This document contains technical drawings and specifications for a fire protection system and plumbing system renovation project at Building 80 of the Parnall Correctional Facility in the State of Michigan. The project is being overseen by the State of Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division.

The key details of the project include modifying the existing 8-inch fire protection piping system and 4-inch fire protection piping system, installing new shutoff valves and pressure gauges, and patching exterior walls as needed. On the plumbing side, the project involves modifying existing sanitary, storm, domestic water, and gas piping systems. The contractor will need to coordinate shutdowns of the facility's domestic water and fire suppression systems, with work occurring after 1:00 PM and services restored by 5:00 PM the same day. The project also has specific requirements for live-tapping existing piping, securing vertical risers, and filling/patching construction areas.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X-FIRE

RISER-1

X-FIRE

RISER-2

X-8"

FP-300

LAUNDRY

SOAP FACTORY

HEALTH OFFICES

X-4"

X-FP

X-4"

X-FP

X-4"

X-FP

X-4"

X-8"

X-

FP

X-

FP

X-4" FP TO

LAUNDRY

X-8" FP TO

SOAP FACTORY

X-8"

X-

FP

X-4" FP TO

PORTION OF

PLENUM AREA

FIRE

DEPARTMENT

CONN.

X-4" CW DN

X-4" CW

(BELOW

GRADE)

X-

FP1

X-8" FP

(BELOW GRADE)

X-SOAP FACTORY

SPRINKLED AREA

X-LAUNDRY

SPRINKLED AREA

X-FINISHED

FLOOR

X-4" FP TO FIRE

DEPARTMENT CONNECTION

X-FP THROUGH

EXTERIOR WALL

X-1-1/4" CW

TO FACILITY

X-1-1/4" CW

X-DRAIN VALVE

X-1-1/4"

CW

X-4" CW

X-FP

SHUTOFF

VALVE

X-PRESSURE

GAUGE

X-4" FP

TO FACILITY

X-DRAIN

TO FACILITY

X-4" FP

X-4" FP

X-SHUT OFF

VALVE (TYP.)

X-FIRE RISER-1 PIPING

DIAGRAM - PIPING DEMOLITION

SCALE: NTS

X-CHECK

VALVE

NC

NC

DEMOLITION NOTES

EXISTING FIRE DEPARTMENT CONNECTION TO

REMAIN.

DISCONNECT, REMOVE AND DEMO EXISTING 4"

FIRE PROTECTION PIPING TO EXTENTS SHOWN

AND CAP. DEMO ASSOCIATED CHECK VALVE AND

WALL MOUNTED SHUTOFF VALVE. PATCH

EXTERIOR WALL AS REQUIRED TO MATCH

EXISTING.

MODIFY EXISTING 8" FIRE PROTECTION SYSTEM

AS REQUIRED TO SERVE EXISTING 4" FIRE

PROTECTION PIPING. MODIFY IN ACCORDANCE

WITH NFPA 13.

MODIFY / LIVE-TAP EXISTING 4" COLD WATER

PIPING AS REQUIRED TO INSTALL NEW SHUTOFF

VALVE. CONTRACTOR TO COORDINATE WITH

FACILITY ON EXACT LIVE-TAP LOCATION PRIOR TO

STARTING CONSTRUCTION. REFER TO NEW

PLANS.

1. BUILDING 80 DOMESTIC WATER / FIRE

SUPPRESSION SHUTDOWN MUST BE

COORDINATED WITH THE FACILITY ATLEAST 4

WEEKS IN ADVANCE.

2. WATER SHUTDOWN TO OCCUR AFTER 1:00PM.

DOMESTIC WATER FOR BUILDING 80 SHALL BE

BACK IN OPERATION BY 5:00PM ON THE SAME

DAY.

3. BUILDING 80 DOMESTIC WATER SERVICE SHALL

REMAIN ACTIVE THROUGHOUT CONSTRUCTION

BESIDES TIME PERIOD OF X-FIRE RISER-1

DEMOLITION.

4. LIVE-TAP BASED ON WATERTAP INC INSTA-VALVE

OR APPROVED EQUIVALENT. CONTACT ERIC

OLSEN (ERIC@WATERTAPINC.COM) FOR ALL

TECHNICAL QUESTIONS.

GENERAL FIRE

PROTECTION NOTES

N

LS

N

LS

BU

IL

D

IN

G

FL

O

O R

P

LA

N

FI

R

E

PR

O

TE

C

TI

O N

D

EM

O

LI

TI

O

N

N

BUILDING 80 - FLOOR PLAN - FIRE

PROTECTION DEMOLITION

FP

-3

SCALE: 1/16" = 1'-0"

10510 4020

R ev ie w

D

AT

E

3/

/2

BI

D S

ET

AR

C

H

IT

EC

TS

EN

G

IN

EE

R S

M A

T R

I X

M

EN

TA

L

H

EA

LT

H

O

FF

IC

E

R

EM

O D

EL

AN

D A

D D

IT

IO

N

PA

R

N

AL

L C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

JC

/E

N G

B Y

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

PR

O

JE

C T

N O

2/

7.

H

JD

X-FIRE

RISER-1

FP-400

X-FIRE

RISER-2

X-8"

LAUNDRY

SOAP FACTORY

HEALTH OFFICES

X-4"

X-FP

X-4"

X-FP

X-4"

X-FP

X-4"

X-8"

X-

FP

X-

FP

X-4" FP TO

LAUNDRY

X-8" FP TO

SOAP FACTORY

X-8"

X-

FP

X-4" FP TO

PORTION OF

PLENUM AREA

FIRE

DEPARTMENT

CONN.

X-4" CW DN

X-4" CW

(BELOW

GRADE)

X-

FP

X-8" FP

(BELOW GRADE)

X-SOAP FACTORY

SPRINKLED AREA

X-LAUNDRY

SPRINKLED AREA

2 3

X-4" CW

X-FIRE RISER-1 PIPING

DIAGRAM - PIPING NEW

SCALE: NTS

X-FINISHED

FLOOR

X-4" FP TO FIRE

DEPARTMENT CONNECTION

X-FP THROUGH

EXTERIOR WALL

X-1-1/4" CW

TO FACILITY

X-1-1/4" CW

X-DRAIN VALVE

X-1-1/4"

CW

X-4" CW

X-PRESSURE

GAUGE

X-4" FP

TO FACILITY

X-DRAIN

TO FACILITY

X-4" FP

X-4" FP

X-SHUT OFF

VALVE (TYP.)

NC

NC

X-4" FP

(IN PLENUM)

1 MODIFY EXISTING 8" FIRE PROTECTION PIPING AS

REQUIRED TO CONNECT TO EXISTING 4" FIRE

PROTECTION PIPING PER NFPA 13.

MODIFY EXISTING FIRE PROTECTION PIPING AS

REQUIRED TO INSTALL CAP.

CONTRACTOR TO SECURE X-4" FIRE SUPPRESSION

VERTICAL PIPING RISER TO ADJACENT WALL. SECURE

EXISTING PIPING IN ACCORDANCE WITH NFPA 13.

LIVE-TAP NEW SHUTOFF VALVE AT LOCATION SHOWN.

MODIFY EXISTING PIPING AS REQUIRED TO CONNECT TO

NEW PIPING. CONTRACTOR TO COORDINATE WITH

FACILITY ON EXACT LIVE-TAP LOCATION PRIOR TO

STARTING CONSTRUCTION. FILL AND PATCH

CONSTRUCTION AREA AS REQUIRED TO MATCH

EXISTING GRADE / SURFACE OF CONCRETE OR ASPHALT

DEPENDING ON CONSTRUCTION AREA.

KEY NOTES

FIRE PROTECTION

1. BUILDING 80 DOMESTIC WATER / FIRE

SUPPRESSION SHUTDOWN MUST BE

COORDINATED WITH THE FACILITY ATLEAST 4

WEEKS IN ADVANCE.

2. WATER SHUTDOWN TO OCCUR AFTER 1:00PM.

DOMESTIC WATER FOR BUILDING 80 SHALL BE

BACK IN OPERATION BY 5:00PM ON THE SAME

DAY.

3. BUILDING 80 DOMESTIC WATER SERVICE SHALL

REMAIN ACTIVE THROUGHOUT CONSTRUCTION

BESIDES TIME PERIOD OF X-FIRE RISER-1

DEMOLITION.

4. LIVE-TAP BASED ON WATERTAP INC INSTA-VALVE

OR APPROVED EQUIVALENT. CONTACT ERIC

OLSEN (ERIC@WATERTAPINC.COM) FOR ALL

TECHNICAL QUESTIONS.

GENERAL FIRE

PROTECTION NOTES

N

LS

N

LS

BU

IL

D

IN

G

FL

O

O R

P

LA

N

FI

R

E

PR

O

TE

C

TI

O N

N

EW

FP

-4

00N

BUILDING 80 - FLOOR PLAN - FIRE

PROTECTION NEW

SCALE: 1/16" = 1'-0"

10510 4020

R ev ie w

D

AT

E

3/

/2

BI

D S

ET

AR

C

H

IT

EC

TS

EN

G

IN

EE

R S

M A

T R

I X

M

EN

TA

L

H

EA

LT

H

O

FF

IC

E

R

EM

O D

EL

AN

D A

D D

IT

IO

N

PA

R

N

AL

L C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

JC

/E

N G

B Y

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

PR

O

JE

C T

N O

2/

7.

H

JD

1 CLEAN-OUT DETAIL

SCALE: NTS

1/8" BEND IF CLEANOUT OCCURS

AT END OF LINE.

WASTE LINE

C.I. WASTE LINE.

LENGTH TO SUIT.

1/8" C.I. BEND.

16" SQUARE CONC. PAD TROWEL

SMOOTH AND EDGE.

FINISH GRADE.

BRASS CLEANOUT PLUG W/

COUNTER SUNK HEAD.

6"

PLUMBING ABBREVIATIONS

PLUMBING SYMBOLS LEGEND

PLUMBING PIPING PLUMBING EQUIPMENT

MISCELLANEOUS NOTES

PLUMBING VALVES

POINT OF CONNECTION BETWEEN NEW AND

EXISTING

POINT OF EXISTING TO REMAIN AND EXISTING

TO BE REMOVED

INDICATES PLAN NOTE

INDICATES DEMOLITION NOTE

DETAIL BUBBLE

DETAIL NUMBER

PAGE LOCATION INDICATES

DIRECTION OF DETAIL SECTION

AD AREA DRAIN

ASR AUTOMATIC SPRINKLER RISER

BFS BELOW FLOOR SLAB

BWV BACK WATER VALVE

CB CATCH BASIN

CI CAST IRON

CO CLEAN OUT

CV CONTROL VALVE

DF DRINKING FOUNTAIN

DIA DIAMETER

DN DOWN

DWH DOMESTIC WATER HEATER

E.T.C. ELECTRICAL TRADES CONTRACTOR

EWC ELECTRIC WATER COOLER

EXIST EXISTING

FD FLOOR DRAIN

FC FINAL CONNECTIONS

FDC FIRE DEPT. CONNECTION

FF FINISH FLOOR

FHV FIRE HOSE VALVE

FT FEET

GAL GALLON

GD GARBAGE DISPOSAL

GI GREASE INTERCEPTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIB

HD HEAD (FT)

HP HORSE POWER

ID INSIDE DIAMETER

I.E. INVERT ELEVATION

LAV LAVATORY

LT LAUNDRY TRAY

MA MEDICAL AIR

MAX MAXIMUM

MGC MEDICAL GAS CONSOLE

MH MAN HOLE

MIN MINIMUM

MS MOP SINK

M.T.C. MECHANICAL TRADES CONTRACTOR

NTS NOT TO SCALE

ORD OVERFLOW ROOF DRAIN

OXY OXYGEN

P PUMP

PD PRESSURE DROP

PVC POLY-VINYL-CHLORIDE

RC RAIN CONDUCTOR

RD ROOF DRAIN

RI ROUGH-IN

REQ'D REQUIRED

SAN SANITARY

SHWR SHOWER

SK SINK

SP STAND PIPE

SQ. FT. SQUARE FEET

SS SERVICE SINK

ST STORM

S&W STOP & WASTE

STR STRAINER

SV STACKED VENT

TYP. TYPICAL

UR URINAL

VB VACUUM BREAKER

VS VENT STACK

V.F.D VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

W WASTE

WB WET BULB

WC WATER CLOSET

WH WALL HYDRANT

WS WASTE STACK

W&V WASTE AND VENT

X-CW EXIST. CW PIPING

ITEM

EXISTING

COLD WATER

COLD WATER BELOW FINISH SLAB

HOT WATER

HOT WATER BELOW FINISH SLAB

HOT WATER RETURN

HOT WATER RETURN BELOW FINISH SLAB

SOFTENED WATER

SOFTENED WATER BELOW FINISH SLAB

SOFTENED WATER RETURN

SOFTENED WATER RETURN BELOW FINISH

SLAB

TEMPERED WATER

TEMPERED WATER BELOW FINISH SLAB

TEMPERED WATER RETURN

TEMPERED WATER RETURN BELOW FINISH

SLAB

DEIONIZED WATER

DEIONIZED WATER BELOW FINISH SLAB

REVERSE OSMOSIS WATER

REVERSE OSMOSIS WATER RETURN BELOW

FINISH SLAB

FIRE PROTECTION

GAS (NATURAL)

GAS (LIQUID PETROLEUM)

SANITARY WASTE

SANITARY WASTE BELOW FINISH SLAB

VENT PIPING

VENT PIPING BELOW FINISH SLAB

DEMOLITION

LOW PRESSURE STEAM

GATE VALVE

GAS COCK

CHECK VALVE

BALANCE COCK

CIRCUIT SETTER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

GLOBE VALVE

BALL VALVE

OS&Y VALVE

SOLENOID VALVE

EXPANSION VALVE WITH THERMOSTATIC BULB

PLUG VALVE

GAS PRESSURE REGULATOR

FLOW DIRECTION

PIPING DROP

PIPING RISE

FLOOR CLEANOUT

INLINE PIPING DROP

INLINE PIPING RISE

PIPING TEE

PIPING ELBOW

INLINE CLEANOUT

PLUMBING TRAP

THERMOMETER

CONNECTION

PUMP

UNION

PIPE ANCHOR

PIPE GUIDE

FLOOR DRAIN & FLOOR SINK

BACK FLOW PREVENTER

FLANGE END CONNECTION

WALL HYDRANT & HOSE BIBB

REGULAR & OVERFLOW ROOF DRAIN

PIPE CAP

PIPE BREAK

WATER METER

GAS METER

PRESSURE GAUGE

X

X

XX

XXXX

XX

XXXX

CW

CW

HW

HW

HWR

HWR

SW

SW

SWR

SWR

TW

TW

TWR

TWR

DI

DI

RO

RO

FP

G

LP

SAN

SAN

V

V

M

M

P

1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN

PLUMBING CODE, LATEST APPLICABLE EDITION.

2. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES

PER MANUFACTURERS WRITTEN INSTRUCTIONS.

3. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE WATER

SUPPLY LINES.

4. ALL INVERT ELEVATIONS ARE BASED ON A FINISH FLOOR

LEVEL OF 100'-0".

5. ALL ELEVATIONS SHOWN ARE INVERTS OF PIPING. THE

SLEEVES SHALL BE COORDINATED WITH THESE

ELEVATIONS.

6. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE

SLEEVES FOR 1" CLEAR SPACE BETWEEN PIPE AND

SLEEVE FOR INSTALLATION OF MECHANICAL SEAL.

7. CONTRACTOR TO VERIFY LOCATIONS OF EXISTING

UNDERGROUND UTILITIES BEFORE BEGINNING WORK.

8. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING

PIPING, FITTINGS, & EQUIPMENT AS REQUIRED FOR NEW

INSTALLATIONS. VALVE & CAP PIPING TO REMAIN.

9. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY

AFFECT NORMAL OPERATION OF OTHER AREAS.

10. MECHANICAL SEALS REQUIRED FOR BELOW GRADE WALL

PENETRATIONS.

11. ALL FLOOR DRAINS TO BE EQUIPPED WITH APPROVED

TRAP SEALS.

12. 1% SLOPE FOR ALL SANITARY PIPING.

13. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,

LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING

CONDITIONS THAT MAY AFFECT THE WORK.

14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND

MATERIALS IN A "NEW" CONDITION DURING

CONSTRUCTION.

15. ALL WORK SHALL BE PERFORMED BY LICENSED

CONTRACTORS AND SUBCONTRACTORS AS REQUIRED

BY LAW.

16. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE

WITH THE CODES AND REGULATIONS ENFORCED BY

LOCAL BUILDING OFFICIALS.

17. IF THERE IS CONFLICTING INFORMATION IN THE PLANS

OR SPECIFICATIONS THE MORE STRINGENT AND

GREATER COST ITEM SHALL BE USED.

18. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF

TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS

NOT INTENTION OF DRAWINGS TO INDICATE ALL

NECESSARY OFFSETS. INSTALL WORK IN MANNER TO

CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,

PRESERVE HEADROOM AND KEEP OPENINGS AND

PASSAGEWAYS CLEAR. DO NOT SCALE FROM

DRAWINGS.

19. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO

OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED

THROUGHOUT THE PROJECT.

20. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY

IN ADVANCE FOR ANY HOT WORK TO ALLOW THE OWNER

TO DISABLE THE FIRE ALARM.

21. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES

SHALL USE TAMPERPROOF SCREWS.

22. ALL DUST & DEBRIS MUST BE CONTAINED WITHIN THE

CONSTRUCTION AREA VIA TARP AND SEAL. THE

CONTRACTOR SHALL SUPPLY TEMPORARY EXHAUST

FANS, DUCTWORK, AND HEPA FILTERS AS REQUIRED TO

MAINTAIN A CLEAN AIR ENVIRONMENT ADJACENT TO THE

CONSTRUCTION AREA. SILICA DUST MUST BE

HANDLED/DISCARDED IN ACCORDANCE WITH MIOSHA

REQUIREMENTS.

GENERAL PLUMBING NOTES

X-DWH

THERMOMETER

DIELECTRIC

UNION (TYPICAL)

T&P RELIEF VALVE

EXTEND TO

FLOOR

HOSE END

DRAIN VALVE

SHUT-OFF VALVE

(TYPICAL)

CHECK VALVE

CP-1

1/2" HWR

X-

CW

EXISTING DOMESTIC WATER

HEATER DETAIL

SCALE: NTS

3.5 GALLON

EXPANSION TANK

X-1" X-1"

X-

HW

X-1"

LPS

R ev ie w

D

AT

E

3/

/2

BI

D S

ET

AR

C

H

IT

EC

TS

EN

G

IN

EE

R S

M A

T R

I X

M

EN

TA

L

H

EA

LT

H

O

FF

IC

E

R

EM

O D

EL

AN

D A

D D

IT

IO

N

PA

R

N

AL

L C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

JC

/E

N G

B Y

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

PR

O

JE

C T

N O

2/

7.

H

JD

N

LS

N

LS

PL

U

M

BI

N G

SY

M

BO

LS

N O

TE

S, A N

D

AB

BR

EV

IA

TI

O N

S P-

DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING FLOOR DRAIN.

DEMO ASSOCIATED SANITARY PIPING TO EXTENTS SHOWN

AND CAP.

X-STORM

X-4"

X-SAN UP

TO X-FD

X-SAN UP

TO X-FD

X-SAN UP

TO X-FD

X-SAN UP

TO X-FD

X-SAN UP

TO X-FD

X-STORM

X-4"

X-6" SAN

X-SAN

X-4"

X-SAN UP TO

X-CO

X-

ST

OR

M

X-STORM

X-4"

X-STORM DN

TO X-MANHOLE

X-MANHOLE

X-4"

X-4"

X-SAN UP

TO X-FD

X-STORM

X-SAN UP

TO X-FD

X-SAN UP

TO X-FD

1 X-SAN UP

TO X-FCO

X-

SA

N

X-4"X-

ST

OR

M

X-SAN UP

TO X-FD

R ev ie w

D

AT

E

3/

/2

BI

D S

ET

AR

C

H

IT

EC

TS

EN

G

IN

EE

R S

M A

T R

I X

M

EN

TA

L

H

EA

LT

H

O

FF

IC

E

R

EM

O D

EL

AN

D A

D D

IT

IO

N

PA

R

N

AL

L C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

JC

/E

N G

B Y

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

PR

O

JE

C T

N O

2/

7.

H

JD

N

BUILDING 80 - PARTIAL BELOW FLOOR PLAN -

PLUMBING DEMOLITION

SCALE: 3/16" = 1'-0"

10 5 10 13

N

LS

N

LS

BU

IL

D

IN

G

PA

R

TI

AL

B

EL

O W

F

LO

O R

PL

AN

PL

U M

BI

N

G D

EM

O

LI

TI

O N

P-

DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING FLOOR DRAIN.

DEMO ASSOCIATED STORM PIPING BACK TO BELOW FLOOR

AND CAP. PATCH FLOOR AS REQUIRED TO MATCH EXISTING.

DISCONNECT, REMOVE, AND DEMO EXISTING GAS PIPING TO

EXTENTS SHOWN AND CAP.

DISCONNECT, REMOVE, AND DEMO EXISTING ABANDONED

LOW PRESSURE STEAM PIPING TO EXTENTS SHOWN AND CAP.

X-FD

X-FD 1

X-FD 1

X-FD1X-FD 1

X-FDX-FDX-FD

X-MANHOLE

X-1-1/2"

X- G

X-UH

X- G

X-G X-G

X-3/4"

X-3/4"

X-

LP

S

X-

LP

S

X-LPS

X-FD

X-2" CW

X-LPS

X-G

X-UH

X-UH

X-

LP

S

R ev ie w

D

AT

E

3/

/2

BI

D S

ET

AR

C

H

IT

EC

TS

EN

G

IN

EE

R S

M A

T R

I X

M

EN

TA

L

H

EA

LT

H

O

FF

IC

E

R

EM

O D

EL

AN

D A

D D

IT

IO

N

PA

R

N

AL

L C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

JC

/E

N G

B Y

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

PR

O

JE

C T

N O

2/

7.

H

JD

N BUILDING 80 - PARTIAL FLOOR PLAN - PLUMBING DEMOLITION

SCALE: 3/16" = 1'-0"

10 5 10 13

N

LS

N

LS

BU

IL

D

IN

G

PA

R

TI

AL

F

LO

O R

P

LA

N

PL

U

M

BI

N G

D

EM

O

LI

TI

O

N P-

PLUMBING KEY NOTES

MODIFY EXISTING SANITARY PIPING AS REQUIRED TO

CONNECT TO NEW PIPING. CONTRACTOR SHALL FIELD VERIFY

EXISTING INVERT ELEVATION AND PIPING SIZE IS SUFFICIENT

PRIOR TO INSTALLING NEW PIPING.

SAWCUT FLOOR AS REQUIRED TO INSTALL NEW SANITARY

PIPING. FILL AND PATCH FLOOR AS REQUIRED TO MATCH

EXISTING.

GENERAL PLUMBING

1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UNDERGROUND

UTILITIES PRIOR TO STARTING CONSTRUCTION.

NOTES

2" SAN UP

TO LAV-2

4"

2" SAN UP

TO FD-1

2" SAN UP

TO UR-1

4" SAN UP

TO WC-1

2" SAN UP

TO LAV-1

2" V UP

SAN UP

TO FCO

SAN

X-STORM

X-4"

X-SAN UP

TO X-FD

X-SAN UP

TO X-FD

X-STORM

X-4"

X-6" SAN

X-SAN

X-4"

X-SAN UP TO

X-CO

X-

ST

OR

M

X-STORM

X-4"

X-STORM DN

TO X-MANHOLE

X-MANHOLE

X-4"

X-4"

X-SAN UP

TO X-FD

X-STORM

X-

SA

N

X-4"X-

ST

OR

M

X-SAN UP

TO X-FD

SA

N

SAN

4"

4"

SAN UP

TO FCO

4"

2" SAN UP

TO FD-1

SAN UP

TO FCO

FINISHED FLOOR

I.E. = 100'-0"

I.E. = 98'-6"

I.E. = 97'-4"4"

X-SAN UP

TO X-FCO

2 2

2 2

R ev ie w

D

AT

E

3/

/2

BI

D S

ET

AR

C

H

IT

EC

TS

EN

G

IN

EE

R S

M A

T R

I X

M

EN

TA

L

H

EA

LT

H

O

FF

IC

E

R

EM

O D

EL

AN

D A

D D

IT

IO

N

PA

R

N

AL

L C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

JC

/E

N G

B Y

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

PR

O

JE

C T

N O

2/

7.

H

JD

N

BUILDING 80 - PARTIAL BELOW FLOOR PLAN -

PLUMBING NEW

SCALE: 3/16" = 1'-0"

10 5 10 13

N

LS

N

LS

P-

BU

IL

D

IN

G

PA

R

TI

AL

B

EL

O

W F

LO

O

R P

LA

N

PL

U M

BI

N

G N

EW

PLUMBING KEY NOTES

MODIFY EXISTING HOT WATER PIPING AS REQUIRED TO

CONNECT TO NEW HOT WATER PIPING.

BALANCE CIRCUIT SETTER TO 0.5 GPM.

MODIFY EXISTING COLD WATER PIPING AS REQUIRED TO

INSTALL NEW CHECK VALVE AND HOT WATER RETURN PIPING

FOR X-DWH. REFERENCE DETAIL 2 ON P-100.

MODIFY EXISTING GAS PIPING AS REQUIRED TO CONNECT TO

NEW GAS PIPING.

MODIFY EXISTING COLD WATER PIPING AS REQUIRED TO

CONNECT TO NEW COLD WATER WATER PIPING. COORDINATE

WITH ARCHITECTURAL TRADES ON REMOVAL AND

RE-INSTALLMENT OF FIXED CEILING IN EMPLOYEE

BREAKROOM. PATCH, PRIME, AND PAINT CEILING AS REQUIRED

TO MATCH EXISTING.

INSTALL LAVATORY CONTROLLER AT LOCATION SHOWN.

LAVATORY CONTROLLER BASED ON I-CON NEXUS

MODEL100192 4 I/O AC CONTROLLER. CONNECT TO LAVATORY.

ROUTE NEW GAS PIPING UP THROUGH NEW ROOF CURB AND

ROOF BOOT. PATCH ROOF TO MATCH EXISTING AND SEAL

WATER TIGHT.

GAS PIPE SUPPORTS BASED ON MIRO #5-RAH-7 OR APPROVED

EQUIVALENT. SPACE GAS SUPPORTS PER MANUFACTURER'S

RECOMMENDATIONS. INSTALL GAS PIPE SUPPORT ON MIRO

SUPPORT PAD OR MANUFACTURER APPROVED EQUIVALENT.

GENERAL PLUMBING

1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES PRIOR

TO STARTING CONSTRUCTION.

NOTES

RTU-1 - 150 MBH - GAS PRESSURE 4.5" TO 14" W.C.

TOTAL = 150 MBH @ 14" WC.

GAS LOAD SUMMARY

X-DWH

FD-1

HW

V

CW

LAV-1

HWR

WC-1

UR-1

LAV-2

CP-1

X-1" HW

X-1" CW

FD-1

WC-1

HW

CWHW

R

CW

HWR

HW

2" V DN

X-FDX-FDX-FD

X-MANHOLE

X-1-1/2"

X- G

X-G X-G

X-

LP

S

X-2" CW

X-LPS

X-G

X-UH

3/4"

1/2"

1-1/2"

1/2" 3/4"

1-1/2"

1/2"3/4"1/2"3/4"

2" V UP,

3" VTR

1/2"

X-2" CW

51-1/2"1-1/2"3/4"1-1/2"

P-100

RTU-1

(LOCATED ON ROOF)

G

3/4"

(LOCATED IN MAINTENANCE

BUILDING)

R-1 3/4" G

(LOCATED ON ROOF)

3/4" G UP

THROUGH ROOF

X-UH

X-FD

ROOF CURB

3/4" 1-1/2"

LAV-2

CONTROLLER

R ev ie w

D

AT

E

3/

/2

BI

D S

ET

AR

C

H

IT

EC

TS

EN

G

IN

EE

R S

M A

T R

I X

M

EN

TA

L

H

EA

LT

H

O

FF

IC

E

R

EM

O D

EL

AN

D A

D D

IT

IO

N

PA

R

N

AL

L C

O R

R

EC

TI

O

N

AL

F

AC

IL

IT

Y

JC

/E

N G

B Y

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

PR

O

JE

C

T D

ES

C

R

IP

TI

O

N

PR

O

JE

C T

N O

2/

7.

H

JD

N BUILDING 80 - PARTIAL FLOOR PLAN - PLUMBING NEW

SCALE: 3/16" = 1'-0"

10 5 10 13

N

LS

N

LS

P-

BU

IL

D

IN

G

PA

R

TI

AL

F

LO

O

R P

LA

N

PL

U M

BI

N

G N

EW

Sheets and Views
FP300-2213700-FP300
FP400-2213700-FP400
M100-2213700-M100
M300-2213700-M300
M400-2213700-M400
M800-2213700-M800
M900-2213700-M900
P100-2213700-P100
P300-2213700-P300
P301-2213700-P301
P400-2213700-P400
P401-2213700-P401

File details come from the government source that posted it. Updated .