Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25922R0051
About this file
This solicitation package includes drawings and project plans for replacing heat pumps with fan coil units at the Rocky Mountain Regional Medical Center in Aurora, Colorado. The solicitation seeks to replace aging heat pumps throughout four levels of the clinic building with new fan coil units, connecting them to existing or new chilled water, electrical, and control systems. Drawings depict demolition of existing equipment, installation of new fan coils, ductwork, piping, and other mechanical, electrical, and controls work. The related federal contract opportunity is solicitation number 36C25922R0051 for project 554-21-121 issued by the Department of Veterans Affairs for replacing heat pumps in the clinic building with appropriately sized fan coils. This 100% service-disabled veteran-owned small business set-aside contract is valued between $250,000 and $500,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Replace Heat Pumps in CBS with Fan Coils Questions_updated.docx | DOCX document | |
| S06- 36C25922R0051 Amend 0002.docx | DOCX document | |
| Replace Heat Pumps in CBS with Fan Coils Questions.docx | DOCX document | |
| S04- Site Visit Attendance 220408.pdf | ||
| S04- Site Visit Meeting Doc.docx | DOCX document | |
| S06- 36C25922R0051 Amend 0001.docx | DOCX document | |
| Specifications_updated.zip | ZIP file | |
| Specifications.zip | ZIP file | |
| 36C25922R0051_Solicitation.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| 623-18-102 100pct Specifications with Headers stamped.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
10-01-C6-03
WAIT
10-01-C7-02
LOUNGE
10-01-C6-02
ELEC
10-01-C9-01
TELECOM
10-01-C11-01
MAIN ELEC RM
10-01-C7-01
ELEV EQUIP
10-01-C9-02
ELEV EQUIP
10-01-C11-02
(E) WATER ENTRY
10-01-B8-12
CORRIDOR
10-01-B11-01
ELEC
10-01-12B.1-01
LOBBY
10-01-C7-03
CORRIDOR
3" CHS
10-FCUC4
10-FCUC1
1 1/4" CHR
1 1/4" CWS
1" CHS
1" CHR
1 1/2" CHS
1 1/2" CHR
1 1/2" CHR
1 1/2" CHS
2" CHS
2" CHR
2 1/2" CHR
2 1/2" CHS
2" CHR
2" CHS
10-FCUC3
T
1.1
1.1
2.5
11.5
A
B
B.1
B.5
B.7
C
C.9
D
E
T
18" Ø
740 CFM
(TYP-2)
14" x 14"
1740 CFM
18" x 18"
14"x14"
14"x14"
730 CFM
14 / 14
3825 CFM
10-FCUC6
26" x 22" x
T
T
T
T
10-FCUC7
STRUCTURE ABOVE
SUSPEND FROM
OVERHEAD STRUCTURE
WITH HANGER RODS
CLEAR SPACE AT
FILTER ACCESS
DUCT
MANUAL
AIR VENTS
FAN COIL UNIT
P/T (TYP.)
CHS
CHR
CEILING
DRAIN VALVE WITH
HOSE
END AND CAP
D
VIBRATION ISOLATOR
FLEX CONNECTION (TYP.)
COOLING COIL
DUCT
HORIZONTAL CEILING FAN
COIL UNIT PIPING DETAIL
FLEX HOSES
10.M.101
LEVEL 1 PROJECT PLAN
CLINIC BUILDING (SOUTH)
3/5/21
1/8" = 1'-0"
LEVEL 1 PROJECT PLAN
NORTH
0' 4' 8' 16' 32'
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-21-121
REPLACE HEAT PUMPS WITH
FAN COIL UNITS
AURORA, COLORADO
N
C
O N
R
E S
D
A T
I B
S
I B
N
E
N C
L C
B N
B C
B S
P
S N
V N
V S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e i g h t h i n c o e f o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
A
AutoCAD SHX Text
LOCATION #1
AutoCAD SHX Text
LOCATION #2
AutoCAD SHX Text
LOCATION #3
AutoCAD SHX Text
LOCATION #4
AutoCAD SHX Text
LOCATION #5
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
DEMO EXISTING HEAT PUMP AND REPLACE WITH FCU SIZED PER EQUIPMENT SCHEDULE.
AutoCAD SHX Text ADAPT NEW FCU TO EXISTING DUCTWORK AND REUTILIZE EXISTING POWER, CONTROL WIRING AND CONDENSATE DRAIN AS ABLE. ELSE, INSTALL NEW.
AutoCAD SHX Text INSTALL SECONDARY DRAIN PAN UNDER NEW FCU AND DRAIN PAN UNDER ANY PIPING INSTALLED ABOVE ELECTRICAL DISTRIBUTION EQUIPMENT
AutoCAD SHX Text CONNECT NEW FCU TO EXISTING CHILLED WATER SUPPLY AND RETURN AT THIS LOCATION. SIZE PER EQUIPMENT SCHEDULE.
AutoCAD SHX Text
INSTALL 2' X2' ISOLATION VALVE ACCESS HATCH IN HARD CEILING
AutoCAD SHX Text LEAVE EXISTING CONDENSER WATER IN PLACE WITH EXISTING BALANCING VALVE AND LOOP SUPPLY INTO RETURN PIPE. REPOSITION AS NECESSARY TO ACCOMMODATE NEW EQUIPMENT AND CHILLED WATER PIPING.
AutoCAD SHX Text
REUSE EXISTING RETURN DUCT OR ELIMINATE AND INSTALL FIRE DAMPER IN TRANSFER DUCT
AutoCAD SHX Text
NOTE HALLWAY HAS HARD CEILING AND WILL NEED TO BE REMOVED AND REP[LACED..
T
T
B.5
A.1
1.1
A
C
D
E
B.1
2.5
B.7
B
11.5
C9
730 CFM
22" x 12"
10-FCUC11
10-FCUC9
A2-320
OFFICE
10-02-C10-??
A2-200
A2-251
A2-324A
OFFICE
10-02-C10-09
A2-327A x
22" x 12"
730 CFM
FUTURE
VALVES
1-1/4"
FUTURE
VALVES
1-1/2"
1-1/2" CHR
1-1/2" CHS
2" CHR
2" CHS
2" CHR
2" CHS
ELEC
10-02-C10-03
ELEC
10-02-C6-02
STOR
10-02-C6-05
DN
UP
STRUCTURE ABOVE
SUSPEND FROM
OVERHEAD STRUCTURE
WITH HANGER RODS
CLEAR SPACE AT
FILTER ACCESS
DUCT
MANUAL
AIR VENTS
FAN COIL UNIT
P/T (TYP.)
CHS
CHR
CEILING
DRAIN VALVE WITH
HOSE
END AND CAP
D
VIBRATION ISOLATOR
FLEX CONNECTION (TYP.)
COOLING COIL
DUCT
HORIZONTAL CEILING FAN
COIL UNIT PIPING DETAIL
FLEX HOSES
10.M.102
LEVEL 2 PROJECT PLAN
CLINIC BUILDING (SOUTH)
3/5/21
1/8" = 1'-0"
LEVEL 2 PROJECT PLAN
NORTH
0' 4' 8' 16' 32'
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-21-121
REPLACE HEAT PUMPS WITH
FAN COIL UNITS
AURORA, COLORADO
N
O N
E S
A T
B
S
I B
N
E
N C
L C
B N
B C
B S
S N
V N
V S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e i g h o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
A
AutoCAD SHX Text
LOCATION #7
AutoCAD SHX Text
LOCATION #6
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
DEMO EXISTING EXHAUST FAN IN THIS LOCATION.
AutoCAD SHX Text
INSTALL NEW FCU WITH NEW DUCTWORK, POWER, CONTROL WIRING AND CONDENSATE DRAIN.
AutoCAD SHX Text CONNECT NEW FCU TO NEW CHILLED WATER SUPPLY AND RETURN AT THIS LOCATION. SIZE PER EQUIPMENT SCHEDULE.
AutoCAD SHX Text INSTALL NEW CHILLED WATER PIPING FROM EXISTING ISOLATION VALVES IN THIS LOCATION.
AutoCAD SHX Text
TIE-IN CONDENSATE DRAIN TO SEWER VENT IN THIS LOCATION
AutoCAD SHX Text INSTALL NEW CONDENSATE DRAIN AND DRAIN PUMP. RE-UTILIZE EXHAUST FAN ELECTRICAL CIRCUIT FOR CONDENSATE DRAIN PUMP.
INSTALL NEW ELECTRICAL POWER FOR FCUS ON THIS LEVEL FROM EQUIPMENT PANEL IN THIS LOCATION.
DN
10-03-C6-02
ELEC
10-03-C10-09
ELEC
10-03-B10-13
VEST
10-03-C5-02
CORRIDOR
2" CHS
2" CHR
1 1/2" CHS
1 1/2" CHR
1 1/4"
CHR
1 1/4"
CHS
1" CHS
1" CHR
1 1/2" CHS
1 1/2" CHR
E
C
B.7
B.5
B
A.1
1.1
1.1
2.5
2.5
11.5
11.5
C.9
B
A
Z
SA
B.1
C
T
T
730 CFM
14" x 14"
730 CFM
14" x 14"
10-FCUC13
10-FCUC15
STRUCTURE ABOVE
SUSPEND FROM
OVERHEAD STRUCTURE
WITH HANGER RODS
CLEAR SPACE AT
FILTER ACCESS
DUCT
MANUAL
AIR VENTS
FAN COIL UNIT
P/T (TYP.)
CHS
CHR
CEILING
DRAIN VALVE WITH
HOSE
END AND CAP
D
VIBRATION ISOLATOR
FLEX CONNECTION (TYP.)
COOLING COIL
DUCT
HORIZONTAL CEILING FAN
COIL UNIT PIPING DETAIL
FLEX HOSES
10.M.103
LEVEL 3 PROJECT PLAN
CLINIC BUILDING (SOUTH)
3/5/21
1/8" = 1'-0"
LEVEL 3 PROJECT PLAN
NORTH
0' 4' 8' 16' 32'
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-21-121
REPLACE HEAT PUMPS WITH
FAN COIL UNITS
AURORA, COLORADO
N
O N
E S
A T
B
S
I B
N
E
N C
L C
B N
B C
B S
S N
V N
V S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e i g h o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
A
AutoCAD SHX Text
LOCATION #9
AutoCAD SHX Text
LOCATION #8
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
DEMO EXISTING HEAT PUMP AND REPLACE WITH FCU SIZED PER EQUIPMENT SCHEDULE.
AutoCAD SHX Text ADAPT NEW FCU TO EXISTING DUCTWORK AND REUTILIZE EXISTING POWER, CONTROL WIRING AND CONDENSATE DRAIN AS ABLE. ELSE, INSTALL NEW.
AutoCAD SHX Text CONNECT NEW FCU TO EXISTING CHILLED WATER SUPPLY AND RETURN AT THIS LOCATION. SIZE PER EQUIPMENT SCHEDULE.
AutoCAD SHX Text LEAVE EXISTING CONDENSER WATER IN PLACE WITH EXISTING BALANCING VALVE AND LOOP SUPPLY INTO RETURN PIPE. REPOSITION AS NECESSARY TO ACCOMMODATE NEW EQUIPMENT AND CHILLED WATER PIPING.
REUSE EXISTING RETURN DUCT OR ELIMINATE AND INSTALL FIRE DAMPER IN TRANSFER DUCT
DN
10-04-C6-02
ELEC
10-04-C10-02
ELEC
10-04-C10-04
STAFF TLT
10-04-C5-04
VEST
5" CHS
5" CHR
1" CHR
1" CHS
1 1/4" CHS
1 1/4" CHR
6" CHS
1" CHS
1 1/4" CHR
1 1/4" CHS
1 1/4" CHS
1 1/4" CHR
6" CHR
5" CHR
5" CHS
5" CHS
5" CHR
1" CHR
HWS/R UP
TO HWUH
T
T
DN
E
C
B.7
B.5
B
A.1
1.1
1.1
2.5
2.5
11.5
11.5
C.9
B
A
Z
SA
B.1
C
730 CFM
14" x 14"
730 CFM
14" x 14"
10-FCUC17
10-FCUC19
STRUCTURE ABOVE
SUSPEND FROM
OVERHEAD STRUCTURE
WITH HANGER RODS
CLEAR SPACE AT
FILTER ACCESS
DUCT
MANUAL
AIR VENTS
FAN COIL UNIT
P/T (TYP.)
CHS
CHR
CEILING
DRAIN VALVE WITH
HOSE
END AND CAP
D
VIBRATION ISOLATOR
FLEX CONNECTION (TYP.)
COOLING COIL
DUCT
HORIZONTAL CEILING FAN
COIL UNIT PIPING DETAIL
FLEX HOSES
10.M.104
LEVEL 4 PROJECT PLAN
CLINIC BUILDING (SOUTH)
3/5/21
1/8" = 1'-0"
LEVEL 4 PROJECT PLAN
NORTH
0' 4' 8' 16' 32'
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-21-121
REPLACE HEAT PUMPS WITH
FAN COIL UNITS
AURORA, COLORADO
N
O N
E S
A T
B
S
I B
N
E
N C
L C
B N
B C
B S
S N
V N
V S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e i g h o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
A
AutoCAD SHX Text
LOCATION #10
AutoCAD SHX Text
LOCATION #11
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
DEMO EXISTING HEAT PUMP AND REPLACE WITH FCU SIZED PER EQUIPMENT SCHEDULE.
AutoCAD SHX Text ADAPT NEW FCU TO EXISTING DUCTWORK AND REUTILIZE EXISTING POWER, CONTROL WIRING AND CONDENSATE DRAIN AS ABLE. ELSE, INSTALL NEW.
AutoCAD SHX Text CONNECT NEW FCU TO EXISTING CHILLED WATER SUPPLY AND RETURN AT THIS LOCATION. SIZE PER EQUIPMENT SCHEDULE.
AutoCAD SHX Text
INSTALL 2' X2' MAINTENANCE ACCESS HATCH IN HARD CEILING
AutoCAD SHX Text LEAVE EXISTING CONDENSER WATER IN PLACE WITH EXISTING BALANCING VALVE AND LOOP SUPPLY INTO RETURN PIPE. REPOSITION AS NECESSARY TO ACCOMMODATE NEW EQUIPMENT AND CHILLED WATER PIPING.
AutoCAD SHX Text
REUSE EXISTING RETURN DUCT OR ELIMINATE AND INSTALL FIRE DAMPER IN TRANSFER DUCT
NOTE BATHROOM HAS HARD CEILING AND WILL NEED TO BE REMOVED AND REP[LACED..
| Sheets and Views |
| 10.M.10X-10.M.101 |
| 10.M.10X-10.M.102 |
| 10.M.10X-10.M.103 |
| 10.M.10X-10.M.104 |
File details come from the government source that posted it. Updated .