Drawings - Floor Plan 22037.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 230000000356
- Issued by
- Jackson County, Michigan
About this file
This document contains technical drawings and specifications for a fire protection system and plumbing system renovation project at Building 80 of the Parnall Correctional Facility in the State of Michigan. The project is being overseen by the State of Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division.
The key details of the project include modifying the existing 8-inch fire protection piping system and 4-inch fire protection piping system, installing new shutoff valves and pressure gauges, and patching exterior walls as needed. On the plumbing side, the project involves modifying existing sanitary, storm, domestic water, and gas piping systems. The contractor will need to coordinate shutdowns of the facility's domestic water and fire suppression systems, with work occurring after 1:00 PM and services restored by 5:00 PM the same day. The project also has specific requirements for live-tapping existing piping, securing vertical risers, and filling/patching construction areas.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X-FIRE
RISER-1
X-FIRE
RISER-2
X-8"
FP-300
LAUNDRY
SOAP FACTORY
HEALTH OFFICES
X-4"
X-FP
X-4"
X-FP
X-4"
X-FP
X-4"
X-8"
X-
FP
X-
FP
X-4" FP TO
LAUNDRY
X-8" FP TO
SOAP FACTORY
X-8"
X-
FP
X-4" FP TO
PORTION OF
PLENUM AREA
FIRE
DEPARTMENT
CONN.
X-4" CW DN
X-4" CW
(BELOW
GRADE)
X-
FP1
X-8" FP
(BELOW GRADE)
X-SOAP FACTORY
SPRINKLED AREA
X-LAUNDRY
SPRINKLED AREA
X-FINISHED
FLOOR
X-4" FP TO FIRE
DEPARTMENT CONNECTION
X-FP THROUGH
EXTERIOR WALL
X-1-1/4" CW
TO FACILITY
X-1-1/4" CW
X-DRAIN VALVE
X-1-1/4"
CW
X-4" CW
X-FP
SHUTOFF
VALVE
X-PRESSURE
GAUGE
X-4" FP
TO FACILITY
X-DRAIN
TO FACILITY
X-4" FP
X-4" FP
X-SHUT OFF
VALVE (TYP.)
X-FIRE RISER-1 PIPING
DIAGRAM - PIPING DEMOLITION
SCALE: NTS
X-CHECK
VALVE
NC
NC
DEMOLITION NOTES
EXISTING FIRE DEPARTMENT CONNECTION TO
REMAIN.
DISCONNECT, REMOVE AND DEMO EXISTING 4"
FIRE PROTECTION PIPING TO EXTENTS SHOWN
AND CAP. DEMO ASSOCIATED CHECK VALVE AND
WALL MOUNTED SHUTOFF VALVE. PATCH
EXTERIOR WALL AS REQUIRED TO MATCH
EXISTING.
MODIFY EXISTING 8" FIRE PROTECTION SYSTEM
AS REQUIRED TO SERVE EXISTING 4" FIRE
PROTECTION PIPING. MODIFY IN ACCORDANCE
WITH NFPA 13.
MODIFY / LIVE-TAP EXISTING 4" COLD WATER
PIPING AS REQUIRED TO INSTALL NEW SHUTOFF
VALVE. CONTRACTOR TO COORDINATE WITH
FACILITY ON EXACT LIVE-TAP LOCATION PRIOR TO
STARTING CONSTRUCTION. REFER TO NEW
PLANS.
1. BUILDING 80 DOMESTIC WATER / FIRE
SUPPRESSION SHUTDOWN MUST BE
COORDINATED WITH THE FACILITY ATLEAST 4
WEEKS IN ADVANCE.
2. WATER SHUTDOWN TO OCCUR AFTER 1:00PM.
DOMESTIC WATER FOR BUILDING 80 SHALL BE
BACK IN OPERATION BY 5:00PM ON THE SAME
DAY.
3. BUILDING 80 DOMESTIC WATER SERVICE SHALL
REMAIN ACTIVE THROUGHOUT CONSTRUCTION
BESIDES TIME PERIOD OF X-FIRE RISER-1
DEMOLITION.
4. LIVE-TAP BASED ON WATERTAP INC INSTA-VALVE
OR APPROVED EQUIVALENT. CONTACT ERIC
OLSEN (ERIC@WATERTAPINC.COM) FOR ALL
TECHNICAL QUESTIONS.
GENERAL FIRE
PROTECTION NOTES
N
LS
N
LS
BU
IL
D
IN
G
FL
O
O R
P
LA
N
FI
R
E
PR
O
TE
C
TI
O N
D
EM
O
LI
TI
O
N
N
BUILDING 80 - FLOOR PLAN - FIRE
PROTECTION DEMOLITION
FP
-3
SCALE: 1/16" = 1'-0"
10510 4020
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
PR
O
JE
C T
N O
2/
7.
H
JD
X-FIRE
RISER-1
FP-400
X-FIRE
RISER-2
X-8"
LAUNDRY
SOAP FACTORY
HEALTH OFFICES
X-4"
X-FP
X-4"
X-FP
X-4"
X-FP
X-4"
X-8"
X-
FP
X-
FP
X-4" FP TO
LAUNDRY
X-8" FP TO
SOAP FACTORY
X-8"
X-
FP
X-4" FP TO
PORTION OF
PLENUM AREA
FIRE
DEPARTMENT
CONN.
X-4" CW DN
X-4" CW
(BELOW
GRADE)
X-
FP
X-8" FP
(BELOW GRADE)
X-SOAP FACTORY
SPRINKLED AREA
X-LAUNDRY
SPRINKLED AREA
2 3
X-4" CW
X-FIRE RISER-1 PIPING
DIAGRAM - PIPING NEW
SCALE: NTS
X-FINISHED
FLOOR
X-4" FP TO FIRE
DEPARTMENT CONNECTION
X-FP THROUGH
EXTERIOR WALL
X-1-1/4" CW
TO FACILITY
X-1-1/4" CW
X-DRAIN VALVE
X-1-1/4"
CW
X-4" CW
X-PRESSURE
GAUGE
X-4" FP
TO FACILITY
X-DRAIN
TO FACILITY
X-4" FP
X-4" FP
X-SHUT OFF
VALVE (TYP.)
NC
NC
X-4" FP
(IN PLENUM)
1 MODIFY EXISTING 8" FIRE PROTECTION PIPING AS
REQUIRED TO CONNECT TO EXISTING 4" FIRE
PROTECTION PIPING PER NFPA 13.
MODIFY EXISTING FIRE PROTECTION PIPING AS
REQUIRED TO INSTALL CAP.
CONTRACTOR TO SECURE X-4" FIRE SUPPRESSION
VERTICAL PIPING RISER TO ADJACENT WALL. SECURE
EXISTING PIPING IN ACCORDANCE WITH NFPA 13.
LIVE-TAP NEW SHUTOFF VALVE AT LOCATION SHOWN.
MODIFY EXISTING PIPING AS REQUIRED TO CONNECT TO
NEW PIPING. CONTRACTOR TO COORDINATE WITH
FACILITY ON EXACT LIVE-TAP LOCATION PRIOR TO
STARTING CONSTRUCTION. FILL AND PATCH
CONSTRUCTION AREA AS REQUIRED TO MATCH
EXISTING GRADE / SURFACE OF CONCRETE OR ASPHALT
DEPENDING ON CONSTRUCTION AREA.
KEY NOTES
FIRE PROTECTION
1. BUILDING 80 DOMESTIC WATER / FIRE
SUPPRESSION SHUTDOWN MUST BE
COORDINATED WITH THE FACILITY ATLEAST 4
WEEKS IN ADVANCE.
2. WATER SHUTDOWN TO OCCUR AFTER 1:00PM.
DOMESTIC WATER FOR BUILDING 80 SHALL BE
BACK IN OPERATION BY 5:00PM ON THE SAME
DAY.
3. BUILDING 80 DOMESTIC WATER SERVICE SHALL
REMAIN ACTIVE THROUGHOUT CONSTRUCTION
BESIDES TIME PERIOD OF X-FIRE RISER-1
DEMOLITION.
4. LIVE-TAP BASED ON WATERTAP INC INSTA-VALVE
OR APPROVED EQUIVALENT. CONTACT ERIC
OLSEN (ERIC@WATERTAPINC.COM) FOR ALL
TECHNICAL QUESTIONS.
GENERAL FIRE
PROTECTION NOTES
N
LS
N
LS
BU
IL
D
IN
G
FL
O
O R
P
LA
N
FI
R
E
PR
O
TE
C
TI
O N
N
EW
FP
-4
00N
BUILDING 80 - FLOOR PLAN - FIRE
PROTECTION NEW
SCALE: 1/16" = 1'-0"
10510 4020
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
PR
O
JE
C T
N O
2/
7.
H
JD
1 CLEAN-OUT DETAIL
SCALE: NTS
1/8" BEND IF CLEANOUT OCCURS
AT END OF LINE.
WASTE LINE
C.I. WASTE LINE.
LENGTH TO SUIT.
1/8" C.I. BEND.
16" SQUARE CONC. PAD TROWEL
SMOOTH AND EDGE.
FINISH GRADE.
BRASS CLEANOUT PLUG W/
COUNTER SUNK HEAD.
6"
PLUMBING ABBREVIATIONS
PLUMBING SYMBOLS LEGEND
PLUMBING PIPING PLUMBING EQUIPMENT
MISCELLANEOUS NOTES
PLUMBING VALVES
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
AD AREA DRAIN
ASR AUTOMATIC SPRINKLER RISER
BFS BELOW FLOOR SLAB
BWV BACK WATER VALVE
CB CATCH BASIN
CI CAST IRON
CO CLEAN OUT
CV CONTROL VALVE
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
E.T.C. ELECTRICAL TRADES CONTRACTOR
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FC FINAL CONNECTIONS
FDC FIRE DEPT. CONNECTION
FF FINISH FLOOR
FHV FIRE HOSE VALVE
FT FEET
GAL GALLON
GD GARBAGE DISPOSAL
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIB
HD HEAD (FT)
HP HORSE POWER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
LAV LAVATORY
LT LAUNDRY TRAY
MA MEDICAL AIR
MAX MAXIMUM
MGC MEDICAL GAS CONSOLE
MH MAN HOLE
MIN MINIMUM
MS MOP SINK
M.T.C. MECHANICAL TRADES CONTRACTOR
NTS NOT TO SCALE
ORD OVERFLOW ROOF DRAIN
OXY OXYGEN
P PUMP
PD PRESSURE DROP
PVC POLY-VINYL-CHLORIDE
RC RAIN CONDUCTOR
RD ROOF DRAIN
RI ROUGH-IN
REQ'D REQUIRED
SAN SANITARY
SHWR SHOWER
SK SINK
SP STAND PIPE
SQ. FT. SQUARE FEET
SS SERVICE SINK
ST STORM
S&W STOP & WASTE
STR STRAINER
SV STACKED VENT
TYP. TYPICAL
UR URINAL
VB VACUUM BREAKER
VS VENT STACK
V.F.D VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE AND VENT
X-CW EXIST. CW PIPING
ITEM
EXISTING
COLD WATER
COLD WATER BELOW FINISH SLAB
HOT WATER
HOT WATER BELOW FINISH SLAB
HOT WATER RETURN
HOT WATER RETURN BELOW FINISH SLAB
SOFTENED WATER
SOFTENED WATER BELOW FINISH SLAB
SOFTENED WATER RETURN
SOFTENED WATER RETURN BELOW FINISH
SLAB
TEMPERED WATER
TEMPERED WATER BELOW FINISH SLAB
TEMPERED WATER RETURN
TEMPERED WATER RETURN BELOW FINISH
SLAB
DEIONIZED WATER
DEIONIZED WATER BELOW FINISH SLAB
REVERSE OSMOSIS WATER
REVERSE OSMOSIS WATER RETURN BELOW
FINISH SLAB
FIRE PROTECTION
GAS (NATURAL)
GAS (LIQUID PETROLEUM)
SANITARY WASTE
SANITARY WASTE BELOW FINISH SLAB
VENT PIPING
VENT PIPING BELOW FINISH SLAB
DEMOLITION
LOW PRESSURE STEAM
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
OS&Y VALVE
SOLENOID VALVE
EXPANSION VALVE WITH THERMOSTATIC BULB
PLUG VALVE
GAS PRESSURE REGULATOR
FLOW DIRECTION
PIPING DROP
PIPING RISE
FLOOR CLEANOUT
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
PLUMBING TRAP
THERMOMETER
CONNECTION
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
WALL HYDRANT & HOSE BIBB
REGULAR & OVERFLOW ROOF DRAIN
PIPE CAP
PIPE BREAK
WATER METER
GAS METER
PRESSURE GAUGE
X
X
XX
XXXX
XX
XXXX
CW
CW
HW
HW
HWR
HWR
SW
SW
SWR
SWR
TW
TW
TWR
TWR
DI
DI
RO
RO
FP
G
LP
SAN
SAN
V
V
M
M
P
1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN
PLUMBING CODE, LATEST APPLICABLE EDITION.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES
PER MANUFACTURERS WRITTEN INSTRUCTIONS.
3. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE WATER
SUPPLY LINES.
4. ALL INVERT ELEVATIONS ARE BASED ON A FINISH FLOOR
LEVEL OF 100'-0".
5. ALL ELEVATIONS SHOWN ARE INVERTS OF PIPING. THE
SLEEVES SHALL BE COORDINATED WITH THESE
ELEVATIONS.
6. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE
SLEEVES FOR 1" CLEAR SPACE BETWEEN PIPE AND
SLEEVE FOR INSTALLATION OF MECHANICAL SEAL.
7. CONTRACTOR TO VERIFY LOCATIONS OF EXISTING
UNDERGROUND UTILITIES BEFORE BEGINNING WORK.
8. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING
PIPING, FITTINGS, & EQUIPMENT AS REQUIRED FOR NEW
INSTALLATIONS. VALVE & CAP PIPING TO REMAIN.
9. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY
AFFECT NORMAL OPERATION OF OTHER AREAS.
10. MECHANICAL SEALS REQUIRED FOR BELOW GRADE WALL
PENETRATIONS.
11. ALL FLOOR DRAINS TO BE EQUIPPED WITH APPROVED
TRAP SEALS.
12. 1% SLOPE FOR ALL SANITARY PIPING.
13. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,
LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING
CONDITIONS THAT MAY AFFECT THE WORK.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND
MATERIALS IN A "NEW" CONDITION DURING
CONSTRUCTION.
15. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED
BY LAW.
16. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE
WITH THE CODES AND REGULATIONS ENFORCED BY
LOCAL BUILDING OFFICIALS.
17. IF THERE IS CONFLICTING INFORMATION IN THE PLANS
OR SPECIFICATIONS THE MORE STRINGENT AND
GREATER COST ITEM SHALL BE USED.
18. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS
NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM
DRAWINGS.
19. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
20. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY
IN ADVANCE FOR ANY HOT WORK TO ALLOW THE OWNER
TO DISABLE THE FIRE ALARM.
21. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES
SHALL USE TAMPERPROOF SCREWS.
22. ALL DUST & DEBRIS MUST BE CONTAINED WITHIN THE
CONSTRUCTION AREA VIA TARP AND SEAL. THE
CONTRACTOR SHALL SUPPLY TEMPORARY EXHAUST
FANS, DUCTWORK, AND HEPA FILTERS AS REQUIRED TO
MAINTAIN A CLEAN AIR ENVIRONMENT ADJACENT TO THE
CONSTRUCTION AREA. SILICA DUST MUST BE
HANDLED/DISCARDED IN ACCORDANCE WITH MIOSHA
REQUIREMENTS.
GENERAL PLUMBING NOTES
X-DWH
THERMOMETER
DIELECTRIC
UNION (TYPICAL)
T&P RELIEF VALVE
EXTEND TO
FLOOR
HOSE END
DRAIN VALVE
SHUT-OFF VALVE
(TYPICAL)
CHECK VALVE
CP-1
1/2" HWR
X-
CW
EXISTING DOMESTIC WATER
HEATER DETAIL
SCALE: NTS
3.5 GALLON
EXPANSION TANK
X-1" X-1"
X-
HW
X-1"
LPS
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
PR
O
JE
C T
N O
2/
7.
H
JD
N
LS
N
LS
PL
U
M
BI
N G
SY
M
BO
LS
N O
TE
S, A N
D
AB
BR
EV
IA
TI
O N
S P-
DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING FLOOR DRAIN.
DEMO ASSOCIATED SANITARY PIPING TO EXTENTS SHOWN
AND CAP.
X-STORM
X-4"
X-SAN UP
TO X-FD
X-SAN UP
TO X-FD
X-SAN UP
TO X-FD
X-SAN UP
TO X-FD
X-SAN UP
TO X-FD
X-STORM
X-4"
X-6" SAN
X-SAN
X-4"
X-SAN UP TO
X-CO
X-
ST
OR
M
X-STORM
X-4"
X-STORM DN
TO X-MANHOLE
X-MANHOLE
X-4"
X-4"
X-SAN UP
TO X-FD
X-STORM
X-SAN UP
TO X-FD
X-SAN UP
TO X-FD
1 X-SAN UP
TO X-FCO
X-
SA
N
X-4"X-
ST
OR
M
X-SAN UP
TO X-FD
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
PR
O
JE
C T
N O
2/
7.
H
JD
N
BUILDING 80 - PARTIAL BELOW FLOOR PLAN -
PLUMBING DEMOLITION
SCALE: 3/16" = 1'-0"
10 5 10 13
N
LS
N
LS
BU
IL
D
IN
G
PA
R
TI
AL
B
EL
O W
F
LO
O R
PL
AN
PL
U M
BI
N
G D
EM
O
LI
TI
O N
P-
DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING FLOOR DRAIN.
DEMO ASSOCIATED STORM PIPING BACK TO BELOW FLOOR
AND CAP. PATCH FLOOR AS REQUIRED TO MATCH EXISTING.
DISCONNECT, REMOVE, AND DEMO EXISTING GAS PIPING TO
EXTENTS SHOWN AND CAP.
DISCONNECT, REMOVE, AND DEMO EXISTING ABANDONED
LOW PRESSURE STEAM PIPING TO EXTENTS SHOWN AND CAP.
X-FD
X-FD 1
X-FD 1
X-FD1X-FD 1
X-FDX-FDX-FD
X-MANHOLE
X-1-1/2"
X- G
X-UH
X- G
X-G X-G
X-3/4"
X-3/4"
X-
LP
S
X-
LP
S
X-LPS
X-FD
X-2" CW
X-LPS
X-G
X-UH
X-UH
X-
LP
S
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
PR
O
JE
C T
N O
2/
7.
H
JD
N BUILDING 80 - PARTIAL FLOOR PLAN - PLUMBING DEMOLITION
SCALE: 3/16" = 1'-0"
10 5 10 13
N
LS
N
LS
BU
IL
D
IN
G
PA
R
TI
AL
F
LO
O R
P
LA
N
PL
U
M
BI
N G
D
EM
O
LI
TI
O
N P-
PLUMBING KEY NOTES
MODIFY EXISTING SANITARY PIPING AS REQUIRED TO
CONNECT TO NEW PIPING. CONTRACTOR SHALL FIELD VERIFY
EXISTING INVERT ELEVATION AND PIPING SIZE IS SUFFICIENT
PRIOR TO INSTALLING NEW PIPING.
SAWCUT FLOOR AS REQUIRED TO INSTALL NEW SANITARY
PIPING. FILL AND PATCH FLOOR AS REQUIRED TO MATCH
EXISTING.
GENERAL PLUMBING
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UNDERGROUND
UTILITIES PRIOR TO STARTING CONSTRUCTION.
NOTES
2" SAN UP
TO LAV-2
4"
2" SAN UP
TO FD-1
2" SAN UP
TO UR-1
4" SAN UP
TO WC-1
2" SAN UP
TO LAV-1
2" V UP
SAN UP
TO FCO
SAN
X-STORM
X-4"
X-SAN UP
TO X-FD
X-SAN UP
TO X-FD
X-STORM
X-4"
X-6" SAN
X-SAN
X-4"
X-SAN UP TO
X-CO
X-
ST
OR
M
X-STORM
X-4"
X-STORM DN
TO X-MANHOLE
X-MANHOLE
X-4"
X-4"
X-SAN UP
TO X-FD
X-STORM
X-
SA
N
X-4"X-
ST
OR
M
X-SAN UP
TO X-FD
SA
N
SAN
4"
4"
SAN UP
TO FCO
4"
2" SAN UP
TO FD-1
SAN UP
TO FCO
FINISHED FLOOR
I.E. = 100'-0"
I.E. = 98'-6"
I.E. = 97'-4"4"
X-SAN UP
TO X-FCO
2 2
2 2
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
PR
O
JE
C T
N O
2/
7.
H
JD
N
BUILDING 80 - PARTIAL BELOW FLOOR PLAN -
PLUMBING NEW
SCALE: 3/16" = 1'-0"
10 5 10 13
N
LS
N
LS
P-
BU
IL
D
IN
G
PA
R
TI
AL
B
EL
O
W F
LO
O
R P
LA
N
PL
U M
BI
N
G N
EW
PLUMBING KEY NOTES
MODIFY EXISTING HOT WATER PIPING AS REQUIRED TO
CONNECT TO NEW HOT WATER PIPING.
BALANCE CIRCUIT SETTER TO 0.5 GPM.
MODIFY EXISTING COLD WATER PIPING AS REQUIRED TO
INSTALL NEW CHECK VALVE AND HOT WATER RETURN PIPING
FOR X-DWH. REFERENCE DETAIL 2 ON P-100.
MODIFY EXISTING GAS PIPING AS REQUIRED TO CONNECT TO
NEW GAS PIPING.
MODIFY EXISTING COLD WATER PIPING AS REQUIRED TO
CONNECT TO NEW COLD WATER WATER PIPING. COORDINATE
WITH ARCHITECTURAL TRADES ON REMOVAL AND
RE-INSTALLMENT OF FIXED CEILING IN EMPLOYEE
BREAKROOM. PATCH, PRIME, AND PAINT CEILING AS REQUIRED
TO MATCH EXISTING.
INSTALL LAVATORY CONTROLLER AT LOCATION SHOWN.
LAVATORY CONTROLLER BASED ON I-CON NEXUS
MODEL100192 4 I/O AC CONTROLLER. CONNECT TO LAVATORY.
ROUTE NEW GAS PIPING UP THROUGH NEW ROOF CURB AND
ROOF BOOT. PATCH ROOF TO MATCH EXISTING AND SEAL
WATER TIGHT.
GAS PIPE SUPPORTS BASED ON MIRO #5-RAH-7 OR APPROVED
EQUIVALENT. SPACE GAS SUPPORTS PER MANUFACTURER'S
RECOMMENDATIONS. INSTALL GAS PIPE SUPPORT ON MIRO
SUPPORT PAD OR MANUFACTURER APPROVED EQUIVALENT.
GENERAL PLUMBING
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES PRIOR
TO STARTING CONSTRUCTION.
NOTES
RTU-1 - 150 MBH - GAS PRESSURE 4.5" TO 14" W.C.
TOTAL = 150 MBH @ 14" WC.
GAS LOAD SUMMARY
X-DWH
FD-1
HW
V
CW
LAV-1
HWR
WC-1
UR-1
LAV-2
CP-1
X-1" HW
X-1" CW
FD-1
WC-1
HW
CWHW
R
CW
HWR
HW
2" V DN
X-FDX-FDX-FD
X-MANHOLE
X-1-1/2"
X- G
X-G X-G
X-
LP
S
X-2" CW
X-LPS
X-G
X-UH
3/4"
1/2"
1-1/2"
1/2" 3/4"
1-1/2"
1/2"3/4"1/2"3/4"
2" V UP,
3" VTR
1/2"
X-2" CW
51-1/2"1-1/2"3/4"1-1/2"
P-100
RTU-1
(LOCATED ON ROOF)
G
3/4"
(LOCATED IN MAINTENANCE
BUILDING)
R-1 3/4" G
(LOCATED ON ROOF)
3/4" G UP
THROUGH ROOF
X-UH
X-FD
ROOF CURB
3/4" 1-1/2"
LAV-2
CONTROLLER
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
PR
O
JE
C T
N O
2/
7.
H
JD
N BUILDING 80 - PARTIAL FLOOR PLAN - PLUMBING NEW
SCALE: 3/16" = 1'-0"
10 5 10 13
N
LS
N
LS
P-
BU
IL
D
IN
G
PA
R
TI
AL
F
LO
O
R P
LA
N
PL
U M
BI
N
G N
EW
| Sheets and Views |
| FP300-2213700-FP300 |
| FP400-2213700-FP400 |
| M100-2213700-M100 |
| M300-2213700-M300 |
| M400-2213700-M400 |
| M800-2213700-M800 |
| M900-2213700-M900 |
| P100-2213700-P100 |
| P300-2213700-P300 |
| P301-2213700-P301 |
| P400-2213700-P400 |
| P401-2213700-P401 |
File details come from the government source that posted it. Updated .