Drawings - 533-19-103 Replace Boiler Control System.pdf
PDF 16 MB Posted
- Attached to
- Z1DA--Replace Boiler Control System 553-19-103 Federal contract opportunity
- Solicitation number
- 36C25023B0068
About this file
This document outlines a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 to replace a boiler control system. The solicitation number is 36C25023B0068 for the project named "Z1DA--Replace Boiler Control System 553-19-103." Drawings for the project are provided in a 16MB PDF file. The opportunity is for replacing the boiler control system at a VA facility. Responses are due based on the standard solicitation timeline. The award will be made to the responsible offeror whose offer conforming to the solicitation is most advantageous to the government considering only price and past performance as evaluation factors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25023B0068 0001_.pdf | ||
| Breeching_Drawing.pdf | ||
| 553-19-103 Pre-Bid Site Visit Agenda_.pdf | ||
| 553-19-103_Addendum_No1_Drawings_09-11-2023.pdf | ||
| 553-19-103-Breeching Photo.png | PNG image | |
| 553-19-103_Addendum_No1_Narrative_09-11-2023.pdf | ||
| 553-19-103-Pre-bid Site-visit Sign-in Sheet.pdf | ||
| _36C25023B0068_.pdf | ||
| WD DOL GDN MI20230101 - 08-04-2023 Mod 4 - Construction Type - Building - Wayne County - MI.pdf | ||
| P03-Brand Name Only J-A Hilti -Firestopping-553-19-103 -.pdf | ||
| S02 - Contractor EMR Certification Form - 553-19-103.pdf | ||
| S02 - RFI Form 553-19-103.pdf | ||
| Specifications - 533-19-103 Replace Boiler Control System.pdf | ||
| P03-Brand Name Only J-A Siemens -HVAC controls- 553-19-103 -.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B ru sh S t
E Hancock St
Joh n R
S t
W oo d w ard A ve
C a s s A ve
E Canfield St
S t A n to in e
Mack Ave
In terstate 7
E W arre n Ave
Department of Veteran Affairs Medical Campus
N
102 101
Brush St
John R St
E C a n fie ld S t
E H a n c o c k S t
Building Key:
100 MAIN HOPSITAL
101 SOUTH PARKING GARAGE
- SOUTH GENERATING STATION
102 NORTH PARKING GARAGE
103 ENERGY CENTER
MEDICAL CENTER DIRECTOR
VA APPROVAL
DATE
DATEASSOCIATE MEDICAL CENTER DIRECTOR
DATECHIEF, FACILITY MANAGEMENT SERVICES
DATEASSISTANT CHIEF, FMS
DATESAFETY AND OCCUPATIONAL HEALTH MANAGER
DATEENERGY MANAGER
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SOLE SOURCE LIST
BRAND ITEM SPECIFICATION SECTION NOTES
HILTI FS1-FIRESTOP 07 84 00 BOTH SIDES OF FIRE-RATED WALLS, SMOKE BARRIERS, AND
FLOOR REGARDLESS OF FIRE RATING
DIVISION 23 - DIRECT-DIGITAL CONTROL FOR BOILER PLANT
BRAND ITEM SPECIFICATION SECTION NOTES
SIEMENS BUILDING
TECHNOLOGIES
HVAC AUTOMATION
AND CONTROLS
23 09 23 ALL PROGRAMMING, CONNECTIONS, AND CONTROL PANELS
ASSOCIATED WITH CONNECTION TO AND MONITORING OF
THE STEAM SYSTEM BY THE CENTRAL MONITORING SYSTEM.
ST
A
T E O F F L O R
I D A
RE
G
IS
T E R E D A R C I T
EC
T
ROGE
R A R E P
ST
IEN
A R
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
937.461.0260 F
RDC / JOHN POE ARCHITECTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ABOVE GROUP
ENGINEERING
70 BIRCH ALLEY, SUITE 240
BEAVERCREEK, OHIO 45440
70 Birch Alley, Suite 240 Beavercreek OH, 45440
PH: 937.795.4440
www.abovegroupinc.com COA/CA Lic. No. 31120
SCHEMATIC DESIGN 05.15.2020
65% DESIGN DEVELOPMENT 08.21.2020
95% CONSTRUCTION DOCUMENTS 12.11.2020
100% CONSTRUCTION DOCUMENTS 02.19.2021
100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
100% CONSTRUCTION DOCUMENTS -REVISION 2 03.03.2023
BID DOCUMENTS 04.17.2023
/1
/2
:1
:4
P
M
REPLACE BOILER CONTROL
SYSTEM AND OTHER
COMPONENTS
04.17.2023
COVER SHEET
G-001
MDMD
533-19-103
DETROIT VAMC
REPLACE BOILER CONTROL SYSTEM
AND OTHER COMPONENTS
4646 JOHN R STREET DETROIT, MI 48201-1916 PROJECT #: 533-19-103
John D. Dingell VA Medical
Center
BID DOCUMENTS 19010.00
G-001 COVER SHEET
M-001 LEGENDS, SYMBOLS, GENERAL NOTES
M-002 MECHANICAL OVERALL PLAN
M-003 MECHANICAL PHASING PLAN
MD-101 MECHANICAL FIRST FLOOR PLAN - DEMOLITION
MD-102 MECHANICAL MEZZANINE LEVEL FLOOR PLAN - DEMOLITION
MD-103 MECHANICAL ROOF PLAN - DEMOLITION
MD-701 MECHANICAL P&ID - CONDENSATE AND FEEDWATER - DEMO
MD-702 MECHANICAL P&ID - STEAM SYSTEMS - DEMO
MD-703 MECHANICAL P&ID - TYPICAL BOILER TRIM AND TRAIN - DEMO
M-101 MECHANICAL FIRST FLOOR PLAN - NEW WORK
M-102 MECHANICAL MEZZANINE LEVEL FLOOR PLAN - NEW WORK
M-103 MECHANICAL ROOF PLAN - NEW WORK
M-301 MECHANICAL SECTIONS - NEW WORK
M-401 MECHANICAL PART PLANS - NEW WORK
M-501 MECHANICAL DETAILS & DIAGRAMS
M-502 MECHANICAL DETAILS & DIAGRAMS
M-601 MECHANICAL SCHEDULES
MI-701 MECHANICAL P&ID - CONDENSATE AND FEEDWATER - NEW WORK
MI-702 MECHANICAL P&ID - STEAM HEADER - NEW WORK
MI-703 MECHANICAL P&ID - BOILER TRIM AND TRAIN - NEW WORK
MI-801 MECHANICAL INSTRUMENTATION - BALANCE OF PLANT PANEL
MI-802 MECHANICAL INSTRUMENTATION - CONTROLS ARCHITECTURE
MI-901 MECHANICAL HVAC CONTROL DIAGRAMS
E-001 LEGENDS, SYMBOLS, GENERAL NOTES
ED-101 ELECTRICAL 1ST FLOOR PLAN & UPPER LEVEL- BOILER DEMO
EP-101 ELECTRICAL 1ST FLOOR PLAN & UPPER LEVEL - BOILER RM
E-601 ELECTRICAL SCHEDULES
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
DRAWING INDEX
VICINITY MAP
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
8. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
9. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
10. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
Revisions Date
-SPIN-IN TAKE-OFF
-RECTANGLE-TO-ROUND TAKE-OFF
DNUP
-TRANSITION, SQUARE TO ROUND
-CEILING EXHAUST
-CEILING RETURN
-STANDARD BRANCH TAKE-OFF
-RADIUS ELBOW
-TRANSITION, ECCENTRIC
-FLEXIBLE DUCT
-CHANGE OF ELEVATION
-TRANSITION, CONCENTRIC
-SQUARE THROAT ELBOW W/ TURNING VANES
-RECTANGULAR/ROUND BRANCH TAKE-OFF
OR ROUND/ROUND BRANCH TAKE-OFF
-SQUARE THROAT TEE W/ TURNING VANES
-RADIUS TEE
-SUPPLY DIFFUSER OR GRILLE
-RETURN/EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
(VERTICAL MOUNT, SIDEWALL)
-CEILING DIFFUSER, ROUND NECK
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)
-CEILING DIFFUSER, RECTANGULAR OR
SQUARE NECK (CEILING DIFFUSERS
ARE 4-WAY THROW UNO)
HVAC ABBREVIATIONSHVAC SYMBOL LEGEND
SYMBOLSYMBOL DESCRIPTION SYMBOL SYMBOL DESCRIPTION
-#2 FUEL OIL RETURN
-CHILLED WATER RETURN
-CONDENSER WATER SUPPLY
-CHILLED WATER SUPPLY
-CONDENSER WATER RETURN
PIPING LEGEND
SYMBOL DESCRIPTIONSYMBOL DESCRIPTION
CWS
CWR
CHWS
CHWR
FOR
-#2 FUEL OIL SUPPLY
-PROPANELP
FOS
BASIC MATERIALS
-MANUAL BALANCING DAMPER
-MOTOR OPERATED CONTROL DAMPER
(MOD)
-FLEXIBLE CONNECTION
-ACCESS DOORS, VERTICAL OR
HORIZONTAL
-DOOR GRILLE
-UNDERCUT DOOR
-DUCT ELBOW, RETURN AIR
-DUCT ELBOW, EXHAUST AIR
-DUCT ELBOW, SUPPLY OR OUTSIDE AIR
-NEW DUCTWORK, FIRST DIMENSION IS
SIDE SHOWN
-TEMPERATURE SENSOR
-MOTORIZED CONTROL DAMPER
-HUMIDISTAT/HUMIDITY SENSOR
-THERMOSTAT/TEMPERATURE SENSOR
-STATIC PRESSURE SENSOR
-DUCT SMOKE DETECTOR
-BACKDRAFT DAMPER
-CEILING MOUNTED ACCESS DOOR
T
H
DOWN UP
UC
M
T
SP
BD
-CONNECT TO EXISTING
-DEMOLISH TO POINT INDICATED
-HUMIDITY SENSOR (DUCT MOUNTED)H
-CARBON DIOXIDE SENSOR (DUCT MOUNTED)CO2
-CARBON DIOXIDE SENSORCO2
-FIRE DAMPER (WITH ACCESS PANEL)
-SMOKE DAMPER (WITH ACCESS PANEL)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
EXISTING TO REMAIN (THIN, HALFTONED, SOLID LINE)
NEW (HEAVY, SOLID LINE)
2-AHU-3-1
26-TU-I-I
VIEW NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NUMBER; AHU NO. 1, LOCATED ON LEVEL 3, LOCATED IN BLDG. 2
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
AHU NUMBER
EQUIPMENT ABBREVIATION. AN "(E)" SHOWN IN FRONT OF EQUIPMENT TAGS
NOTIFIES THAT EQUIPMENT IS EXISTING
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
BUILDING NO. WHERE EQUIPMENT IS LOCATED
H1
H1
A
SHEET NUMBER
A 200
DEVICE MARK
DEVICE FLOW RATE (CFM)
12X10 SA
DUCT DIMENSION (INCHES)
TYPICAL AIR DISTRIBUTION DEVICE TAG
TYPICAL DUCTWORK TAG
SYSTEM TYPE (SA = SUPPLY AIR , RA = RETURN
AIR, OA = OUTSIDE AIR, EA = EXHAUST AIR,
SS EA = STAINLESS-STEEL EXHAUST)
LEVEL EQUIPMENT LOCATED ON / LEVEL IT SERVES
DRAWING SYMBOLS
-REVISION REFERENCE1
-SHEET NOTE CALLOUT1
-EQUIPMENT WITH MANUFACTURER'S
CLEARANCE
CLEARANCE
EQUIPMENT
1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE
COMPONENTS INDICATED IN DETAILS, RISER DIAGRAMS, CONTROL DIAGRAMS, AND/OR FLOW
DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR
CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND
APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN
GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY
CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR
OWNER'S DESIGN STANDARDS SHALL GOVERN.
2. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.
TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
3. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH
AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.
4. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC
DUCT CONSTRUCTION STANDARD.
5. INSTALL ALL FIRE DAMPERS, SMOKE DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS IN
ACCORDANCE WITH MANUFACTURE'S INSTALLATION DIRECTIONS. PROVIDE ACCESS DOORS TO
ALLOW COMPLETE INSPECTION AND MAINTENANCE OF ALL DEVICES.
6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT
FURNISHED.
7. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48"
ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER
EQUIPMENT, FURNITURE, AND DOOR SWINGS.
8. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE
ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.
9. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
10. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
11. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR
PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED.
12. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR
OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
13. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO
FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
14. COORDINATE SIZE REQUIREMENTS OF ALL CONCRETE HOUSEKEEPING PADS UNDER ALL FLOOR-
MOUNTED EQUIPMENT. SEE STRUCTURAL DRAWINGS FOR PAD DETAILS AND SPECIFICATIONS.
15. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO FANS, AIR HANDLING
UNITS, AND FAN COIL UNITS.
16. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.
17. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.
18. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 25'-0" CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE LOCATIONS. LOWEST POINT OF EACH OUTSIDE AIR INTAKE ON ROOF SHALL
BE A MINIMUM OF 24" ABOVE ROOF.
19. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED
FULL SIZE TO THE NEAREST PLUMBING DRAIN.
GENERAL NOTES
-AIRFLOW SENSOR/STATIONF
24x12
SD
FD
MOD
VD
APPLICABLE CODES
1. VA STEAM, HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEMS DESIGN MANUAL (STEAM
GENERATING SYSTEMS) VOLUME I 2021 EDITION
2. VA STEAM, HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEMS DESIGN MANUAL (STEAM
DISTRIBUTION SYSTEMS) CHAPTER 3, 2020 EDITION
3. ASME BOILER & PRESSURE VESSEL CODE
4. ASME SECTION I – POWER BOILERS
5. ASME B31.1 – POWER PIPING
6. VA PROGRAM GUIDE PG-18-15, VOLUME C.
7. INTERNATIONAL MECHANICAL CODE (IMC) 2021EDITION
8. VHA BOILER PLANT SAFETY DEVICE TESTING MANUAL 5TH EDITION
9. PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL 2022 EDITION
10. VA HVAC DESIGN MANUAL 2021 EDITION
11. VA SEISMIC DESIGN REQUIREMENTS 2019 EDITION
12. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE):
A. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY (ASHRAE 62.1) 2019 EDITION
B. ENERGY STANDARD FOR BUILDINGS (ASHRAE 90.1) 2019 EDITION
13. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
A. COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, NFPA 55 2020 EDITION
B. NATIONAL ELECTRICAL CODE (NEC) 2020 EDITION
C. NATIONAL FIRE ALARM CODE (NFPA 72) 2022 EDITION
D. STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS (NFPA 90A)
2021 EDITION
E. LIFE SAFETY CODE (NFPA 101) 2021 EDITION
14. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)
15. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
16. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
17. AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)
18. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER
DESCRIPTIONDESCRIPTION
A/E -ARCHITECT / ENGINEER
AAHX -AIR TO AIR HEAT EXCHANGER
AAV -AUTOMATIC AIR VENT
ACC -AIR COOLED CONDENSER
ACCU -AIR-COOLED CONDENSING UNIT
ACU -AIR CONDITIONING UNIT
ACD -AUTOMATIC CONTROL DAMPER,MODULATING
ACD-TP -AUTOMATIC CONTROL DAMPER,TWO POSITION
AD -ACCESS DOOR
ADA -AMERICANS WITH DISABILITIES ACT
AFF -ABOVE FINISHED FLOOR
AFOSV -AUTOMATIC FUEL OIL SHUTOFF VALVE
AFR -ABOVE FINISHED ROOF
AH -AIR HANDLING UNIT
AP -ACCESS PANEL
APPROX -APPROXIMATE
AS -AIR SEPARATOR
ASTM -AMERICAN STANDARDS TESTING MATERIALS
B -BOILER
BAS -BUILDING AUTOMATION SYSTEM
BD -BUTTERFLY DAMPER
BDD -BACKDRAFT DAMPER
BFP -BACKFLOW PREVENTER
BFT -BOILER PLANT FIRE TUBE
BFV -BUTTERFLY VALVE
BHP -BRAKE HORSEPOWER
BHP -BOILER HORSEPOWER
BHW -HOT WATER HEATING BOILER
BHX -BOILER BLOWDOWN HEAT EXCHANGER
BOD -BASIS OF DESIGN
BT -BLOWOFF TANK
BTC -BLOWOFF TANK CONTROL VALVE
BTU -BRITISH THERMAL UNIT
BTUH -BRITISH THERMAL UNIT PER HOUR
BWT -BOILER PLANT WATER TUBE
BOP -BOTTOM OF PIPE
CAV -CONSTANT AIR VOLUME
CC -COOLING COIL
CL -CENTER LINE
CFH -CUBIC FEET PER HOUR
CFM -CUBIC FEET PER MINUTE
CFT -CUBIC FEET
CFP -CHEMICAL FEED PUMP
CD -CONDENSATE
CO -CARBON MONOXIDE
CO -CLEAN OUT
CO2 -CARBON DIOXODE
COP -COEFFICIENT OF PERFORMANCE
COR -CONTRACTING OFFICER'S REPRESENTATIVE
CST -CONDENSATE STORAGE TANK
CT -COOLING TOWER
CU -CONDENSING UNIT
D -DAMPER -AUTOMATIC
DA -DEAERATOR
DAODS -DEAERATOR OVERFLOW DRAIN SYSTEM
DB -DRY BULB
DDC -DIRECT DIGITAL CONTROLS
DEG -DEGREE
DIA -DIAMETER
DP -DEW POINT TEMPERATURE
I/O -INPUT/OUTPUT
ID -INSIDE DIAMETER
IFB -INTEGRAL FACE AND BYPASS
IPLV -INTEGRATED PART-LOAD VALUE
IN -INCHES
IN HG -INCHES OF MERCURY
IN WC -INCH WATER COLUMN
IN WG -INCH WATER GAUGE
IN-LB -INCH-POUND
IPLV -INTERGRATED PART LOAD VALUE
KW -KILOWATT
KWH -KILOWATT HOUR
LAT -LEAVING AIR TEMPERATURE
LBS/HR -POUNDS PER HOUR
LF -LINEAR FOOT (FEET)
LH -LATENT HEAT
LPG -LIQUID PROPANE GAS
LPR -LOW PRESSURE RETURN (STEAM CONDENSATE)
LLHX -LIQUID TO LIQUID HEAT EXCHANGER
LPS -LOW PRESSURE STEAM
LSD -LINEAR SLOT DIFFUSER
LTCP -LOCAL TEMPERATURE CONTROL PANEL
LVG -LEAVING
LVR -LOUVER
LWT -LEAVING WATER TEMPERATURE
MAU -MAKEUP AIR UNIT
MAX -MAXIMUM
MBH -THOUSAND BTUs PER HOUR
MCA -MINIMUM CIRCUIT AMPS
MERV -MINIMUM EFFICIENCY REPORTING VALUE
MFR -MANUFACTURER
MH -MANHOLE
MHP -MOTOR HORSEPOWER
MIN -MINIMUM
MOCP -MAXIMUM OVER CURRENT PROTECTION
MOD -MOTORIZED CONTROL DAMPER
MOV -MOTOR OPERATED VALVE
MVD -MANUAL VOLUME DAMPER
NA -NOT APPLICABLE
NC -NORMALLY CLOSED
NIC -NOT IN CONTRACT
NG -NATURAL GAS
NGFM -NATURAL GAS FLOWMETER
NO -NORMALLY OPEN
NOM -NOMINAL
NOX -NITROGEN OXIDES
NPLV -NON-STANDARD PART LOAD VALUE
NPSHA -NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR -NET POSITIVE SUCTION HEAD REQUIRED
NTS -NOT TO SCALE
OA -OUTSIDE AIR
OAT -OUTSIDE AIR TEMPERATURE
OFM -OIL FLOWMETER
P -PUMP
PC -PUMPED CONDENSATE
PCF -POUNDS PER CUBIC FOOT (FEET)
PD -PRESSURE DROP
NOTE: SOME SYMBOLS SHOWN MAY NOT PERTAIN TO THIS PROJECT
-HIGH PRESSURE STEAM SUPPLY (>60#)HPS
-MEDIUM PRESSURE STEAM SUPPLY
(>15#, <60#)
MPS
-LOW PRESSURE STEAM SUPPLY (0#-15#)LPS
-HIGH PRESSURE CONDENSATE RETURNHPR
-CONDENSATE TRANSFERCT
-NATURAL GASG
-#2 FUEL OIL OVERFLOWFOO
-BOILER FEED WATERBFW
-BOILER FEED SUPPLYBFR
-VENTV
SYMBOL SYMBOL DESCRIPTIONDESCRIPTION
PH -PHASE
PPM -Parts per Million
PRV -PRESSURE REGULATING VALVE
PRS -PRESSURE REGULATING (VALVE) STATION
PSI -POUNDS PER SQUARE INCH
PSIG -PSI GAUGE
PTAC -PACKAGED TERMINAL AIR CONDITIONER
PVC -POLYVINYL CHLORIDE PIPE
RA -RETURN AIR
RAT -RETURN AIR TEMPERATURE
REA -RELIEF AIR
RH -RELATIVE HUMIDITY
RHC -REHEAT COIL
RHP -ROOFTOP HEAT PUMP
RLA -RUN LOAD AMPERE
RO -REVERSE OSMOSIS
RV -RELIEF VALVE
RX -REMOVE EXISTING
RPM -REVOLUTIONS PER MINUTE
RS/L -REFRIGERANT SUCTION & LIQUID LINES
RTU -ROOFTOP AIR CONDITIONING UNIT
SA -SUPPLY AIR
SD -SMOKE DETECTOR
SF -SQUARE FEET
SP -STATIC PRESSURE
SPEC -SPECIFICATION
SPRV -STEAM PRESSURE REDUCING VALVE
SPS -STATIC PRESSURE SENSOR
SRV -SAFETY RELIEF VALVE
SS -STAINLESS STEEL
SSHX -STEAM TO STEAM HEAT EXCHANGER
SSR -SOLID SEPARATOR
ST -STEAM TRAP
SUH -STEAM UNIT HEATER
STD -STANDARD
SVS -STEAM VENT SILENCER
TA -TRANSFER AIR
TAB -TESTING, ADJUSTING, BALANCE
TDH -TOTAL DYNAMIC HEAD
TDS -TOTAL DISSOLVED SOLIDS
TEMP -TEMPERATURE
TSP -TOTAL STATIC PRESSURE
TU -TERMINAL UNIT
TYP -TYPICAL
UH -UNIT HEATER
UL -UNDERWRITER'S LABORATORY
U/G -UNDERGROUND
UNO -UNLESS NOTED OTHERWISE
V/PH -VOTS/PHASE
VA -VETERANS AFFAIRS
VAV -VARIABLE AIR VOLUME
VFD -VARIABLE FREQUENCY DRIVE
W -WATTS
W/ -WITH
WB -WET BULB
DPA -DIFFERENTIAL PRESSURE ASSEMBLY
DPS -DIFFERENTIAL PRESSURE SENSOR
DN -DOWN
DX -DIRECT EXPANSION
EA -EXHAUST AIR
EAT -ENTERING AIR TEMPERATURE
ECC -ENGINEERING CONTROL CENTER
EER -ENERGY EFFICIENCY RATING
EF -EXHAUST FAN
EQUIP -EQUIPMENT
ESP -EXTERNAL STATIC PRESSURE
ETR -EXISTING TO REMAIN
EWT -ENTERING WATER TEMPERATURE
EX -EXISTING
ºF -DEGREES FAHRENHEIT
FA -FREE AREA
FAS -FIRE ALARM SYSTEM
FC -FLEXIBLE CONNECTION
FD -FIRE DAMPER
FDMIS -FORCED DRAFT MOTOR INTERLOCK SWITCH
FE -FLUE EXHAUST
FHX -FLUE GAS ECONOMIZER
FLA -FULL LOAD AMPS
FM -FLOW METER
FOP -FUEL OIL PUMP
FOT -FUEL OIL TANK
FPM -FEET PER MINUTE
FPS -FEET PER SECOND
FS -FLOW SWITCH
FSTAT -FREEZESTAT
FT -FEET
FT-LB -FOOT-POUND
FV -FACE VELOCITY
GA -GAUGE
GAL -GALLONS
GH -GRAVITY HOOD
GPD -GALLONS PER DAY
GPH -GALLONS PER HOUR
GPM -GALLONS PER MINUTE
GPR -GAS PRESSURE REGULATOR
GS -GALVANIZED STEEL
H -HUMIDIFER
H&CW -HOT & COLD WATER
HC -HEATING COIL
HD -HEAD
HOA -HAND/OFF/AUTOMATIC
HP -HORSEPOWER
HPDT -HIGH PRESSURE DRIP TRAP
HPR -HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS -HIGH PRESSURE SUPPLY (STEAM)
HSTAT -HUMIDISTAT
HTM -HUMIDIFIER TERMINAL
HUM -HUMIDIFIER UNIT MOUNTED
HW -HOT WATER
HP -HORSEPOWER
HR -HOUR
HX -HEAT EXCHANGER
HZ -HERTZ
SYMBOL DESCRIPTION
-DUCT SMOKE DETECTOR
-STARTER
-CURRENT SENSING STATUS
-DRY CONTACT
CS
A -ALARM
S
-IMMERSION TEMPERATURE TRANSMITTER
W/ THERMOWELL
R -REFRIGERANT SENSOR
T -SPACE THERMOSTAT SENSOR
-EMERGENCY PUSHBUTTON
CO2 -SPACE CARBON DIOXIDE SENSOR
-PUSH-BUTTON OVER-RIDE SWITCH
-AIR FLOW SENSOR
-DUCT MOUNTED TEMPERATURE SENSOR
-TWO POSITION VALVE W / 24VAC OR
120VAC AS INDICATED
-TEMPERATURE SENSOR
-RELATIVE HUMIDITY SENSOR
24VAC
24VAC
F
-ACTUATOR W / 24VAC OR 120VAC AS
INDICATED
-INDICATES AVERAGING ELEMENT SENSOR
-VARIABLE FREQUENCY DRIVEVFD
-DIFF. PRESSURE INDICATING
TRANSMITTER
-MAGNEHELIC DIFFERENTIAL PRESSURE
GAUGE
-OPPOSED BLADE DAMPER
-PARALLEL BLADE DAMPER
DPIT
-PARTICULATE TRANSMITTERPT
-INDICATES PROBE SENSOR
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
-PRESSURE SENSOR
H -SPACE HUMIDISTAT / HUMIDITY SENSOR
AFS-X -AIRFLOW SENSOR
CO2-X -CARBON DIOXIDE SENSOR
CT-X -CONDUCTIVITY TRANSMITTER
D-X -DAMPER
DPS-X -DIFFERENTIAL PRESSURE SENSOR
ECC-X -ENGINEERING CONTROL CENTER
FT-X -FLOW TRANSMITTER
H-X -HUMIDITY TRANSMITTER
HOA -HAND SWITCH (HAND-OFF-AUTO SWITCH)
IT-X -CURRENT TRANSMITTER
LC-X -LEVEL CONTROLLER
LT-X -LEVEL TRANSMITTER
PT-X -PRESSURE TRANSMITTER
PDT-X -PRESSURE DIFFERENTIAL TRANSMITTER
SPS-X -STATIC PRESSURE SWITCH
TT-X -TEMPERATURE TRANSMITTER
TS-X -TEMPERATURE SWITCH (FREEZESTAT)
VC-X -VALVE POSITION CONTROLLER
WFM-X -WATER FLOW METER
WFS-X -WATER FLOW SWITCH DIGITAL
P -SPACE PRESSURE SENSOR
-ELBOW, TURNED DOWN
-ELBOW, TURNED UP
-TEE, OUTLET DOWN
-TEE, OUTLET UP
-FLEX CONNECTION (DOUBLE SPHERE FOR
PIPES 6" AND LARGER; SINGLE SPHERE FOR
PIPES 4" AND SMALLER
CONTROLS LEGEND
-TEE, SIDE CONNECTION
-BUTTERFLY VALVE
-PRESSURE REGULATING VALVE
-CIRCUIT SETTER VALVE
-CHECK VALVE
-GATE VALVE
-BALL VALVE
-GLOBE VALVE
-MOTORIZED ACTUATOR
-PNEUMATIC ACTUATOR
-SOLENOID VALVE (2-POSTION W/
ACTUATOR)
-STRAINER
-THREE-WAY VALVE
-FLOW METER
-INLINE PUMP
-CAP
FM
-45° PIPE RISE (R) / DROP (D)
-PIPE ANCHORS
-CONCENTRIC REDUCER
-ECCENTRIC REDUCER
R R
-FLANGES
-FLOW DIRECTION
-UNION
-RELIEF VALVE
-TEST PLUG (PRESSURE/TEMPERATURE)
-MANUAL VENT
-FLOW SWITCH
-PRESSURE SWITCH
-AUTOMATIC AIR VENT
-HOSE CONNECTION
-ANGLE GLOBE VALVE
DRAWING SHEET NUMBER FOR CONTINUATION / CONNECTION
GRID LOCATION FOR CONTINUATION / CONNECTION
ARROW INDICATES DIRECTION OF FLOW
FROM ENERGY
CENTER DISTRIBUTION
SYSTEM SYSTEM / LOCATION DESCRIPTION
P&ID DRAWING SYMBOLS
INSTRUMENT DESCRIPTION (TYP). REFER TO P&ID INSTRUMENT
DESCRIPTION TABLE.
INSTRUMENT NUMBER (TYP). REFER TO INSTRUMENT SCHEDULE.
DISCRETE DEVICE; LOCATED IN FIELD
DISCRETE DEVICE; LOCATED IN OR ON FRONT OF CENTRAL OR
MAIN PANEL.
PROCESS CONTROL; LOCATED IN FIELD
PROCESS CONTROL; LOCATED IN OR ON FRONT OF CENTRAL OR
MAIN PANEL
COMPUTER SYSTEMS AND SOFTWARE; SCADA INDICATION
-HARD-WIRED ELECTRICAL INTERLOCKI
-BURNER MANAGEMENT INTERLOCKB
-COMBUSTION CONTROL INTERLOCKC
-NEEDLE VALVE
-SLOW / QUICK OPENING BLOW-OFF VALVE
-STOP / CHECK NON-RETURN VALVE
-ANGLE VALVE
1/ FP501
-STEAM TRAP
MPR
LPR
-MEDIUM PRESSURE CONDENSATE RETURN
-LOW PRESSURE CONDENSATE RETURN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:4
:1
A
M
M-001
LEGENDS, SYMBOLS, GENERAL
NOTES
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
M-001 LEGENDS, SYMBOLS, GENERAL NOTES
M-002 MECHANICAL OVERALL PLAN
M-003 MECHANICAL PHASING PLAN
MD-101 MECHANICAL FIRST FLOOR PLAN - DEMOLITION
MD-102 MECHANICAL MEZZANINE LEVEL FLOOR PLAN - DEMOLITION
MD-103 MECHANICAL ROOF PLAN - DEMOLITION
MD-701 MECHANICAL P&ID - CONDENSATE AND FEEDWATER - DEMO
MD-702 MECHANICAL P&ID - STEAM SYSTEMS - DEMO
MD-703 MECHANICAL P&ID - TYPICAL BOILER TRIM AND TRAIN - DEMO
M-101 MECHANICAL FIRST FLOOR PLAN - NEW WORK
M-102 MECHANICAL MEZZANINE LEVEL FLOOR PLAN - NEW WORK
M-103 MECHANICAL ROOF PLAN - NEW WORK
M-301 MECHANICAL SECTIONS - NEW WORK
M-401 MECHANICAL PART PLANS - NEW WORK
M-501 MECHANICAL DETAILS & DIAGRAMS
M-502 MECHANICAL DETAILS & DIAGRAMS
M-601 MECHANICAL SCHEDULES
MI-701 MECHANICAL P&ID - CONDENSATE AND FEEDWATER - NEW WORK
MI-702 MECHANICAL P&ID - STEAM HEADER - NEW WORK
MI-703 MECHANICAL P&ID - BOILER TRIM AND TRAIN - NEW WORK
MI-801 MECHANICAL INSTRUMENTATION - BALANCE OF PLANT PANEL
MI-802 MECHANICAL INSTRUMENTATION - CONTROLS ARCHITECTURE
MI-901 MECHANICAL HVAC CONTROL DIAGRAMS
INSTRUMENT DESCRIPTION TABLE
LE
T
T E
R FIRST LETTER SECOND LETTER
MEASURED OR INITIATED
VARIABLE MODIFIER
READOUT OR
PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER
A ANALYSIS ALARM ALARM / AUTOMATIC
B BURNER FLAME USERS CHOICE USERS CHOICE BEACON (LIGHT)
C CONDUCTIVITY CONTROL CLOSED
D DENSITY (MASS) OR
SPECIFIC GRAVITY
DIFFERENTIAL
E VOLTAGE (EMF) PRIMARY ELEMENT
F FLOW RATE RATIO (FRACTION)
G GAUGING (DIMENSIONAL) GLASS, GAUGE
H HAND (MANUALLY
INITIATED)
HORN (BUZZER) HIGH
I CURRENT (ELECTRICAL) INDICATE
J POWER SCAN
K TIME OR TIME SCHEDULE TIME RATE OF
CHANGE
CONTROL STATION
L LEVEL LIGHT (PILOT) LOW
M MOISTURE HUMIDITY MIDDLE OR
INTERMEDIATE
N CONSISTENCY USERS CHOICE USERS CHOICE USERS CHOICE
O USERS CHOICE ORIFICE
(RESTRICTION)
P PRESSURE OR VACUUM POINT (TEST)
CONNECTION
Q QUALITY INTEGRATE OR
TOTALIZE
R RADIOACTIVITY RECORD OR PRINT
S SPEED OR SOLENOID
FREQUENCY
SAFETY SWITCH
T TEMPERATURE TRANSMIT
U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION
V VISCOSITY OR
VIBRATION
VALVE, DAMPER, OR
LOUVER
W WEIGHT OR FORCE WELL
X UNCLASSIFIED X AXIS UNCLASSIFIED UNCLASSIFIED
Y EVENT, STATE, OR
PRESENCE
Y AXIS RELAY OR COMPUTE
Z POSITION OR DIMENSION Z AXIS DRIVE, ACTUATE, OR
UNCLASSIFIED FINAL
CONTROL ELEMENT
ZERO (SPEED OR
POSITION)
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
0119035
04/17/2023
UP
UP
3839 37 36 35
F
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
COOLING TOWERS
CHILLER PLANT
BOILER PLANT
ELECTRICAL ROOM
GENERATOR ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:4
:2
A
M
M-002
MECHANICAL OVERALL PLAN REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
1/8" = 1'-0"
OVERALL FLOOR PLAN
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
UP
UP
UP
UP
UP
UP
3839 37 36 35
F
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
ENABLING AND
PREPARATION - LEVEL
DEVICES, CONDENSATE
TRAP DRAINS
CST-1
BALANCE PLANT PANEL
STAGE - COND PUMP
CONTROLS
3839 37 36 35
F
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
B-1 B-2 B-3 B-4
BOILER AREA 1 BOILER AREA 2 BOILER AREA 3 BOILER AREA 4
BALANCE OF PLANT PANEL
PHASE - BOP PANEL AND
PUMP CONTROLS
BALANCE OF PLANT PANEL
PHASE - SIEMENS SYSTEM
SEQUENCES AND GRAPHICS,
FW PUMP CONTROLS
ENABLING AND
PREPARATION -
DA OVERFLOW
BALANCE OF PLANT
PANEL PHASE - HEADER
PRESSURE INSTRUMENTS
3839 37 36 35
F
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
BOILER AREA 1
ENABLING AND PREPARATION -
LEVEL DEVICES, PRV RELIEF
VALVE, DA OVERFLOW VALVES.
DEAERATOR
DA-1
BOILER AREA 2 BOILER AREA 3 BOILER AREA 4
ENABLING AND PREPARATION - DRAFT
DAMPER INSTALLATION (REQUIRES
SHUTDOWN TO INSTALL IN BREECHING)
3839 37 36 35
F
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
ENABLING AND PREPARATION -
PRV RELIEF VALVE.
BOILER AREA 1 BOILER AREA 2 BOILER AREA 3 BOILER AREA 4
KEY PLAN - 1ST FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:4
:2
A
M
M-003
MECHANICAL PHASING PLAN REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
1/8" = 1'-0"1
BOILER PLANT AREA OF WORK PHASING DIAGRAM - BASEMENT
1/8" = 1'-0"2
BOILER PLANT AREA OF WORK PHASING DIAGRAM - FIRST FLOOR
1/8" = 1'-0"
BOILER PLANT AREA OF WORK PHASING DIAGRAM - MEZZANINE
1/8" = 1'-0"
BOILER PLANT AREA OF WORK PHASING DIAGRAM - ROOF
WORK PHASING TABLE
WORK PHASE
BASE SCOPE
OF WORK
DEDUCTIVE ALTERNATE BID ITEM
DESCRIPTION1 2 3 4 5
ENABLING AND
PREPERATION
X X WORK IN THIS PHASE INCLUDES VARIOUS SCOPE ITEMS DESIGNED TO FACILITATE WORK IN
THE FOLLOWING PHASES AND TO PREPARE THE PLANT FOR LONGER SHUTDOWN
DURATIONS OF EACH OF THE BOILERS, DEAERATOR, CONDENSATE TANK, AND COMBUSTION
AIR SYSTEMS. SCOPE ITEMS INCLUDE BUT ARE NOT LIMTED TO LEVEL DEVICE ADJUSTMENTS
AND ADDTIONS, DA OVERFLOW, GENERAL INSTRUMENTATION, HPS TO LPS REDUCING
STATION TIE-IN (MAUs), ELECTRICAL WORK TO POWER PANELS.
BOILER AREA 1 X X X X X WORK IN THIS PHASE INCLUDE ALL WORK ASSOCIATED WITH BOILER NO 1, ASSOCIATED
ECONOMIZER, BURNER DEVICES, COMBUSTION MAKE-UP AIR UNIT, AND FLOW METERS.
BOILER AREA 2 X X X X X WORK IN THIS PHASE INCLUDE ALL WORK ASSOCIATED WITH BOILER NO 2, ASSOCIATED
ECONOMIZER, BURNER DEVICES, COMBUSTION MAKE-UP AIR UNIT, AND FLOW METERS.
BOILER AREA 3 X X X X X WORK IN THIS PHASE INCLUDE ALL WORK ASSOCIATED WITH BOILER NO 3, ASSOCIATED
ECONOMIZER, BURNER DEVICES, COMBUSTION MAKE-UP AIR UNIT, AND FLOW METERS.
BOILER AREA 4 X X X X X WORK IN THIS PHASE INCLUDE ALL WORK ASSOCIATED WITH BOILER NO 4, ASSOCIATED
ECONOMIZER, BURNER DEVICES, COMBUSTION MAKE-UP AIR UNIT, AND FLOW METERS.
BALANCE OF
PLANT PANEL
PHASE
X X X X WORK IN THIS PHASE INCLUDES ALL SCOPE ASSOCIATED WITH THE BOP PANEL
INSTALLATION. THE INTENT IS THAT ALL OTHER WORK THAT THIS PANEL CONNECTS TOO IS
COMPLETE AND READY FOR INTEGRATION.
NOTES:
1. WORK PHASING IS GENERALLY DESCRIBED AND DOES NOT INCLUDE ALL SCOPE OF WORK ITEMS OR WORK STEPS TO COMPLETE THE WORK. THE DESCRIPTIONS AND GENERAL INTENT OF THE TABLE IS TO IDENTIFY THE GENERAL WORK PHASES AND SCOPE ITEMS AS THEY RELATE. IT IS THE CONTRACTORS RESPONSIBILITY TO ESTABLISH ALL REQUIRED WORK ITEMS FOR EACH PHASE AND TO COORDINATE THE PHASES WITH EACH OTHER
TO PROVIDE A COMPLETE PROJECT WITH ALL ITEMS OPERATIONAL AND RELIABLE.
2. BOILER AREA WORK IS INTENDED TO CONFINE THE WORK IN AND AROUND AS WELL AS ASSOCIATED WITH THE BOILER SO THAT CONSTRUCTION OPERATIONS, REQUIRED SHUTDOWNS AND ISOLATIONS, AND TESTING, COMMISSIONING, AND START UP WORK CAN OCCUR INDEPENDENT OF THE OTHER EQUIPMENT. IT ALSO INTENDS TO ONLY DISABLE ONE BOILER AT A TIME TO MAINTAIN PLANT OPERATIONS. COORDINATE ALL WORK WITH VA
PLANT MANAGEMENT AND CHIEF OPERATORS TO ENSURE CONTINUITY OF OPERATIONS.
3. ENABLING AND PREPARATION WORK IS INTENDED TO PERFORM CERTAIN SCOPE OF WORK ITEMS TO FACILITATE THE MAIN BOILERS PHASES AND BOP PHASE. THIS WORK MAY INCLUDE COORDINATED PLANT OR EQUIPMENT SHUTDOWNS AND ISOLATIONS TO PERMIT INSTALLATION OF EQUIPMENT AND SPECIALTIES. FOR EXAMPLE, DRAFT DAMPER INSTALLATION MAY REQUIRE SPECIALIZED INSTALLATION PHASING BUT CONNECTION OF DAMPER CONTROLS, TESTING, AND ADJUSTING WILL OCCUR IN THE INDIVIDUAL BOILERS PHASES. THE CONTRACTOR SHALL COORDINATE THIS WORK AS REQUIRED TO MINIMIZE IMPACT TO PLANT OPERATIONS AND TO MAINTAIN STEAM SERVICE TO THE HOSPITAL. COORDINATE ALL WORK WITH THE VA
PLANT MANAGEMENT AND CHIEF OPERATORS TO ENSURE CONTINUITY OF OPERATIONS.
4. BALANCE OF PLANT PANEL PHASE WORK SHALL BE COORDINATED BY THE CONTRACTOR TO ENSURE WORK OF THIS PHASE IS PERFORMED ONCE WORK IN THE OTHER PHASES IS COMPLETED AS NEEDED, ENSURING WORK OF THIS PHASE CAN BE PERFORMED FULLY. FOR EXAMPLE, THE BOP PANEL WILL MONITOR CONDITIONS OF THE INDIVIDUAL BOILERS, THEREFORE ALL WORK FOR THE INDIVIDUAL BOILERS MUST BE COMPLETED AND
READY FOR INTEGRATION WITH THE BOP PANEL.
5. THE CONTRACTOR SHALL PREPARE A SHUTDOWN AND ISOLATION PLAN FOR EACH PHASE AND EACH PIECE OF EQUIPMENT. SUBMIT SHUTDOWN AND ISOLATION PLAN FOR REVIEW BY THE ENGINEER, COR, AND PLANT PERSONNEL. DO NOT START PHASED WORK WITHOUT RECEIVING FINAL APPROVAL.
DEDUCTIVE ALTERNATE BID ITEMS TABLE
BASE BID AND ALTERNATE BID ITEM DESCRIPTION
ALTERNATE BID
ITEM
ASSOCIATED
PHASE SHORT NAME DESCRIPTION
BASE ENABLING AND
PREPARATION
AND BOILER
PHASES
BASE SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO DA AND CONDENSATE TANK LEVEL CONTROL ADJUSTMENTS, DA OVERFLOW VALVE, DA PRV RELIEF VALVE, BOILER RELIEF VALVE REPLACEMENT, BURNER DEVICE ADJUSTMENTS AND REPLACEMENTS, FLAME SAFEGUARD SYSTEM REPLACEMENT, FW ECONOMIZER MODIFICATIONS, AND ASSOCIATED PIPING, CONTROLS, AND ELECTRICAL WORK.
1 BOILER PHASES STEAM FLOW
METERS
SCOPE INCLUDES REPLACEMENT OF EXISTING STEAM FLOW METERS OF EACH BOILER. FLOW WILL
REPORT TO THE BOP PANEL FOR MONITORING AND HISTORIAN TRENDING.
2 BOILER PHASES FUEL FLOW
METERS
SCOPE INCLUDES INSTALLATION OF NO2 FUEL OIL FLOW METERS IN THE BURNER TRAIN OF EACH
BOILER. FLOW WILL REPORT TO THE BOP PANEL FOR MONITORING AND HISTORIAN TRENDING.
3 BOILER PHASES DRAFT CONTROL
DAMPERS
SCOPE INCLUDES INSTALLATION OF A DRAFT CONTROL SYSTEM ON THE EXISTING BOILERS. THIS
SYSTEM CONSISTS OF A BREECHING DAMPER LOCATED AFTER THE ECONOMIZER, A FURNACE
PRESSURE TRANSMITTER AND SWITCH, AND A SELF CONTAINED MICROPROCESSOR BASED
CONTROLLER.
4 BOILER PHASES MAKE-UP AIR
UNITS
SCOPE OF WORK INCLUDES REPLACEMENT OF THE EXISTING LJ WING UNITS WITH UNITARY
EQUIPMENT LOCATED ON THE ROOF. THESE UNITS PROVIDED COMBUSTION AIR TO THE BURNERS AND WILL BE INTERLOCKED WITH THE NEW FLAME SAFE GUARD SYSTEMS. INTERLOCK WITH THE
EXISTING WALL DAMPERS SHALL BE COMPLETED IF THIS ALTERANTE IS NOT COMPLETED.
5 BALANCE OF
PLANT PANEL
PHASE
BALANCE OF
PLANT PANEL
SCOPE OF WORK INCLUDES REPLACEMENT OF THE EXISTING PLANT MASTER PANEL WITH A BLANCE
OF PLANT (BOP) PANEL. NEW PANEL MOUNTED PUMP CONTROLS, VARIOUS PLANT DEVICE
REPLACEMENTS AND UPGRADES, AND ASSOCIATED PIPING, CONTROLS, AND ELECTRICAL WORK.
NOTES:
1. NOTE THAT BID ITEMS, IF ELIMINATED FROM THE PROJECT, ARE INTEGRATED WITH PHASED WORK THAT MAY NOT BE DIRECTLY RELATED. BID ITEMS AND PHASES ARE NOT DIRECTLY RELATED. THE CONTRACTOR SHALL FULLY COORDINATE THE INTEGRATION OF THE BID ITEMS WITH THE PHASED
WORK TO ENSURE ALL NEEDED WORK IS BEING PERFORMED AND SCHEDULED.
2. BID ITEM WORK ASSOCIATED WITH THE BOILER PHASES REQUIRES THE INDIVIDUAL BOILER TO BE SHUTDOWN. COORDINATE ALL REQUIRED WORK
WITH THE SHUTDOWN AND ISOLATION PLAN FOR THE BOILER.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
3839 37 36 35
F
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
5 5 552
MD-101
MD-101
EX 1"ø V
EX 1/2"ø V
EX 2"ø V
EX 1"ø V
EX 1/2"ø V
EX 2"ø V
EX 1"ø V
EX 1/2"ø V
EX 2"ø V
EX 1"ø V
EX 1/2"ø V
EX 2"ø V
3/4"ø CF
3/4"ø CF
1/2"ø BWS
1/2"ø BWS 2"ø FW
2"ø FW
3"ø MPS
3"ø MPR
EX 1/2"ø BWS
EX 3/4"ø CF
EX 1/2"ø BWS
EX 3/4"ø CF
EX 1/2"ø BWS EX 3/4"ø CF
EX 3"ø FW
EX 2"ø BO
EX 2"ø BO
EX 2"ø BO
EX 6"ø GEX 6"ø GEX 6"ø GEX 6"ø G
EX 3"ø FW
EX 3"ø FW
EX 3"ø FW
EX 6"ø V
EX 8"ø HPS
EX 3"ø MPS
EX 3"ø MPR
EX 3"ø
EX 3"ø
EX 1/2"ø
EX 2"ø S
EX 6"ø HPS
EX 6"ø HPS
EX 6"ø HPS
EX 6"ø HPS
EX 1/2"ø
EX 3"ø MPR
EX 3"ø MPS
EX 1"ø FO
EX 2"ø FW
EX 2"ø BO
EX 1"ø FO
EX 2"ø
EX 1"ø FO
EX 2"ø FW
EX 1"ø FO
EX 2"ø FW
EX 12"ø HPS
EX 8"ø HPS EX 3/4"ø CF
EX 3/4"ø CF
EX 3"ø MPR
EX 3"ø MPS
EX 1/2"ø BWS
EX 3/4"ø CF
EX 2"ø FW
EX 2"ø FW
EX 4"ø FW
EX 4"ø HPSEX 3"ø MPR
EX 1"ø FO
EX 1"ø FO
EX 1"ø FOEX 1"ø FO
EX 3"ø MPS
EX 2"ø FW
EX 2"ø FW EX 2"ø FW
EX 2"ø FW
EX 2"ø FW EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 1"ø LP
EX 2"ø BO
EX 1"ø LP
EX 2"ø BO
EX 1"ø LP
EX 2"ø S EX 2"ø S EX 2"ø S
EX 2"ø BO
EX 1"ø LP
EX 2"ø LP
P-59
P-60
P-62
P-61
EX B-1 EX B-2 EX B-3 EX B-4
LP CYLINDER
FUEL OIL TANK
LEVEL ALARM
PANEL
FUEL OIL LEAK
DETECTION
CABINET
EX 3/4" LP DN
EX 2" BFS DN
EX CABINET HEATER EX CABINET HEATER EX CABINET HEATER EX CABINET HEATER
RX 4" VTR
BOILER CONTROL ROOM
RX 4" VTR RX 4" VTR RX 4" VTR RX 4" VTR RX 4" VTR RX 4" VTR RX 4" VTR
6 6 6 6
M-301
EX 2"ø LP
EX 3/4"ø LP
M-301
RX 3"ø
MPS UP
RX 3"ø
MPR UP
RX 3"ø MPS UPRX 3"ø MPR UP
RX 3"ø MPS DN
RX 3"ø MPR UP
RX 3"ø MPS DNRX 3"ø MPR DN
EX 8" LPS
1 1 1
EX 4" SOFT WATER
EX 1" PUMPED CONDENSATE RECIRC.
EX 4" PUMPED CONDENSATE
EX 4" FW (DA OVERFLOW)
MD-101
ELEMENT MATERIAL: 316 SS
d/D RATIO: 0.64979799
THICKNESS: 0.125 IN
KEY PLAN - 1ST FLOOR
EX PRESSURE
TRANSMITTER
CONNECTED TO
SEIMENS SYSTEM
REFER TO CODED
NOTE #11 ON M-101
FOR NEW WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:4
:5
A
M
MD-101
MECHANICAL FIRST FLOOR PLAN -
DEMOLITION
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
0 2' 4' 8' 12'
1/4" = 1'-0"
N
1/4" = 1'-0"1
BOILER ROOM FIRST FLOOR - DEMOLITION
CODED NOTES:
DRAWING NOTES:
1. ALL WORK SHALL BE COORDINATED AND PHASED SO THE BOILER PLANT REMAINS OPERATIONAL AT ALL TIMES. ONLY ONE BOILER SHALL BE TAKEN OUT OF SERVICE AT A TIME. BALANCE OF PLANT SYSTEMS SHALL BE TEMPORARILY BYPASSED TO MAINTAIN THE BOILERS OPERATIONAL. REFER TO
M-003 FOR PHASING PLAN.
2. DASHED EQUIPMENT, DUCTWORK, AND PIPING SHALL BE REMOVED.
REMOVE EXISTING PRESSURE SAFETY VALVES (PSV) AND CONNECTING VENT PIPING ALL THE WAY THROUGH THE ROOF. ROOF PENETRATION SHALL REMAIN AND SHALL BE ENLARGED FOR NEW VENT
PIPING.
GAS AND OIL (NOT SHOWN ON PLAN VIEW) FLOW CONTROL VALVES SHALL BE REPLACED WITH
CONTROLS UPGRADE.
REMOVE EXISTING BOILER PLANT MASTER PANEL (DEDUCT ALTERNATE 5), COORDINATE
DISCONNECTION AND RELOCATION OF ANY OPERATIONAL CONTROLS/DEVICES WITH COR AND VA
PERSONNEL TO PREVENT INADVERTENTLY SHUTTING DOWN OPERATIONAL SYSTEMS.
REMOVE PSV DRAIN LINE BACK TO DRAIN HEADER.
REMOVE EXISTING ORIFICE PLATE FLOW METER AND ALL ASSOCIATED CONDENSATE POTS, 1/2" PIPING, VALVES, FITTINGS, TRANSMITTERS, AND CONDUIT AND WIRE BACK TO PLANT MASTER PANEL. (TYPICAL
OF ALL BOILERS) REPLACE WITH A VORTEX FLOW METER. REFER TO M-101.
REFER TO P&ID LOCATED ON MD-703 & MI-703 FOR BURNER TRIM AND MODIFICATIONS.
REMOVE EXISTING DEAERATOR OVERFLOW ISOLATION TRAP AND REPLACE WITH GATE VALVE. REFER
TO VIEW 1 / M-301 FOR SECTION VIEW.
REMOVE 3"ø MPS BACK TO MAIN AND CAP.
REMOVE 3"ø MPR BACK TO MAIN AND CAP.
EXISTING SIEMENS APOGEE BUILDING MANAGEMENT SYSTEM ACCESS TERMINAL. SEE NOTE 2 / M-101
FOR ADDITIONAL INFORMATION.
REMOVE EXISTING STEAM HEADER PRESSURE TRANSMITTER AND SWITCH. THERE ARE TWO
PRESSURE TRANSMITTERS INSTALLED, ONE IS CONNECTED DIRECTLY TO THE SIEMENS SYSTEM (KELE TRANSMITTER). THE OTHER, IS A BAILEY INDUSTRIAL TRANSMITTER AND IS CONNECTED TO THE EXISTING PLANT MASTER PANEL. REMOVE THE BAILEY INDUSTRIAL TRANSMITTER AND NEARBY LOW PRESSURE SWITCH CONNECTED TO THE PLANT MASTER PANEL AS WELL AS ALL ASSOCIATED 1/2" PIPING, VALVES, AND FITTINGS BACK TO THE NEAREST TEE AND ALL CONTROL WIRING AND CONDUIT
FROM THE TRANSMITTER TO THE PLANT MASTER PANEL.
DISCONNECT EXISTING PLANT MASTER PANEL INDICATING GAUGES FOR STEAM HEADER PRESSURE, NATURAL GAS PRESSURE, FEEDWATER PRESSURE, AND FUEL OIL PRESSURE. LOCATE ALL PIPING AND
PREPARE FOR RECONNECTION TO SYSTEMS AND EXTENSION TO NEW BALANCE OF PLANT PANEL.
REMOVE EXISTING PRESSURE TRANSMITTER
REMOVE EXISTING LOW PRESSURE SWITCH
DISCONNECT FROM EXISTING
EXISTING TRANSMITTER CONNECTED TO SIEMENS SYSTEM
N.T.S.
EXISTING BOILER PLANT MASTER INSTRUMENTATION PANEL
2N.T.S.
EXISTING ORIFICE PLATE
N.T.S.
EXISTING STEAM HEADER INSTRUMENTATION
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
RX
AH-1052
RX
AH-1053
RX
AH-1054
RX
AH-1055
RX 4"ø VTR
RX 4"ø VTR
EX 1"ø VTR
EX 1/2"ø VTR
EX 2"ø VTR
EX 1"ø VTR
EX 1/2"ø VTR
EX 2"ø VTR
EX 1"ø VTR
EX 1/2"ø VTR
EX 2"ø VTR
EX 1"ø VTR
EX 1/2"ø VTR
EX 2"ø VTR
EX 36ø FE EX 42ø FE EX 45ø FE EX 51ø FE
EX 36ø FE EX 36ø FE EX 36ø FE
EX 36ø FE
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
RX 3"ø
RX 3"ø
RX 3"ø
RX 3"ø
EX 3"ø HPS EX 3"ø HPS EX 3"ø HPS EX 3"ø HPS
EX 6"ø LPS
EX 4"ø FW
EX 4"ø FW
EX 2 1/2"ø FW
EX 3/4"ø CF
EX 4"ø HPS
M-301
M-301
M-301
EX 36ø FE DN EX 36ø FE DN EX 36ø FE DN EX 36ø FE DN
RX 3"ø
MPS DN
RX 3"ø MPR DN
RX 3"ø MPS DN RX 3"ø MPR DN
RX 3"ø MPS DN RX 3"ø MPR DN
RX 3"ø MPS DN RX 3"ø MPR DN
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
EX 8" LPS VTR
4 4 4
EX 4" SOFT WATER
EX 1" PUMPED CONDENSATE RECIRC.
EX 4" PUMPED CONDENSATE
EX 4" FW (DA OVERFLOW)
KEY PLAN - UPPER LEVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:4
:0
A
M
MD-102
MECHANICAL MEZZANINE LEVEL
FLOOR PLAN - DEMOLITION
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
CODED NOTES:
DRAWING NOTES:
1. ALL WORK SHALL BE COORDINATED AND PHASED SO THE BOILER PLANT REMAINS OPERATIONAL AT ALL TIMES. ONLY ONE BOILER SHALL BE TAKEN OUT OF SERVICE AT A TIME. BALANCE OF PLANT SYSTEMS SHALL BE TEMPORARILY BYPASSED TO MAINTAIN THE BOILERS OPERATIONAL. REFER TO
M-003 FOR PHASING PLAN.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
1/4" = 1'-0"
BOILER ROOM MEZZANINE - DEMOLITION
REMOVE EXISTING MAU AND ALL ASSOCIATED APPURTENANCES.
REMOVE EXISTING GATE VALVE AND PREPARE FOR NEW BUTTERFLY OVERFLOW CONTROL VALVE.
EXISTING WELD NECK FLANGE AT ELBOW PLAN RIGHT OF VALVE SHALL REMAIN. WELD NECK ELBOW
PLAN LEFT OF VALVE SHALL BE REMOVED. REFER TO VIEW 1 / M-301 FOR SECTION VIEW.
RX 6" LPS TO ALLOW FOR NEW GATE VALVE. REFER TO M-102 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING BREACHING FOR INSTALLATION OF DRAFT DAMPER. BREECHING IS A PRE-
MANUFACTURED SYSTEM. CONTRACTOR SHALL COORDINATE LENGTH OF SECTION REMOVAL AND
REQUIRED COMPONENTS FOR CONNECTION OF DRAFT DAMPER. ENSURE BREECHING STRUCTURAL
AND GAS TIGHT INTEGRITY IS MAINTAINED. TEMPORARILY SUPPORT BREACHING AS REQUIRED TO
COMPLETE WORK.
N.T.S.
EXISTING VALVE
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
EX
ROOF
HATCH
EX EF
1 1 1
EX 1"ø VTR
EX 1/2"ø VTR
EX 2"ø VTR
EX 1"ø VTR
EX 1/2"ø VTR
EX 2"ø VTR
EX 1"ø VTR
EX 1/2"ø VTR
EX 2"ø VTR
EX 1"ø VTR
EX 1/2"ø VTR
EX 2"ø VTR
2"ø VTR
2"ø VTR
6"ø VTR
M-301
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:4
:0
A
M
MD-103
MECHANICAL ROOF PLAN -
DEMOLITION
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
CODED NOTES:
0 2' 4' 8' 12'
1/4" = 1'-0"
N
1/4" = 1'-0"
BOILER ROOM ROOF PLAN - DEMOLITION
REMOVE EXISTING INTAKE HOOD SERVING THE MAKEUP AIR UNIT BELOW. REMOVE EXISTING ROOF
CURB AND PREPARE FOR NEW ROOF CURB AND MAKEUP AIR UNIT. REFER TO MD-102 FOR
ADDITIONAL SCOPE OF WORK.
EX 18"ø HPS FROM SILENCE UP THROUGH ROOF.
DRAWING NOTES:
1. ALL WORK SHALL BE COORDINATED AND PHASED SO THE BOILER PLANT REMAINS OPERATIONAL AT ALL TIMES. ONLY ONE BOILER SHALL BE TAKEN OUT OF SERVICE AT A TIME. BALANCE OF PLANT SYSTEMS SHALL BE TEMPORARILY BYPASSED TO MAINTAIN THE BOILERS OPERATIONAL. REFER TO
M-003 FOR PHASING PLAN.
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
FROM BLDG. 100
PROBE
EX 1 1/4" FWS
TO SAMPLE
COOLER EX 2" D
EX 1-1/2"
EX 3/4" D
EX 6" BFS
TO BF TEMP
RECORDER
EX DA-1
EX 1-1/2"
EX 3/4" D
EX 3/4" D EX 3/4" D
FD
30-300 °F
GAGE GL.
PROBE
EX 3/4" CF
FLOAT
GAGE
MECH
LINKAGE
EX R
ROOF
6'-0"
LOW LEVEL
ALARM
HIGH LEVEL
ALARM
OFL LEVEL
3/4" EQUALIZING LINE
EX 4" OFL
FLOOR
CV-3
EX 4" CT
EX 4" CT
EX 4" CW/SW
EX CST-1
GAGE GLASS
OVERFLOW CONTROLLER
MIN. CAP. 40 GPM@ 4' HEAD
E X
P R
NC
NC
2 1/2" CW
2 1/2" SW
NC
NC
NC NC
E X
P R
CV-2
E X
S W
E X
C W
MECH.
LINKAGE
CV-1
E X
V
EX 2 1/2" CW
EX 2" SW
EX 4" CW/SW
E X
/2
C W
E X
/2
S W
EX 6" PR
EX 3/4" D
FROM ENERGY
CENTER DISTRIBUTION
SYSTEM
EX 4" MPR
EX 3/4" D
ROOF
6'-0"
E X
M P
R
EX R
NC
EX OFL
E X
D
E X
C T
S
NC
E X
O F
L
SIGHT FLOW
INDICATOR
WITH ROTOR
E X
O F
L
EX R
6"
E X
O F
L
EX 3/4" V
E X
P R
0-60 PSIG0-60 PSIG
OSD
OSD
E X
O F
L
E X
V
EX 6" PR
CONDENSATE RETURN PUMP SET CP-10
FOR ADDITIONAL CONNECTIONS TO
CP-10 SEE H SERIES DWG.'S
GAGE GL
3/4" D
30" HG VAC - 15 PSIG
EX P-63
0-60 PSIG
EX 1 1/4" R
EX 4" CT
EX P-64
EX P-65
NC
EX R
E X
C T
E X
C W
/S W
E X
R
NC
NC
EX 6" BFS
TO B-4
MI103
E X
/4
R
E X
B F
S
E X
B F
S
E X
B F
S
EX 2" BF
TO B-3
MI103
TO B-2
MI103
TO B-1
MI103
NC
NC
NC
EX 2" BF
EX 2" BF
EX 2" BFE
X
B F
S
FROM STEAM
HEADER
EX 8" LPS (5 PSIG)
6'-0"
SV-1 @15 PSIG
VACUUM BREAKER
EX 6" BFS
EX 1 1/4" R
EX 4" CT
EX 1 1/4" R
EX 4" CT
EX 1"
EX 1"
E X
EX PR
EX 3/4" D
EX V EX 1 1/2" V
E X
V
E X
/4
R
E X
/4
R
E X
/4
R
SAN SAN SAN
NCNC
EX 1 1/2"EX 1"
FLOW ORIFICE
(TYP OF 3) SAN
NC
FROM WATER
SOFTENERS
FROM WATER
SOFTENERS
FROM HOSPITAL
EX 4" CW
NC
SAN2
NC
EX 3/4"
EX 6"
30-300 °F
SAMPLER
COOLER
TO WATER
TREATMENT
LSHH
LSLL
LG
LG
LG
LG
PG
PG
30" HG VAC - 15 PSIG
0-60 PSIG
PG
PG
30" HG VAC - 15 PSIG
0-60 PSIG
PG
PG
LSL
LSH
LCV
LCV
30-300 °F
EX P-62
0-300 PSIG
0-300 PSIG
30-300 °F
FLOOR
EX P-61 EX P-60 EX P-59
PG
- PG
TG
0-300 PSIG
0-300 PSIG
30-300 °F
PG
- PG
TG
0-300 PSIG
0-300 PSIG
30-300 °F
PG
- PG
TG
0-300 PSIG
0-300 PSIG
30-300 °F
PG
- PG
TG
TG
30-300 °F
TG
30-300 °F
TG
TG
TG
RX 1/2" LPS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:4
:0
A
M
MD-701
MECHANICAL P&ID - CONDENSATE
AND FEEDWATER - DEMO
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
N.T.S.
CONDENSATE STORAGE & DEAERATOR TANK P&ID - DEMO
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
FROM BOILER B-4
FROM BOILER B-3
FROM BOILER B-2
FROM BOILER B-1
EX 6" HPS (90 PSIG)
3/4" HALF-COUPLING THREADED FOR CALORIMETER CONNECTION.
PROVIDE PLUG (TYP.). (LOCATE TO ALLOW SPACE FOR CALORIMETER)
(TYPICAL)
EX HPR
E X
2"
H P
S
P
S
IG
EX HPR
12" HPS (90 PSIG)
12" HPS (90 PSIG)
EX HPR
NC
EX HPR
BUILDING WALL
FUTURE DISTRICT STEAM
T-5
T-4
T-3
FUTURE 12" DISTRICT
STEAM CONNECTION
PRIMARY ELEMENT - BOILER OPERATION
FLOW RECORDER
FD
EX 3/4" D
FUTURE BOILER
CONNECTION 8"
D
D
EX 3/4" D
T-2
EX HPR
BOILER ROOM FLOOR
2'-6"
V
FUTURE HPS
CONNECTION 12"
STEAM SILENCER (EXHAUST
SYSTEM FOR BOILER-BURNER
TESTING & ADJUSTING)
PRIMARY ELEMENT - HPS DISTRIBUTION
FLOW RECORDER
EX 12" HPS (90 PSIG)
TO BLDG. 100
THRU ROOF
PRIMARY ELEMENT - ENERGY CENTER
HEATING
E X
H P
S
P
S
IG
HPR
MPS (30 PSIG)
MPR
MPS (30 PSIG)
MPR
V
THRU ROOF
TO ENERGY CENTER
LATERAL CONNECTION (TYP.)
REQUIRED FOR SOUND REDUCTION
EX 12" MPS (30 PSIG)
EX 4" HPS (90 PSIG)
E X
H P
S
P
S
IG
PRV STATION 11 3/4" (TYP)
TO DEAERATOR
EX 6" LPS (5 PSIG)
PRV STATION 12
RELIEF VALVE
CAPACITY: 5200 LB/HR
SET PRESSURE: 5 PSIG
ABOVE STEAM HEADER NORMAL
OPERATING PRESSURE
FACTORY INSTALLED BY-PASSES
ON VALVES 4" & LARGER
NC
NC
STRAIGHT PIPE AS
RECOMMENDED BY FLOW
METER MANUFACTURER (TYP.)
EX 6" HPS (90 PSIG)
EX 6" HPS (90 PSIG)
EX 6" HPS (90 PSIG)
/1 MI104
/1 MI104
/1 MI104
/1 MI104
PRIMARY ELEMENT - ENERGY CENTER
DEAERATOR
IB
30# COND
EX 4" LPS (5 PSIG)
EX 3" HPS (5 PSIG)
EX 3" HPS (5 PSIG)
EX 1" HPR
NC
PG
PG
PG
PG
PG
RX 4" LPS FOR NEW STEAM TRAP
CONNECTION
PT
SIEMENS
PSL
PT
PSL
SIEMENS
PG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:4
:0
A
M
MD-702
MECHANICAL P&ID - STEAM
SYSTEMS - DEMO
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
N.T.S.
STEAM PIPING P&ID - DEMO
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
STP-06
M
CBD
CBD
BO
LSAMP
BLR-1,2,3,4 TRIM
EX B-1
EX B-2
EX B-3
EX B-4
BLR-1,2,3,4 FUEL TRAIN & DRAFT
TO MAIN STEAM
HEADER
MXX
TO DA-1
EX 6" HPS EX 6" HPS
EX 3/4" VENT
INSPECTOR VENT
EX 6" HPS
(NON RETURN VALVE)
NC
8" H
P S
FE
04013
FT
CONDUCTIVITY
VTR
RX 4" VENT
EX 2" ED
RX 6" VENT
SAN
EX 1 1/2" FW
NC
EX 1 1/2" FW
EX 1 1/2" FW
(BY-PASS)
EX 3/4" CF
(SS TUBING)
MI101
FRO…