREAKER TURNED ON. SYSTEM POWERS UP AND STATUS SHOWN ON CONTROLLER.
4. SYSTEM ARMED AND TIMED OR CONTINUOUS TEST IS SELECTED.
5. OPERATOR STARTS LOAD TEST VIA "START LOAD TEST" PUSHBUTTON.
6. TEST LOAD IS MODULATED AT LOAD BANK CONTROL PANEL.
7. TEST RUNS UNTIL OPERATOR STOPS OR UNIT TIMES OUT (AUTO TEST MODE.)
8. MAIN BREAKER IS SHUT OFF AND SYSTEM IS COLD AND TEST COMPLETE.
9. IF DURING TEST, UTILITY POWER IS LOST, MAIN BREAKER DISENGAGED INSTANTLY AND FULL GENERATOR POWER OUTPUT AVAILABLE TO BUILDING.
SEQUENCE OF OPERATION (PORTABLE GENERATOR CONNECTION)
1. MAIN CABINET BREAKER OFF. SYSTEM COLD. PORTABLE GENERATOR PLUGGED INTO RECEPTACLE.
2. MAIN GENERATOR BREAKER LOCKED OFF.
3. SELECTOR SWITCH TURNED TO "BACK-UP-POWER" MODE.
4. PORTABLE GENERATOR STARTED.
5. MAIN CABINET BREAKER TURNED ON.
BYPASS ISOLATION
TRANSFER SWITCH
EXIST.
600A
120/240V
1PH, 3W
DISC.
PANEL MDP
600A MCB
120/240V
1PH, 3WA.T.S.
B.T.S.
2P PORT.
LOAD
BANK
PORTABLE GENERATOR LUGS
2P
20KW
120/240V
1PH, 3W
GENERATOR
GENERATOR BREAKER
LOAD BANK/
PORT. GEN.
CONNECTION
CABINET
PANEL B
120/240V
1PH 3W
100A
EXISTING
BYPASS ISOLATION
TRANSFER SWITCH
FROM TRANSFORMER
3P SW
3P SW
A.T.S.
B.T.S.
FROM
TRANSFORMER
4P SW
4P SW
3P LOAD
BANK
PORTABLE GENERATOR LUGS
3P
60KW
277/480V
3PH, 4W
GENERATOR
GENERATOR BREAKER
LOAD BANK CONTROL
PANEL
LOAD BANK/
PORT. GEN.
CONNECTION
CABINET
N
E
L
BYPASS ISOLATION
TRANSFER SWITCH
EXIST.
100A
277/480V
3PH, 4W
DISC.
A.T.S.
B.T.S.
TO BUILDING 750
PIPE SIZES
3/8" NPT
1/2" NPT
3/4" NPT
1" NPT
1-1/4" NPT
1-1/2" NPT
2" NPT
3" NPT
A B C D E F G H
B D
C
D D B G
B G H
G
H A
A
ENGINE
1" 24 VDC
1" RETURN
FROM ENGINE
1" SUPPLY
TO ENGINE
SPIN-ON REPLACEABLE
ELEMENT 30 MICRON
FILTER
LEVEL CONTROLLER
DAY TANK
(DOUBLE WALLED)
2" STD VENT
3" EMERGENCY VENT
1" NPT FOOT VALVE IN MAIN STORAGE
MAIN TANK
(DOUBLE WALLED)
FUEL RETURN
FUEL SUPPLY1"
1"
CHECK VALVE
SOLENOID VALVE
BALL VALVE
UNION
NOTE: ABOVE DIAGRAM INDICATES THE MAJOR PIPING ELEMENTS IN THE FUEL SYSTEM FOR REMOTE TANKS.
IT IS NOT MEANT TO DETAIL ALL OF THE INSPECTION PORTS, MONITORING OR CONTROL LOCATIONS.
FOR SITE OWNED UTILITIES
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2022C SH
EE
T
TI
TL
E:
SH
EE
T
ID
EN
TI
FI
CA
TI
O N
NO
PR
O
JE
C
T N
O
FI
LE
N O
./I N
D
EX
C O
D E:
IS
SU
ED
F
O R:
PR
EL
IM
IN
AR
Y
C O
N
ST
R U
C
TI
O N
FI
N
AL
R
EC
O
R D
DA
TE
D R
AW
N
D
ES
IG
N
ED
C H
EC
KE
D
AP
PR
O
VE
D
ST
AT
E O
F M
IC
H
IG
AN
D
EP
AR
TM
EN
T
O F
TE
C
H N
O
LO
G Y, M
AN
AG
EM
EN
T, A N
D B
U D
G
ET
FA
C
IL
IT
IE
S
AN
D
B U
SI
N
ES
S
SE
R
VI
C
ES
A
D M
IN
IS
TR
AT
IO
N
AD
AM
P . L
AR
C
H , R
.A
D
IR
EC
TO
R
DE
SI
G
N
AN
D
CO
NS
TR
UC
TI
O N
DI
VI
SI
O
N
CALL:
PH:
MR. KENDZIORSKI
(989) 657-3026
ALPENA CRTC ENGINEERING
1/
.J
LM
X E3
O
PE
R
AT
IO
N
AL
D
ET
AI
LS
AL
PE
NA
C.
R.
T.
C.
M
UL
TI
PL
E
BL
DG
S- G
EN
ER
AT
O
R
RE
PL
AC
EM
EN
T D
EP
AR
TM
EN
T O
F M
IL
IT
AR
Y
AN
D
V
ET
ER
AN
S
AF
FA
IR
S
AL
PE
N
A C
.R .T
.C
AL
PE
N A, M I
M
RI
M
RI
LR M
RI
-2 2-
N.T.S.E300
1 OPERATIONAL ONE LINE DIAGRAM BUILDING 6131
N.T.S.E300
2 OPERATIONAL ONE LINE DIAGRAM BUILDING 5050
N.T.S.E300
3 OPERATIONAL ONE LINE DIAGRAM BUILDING 751
N.T.S.E300
4 FUEL SYSTEM PIPING DIAGRAM FOR BUILDING 751 AND 6131
| Sheets |
| CS000 - COVER SHEET |
| 23452 - CRTC Generator Replacements - Bldg 751 - Sheet - E100A - DEMOLITION PLAN - CRTC - BUILDING 751.pdf |
| Sheets |
| E100A - DEMOLITION PLAN - CRTC - BUILDING 751 |
| E200A - NEW EQUIPMENT PLAN - BUILDING 751 |
| 23452 - CRTC Generator Replacements - Bldg 751 - Sheet - E200A - NEW EQUIPMENT PLAN - BUILDING 751.pdf |
| Sheets |
| E100A - DEMOLITION PLAN - CRTC - BUILDING 751 |
| E200A - NEW EQUIPMENT PLAN - BUILDING 751 |
| 23452 - CRTC Generator Replacements - Bldg 5040 - Sheet - E100B - DEMOLITION PLAN - CRTC - BUILDING 5050.pdf |
| Sheets |
| E100B - DEMOLITION PLAN - CRTC - BUILDING 5050 |
| E200B - NEW EQUIPMENT PLAN - CRTC - BUILDING 5050 |
| 23452 - CRTC Generator Replacements - Bldg 6131 - Sheet - E100C - DEMOLITION PLAN - RANGE - BUILDING 6131.pdf |
| Sheets |
| E100C - DEMOLITION PLAN - RANGE - BUILDING 6131 |
| E200C - NEW EQUIPMENT PLAN- RANGE - BUILDING 6131 |
| E300 - OPERATIONAL DETAILS |
| 23452 - CRTC Generator Replacements - Bldg 751 - Sheet - E200A - NEW EQUIPMENT PLAN - BUILDING 751.pdf |
| Sheets |
| E100A - DEMOLITION PLAN - CRTC - BUILDING 751 |
| E200A - NEW EQUIPMENT PLAN - BUILDING 751 |
| 23452 - CRTC Generator Replacements - Bldg 5040 - Sheet - E200B - NEW EQUIPMENT PLAN - CRTC - BUILDING 5050.pdf |
| Sheets |
| E100B - DEMOLITION PLAN - CRTC - BUILDING 5050 |
| E200B - NEW EQUIPMENT PLAN - CRTC - BUILDING 5050 |
| 23452 - CRTC Generator Replacements - Bldg 6131 - Sheet - E200C - NEW EQUIPMENT PLAN- RANGE - BUILDING 6131.pdf |
| Sheets |
| E100C - DEMOLITION PLAN - RANGE - BUILDING 6131 |
| E200C - NEW EQUIPMENT PLAN- RANGE - BUILDING 6131 |
| E300 - OPERATIONAL DETAILS |
| 23452 - CRTC Generator Replacements - Bldg 6131 - Sheet - E300 - OPERATIONAL DETAILS.pdf |
| Sheets |
| E100C - DEMOLITION PLAN - RANGE - BUILDING 6131 |
| E200C - NEW EQUIPMENT PLAN- RANGE - BUILDING 6131 |
| E300 - OPERATIONAL DETAILS |