This document is an Addendum #1 issued by the Department of Technology, Management and Budget (DTMB) for the Mental Health Office Remodel and Addition project at the Parnall Correctional Facility in Michigan. The addendum modifies and clarifies the original contract documents. It includes information on construction specifications, RFI responses, revised drawings and specifications, and administrative details such as the mandatory site walk-through and tracking of recyclable materials. The bid opening date is April 26, 2023.
The addendum addresses concrete reinforcing, cast-in-place concrete, and phenolic-core toilet compartments. It provides revised specifications, drawings, and details on these components. The addendum also includes updates to the HVAC and plumbing systems, as well as electrical work. Contractors are instructed to review the revised documents and acknowledge receipt of the addendum in their bid proposal.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 10/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
4/21/2023
PROJECT NAME
SMT Parnall Correctional Facility – Mental Health Office Remodel and Addition
FILE NUMBER
472/22037.HJD
PROFESSIONAL
DS Architects, Inc.
PROJECT DIRECTOR
Heather DeKorte, RA
BID OPENING DATE:
4/26/2023
This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.
All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.
This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Proposal Form in the appropriate location.
General Notes / Clarification
- Moore Trosper did not attend the mandatory site walk-through; therefore, the DTMB cannot accept a bid from them.
- Any recyclable materials removed from the project site must be tracked and reported to the DTMB and the agency (lbs., linear feet, etc.).
- Contractor to assist the design professional and facility staff by providing information to obtain any potential energy credits or rebates.
RFI Questions
1. Q: Please provide a specification for the cast-in-place concrete (ref A102 note 16) and the metal fabrication (ref detail 7 – Roof Opening Frame, on A501).
See Cast-In-Place Concrete specifications.
Metal Fabrication: see detail #6 and #7 on sheet A-501.
2. Q: I am writing a request for approval for Shoemaker Manufacturing as an equal to the specified make and model grilles and diffusers specified and scheduled in the bid documents.
Shoemaker Manufacturing is an approved alternate to submit for shop drawing review. Shop drawings of the listed equipment for final approval is still required.
http://www.michigan.gov/SIGMAVSS
3. Q: I am looking at the Parnall Correction Facility project and have a question about fire rated glass.
The door schedule on page A601 does not have a rating or designation of fire rating, however, page A201 detail 2 shows a fire door typ. Are all D2 doors to receive fire rated glazing? How many minutes? Or are just doors 106 and 107 fire rated? Please clarify.
There are no fire rated doors and glazing on this project. See attached revised sheet A-201.
4. What is the height from the ceiling to deck?
There is 6-8 feet of working room above the suspended drop ceiling when working from the fire panel to the new area. The ceiling access is in the mechanical room just behind the fire panel, however there is nothing really to walk on up there, it’s just the suspended ceiling grid and wire.
5. Fire protection drawings FP-300 and FP-400.
Note number 4 show adding Live-Tap shut off valve to be installed outside building underground This valve has to be installed before Fire Suppression rider can be modified.
Since the valve that has to be installed is for domestic water who will install this valve?
Plummer or Fire Suppression.
General Contractor to determine who is responsible for installation of new live-tap shutoff valve.
6. Fire protection drawings FP-300 and FP-400 Plans do not show any work in remodeled area. Will the sprinkler heads need to be relocated?
Fire suppression piping is not currently installed in existing dry storage area. Fire suppression piping is not required to serve new Mental Health office area.
Attachments
1. Pre-Bid Meeting Attendance Record as PDF - 22037_Pre-BID MtgSignIn_2023.pdf
2. Images from Pre-Bid Meeting – 22037.HJD Parnall_Mental Health Office Remodel Photos.pdf
3. Addendum drawings –
Arch- Addendum #1 – Parnall Correctional Facility – Mental Health Office Remodel.pdf Mech. – Addendum #1 – Parnall Correctional Facility – Mental Health Remodel.
4. Revised specifications – 22037.HJD Parnall_Mental Health Revised Specifications
Modifications to Drawings G-001 (Sheet Re-Issued):
1. Under alternates, modified thickness of under slab vapor barrier from 6 MIL to 10 MIL vapor barrier.
A-102 (Sheet Re-Issued):
2. Modified note #27 thickness of under slab vapor barrier from 6 MIL to 10 MIL vapor barrier.
A-104 (Sheet Re-Issued):
3. Modified finish specification for toilet partition TP-1.
A-201 (Sheet Re-Issued):
4. Modified elevations to have NO fire rated doors.
5. Modified urinal screen specification.
A-301 (Sheet Re-Issued):
6. Modified urinal screen specification.
A-501 (Sheet Re-Issued):
7. Modified enlarged plan #3 urinal screen specification.
M-400 (Sheet Re-Issued):
8. Modified ‘HVAC Key Notes’.
9. Modified ‘General HVAC Notes’.
Modifications to Specifications
1. Added Section 032000 – Concrete Reinforcing.
2. Added Section 033000 – Cast-In-Place Concrete.
3. Modified toilet partition specification from Section 102113.19 – Plastic Toilet Compartments to Section
102113.17 – Phenolic-Core Toilet Compartments.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DS Architects, Inc. DATE: 4/21/2023
APPROVED BY:
PROJECT DIRECTOR: DATE: Heather DeKorte, R.A. 4/21/2023
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
AL
M
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
LE
G
EN
D S
H
EE
T
- M
EN
TA
L H
EA
LT
H O
FF
IC
ES
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
D
JS
2/
6.
H
JD
G -0
MICHIGAN DEPARTMENT OF CORRECTIONS
PARNALL CORRECTIONAL FACILITY
MENTAL HEALTH OFFICE REMODEL AND ADDITION
472/22037.HJD
TITLESHEET
NO.
DETAILSA-501
COVER SHEETG-001
CODE DATA / BUILDING 80 - OVERALL PLANG-002
OCCUPANCIES / USE ANALYSIS PLANG-003
FUNCTION OF SPACE & OCCUPANT LOAD ANALYSIS PLANG-004
DEMOLITION PLANA-101
FLOOR PLANA-102
REFLECTED CEILING PLANA-103
FINISH PLANA-104
INTERIOR ELEVATIONSA-201
SECTIONSA-301
DOOR SCHEDULE / DOOR LEGENDA-601
HVAC SYMBOLS NOTES, AND ABBREVIATIONSM-100
PLUMBING SYMBOLS NOTES, AND ABBREVIATIONSP-100
ELECTRICAL SYMBOLS ABBREV. + NOTESE-100
ELECTRICAL FLOOR PLAN LIGHTING AND POWER DEMOLITIONE-300
ELECTRICAL FLOOR PLAN LIGHTING NEWE-400
ELECTRICAL FLOOR PLAN POWER NEWE-500
ELECTRICAL PANEL SCHEDULES AND DETAILSE-900
CLARKSTON, MI
7300 DIXIE HWY.
PHONE
FAX
PHONE
248.605.2030 248.605.2030
48346 #600
WEB DSARCHITECTS.COM
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
R ev ie w
D
AT
E
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
BUILDING 80 - FLOOR PLAN - FIRE PROTECTION DEMOLITIONFP-300
BUILDING 80 - FLOOR PLAN - FIRE PROTECTION NEWFP-400
BUILDING 80 - PARTIAL BELOW FLOOR PLAN - PLUMBING DEMOLITIONP-300
BUILDING 80 - PARTIAL FLOOR PLAN - PLUMBING DEMOLITIONP-301
BUILDING 80 - PARTIAL BELOW FLOOR PLAN - PLUMBING NEWP-400
BUILDING 80 - PARTIAL FLOOR PLAN - PLUMBING NEWP-401
BUILDING 80 - PARTIAL FLOOR PLAN - HVAC DEMOLITIONM-300
BUILDING 80 - PARTIAL FLOOR PLAN - HVAC NEWM-400
HVAC DETAILSM-800
HVAC SCHEDULESM-900
3/
/2
BI
D S
ET
CABLING LEGENDS AND DETAILSTC-101
CABLING LEGENDS AND DETAILSTC-102
CABLING LEGENDS AND DETAILSTC-103
HDMI AND USB CONNECTIVITY TC-104
PARNALL MENTAL HEALTH CABLINGTC-201
4/
/2
AD
D
EN
D U
M
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
AL
M
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
FL
O O
R P
LA
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
D
JS
2/
7.
H
JD
A-
CLARKSTON, MI
7300 DIXIE HWY.
PHONE
FAX
PHONE
248.605.2030 248.605.2030
48346 #600
WEB DSARCHITECTS.COM
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
R ev ie w
D
AT
E
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y 3/
/2
BI
D
S
ET
4/
/2
AD
D
EN
D U
M
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
AL
M
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
FI
N
IS
H P
LA
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
D
JS
2/
7.
H
JD
A-
CLARKSTON, MI
7300 DIXIE HWY.
PHONE
FAX
PHONE
248.605.2030 248.605.2030
48346 #600
WEB DSARCHITECTS.COM
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
M
EN
TA
L H
EA
LT
H O
FF
IC
E R
EM
O
D
EL
AN
D
A D
D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y 4/
/2
AD
D
EN
D
U M
AL
M
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
IN
TE
R
IO
R
E
LE
VA
TI
O N
S
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
D
JS
A-
PR
O
JE
C T
N O
2/
7.
H
JD
CLARKSTON, MI
7300 DIXIE HWY.
PHONE
FAX
PHONE
248.605.2030 248.605.2030
48346 #600
WEB DSARCHITECTS.COM
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
R ev ie w
D
AT
E
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y 3/
/2
BI
D
S
ET
4/
/2
AD
D
EN
D U
M
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
SE
C
TI
O N
S
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
D
JS
A-
PR
O
JE
C T
N O
2/
7.
H
JD
CLARKSTON, MI
7300 DIXIE HWY.
PHONE
FAX
PHONE
248.605.2030 248.605.2030
48346 #600
WEB DSARCHITECTS.COM
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
R ev ie w
D
AT
E
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y 3/
/2
BI
D
S
ET
4/
/2
AD
D
EN
D U
M
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y D
ET
AI
LS
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
D
JS
A-
PR
O
JE
C T
N O
2/
7.
H
JD
CLARKSTON, MI
7300 DIXIE HWY.
PHONE
FAX
PHONE
248.605.2030 248.605.2030
48346 #600
WEB DSARCHITECTS.COM
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
R ev ie w
D
AT
E
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y 3/
/2
BI
D
S
ET
4/
/2
AD
D
EN
D U
M
X-UH
X-SA
X-SD ---
X-SA
X-SD ---
X-RG ---
10x10 ---
X-RG ---
10x10 ---
X-RA
X-RA
T
X-RTU
X-IT RACK
RTU-1
(LOCATED ON ROOF)
VAV-1
DDC TOUCHSCREEN
CONTROL PANEL
20x12 SA UP TO RTU-1
24x14 RA UP
TO RTU-1
VAV-5
VAV-7
VAV-9
EF-1
(LOCATED
ON ROOF)
VAV-8
10x6 SA
VAV-4
VAV-7
SD-2 150
6"ø ---
RG-1 150
24x6 ---
SD-1 150
8"ø TYP. 3
RG-1 450
24x12 ---
SD-1 125
6"ø ---
RG-1 125
24x6 ---
SD-1 135
6"ø TYP. 3
RG-1 405
24x12 ---
RG-1 450
24x12 ---
SD-1 150
8"ø TYP. 3
SD-2 125
6"ø ---
SD-2 125
6"ø ---
RG-1 125
24x6 ---
SD-1 200
8"ø ---
SD-1 75
6"ø ---
EG-1 75
12x12 ---
SD-3 50
6"ø ---
10x10 EA
CUH-1
VAV-10
VAV-6
S
SD-1 100
6"ø ---
20x12 SA10x12 SA
10x6 SA
12x10 SA
8x10 SA
24x14 RA
24x14 RA
12x10 RA
12x10 RA
8x8 RA
16x14 RA
6x6 RA
10x10 SA
10x10 SA
8x10 SA
6x8 SA
14x8 SA10x8 SA
6x8 SA
6x8 SA
6x6 EA
EG-1 400
12x12 ---
10x10 EA
AC-1
T
DX PIPING
(LOCATED ON ROOF)
CU-1
(LOCATED ON ROOF)
3/4" CD
X-FD
6x8 SA
VAV-2
RG-1 125
24x6 ---
VAV-3
RG-1 125
24x6 ---
VAV-6
6x8 SA
VAV-8
VAV ACCESS
PANEL (TYP.)
10x6 SA
6x8 SA
SD-2 125
6"ø ---
SD-2 125
6"ø ---
VAV-4
RG-1 125
24x6 ---
S
S
S
S
S
S
S
S
S S
6x8 SA
6x8 SA
6x10 SA
6x10 SA
10x6 SA
8x14 RA
3/4" CD
CO
DX PIPING
12x10 RA
BAS
HVAC KEY NOTES
INSTALL NEW DDC TOUCHSCREEN CONTROL PANEL AT
LOCATION SHOWN PER MANUFACTURES INSTALLATION
INSTRUCTIONS.
INSTALL RETURN GRILLE AT LOCATION SHOWN. RETURN AIR
BRANCH DUCTWORK SIZE SHALL BE 10x10.
INSTALL RETURN GRILLE AT LOCATION SHOWN. RETURN AIR
BRANCH DUCTWORK SIZE SHALL BE 6x6.
INSTALL WALL MOUNTED AIR CONDITIONER AT LOCATION
SHOWN. INSTALL TOP OF AIR CONDITIONER 1' BELOW CEILING.
INSTALL PER MANUFACTURES INSTALLATION INSTRUCTIONS.
INSTALL ROOFTOP UNIT AND ROOF CURB AT LOCATION
SHOWN. INSTALL ROOFTOP UNIT AND ASSOCIATED
ACCESSORIES PER MANUFACTURES INSTALLATIONS
INSTRUCTIONS.
INSTALL CONDENSING UNIT ON ROOF AT LOCATION SHOWN
PER MANUFACTURES INSTALLATION INSTRUCTIONS.
CONNECT NEW DDC CONTROL PANEL TO DARK NETWORK I.T.
RACK WITH PURPLE CAT-6 CABLE(S) AS REQUIRED TO SEE THE
BUILDING FROM BUILDING 71. CONTRACTOR TO HIRE AND
COORDINATE CONNECTION TO DARK NETWORK IT RACK WITH
BRET EMERSON FROM COMMTECH DESIGN
(PHONE 616-446-4545).
REFER TO ARCHITECTURAL PLANS FOR EXACT ACCESS PANEL
LOCATION.
CONNECT DDC CONTROL PANEL TO I.T. RACK SYSTEM TO
ALLOW FOR REMOTE TRACKING AND MONITORING. SYSTEM TO
SEND ALARM POINT TO STARNET 2 SYSTEM THROUGH AN
ETHERNET CONTACT CLOSURE.
INSTALL ROOF MOUNTED EXHAUST FAN AT LOCATION SHOWN.
10x10 EXHAUST AIR DUCTWORK UP TO NEW EXHAUST FAN.
INSTALL RETURN GRILLE AT LOCATION SHOWN. RETURN AIR
BRANCH DUCTWORK SIZE SHALL BE 10x8.
GENERAL HVAC NOTES
1. INSTALL ALL FLAT PLATE SENSORS WITH TAMPER
PROOF SCREWS.
2. CONTRACTOR TO COORDINATE VAV AND DUCTWORK
INSTALLATION WITH ACCESS PANEL LOCATIONS.
3. ALL VAV BOXES MUST BE FULLY SERVICEABLE FROM
ACCESS PANELS. CONTRACTOR SHALL COORDINATE
VAV LOCATIONS WITH ARCHITECTURAL TRADES.
4. CONTRACTOR TO PROVIDE AND INSTALL A LAPTOP IN
BUILDING 71 TO ALLOW THE FACILITY TO ACCESS THE
NEW BAS. THE NEW LAPTOP IS TO BE INSTALLED IN THE
HVAC TECH OFFICE INSIDE BUILDING 71. THE NEW
LAPTOP SHALL BE CONNECTED TO THE DARK
NETWORK IT RACK IN BUILDING 71. DISTANCE FROM
DARK NETWORK I.T. RACK TO HVAC TECH OFFICE IS
APPROXIMATELY 300'-0". CONTRACTOR TO HIRE AND
COORDINATE CONNECTION TO DARK NETWORK IT
RACK WITH BRET EMERSON FROM COMMTECH DESIGN
(PHONE 616-446-4545).
R ev ie w
D
AT
E
3/
/2
BI
D S
ET
AR
C
H
IT
EC
TS
EN
G
IN
EE
R S
M A
T R
I X
M
EN
TA
L
H
EA
LT
H
O
FF
IC
E
R
EM
O D
EL
AN
D A
D D
IT
IO
N
PA
R
N
AL
L C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
JC
/E
N G
B Y
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , N
C A
R B
, D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PR
O
JE
C
T D
ES
C
R
IP
TI
O
N
PR
O
JE
C T
N O
2/
7.
H
JD
N BUILDING 80 - PARTIAL FLOOR PLAN - HVAC NEW
SCALE: 3/16" = 1'-0"
10 5 10 13
N
LS
N
LS
M -4
BU
IL
D
IN
G
PA
R
TI
AL
F
LO
O
R P
LA
N
H
VA
C
N
EW
4/
/2
AD
D
EN
D U
M
Bidding and Contract Document (R 02/22)
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CONCRETE REINFORCING 032000 - 1
SECTION 032000 - CONCRETE REINFORCING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Welded-wire reinforcement.
1.2 ACTION SUBMITTALS
A. Product Data: For the following:
1. Each type of steel reinforcement.
B. Construction Joint Layout: Indicate proposed construction joints required to build the structure.
1. Location of construction joints is subject to approval of Architect.
1.3 DELIVERY, STORAGE, AND HANDLING
A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage and to avoid damaging coatings on steel reinforcement.
1. Store reinforcement to avoid contact with earth.
2. Do not allow epoxy-coated reinforcement to be stored outdoors for more than 60 days without being stored under an opaque covering.
3. Do not allow dual-coated reinforcement to be stored outdoors for more than 60 days without being stored under an opaque covering.
4. Do not allow stainless steel reinforcement to come into contact with uncoated reinforcement.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Structural Performance of Structural Thermal Break Insulating Connection System:
Structural thermal break insulated connection system to withstand the following loads and stresses:
1. Dead Loads: As indicated on Drawings.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CONCRETE REINFORCING 032000 - 2
a. Shear Load: As indicated on Drawings.
b. Bending Moment: As indicated on Drawings.
2. Live Loads: As indicated on Drawings.
a. Shear Load: As indicated on Drawings.
b. Bending Moment: As indicated on Drawings.
2.2 STEEL REINFORCEMENT
A. Plain-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, plain, fabricated from as-drawn steel wire into flat sheets.
2.3 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
PART 3 - EXECUTION
3.1 PREPARATION
A. Protection of In-Place Conditions:
1. Do not cut or puncture vapor retarder.
2. Repair damage and reseal vapor retarder before placing concrete.
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.
3.2 INSTALLATION OF STEEL REINFORCEMENT
A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.
B. Accurately position, support, and secure reinforcement against displacement.
1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.
C. Provide concrete coverage in accordance with ACI 318.
D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
E. Install welded-wire reinforcement in longest practicable lengths.
1. Support welded-wire reinforcement in accordance with CRSI "Manual of
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CONCRETE REINFORCING 032000 - 3
Standard Practice."
a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed 12 inches.
2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches for plain wire and 8 inches for deformed wire.
3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.
4. Lace overlaps with wire.
3.3 JOINTS
A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.
1. Place joints perpendicular to main reinforcement.
2. Continue reinforcement across construction joints unless otherwise indicated.
3. Do not continue reinforcement through sides of strip placements of floors and slabs.
B. Doweled Joints: Install dowel bars and support assemblies at joints where indicated.
Lubricate or asphalt coat one-half of dowel length, to prevent concrete bonding to one side of joint.
3.4 INSTALLATION TOLERANCES
A. Comply with ACI 117.
END OF SECTION 032000
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 1
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast-in-place concrete, including concrete materials, mixture design, placement procedures, and finishes.
B. Related Requirements:
1. Section 032000 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash, slag cement, other pozzolans, and silica fume; materials subject to compliance with requirements.
B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.
1.3 ACTION SUBMITTALS
A. Product Data: For each of the following.
1. Vapor retarders.
B. Design Mixtures: For each concrete mixture, include the following:
1. Mixture identification.
2. Minimum 28-day compressive strength.
3. Durability exposure class.
4. Maximum w/cm.
5. Calculated equilibrium unit weight, for lightweight concrete.
6. Slump limit.
7. Air content.
8. Nominal maximum aggregate size.
9. Steel-fiber reinforcement content.
10. Indicate amounts of mixing water to be withheld for later addition at Project site if permitted.
11. Include manufacturer's certification that permeability-reducing admixture is compatible with mix design.
12. Include certification that dosage rate for permeability-reducing admixture
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 2
matches dosage rate used in performance compliance test.
13. Intended placement method.
14. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
C. Shop Drawings:
1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.
a. Location of construction joints is subject to approval of the Architect.
D. Concrete Schedule: For each location of each Class of concrete indicated in "Concrete Mixtures" Article, including the following:
1. Concrete Class designation.
2. Location within Project.
3. Exposure Class designation.
4. Formed Surface Finish designation and final finish.
5. Final finish for floors.
6. Curing process.
7. Floor treatment if any.
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: For the following:
1. Installer: Include copies of applicable ACI certificates.
2. Ready-mixed concrete manufacturer.
3. Testing agency: Include copies of applicable ACI certificates.
B. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Vapor retarders.
C. Research Reports:
1. For concrete admixtures in accordance with ICC's Acceptance Criteria AC198.
2. For sheet vapor retarder/termite barrier, showing compliance with ICC AC380.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs Project personnel qualified as an ACI-certified Flatwork Technician and Finisher and a supervisor who is a certified ACI Flatwork Concrete Finisher/Technician or an ACI Concrete Flatwork Technician .
B. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 3
C94/C94M requirements for production facilities and equipment.
1. Manufacturer certified in accordance with NRMCA's "Certification of Ready Mixed Concrete Production Facilities."
1.6 PRECONSTRUCTION TESTING
A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on each concrete mixture.
1. Include the following information in each test report:
a. Admixture dosage rates.
b. Slump.
c. Air content.
d. Seven-day compressive strength.
e. 28-day compressive strength.
f. Permeability.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Comply with ASTM C94/C94M and ACI 301.
1.8 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 301 and ACI 306.1 and as follows.
1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
2. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.
3. Do not use frozen materials or materials containing ice or snow.
4. Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.
5. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:
1. Maintain concrete temperature at time of discharge to not exceed 95 deg F.
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete.
Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 4
1.9 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to furnish replacement sheet vapor retarder/termite barrier material and accessories for sheet vapor retarder/ termite barrier and accessories that do not comply with requirements or that fail to resist penetration by termites within specified warranty period.
1. Warranty Period: 10 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.
2.2 CONCRETE MATERIALS
A. Source Limitations:
1. Obtain all concrete mixtures from a single ready-mixed concrete manufacturer for entire Project.
2. Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant.
3. Obtain aggregate from single source.
4. Obtain each type of admixture from single source from single manufacturer.
B. Cementitious Materials:
1. Portland Cement: ASTM C150/C150M, Type II, gray.
2. Fly Ash: ASTM C618, Class C or F.
3. Slag Cement: ASTM C989/C989M, Grade 100 or 120.
C. Normal-Weight Aggregates: ASTM C33/C33M, [Class 3S] [Class 3M] [Class 1N] <Insert class> coarse aggregate or better, graded. Provide aggregates from a single source.
1. Alkali-Silica Reaction: Comply with one of the following:
a. Expansion Result of Aggregate: Not more than 0.04 percent at one-year when tested in accordance with ASTM C1293.
b. Expansion Results of Aggregate and Cementitious Materials in Combination: Not more than 0.10 percent at an age of 16 days when tested in accordance with ASTM C1567.
c. Alkali Content in Concrete: Not more than 4 lb./cu. yd. for moderately reactive aggregate or 3 lb./cu. yd. for highly reactive aggregate, when tested in accordance with ASTM C1293 and categorized in accordance with ASTM C1778, based on alkali content being calculated in accordance
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 5
with ACI 301.
2. Maximum Coarse-Aggregate Size: 3/4 inch nominal.
3. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
D. Lightweight Aggregate: ASTM C330/C330M, 3/4-inch nominal maximum aggregate size.
E. Water and Water Used to Make Ice: ASTM C94/C94M, potable
2.3 VAPOR RETARDERS
A. Sheet Vapor Retarder, Class A: ASTM E1745, Class A; not less than 10 mils thick.
Include manufacturer's recommended adhesive or pressure-sensitive tape.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Barrier-Bac; Inteplast Group
b. Fortifiber Building Systems Group
c. Foxfire Enterprises, Inc.
d. ISI Building Products
e. Poly-America, L.P.
f. Raven Industries, Inc
g. Reef Industries, Inc.
h. Stego Industries, LLC
i. Tex-Trude
j. W. R. Meadows, Inc
2.4 REPAIR MATERIALS
A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.
1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.
2. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.
3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand, as recommended by underlayment manufacturer.
4. Compressive Strength: Not less than 4100 psi at 28 days when tested in accordance with ASTM C109/C109M.
B. Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/4 inch and that can be filled in over a scarified surface to match adjacent floor elevations.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 6
1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.
2. Primer: Product of topping manufacturer recommended for substrate, conditions, and application.
3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by topping manufacturer.
4. Compressive Strength: Not less than 5000 psi at 28 days when tested in accordance with ASTM C109/C109M.
2.5 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.
1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.
B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:
1. Fly Ash or Other Pozzolans: 25 percent by mass.
2. Slag Cement: 50 percent by mass.
3. Silica Fume: 10 percent by mass.
4. Total of Fly Ash or Other Pozzolans, Slag Cement, and Silica Fume: 50 percent by mass, with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.
5. Total of Fly Ash or Other Pozzolans and Silica Fume: 35 percent by mass with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.
2.6 CONCRETE MIXTURES
A. Class B: Normal-weight concrete used for foundation walls.
1. Exposure Class: ACI 318 F3.
2. Minimum Compressive Strength: 4000 psi at 28 days.
3. Maximum w/cm: 0.45.
4. Slump Limit: 4 inches, plus or minus 1 inch.
5. Air Content:
a. Exposure Classes F2 and F3: 6 percent, plus or minus 1.5 percent at point of delivery for concrete containing 3/4-inch nominal maximum aggregate size.
B. Class C: Normal-weight concrete used for interior slabs-on-ground.
1. Exposure Class: ACI 318 F0.
2. Minimum Compressive Strength: 4000 psi at 28 days.
3. Maximum w/cm: 0.45.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 7
4. Minimum Cementitious Materials Content: 540 lb/cu. yd..
5. Slump Limit: 4 inches, plus or minus 1 inch.
6. Air Content:
a. Do not use an air-entraining admixture or allow total air content to exceed 3 percent for concrete used in trowel-finished floors.
2.7 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with ASTM C94/C94M and ASTM C1116/C1116M, and furnish batch ticket information.
B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete in accordance with ASTM C94/C94M. Mix concrete materials in appropriate drum-type batch machine mixer.
1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than five minutes after ingredients are in mixer, before any part of batch is released.
2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd..
3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions:
1. Before placing concrete, verify that installation of concrete forms, accessories, and reinforcement, and embedded items is complete and that required inspections have been performed.
2. Do not proceed until unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Provide reasonable auxiliary services to accommodate field testing and inspections, acceptable to testing agency, including the following:
1. Daily access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Secure space for storage, initial curing, and field curing of test samples, including source of water and continuous electrical power at Project site during site curing period for test samples.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 8
4. Security and protection for test samples and for testing and inspection equipment at Project site.
3.3 INSTALLATION OF VAPOR RETARDER
A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder in accordance with ASTM E1643 and manufacturer's written instructions.
1. Install vapor retarder with longest dimension parallel with direction of concrete pour.
2. Face laps away from exposed direction of concrete pour.
3. Lap vapor retarder over footings and grade beams not less than 6 inches, sealing vapor retarder to concrete.
4. Lap joints 6 inches and seal with manufacturer's recommended tape.
5. Terminate vapor retarder at the top of floor slabs, grade beams, and pile caps, sealing entire perimeter to floor slabs, grade beams, foundation walls, or pile caps.
6. Seal penetrations in accordance with vapor retarder manufacturer's instructions.
7. Protect vapor retarder during placement of reinforcement and concrete.
a. Repair damaged areas by patching with vapor retarder material, overlapping damages area by 6 inches on all sides, and sealing to vapor retarder.
B. Bituminous Vapor Retarders: Place, protect, and repair bituminous vapor retarder in accordance with manufacturer's written instructions.
3.4 JOINTS
A. Construct joints true to line, with faces perpendicular to surface plane of concrete.
B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.
1. Install so strength and appearance of concrete are not impaired, at locations indicated on Drawings or as approved by Architect.
2. Place joints perpendicular to main reinforcement.
a. Continue reinforcement across construction joints unless otherwise indicated.
b. Do not continue reinforcement through sides of strip placements of floors and slabs.
3. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete.
4. Locate joints for beams, slabs, joists, and girders at third points of spans. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.
5. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 9
6. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.
7. Use epoxy-bonding adhesive at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.
C. Control Joints in Slabs-on-Ground: Form weakened-plane control joints, sectioning concrete into areas as indicated. Construct control joints for a depth equal to at least one-fourth of concrete thickness as follows:
1. Grooved Joints: Form control joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch. Repeat grooving of control joints after applying surface finishes. Eliminate groover tool marks on concrete surfaces.
2. Sawed Joints: Form control joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch- wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random cracks.
D. Isolation Joints in Slabs-on-Ground: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.
1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface unless otherwise indicated on Drawings.
2. Terminate full-width joint-filler strips not less than 1/2 inch or more than 1 inch below finished concrete surface, where joint sealants, specified in Section 079200 "Joint Sealants," are indicated.
3. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.
E. Doweled Joints:
1. Install dowel bars and support assemblies at joints where indicated on Drawings.
2. Lubricate or asphalt coat one-half of dowel bar length to prevent concrete bonding to one side of joint.
F. Dowel Plates: Install dowel plates at joints where indicated on Drawings.
3.5 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.
1. Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.
2. Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.
B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Architect in writing, but not to exceed the amount indicated on the concrete delivery ticket.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 10
1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.
C. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301, but not to exceed the amount indicated on the concrete delivery ticket.
1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.
D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.
1. If a section cannot be placed continuously, provide construction joints as indicated.
2. Deposit concrete to avoid segregation.
3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.
4. Consolidate placed concrete with mechanical vibrating equipment in accordance with ACI 301.
a. Do not use vibrators to transport concrete inside forms.
b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer.
c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.
d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.
E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.
1. Do not place concrete floors and slabs in a checkerboard sequence.
2. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.
3. Maintain reinforcement in position on chairs during concrete placement.
4. Screed slab surfaces with a straightedge and strike off to correct elevations.
5. Level concrete, cut high areas, and fill low areas.
6. Slope surfaces uniformly to drains where required.
7. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface.
8. Do not further disturb slab surfaces before starting finishing operations.
3.6 FINISHING FLOORS AND SLABS
A. Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 11
B. Trowel Finish:
1. After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel.
2. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance.
3. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.
4. Do not add water to concrete surface.
5. Do not apply hard-troweled finish to concrete, which has a total air content greater than 3 percent.
6. Apply a trowel finish to surfaces to be covered with resilient flooring, carpet, ceramic or quarry tile set over a cleavage membrane, paint, or another thin-film-finish coating system.
7. Finish surfaces to the following tolerances, in accordance with ASTM E1155, for a randomly trafficked floor surface:
a. Slabs on Ground:
1) Specified overall values of flatness, FF 45; and of levelness, FL 35;
with minimum local values of flatness, FF 30; and of levelness, FL 24.
3.7 CONCRETE CURING
A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
1. Comply with ACI 301 and ACI 306.1 for cold weather protection during curing.
2. Comply with ACI 301 and ACI 305.1 for hot-weather protection during curing.
3. Maintain moisture loss no more than 0.2 lb/sq. ft. x h before and during finishing operations.
B. Curing Unformed Surfaces: Comply with ACI 308.1 as follows:
1. Begin curing immediately after finishing concrete.
2. Interior Concrete Floors:
a. Floors to Receive Floor Coverings Specified in Other Sections: Contractor has option of the following:
1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.
a) Lap edges and ends of absorptive cover not less than 12 inches.
b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 12
2) Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive.
a) Immediately repair any holes or tears during curing period, using cover material and waterproof tape.
b) Cure for not less than seven days.
3) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following:
a) Water.
b) Continuous water-fog spray.
3.8 TOLERANCES
A. Conform to ACI 117.
3.9 JOINT FILLING
A. Prepare, clean, and install joint filler in accordance with manufacturer's written instructions.
1. Defer joint filling until concrete has aged at least [one] [six] month(s).
2. Do not fill joints until construction traffic has permanently ceased.
B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave contact faces of joints clean and dry.
C. Install semirigid joint filler full depth in saw-cut joints and at least 2 inches deep in formed joints.
D. Overfill joint, and trim joint filler flush with top of joint after hardening.
3.10 CONCRETE SURFACE REPAIRS
A. Defective Concrete:
1. Repair and patch defective areas when approved by Architect.
2. Remove and replace concrete that cannot be repaired and patched to Architect's approval.
B. Patching Mortar: Mix dry-pack patching mortar, consisting of 1 part portland cement to 2-1/2 parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 13
C. Repairing Unformed Surfaces:
1. Test unformed surfaces, such as floors and slabs, for finish, and verify surface tolerances specified for each surface.
a. Correct low and high areas.
b. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template.
2. Repair finished surfaces containing surface defects, including spalls, popouts, honeycombs, rock pockets, crazing, and cracks in excess of 0.01 inch wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width, and other objectionable conditions.
3. After concrete has cured at least 14 days, correct high areas by grinding.
4. Correct localized low areas during, or immediately after, completing surface-finishing operations by cutting out low areas and replacing with patching mortar.
a. Finish repaired areas to blend into adjacent concrete.
5. Correct other low areas scheduled to receive floor coverings with a repair underlayment.
a. Prepare, mix, and apply repair underlayment and primer in accordance with manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.
b. Feather edges to match adjacent floor elevations.
6. Correct other low areas scheduled to remain exposed with repair topping.
a. Cut out low areas to ensure a minimum repair topping depth of 1/4 inch to match adjacent floor elevations.
b. Prepare, mix, and apply repair topping and primer in accordance with manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.
7. Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete.
a. Remove defective areas with clean, square cuts, and expose steel reinforcement with at least a 3/4-inch clearance all around.
b. Dampen concrete surfaces in contact with patching concrete and apply bonding agent.
c. Mix patching concrete of same materials and mixture as original concrete, except without coarse aggregate.
d. Place, compact, and finish to blend with adjacent finished concrete.
e. Cure in same manner as adjacent concrete.
8. Repair random cracks and single holes 1 inch or less in diameter with patching mortar.
a. Groove top of cracks and cut out holes to sound concrete, and clean off
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
CAST-IN-PLACE CONCRETE 033000 - 14
dust, dirt, and loose particles.
b. Dampen cleaned concrete surfaces and apply bonding agent.
c. Place patching mortar before bonding agent has dried.
d. Compact patching mortar and finish to match adjacent concrete.
e. Keep patched area continuously moist for at least 72 hours.
D. Perform structural repairs of concrete, subject to Architect's approval, using epoxy adhesive and patching mortar.
E. Repair materials and installation not specified above may be used, subject to Architect's approval.
3.11 PROTECTION
A. Protect concrete surfaces as follows:
1. Protect from petroleum stains.
2. Diaper hydraulic equipment used over concrete surfaces.
3. Prohibit vehicles from interior concrete slabs.
4. Prohibit use of pipe-cutting machinery over concrete surfaces.
5. Prohibit placement of steel items on concrete surfaces.
6. Prohibit use of acids or acidic detergents over concrete surfaces.
7. Protect liquid floor treatment from damage and wear during the remainder of construction period. Use protective methods and materials, including temporary covering, recommended in writing by liquid floor treatments installer.
8. Protect concrete surfaces scheduled to receive surface hardener or polished concrete finish using Floor Slab Protective Covering.
END OF SECTION 033000
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
PHENOLIC-CORE TOILET
COMPARTMENTS
102113.17 - 1
SECTION 102113.17 - PHENOLIC-CORE TOILET COMPARTMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Phenolic-core toilet compartments.
1.2 COORDINATION
A. Coordinate requirements for blocking, reinforcing, and other supports concealed within wall to ensure that toilet compartments can be supported and installed as indicated.
1.3 ACTION SUBMITTALS
A. Product Data.
1. Phenolic-core toilet compartments.
a. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for toilet compartments.
B. Shop Drawings:
1. Include plans, elevations, sections, details, and attachment details.
2. Show locations of cutouts for compartment-mounted toilet accessories.
3. Show locations of centerlines of toilet fixtures.
4. Show locations of floor drains.
C. Samples for Verification: Actual sample of finished products for each type of toilet compartment, hardware, and accessory.
1. Size: see drawings.
D. Product Schedule: For toilet compartments, prepared by or under the supervision of supplier, detailing location and selected colors for toilet compartment material.
E. Delegated Design Submittals: For grab bars mounted on toilet compartment panels, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
1. Include structural design calculations indicating compliance with specified structural-performance requirements.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
PHENOLIC-CORE TOILET
COMPARTMENTS
102113.17 - 2
1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For toilet compartments.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Extra Stock Materials: Furnish extra materials to Owner that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Door Hinges: One hinge(s) with associated fasteners.
2. Latch and Keeper: One latch(es) and keeper(s) with associated fasteners.
3. Door Bumper: One door bumper(s) with associated fasteners.
4. Door Pull: One door pull(s) with associated fasteners.
5. Fasteners: 10 fasteners of each size and type.
1.6 FIELD CONDITIONS
A. Field Measurements: Verify actual locations of toilet fixtures, walls, columns, ceilings, and other construction contiguous with toilet compartments by field measurements, and coordinate before fabrication.
PART 2 - PRODUCTS
2.1 SOURCE LIMITATIONS
A. Obtain phenolic-core toilet compartments from single source from single manufacturer.
2.2 PERFORMANCE REQUIREMENTS
A. Surface-Burning Characteristics: Comply with ASTM E84; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1. Flame-Spread Index: 25 or less.
2. Smoke-Developed Index: 450 or less.
3. Class A
B. Structural Performance: Where grab bars are mounted on toilet compartments, design panels to comply with the following requirements:
1. Panels are able to withstand a concentrated load on grab bar of at least 250 lbf applied at any direction and at any point, without deformation of panel.
C. Regulatory Requirements: Comply with applicable provisions in the USDOJ's "2010 ADA Standards for Accessible Design", and, ICC A117.1 for toilet compartments designated as accessible.
Parnall Correctional Facility:
Mental Health Offices
File No. 472/22037.HJD
PHENOLIC-CORE TOILET
COMPARTMENTS
102113.17 - 3
2.3 PHENOLIC-CORE TOILET COMPARTMENTS
A. Basis-of-Design Product: Subject to compliance with requirements, provide Metpar:
color - thru phenolic standard floor mounted or comparable product by one of the following:
1. Metpar Corp
B. Toilet-Enclosure Style: Floor anchored.
C. Entrance-Screen Style: Floor anchored.
D. Urinal-Screen Style: Wall hung.
E. Door, Panel, and Pilaster Construction: Solid phenolic-core material with melamine facing on both sides fused to substrate during manufacture (not separately laminated), and with eased and polished edges. Provide minimum 3/4-inch- thick doors and pilasters and minimum 1/2-inch- thick panels.
F. Entrance-Screen Construction: Matching panel construction.
G. Urinal-Screen Construction: Matching…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .