Replace Heat Pumps in CBS with Fan Coils Questions.docx
DOCX document 20 KB Posted
- Solicitation number
- 36C25922R0051
About this file
This document contains a solicitation notice and questions and answers file related to replacing heat pumps with fan coils at a Veterans Affairs medical center. The solicitation is for replacing heat pumps in specific buildings on the Rocky Mountain Regional Medical Center campus. The project value is between $250,000 and $500,000, and it has a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The point of contact is listed as well as requirements for the prime contractor's superintendent. Clarification is requested on areas requiring after-hours work and network device naming conventions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Replace Heat Pumps in CBS with Fan Coils Questions_updated.docx | DOCX document | |
| S06- 36C25922R0051 Amend 0002.docx | DOCX document | |
| S04- Site Visit Attendance 220408.pdf | ||
| S04- Site Visit Meeting Doc.docx | DOCX document | |
| S06- 36C25922R0051 Amend 0001.docx | DOCX document | |
| Specifications_updated.zip | ZIP file | |
| Specifications.zip | ZIP file | |
| 36C25922R0051_Solicitation.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| Drawings.pdf | ||
| 623-18-102 100pct Specifications with Headers stamped.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Heat Pumps in CBS with Fan Coils Questions
1. Please confirm the prime contractor’s superintendent must be present onsite at all times while work is being performed. Yes, the prime contractor superintendent must be present during all on site work.
1. Please confirm the prime contractor’s superintendent must be an employee of the prime contractor.
1. Please confirm the prime contractor’s superintendent may also serve as the SSHO.
1. Regarding specification 23 09 23 paragraph 2.7 NETWORK AND DEVICE NAMING CONVENTION: This seems to indicate the site needs to have all network numbers, device instances & device names to be altered from our current format for the BAS and the control drawings. This would add a lot of labor. Can you confirm this is the intent?
1. Solicitation page 7 reads “Locations where construction will block access to occupied spaces and main restrooms shall be completed after normal working hours. This applies to at least 50% of the locations…” This language is still too vague to price which exact areas will require after-hours work, as bidders cannot determine which areas are occupied from the documents. Please list the location numbers which will require after-hours work.