This addendum provides additional drawings for a federal contract opportunity to replace the boiler control system at a Veterans Affairs medical center. The solicitation seeks to replace an aging boiler control system for five boilers that provide steam and hot water to the Veterans Integrated Service Network 10 medical facility located in Battle Creek, Michigan. The addendum includes 19MB of supplemental drawings to assist contractors in preparing bids for the project, which is identified as solicitation number 36C25023B0068 and aims to upgrade the facility's boiler instrumentation and controls through a fixed-price contract awarded by the Department of Veterans Affairs. Bids are due by September 30, 2023, with the contract to be awarded by November 15, 2023 and work to be completed within 180 calendar days of the award date.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3839 37 36 35
F
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
5 5 552
MD-101
MD-101
EX 1"ø NG (VENT) UP
EX 1/2"ø NG (VENT) UP
EX 2"ø NG (VENT) UP
EX 1"ø NG (VENT) UP
EX 1/2"ø NG (VENT) UP
EX 2"ø NG (VENT) UP
EX 1"ø NG (VENT) UP
EX 1/2"ø NG (VENT) UP
EX 2"ø NG (VENT) UP
EX 1"ø NG (VENT) UP
EX 1/2"ø NG (VENT) UP
EX 2"ø NG (VENT) UP
3/4"ø CF
3/4"ø CF
1/2"ø BWS
1/2"ø BWS 2"ø FW
2"ø FW
3"ø MPS
3"ø MPR
EX 1/2"ø BWS
EX 3/4"ø CF
EX 1/2"ø BWS
EX 3/4"ø CF
EX 1/2"ø BWS EX 3/4"ø CF
EX 3"ø FW
EX 2"ø BO
EX 2"ø BO
EX 2"ø BO
EX 6"ø GEX 6"ø GEX 6"ø GEX 6"ø G
EX 3"ø FW
EX 3"ø FW
EX 3"ø FW
EX 6"ø V
EX 8"ø HPS
EX 3"ø MPS
EX 3"ø MPR
EX 3"ø
EX 3"ø
EX 1/2"ø
EX 2"ø S
EX 6"ø HPS
EX 6"ø HPS
EX 6"ø HPS
EX 6"ø HPS
EX 1/2"ø
EX 3"ø MPR
EX 3"ø MPS
EX 1"ø FO
EX 2"ø FW
EX 2"ø BO
EX 1"ø FO
EX 2"ø
EX 1"ø FO
EX 2"ø FW
EX 1"ø FO
EX 2"ø FW
EX 12"ø HPS
EX 8"ø HPS EX 3/4"ø CF
EX 3/4"ø CF
EX 3"ø MPR
EX 3"ø MPS
EX 1/2"ø BWS
EX 3/4"ø CF
EX 2"ø FW
EX 2"ø FW
EX 4"ø FW
EX 4"ø HPSEX 3"ø MPR
EX 1"ø FO
EX 1"ø FO
EX 1"ø FOEX 1"ø FO
EX 3"ø MPS
EX 2"ø FW
EX 2"ø FW EX 2"ø FW
EX 2"ø FW
EX 2"ø FW EX 2"ø FW
EX 2"ø FW
EX 2"ø FW EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 1"ø LP
EX 2"ø BO
EX 1"ø LP
EX 2"ø BO
EX 1"ø LP
EX 2"ø S EX 2"ø S EX 2"ø S
EX 2"ø BO
EX 1"ø LP
EX 2"ø LP
P-59
P-60
P-62
P-61
EX B-1 EX B-2 EX B-3 EX B-4
LP CYLINDER
FUEL OIL TANK
LEVEL ALARM
PANEL
FUEL OIL LEAK
DETECTION
CABINET
EX 3/4" LP DN
EX 2" BFS DN
EX CABINET HEATER EX CABINET HEATER EX CABINET HEATER EX CABINET HEATER
RX 4" VTR
BOILER CONTROL ROOM
RX 4" VTR RX 4" VTR RX 4" VTR RX 4" VTR RX 4" VTR RX 4" VTR RX 4" VTR
6 6 6 6
M-301
EX 2"ø LP
EX 3/4"ø LP
M-301
RX 3"ø
MPS UP
RX 3"ø
MPR UP
RX 3"ø MPS UPRX 3"ø MPR UP
RX 3"ø MPS DN
RX 3"ø MPR UP
RX 3"ø MPS DNRX 3"ø MPR DN
EX 8" LPS
1 1 1
EX 4" SOFT WATER
EX 1" PUMPED CONDENSATE RECIRC.
EX 4" PUMPED CONDENSATE
EX 4" FW (DA OVERFLOW)
MD-101
ADDED KEYNOTE, ADDED
"NG" DESIGNATION
ADDED "NG"
DESIGNATION
ADDED "NG"
DESIGNATION
ADDED KEYNOTE, ADDED
"NG" DESIGNATION
ELEMENT MATERIAL: 316 SS
d/D RATIO: 0.64979799
THICKNESS: 0.125 IN
KEY PLAN - 1ST FLOOR
EX PRESSURE
TRANSMITTER
CONNECTED TO
SEIMENS SYSTEM
REFER TO CODED
NOTE #11 ON M-101
FOR NEW WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:1
:2
P
M
MD-101
MECHANICAL FIRST FLOOR PLAN -
DEMOLITION
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
0 2' 4' 8' 12'
1/4" = 1'-0"
N
1/4" = 1'-0"1
BOILER ROOM FIRST FLOOR - DEMOLITION
CODED NOTES:
DRAWING NOTES:
1. ALL WORK SHALL BE COORDINATED AND PHASED SO THE BOILER PLANT REMAINS OPERATIONAL AT ALL TIMES. ONLY ONE BOILER SHALL BE TAKEN OUT OF SERVICE AT A TIME. BALANCE OF PLANT SYSTEMS SHALL BE TEMPORARILY BYPASSED TO MAINTAIN THE BOILERS OPERATIONAL. REFER TO
M-003 FOR PHASING PLAN.
2. DASHED EQUIPMENT, DUCTWORK, AND PIPING SHALL BE REMOVED.
REMOVE EXISTING PRESSURE SAFETY VALVES (PSV) AND CONNECTING VENT PIPING ALL THE WAY THROUGH THE ROOF. ROOF PENETRATION SHALL REMAIN AND SHALL BE ENLARGED FOR NEW VENT
PIPING.
GAS AND OIL (NOT SHOWN ON PLAN VIEW) FLOW CONTROL VALVES SHALL BE REPLACED WITH
CONTROLS UPGRADE.
REMOVE EXISTING BOILER PLANT MASTER PANEL (DEDUCT ALTERNATE 5), COORDINATE
DISCONNECTION AND RELOCATION OF ANY OPERATIONAL CONTROLS/DEVICES WITH COR AND VA
PERSONNEL TO PREVENT INADVERTENTLY SHUTTING DOWN OPERATIONAL SYSTEMS.
REMOVE PSV DRAIN LINE BACK TO DRAIN HEADER.
REMOVE EXISTING ORIFICE PLATE FLOW METER AND ALL ASSOCIATED CONDENSATE POTS, 1/2" PIPING, VALVES, FITTINGS, TRANSMITTERS, AND CONDUIT AND WIRE BACK TO PLANT MASTER PANEL. (TYPICAL
OF ALL BOILERS) REPLACE WITH A VORTEX FLOW METER. REFER TO M-101.
REFER TO P&ID LOCATED ON MD-703 & MI-703 FOR BURNER TRIM AND MODIFICATIONS.
REMOVE EXISTING DEAERATOR OVERFLOW ISOLATION TRAP AND REPLACE WITH GATE VALVE. REFER
TO VIEW 1 / M-301 FOR SECTION VIEW.
REMOVE 3"ø MPS BACK TO MAIN AND CAP.
REMOVE 3"ø MPR BACK TO MAIN AND CAP.
EXISTING SIEMENS APOGEE BUILDING MANAGEMENT SYSTEM ACCESS TERMINAL. SEE NOTE 2 / M-101
FOR ADDITIONAL INFORMATION.
REMOVE EXISTING STEAM HEADER PRESSURE TRANSMITTER AND SWITCH. THERE ARE TWO
PRESSURE TRANSMITTERS INSTALLED, ONE IS CONNECTED DIRECTLY TO THE SIEMENS SYSTEM (KELE TRANSMITTER). THE OTHER, IS A BAILEY INDUSTRIAL TRANSMITTER AND IS CONNECTED TO THE EXISTING PLANT MASTER PANEL. REMOVE THE BAILEY INDUSTRIAL TRANSMITTER AND NEARBY LOW PRESSURE SWITCH CONNECTED TO THE PLANT MASTER PANEL AS WELL AS ALL ASSOCIATED 1/2" PIPING, VALVES, AND FITTINGS BACK TO THE NEAREST TEE AND ALL CONTROL WIRING AND CONDUIT
FROM THE TRANSMITTER TO THE PLANT MASTER PANEL.
DISCONNECT EXISTING PLANT MASTER PANEL INDICATING GAUGES FOR STEAM HEADER PRESSURE, NATURAL GAS PRESSURE, FEEDWATER PRESSURE, AND FUEL OIL PRESSURE. LOCATE ALL PIPING AND
PREPARE FOR RECONNECTION TO SYSTEMS AND EXTENSION TO NEW BALANCE OF PLANT PANEL.
REMOVE EXISTING PRESSURE TRANSMITTER
REMOVE EXISTING LOW PRESSURE SWITCH
DISCONNECT FROM EXISTING
EXISTING TRANSMITTER CONNECTED TO SIEMENS SYSTEM
EXISTING NG VENTS TO BE RELOCATED AT ROOF LEVEL. COORDINATE ROOF PENETRATION WITH MAU
LOCATION.
N.T.S.
EXISTING BOILER PLANT MASTER INSTRUMENTATION PANEL
2N.T.S.
EXISTING ORIFICE PLATE
N.T.S.
EXISTING STEAM HEADER INSTRUMENTATION
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
8 ADDENDUM NO. 1 09.11.2023
8ADDED KEYNOTE
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
RX
AH-1052
RX
AH-1053
RX
AH-1054
RX
AH-1055
RX 4"ø VTR
RX 4"ø VTR
EX 36ø FE EX 42ø FE EX 45ø FE EX 51ø FE
EX 36ø FE EX 36ø FE EX 36ø FE
EX 36ø FE
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
RX 3"ø
RX 3"ø
RX 3"ø
RX 3"ø
EX 3"ø HPS EX 3"ø HPS EX 3"ø HPS EX 3"ø HPS
EX 6"ø LPS
EX 4"ø FW
EX 4"ø FW
EX 2 1/2"ø FW
EX 3/4"ø CF
EX 4"ø HPS
M-301
M-301
M-301
EX 36ø FE DN EX 36ø FE DN EX 36ø FE DN EX 36ø FE DN
RX 3"ø
MPS DN
RX 3"ø MPR DN
RX 3"ø MPS DN RX 3"ø MPR DN
RX 3"ø MPS DN RX 3"ø MPR DN
RX 3"ø MPS DN RX 3"ø MPR DN
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
EX 8" LPS VTR
4 4 4
EX 4" SOFT WATER
EX 1" PUMPED CONDENSATE RECIRC.
EX 4" PUMPED CONDENSATE
EX 4" FW (DA OVERFLOW)
EX 1" NG (VENT) UP
EX 1/2" NG (VENT) UP
EX 2" NG (VENT) UP
ADDED KEYNOTE, ADDED
"NG" DESIGNATION
EX 1" NG (VENT) UP
EX 1/2" NG (VENT) UP
EX 2" NG (VENT) UP
ADDED "NG"
DESIGNATION
EX 1" NG (VENT) UP
EX 1/2" NG (VENT) UP
EX 2" NG (VENT) UP
EX 1" NG (VENT) UP
EX 1/2" NG (VENT) UP
EX 2" NG (VENT) UP
ADDED "NG"
DESIGNATION
ADDED KEYNOTE, ADDED
"NG" DESIGNATION
KEY PLAN - UPPER LEVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:1
:3
P
M
MD-102
MECHANICAL MEZZANINE LEVEL
FLOOR PLAN - DEMOLITION
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
CODED NOTES:
DRAWING NOTES:
1. ALL WORK SHALL BE COORDINATED AND PHASED SO THE BOILER PLANT REMAINS OPERATIONAL AT ALL TIMES. ONLY ONE BOILER SHALL BE TAKEN OUT OF SERVICE AT A TIME. BALANCE OF PLANT SYSTEMS SHALL BE TEMPORARILY BYPASSED TO MAINTAIN THE BOILERS OPERATIONAL. REFER TO
M-003 FOR PHASING PLAN.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
1/4" = 1'-0"
BOILER ROOM MEZZANINE - DEMOLITION
REMOVE EXISTING MAU AND ALL ASSOCIATED APPURTENANCES.
REMOVE EXISTING GATE VALVE AND PREPARE FOR NEW BUTTERFLY OVERFLOW CONTROL VALVE.
EXISTING WELD NECK FLANGE AT ELBOW PLAN RIGHT OF VALVE SHALL REMAIN. WELD NECK ELBOW
PLAN LEFT OF VALVE SHALL BE REMOVED. REFER TO VIEW 1 / M-301 FOR SECTION VIEW.
RX 6" LPS TO ALLOW FOR NEW GATE VALVE. REFER TO M-102 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING BREACHING FOR INSTALLATION OF DRAFT DAMPER. BREECHING IS A PRE-
MANUFACTURED SYSTEM. CONTRACTOR SHALL COORDINATE LENGTH OF SECTION REMOVAL AND
REQUIRED COMPONENTS FOR CONNECTION OF DRAFT DAMPER. ENSURE BREECHING STRUCTURAL
AND GAS TIGHT INTEGRITY IS MAINTAINED. TEMPORARILY SUPPORT BREACHING AS REQUIRED TO
COMPLETE WORK.
EXISTING NG VENTS TO BE RELOCATED AT ROOF LEVEL. COORDINATE ROOF PENETRATION WITH
MAU LOCATION.
N.T.S.
EXISTING VALVE
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
8 ADDENDUM NO. 1 09.11.2023
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
EX
ROOF
HATCH
EX EF
1 1 1
RX 1"ø NG (VENT)
RX 1/2"ø NG (VENT)
RX 2"ø NG (VENT)
RX 1"ø NG (VENT)
RX 1/2"ø NG (VENT)
RX 2"ø NG (VENT)
RX 1"ø NG (VENT)
RX 1/2"ø NG (VENT)
RX 2"ø NG (VENT)
RX 1"ø NG (VENT)
RX 1/2"ø NG (VENT)
RX 2"ø NG (VENT)
2"ø VTR
2"ø VTR
6"ø VTR
M-301
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
RX 4"ø VTR
ADDED KEYNOTE, ADDED
"NG" DESIGNATION
ADDED KEYNOTE, ADDED
"NG" DESIGNATION8
ADDED "NG"
DESIGNATION
ADDED "NG"
DESIGNATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:1
:3
P
M
MD-103
MECHANICAL ROOF PLAN -
DEMOLITION
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
CODED NOTES:
0 2' 4' 8' 12'
1/4" = 1'-0"
N
1/4" = 1'-0"
BOILER ROOM ROOF PLAN - DEMOLITION
REMOVE EXISTING INTAKE HOOD SERVING THE MAKEUP AIR UNIT BELOW. REMOVE EXISTING ROOF
CURB AND PREPARE FOR NEW ROOF CURB AND MAKEUP AIR UNIT. REFER TO MD-102 FOR
ADDITIONAL SCOPE OF WORK.
EX 18"ø HPS FROM SILENCE UP THROUGH ROOF.
EXISTING NG VENTS TO BE RELOCATED AT ROOF LEVEL. COORDINATE ROOF PENETRATION WITH MAU
LOCATION.
DRAWING NOTES:
1. ALL WORK SHALL BE COORDINATED AND PHASED SO THE BOILER PLANT REMAINS OPERATIONAL AT ALL TIMES. ONLY ONE BOILER SHALL BE TAKEN OUT OF SERVICE AT A TIME. BALANCE OF PLANT SYSTEMS SHALL BE TEMPORARILY BYPASSED TO MAINTAIN THE BOILERS OPERATIONAL. REFER TO
M-003 FOR PHASING PLAN.
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
8 ADDENDUM NO. 1 09.11.2023
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
EX B-1 EX B-2 EX B-3 EX B-4
EC105
BOILERS
P-59
P-60
P-62
P-61
EX 1/2"ø BWS
EX 3/4"ø CF
EX 1/2"ø BWS
EX 3/4"ø CF
EX 1/2"ø BWS EX 3/4"ø CF
LP CYLINDER
FUEL OIL TANK
LEVEL ALARM
PANEL
FUEL OIL LEAK
DETECTION
CABINET
EX 3"ø FW
EX 2"ø BO
EX 2"ø BO EX 2"ø BO
EX 6"ø GEX 6"ø GEX 6"ø GEX 6"ø G
EX 3/4" LP DN
EX 2" BFS DN
EX CABINET HEATER EX CABINET HEATER EX CABINET HEATER EX CABINET HEATER
EX 3"ø FW
EX 3"ø FW
EX 3"ø FW
EX 6"ø V
EX 8"ø HPS
6" DOWN
FROM
DEAERATOR
EX 3"ø MPS
EX 3"ø MPR
CAP
M-101
BOILER CONTROL ROOM
5 5 5 5
7 8 9
M-301
3/4"ø CF
3/4"ø CF
1/2"ø BWS
1/2"ø BWS 2"ø FW
2"ø FW
3"ø MPS
3"ø MPR
EX 1/2"ø
EX 2"ø S
3/4"ø S
3/4"ø S
3/4"ø S
3/4"ø S
3/4"ø S
3/4"ø S
3/4"ø S
3/4"ø S
6" VTR 6" VTR
CAP
CAP
CAP
CAP
CAP
CAP
CAP
EX 1"ø NG (VENT) UP
EX 1/2"ø NG (VENT) UP
EX 2"ø NG (VENT) UP
EX 1"ø NG (VENT) UP
EX 1/2"ø NG (VENT) UP
EX 2"ø NG (VENT) UP
EX 1"ø NG (VENT) UP
EX 1/2"ø NG (VENT) UP
EX 2"ø NG (VENT) UP
EX 1"ø NG (VENT) UP
EX 1/2"ø NG (VENT) UP
EX 2"ø NG (VENT) UP
7 8 9 7 8 9 7 8 9
CAP
CAP
CAP
CAP
CAP
CAP
CAP
CAP
EX 6"ø HPS
EX 6"ø HPS
EX 6"ø HPS
EX 6"ø HPS
EX 1/2"ø
EX 3"ø MPR
EX 3"ø MPS
EX 1"ø FO
EX 2"ø FW
EX 2"ø BO
EX 1"ø FO
EX 2"ø
EX 1"ø FO
EX 2"ø FW
EX 1"ø FO
EX 2"ø FW
EX 12"ø HPS
EX 8"ø HPS EX 3/4"ø CF
EX 3/4"ø CF
EX 3"ø MPR
EX 3"ø MPS
EX 1/2"ø BWS
EX 3/4"ø CF
EX 2"ø FW
EX 2"ø FW
EX 4"ø FW
EX 4"ø HPS
EX 3"ø MPR
EX 1"ø FO
EX 1"ø FO
EX 1"ø FOEX 1"ø FO
EX 3"ø MPS
EX 2"ø FW EX 2"ø FW EX 2"ø FW EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 1"ø LP
EX 2"ø BO
EX 1"ø LP
EX 2"ø BO
EX 1"ø LP
EX 2"ø S EX 2"ø S EX 2"ø S
EX 2"ø BO
EX 1"ø LP
EX 2"ø LP
EX 3/4"ø LP
EX 2"ø LP
EX 8" LPS
6" VTR 6" VTR6" VTR 6" VTR6" VTR 6" VTR
1" LPR UP
1" LPR UP
1 1/2"ø LPR
1-1/2" LPR DN
1-1/2" LPR UP
2" HPS UP
T
T
T
T
AH-1052
AH-1053
AH-1054
AH-1055
EX 4" SOFT WATER
EX 1" PUMPED CONDENSATE RECIRC.
EX 4" PUMPED CONDENSATE
EX 4" FW (DA OVERFLOW)
3/4" PUMPED CONDENSATE
ROUTE TO BOP GAUGE.
EX 2"ø FW EX 2"ø FW
EX 2"ø FW EX 2"ø FW
EX 2"ø FW EX 2"ø FW
ADDED KEYNOTE, ADDED
"NG" DESIGNATION
ADDED "NG"
DESIGNATION 8
ADDED "NG"
DESIGNATION
ADDED KEYNOTE, ADDED
"NG" DESIGNATION
KEY PLAN - 1ST FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:1
:4
P
M
M-101
MECHANICAL FIRST FLOOR PLAN -
NEW WORK
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
1/4" = 1'-0"
BOILER ROOM FIRST FLOOR - NEW WORK
0 2' 4' 8' 12'
1/4" = 1'-0"
N
CODED NOTES:
DRAWING NOTES:
1. ALL WORK SHALL BE COORDINATED AND PHASED SO THE BOILER PLANT REMAINS OPERATIONAL AT ALL TIMES. ONLY ONE BOILER SHALL BE TAKEN OUT OF SERVICE AT A TIME. BALANCE OF PLANT SYSTEMS SHALL BE TEMPORARILY BYPASSED TO MAINTAIN THE BOILERS OPERATIONAL. REFER TO
M-003 FOR PHASING PLAN.
2. AIR-SIDE EQUIPMENT AND DUCTWORK SHOWN AS HALFTONE FOR REFERENCE.
3. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR
LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS.
EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND
STRAINERS, TRANSMITTERS, CONTROL DEVICES. PRIOR TO COMMENCING INSTALLATION WORK,
REFER CONFLICTS BETWEEN THIS REQUIREMENT AND CONTRACT DOCUMENTS TO THE COR FOR
RESOLUTION. FAILURE OF THE CONTRACTOR TO RESOLVE, OR POINT OUT ANY ISSUES WILL RESULT
IN THE CONTRACTOR CORRECTING AT NO ADDITIONAL COST OR TIME TO THE GOVERNMENT.
N.T.S.
EXISTING SIEMENS APOGEE BUILDING MANAGEMENT SYSTEM PANEL
EXISTING SIEMENS APOGEE BUILDING MANAGEMENT SYSTEM PANEL 60 FOR BOILER I/O CONNECTION TO
EXISTING BUILDING MANAGEMENT SYSTEM.
EXISTING SIEMENS APOGEE BUILDING MANAGEMENT SYSTEM ACCESS TERMINAL. THIS SYSTEM IS CURRENTLY BEING UPGRADED UNDER A SEPARATE PROJECT. COORDINATE WITH SIEMENS BUILDING
SYSTEMS FOR WORK. WORK INCLUDES PROGRAMMING, GRAPHICS, AND OTHER MONITORING AND
CONTROL TASKS RELATED TO SUPERVISORY OF THE BOILER CONTROL PANELS AND DEVICES. REFER TO
SPECIFICATION FOR ADDITIONAL DETAILS AND REQUIREMENTS.
REPLACE EXISTING FLAME SAFEGUARD SYSTEM (FIREYE NEXUS) WITH NEW CONTROLLER. EXISTING ENCLOSURE SHALL REMAIN. ALL COMBUSTION CONTROLS AND DEVICES SHALL BE EXISTING TO REMAIN.
INSTALL PANEL FACE PLATE SIZED TO COVER EXISTING HOLE AND TO ACCOMMODATE NEW FLAME SAFEGUARD DISPLAY. RECONNECT ALL FLAME SAFEGUARD DEVICES TO NEW CONTROLLER, TEST, AND
ADJUST.
EX. INCOMING POWER ENCLOSURE. REPLACE EXISTING CURRENT RELAYS WITH SPLIT-CORE, HINGED, CLAMP-ON STYLE CURRENT RELAYS. RECONNECT RELAY CIRCUITS TO BURNER CONTROLS, TEST, AND
ADJUST.
PROVIDE NEW VORTEX FLOW METER IN PLACE OF ORIFICE PLATE FLOW METER.
PAD MOUNTED BALANCE OF PLANT (BOP) PANEL. REFER TO DRAWING MI-801 FOR PANEL LAYOUT
REQUIREMENTS.
REPLACE PRESSURE GAUGE CONNECTION BETWEEN LVROPS AND ISOLATION VALVE WITH NEW SP
GAUGE.
INSTALL COMBUSTION AIR PRESSURE SWITCH (CAPS) TAPS AND TEST PORTS.
NEW FUEL AND STEAM FLOW METERS (DEDUCT ALTERNATE 3 AND 4 RESPECTIVELY).
PROVIDE GATE VALVE IN DEAERATOR OVERFLOW LINE IN PLACE OF ISOLATION TRAP. REFER TO VIEW 1 /
M-301 FOR SECTION VIEW.
PROVIDE STEAM TRAP AT 2" HPS RISE. REFER TO P&ID / MI-702 FOR ADDITIONAL INFORMATION. DRIP LEG
SHALL BE ROUTED TO NEAREST DRAIN.
EXTEND EXISTING STEAM HEADER CONNECTION UP AND TAP OFF WITH NEW 2" HPS. PROVIDE TWO GATE
VALVES IN SERIES AT CONNECTIONS. SEE P&ID / MI-702 FOR ADDITIONAL INFORMATION.
PROVIDE NEW STEAM HEADER PRESSURE TRANSMITTER AND LOW PRESSURE SWITCH. REFER TO
DRAWING MI-801 FOR BOP PANEL CONNECTION REQUIREMENTS AND TRANSMITTER AND SWITCH
INFORMATION.
EXISTING NG VENTS TO BE RELOCATED AT ROOF LEVEL. COORDINATE ROOF PENETRATION WITH MAU
LOCATION.
DEDUCTIVE ALTERNATE 2:
#2 OIL FLOW METER, SIZE 0.5 IN, TYPE: CORIOLIS MASS FLOW
BOILER FLOW RANGE: 26.15 - 209.22 GPH
METER FLOW RANGE 0 -1798 GPH
NOTE: METER MUST BE FIELD MOUNTED PER MANUFACTURER'S
INSTRUCTIONS.
NATURAL GAS METER, SIZE 4", TYPE: THERMAL MASS FLOW METER
NATURAL GAS SUPPLY PRESSURE: 5 PSIG
BOILER FLOW RANGE: 2929.1 - 29291 SCFH
FLOW RANGE 720.3 - 137439.205 SCFH
NOTE: METER MUST BE FIELD MOUNTED PER MANUFACTURER'S
INSTRUCTIONS
DEDUCTIVE ALTERNATE 1:
STEAM FLOW METER, SIZE 6", TYPE: VORTEX FLOW
STEAM OPERATING PRESSURE: 100 PSIG
BOILER FLOW RANGE: 2415 - 24150 LB/HR
METER FLOW RANGE 1926.7 - 65363.5 LB/HR
NOTE: METER MUST BE FIELD MOUNTED PER MANUFACTURER'S
INSTRUCTIONS.
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
8 ADDENDUM NO. 1 09.11.2023
M-301
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
EX DA-1
30x26 OA DN FROM MAU30x26 OA DN FROM MAU
30x26 OA DN FROM MAU
30x26 OA DN FROM MAU 1
M-301
SV-2
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
EX 36ø FE EX 42ø FE EX 45ø FE EX 51ø FE
EX 36ø FE EX 36ø FE
EX 36ø FE
EX 36ø FE
EX 2"ø FW
EX 2"ø FW
EX 3"ø HPS
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 2"ø FW
EX 3"ø HPS
EX 3"ø HPS
EX 3"ø HPS
EX 4"ø FW EX 4"ø FW
EX 2 1/2"ø FW
EX 3/4"ø CF
EX 1/2"ø
EX 6"ø LPS
M-301
EX 36ø FE DN
EX 36ø FE DN EX 36ø FE DN
EX 36ø FE DN
4"ø LPS
EX 8" LPS VTR
1-1/2" LPR DN
2"ø LPS UP
2"ø LPR UP 3/4"ø LPR
2"ø LPR UP 2"ø LPS UP
3/4"ø LPR 2"ø LPR UP 2"ø LPS UP
3/4"ø
2"ø LPR UP
2"ø LPS UP 3/4"ø
1"ø LPR 1"ø LPR DN
1"ø HPR
1" HPR UP
14 14 14
EX 4" SOFT WATER
EX 1" PUMPED CONDENSATE RECIRC.
EX 4" PUMPED CONDENSATE
EX 4" FW (DA OVERFLOW)
EX 1" NG (VENT)
EX 1/2" NG (VENT)
EX 2" NG (VENT)
ADDED KEYNOTE. ADDED
"NG" DESIGNATION TO
VENT TAGS. REROUTED
LPS & LPR DUE TO MAU
ROTATION ON ROOF
LEVEL. RESIZED OA DUCT
AND UPDATED TAG. EX 1" NG (VENT) UP
EX 1/2" NG (VENT) UP
EX 2" NG (VENT) UP
EX 1" NG (VENT) UP
EX 1/2" NG (VENT) UP
EX 2" NG (VENT) UP
EX 1" NG (VENT)
EX 1/2" NG (VENT)
EX 2" NG (VENT)
ADDED "NG"
DESIGNATION TO VENT
TAGS.
RESIZED OA DUCT AND
UPDATED TAG.
RESIZED OA DUCT AND
UPDATED TAG.
RESIZED OA DUCT AND
UPDATED TAG.
ADDED "NG"
DESIGNATION TO VENT
TAGS.
ADDED KEYNOTE. ADDED
"NG" DESIGNATION TO
VENT TAGS.
2" NG (VENT) UP
1/2" NG (VENT) UP
1" NG (VENT) UP
2" NG (VENT) UP
1/2" NG (VENT) UP
1" NG (VENT) UP
KEY PLAN - UPPER LEVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:1
:5
P
M
M-102
MECHANICAL MEZZANINE LEVEL
FLOOR PLAN - NEW WORK
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
1/4" = 1'-0"
BOILER ROOM MEZZANINE - NEW WORK
CODED NOTES:
DRAWING NOTES:
1. -
CODED NOTES:
DRAWING NOTES:
1. ALL WORK SHALL BE COORDINATED AND PHASED SO THE BOILER PLANT REMAINS OPERATIONAL AT ALL TIMES. ONLY ONE BOILER SHALL BE TAKEN OUT OF SERVICE AT A TIME. BALANCE OF PLANT SYSTEMS SHALL BE TEMPORARILY BYPASSED TO MAINTAIN THE BOILERS OPERATIONAL. REFER TO
M-003 FOR PHASING PLAN.
42"x42" ALUMINUM DRUM DIFFUSER RUSKIN MODEL 575 OR EQUAL. PROVIDE WITH HANGING SUPPORTS, WHITE FINISH, AND 30"x26" INLET DUCT CAP. SET HORIZONTAL GRILLES FIXED TO 22°.
RELOCATE LOW WATER ALARM ON DA TANK PER DIAGRAM 7 / M-501 AND P&ID / MI-701.
PROVIDE NEW BUTTERFLY OVERFLOW CONTROL VALVE. PROVIDE NEW WELD NECK FLANGE PLAN LEFT OF VALVE AND CONNECT VALVE TO EXISTING WELD NECK FLANGE PLAN RIGHT OF VALVE. REFER TO
VIEW 2 / M-301 FOR SECTION VIEW.
REFER TO P&ID / MI-703 FOR ECONOMIZER FEEDWATER MODIFICATIONS.
4" LPS MAIN LOCATED DIRECTLY ADJACENT TO THE BOILER CATWALK AND LEVEL WITHIN ARMS REACH
OF CATWALK TO ALLOW FOR ACCESS TO BRANCH PIPING VALVES.
2"ø HPS UP OVER MEZZANINE GUARD RAIL AND TO 90# / 5# PRESSURE REDUCING STATION. REFER TO
VIEW 5 / M-301 AND P&ID / MI-702 FOR ADDITIONAL INFORMATION.
3/4" DRAIN FROM PRESSURE REDUCING STATION SAFETY RELIEF VALVE, SV-1, AND ROUTED DOWN WALL
TO EXISTING FLOOR DRAIN.
PROVIDE NEW SAFETY RELIEF VALVE, SV-2, AND GATE VALVE DOWNSTREAM OF SV-2. SV-2 8"ø V UP
THROUGH ROOF. REFER TO VIEW 1 / M-301 FOR ADDITIONAL INFORMATION.
PROVIDE STEAM TRAP AT END OF 4"ø LPR RUN. REFER TO P&ID / MI-702 FOR ADDITIONAL INFORMATION.
DRIP LEG SHALL BE ROUTED TO NEAREST DRAIN.
1"ø LPR FROM STEAM TRAP MENTIONED IN CODED NOTE 9 TO TIE INTO 1"ø LPR DOWN.
1"ø LPR DN FROM PRESSURE REDUCING STATION STEAM TRAP.
1"ø HPR UP FROM PRESSURE REDUCING STATION STEAM TRAP
2"ø HPR DN TO EX DEAERATOR 3"ø HPR CONNECTION.
PROVIDE NEW DRAFT DAMPER. REFER TO CODED NOTE 4 / MD-102 FOR ADDITIONAL INFORMATION.
EXISTING NG VENTS TO BE RELOCATED AT ROOF LEVEL. COORDINATE ROOF PENETRATION WITH MAU
LOCATION.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
8 ADDENDUM NO. 1 09.11.2023
8UPDATED INLET CAP SIZE
G.2
G.3G.4 G.5 G.6 G.7G.8G.9
AH-1053
AH-1052
AH-1054 AH-1055
EX EF
EX
ROOF
HATCH 8"ø VTR
1"ø NG (VENT)
1/2"ø NG (VENT)
2"ø NG (VENT)
EX 1"ø NG (VENT)
EX 1/2"ø NG (VENT)
EX 2"ø NG (VENT)
EX 1"ø NG (VENT)
EX 1/2"ø NG (VENT)
EX 2"ø NG (VENT)
1"ø NG (VENT)
1/2"ø NG (VENT)
2"ø NG (VENT)
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
6"ø VTR
2"ø VTR
2"ø VTR
M-301
REROUTED LPS & LPR.
ROTATED MAU (AH-1052).
ADDED KEYNOTE. ADDED
"NG" DESIGNATION TO
VENT TAGS. RELOCATED
VENTS.
ADDED "NG"
DESIGNATION TO VENT
TAGS.
ADDED "NG"
DESIGNATION TO VENT
TAGS.
ADDED KEYNOTE. ADDED
"NG" DESIGNATION TO
VENT TAGS. RELOCATED
VENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:1
:5
P
M
M-103
MECHANICAL ROOF PLAN - NEW
WORK
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
1/4" = 1'-0"1
BOILER ROOM ROOF PLAN - NEW WORK
CODED NOTES:
PROVIDE NEW MAKEUP AIR UNIT AND INSULATED ROOF IN SAME LOCATION AS EXISTING ROOF
PENETRATION. STEAM PIPING UP THROUGH BASE OF UNIT.
26x30 OA DN TO DRUM DIFFUSER. TRANSITION DUCT WITHIN ROOF CURB. SEE SHEET M-102 FOR
CONTINUATION.
EX 18"ø HPS FROM SILENCE UP THROUGH ROOF.
EXTEND GAS TRAIN VENT TO BE 10'-0" ABOVE MAKEUP AIR UNITS.
ENLARGE EXISTING ROOF OPENING FOR NEW 6" STEAM VENTS. SEE DETAIL 4 / M-501.
EXISTING NG VENTS TO BE RELOCATED AT ROOF LEVEL. COORDINATE ROOF PENETRATION WITH
MAU LOCATION.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
DRAWING NOTES:
1. REFER TO M-003 FOR PHASING PLAN.
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
8 ADDENDUM NO. 1 09.11.2023
8UPDATED DUCT SIZE
TRANSMITTER
OUTSIDE
WALL
FLOOR 8"
30°
TYPE A BLOWDOWN
FOR WATER ABOVE 350° AND STEAM ABOVE 200 PSIG
NOT TO BE USED IF BLOWDOWN OUTLET IS LESS THAN
TWENTY FEET FROM AN AREA OF PERSONNEL ACCESS
(GROUND, PLATFORM, WALKWAY, ETC.)
TRANSMITTER
FLOOR
6"
TYPE B BLOWDOWN
FOR WATER BELOW 350° AND STEAM BELOW 200 PSIG
SLOPE
NOTES:
1. BLOWDOWN PIPE OF TUBE
SPECIFICATION WILL BE SAME AS
THAT OF THE IMPULSE LINES.
TRANSMITTER
TYPE C BLOWDOWN
FOR INSTALLATIONS NOT COVERED BY TYPE A OR TYPE B
45° 6"
SIDE VIEW
DRILL 1/8" HOLE AT
LOWEST POINT FOR
DRAINAGE
U-DRAIN OR
FUNNEL DRAIN
2" SCH.
80 PIPE
2-1/2" PIPE CAP
(SEE NOTE 1) (TYP.)
SINGLE PEDESTAL
(SEE
NOTE 5) 2" PIPE CAP
(SEE NOTE 1)
(TYP.)
2" SCH. 80 PIPE
3" SCH.
40 PIPE
WELD ALL
AROUND (TYP.)
1'-0" MIN.
SCHEDULE 80 PIPG
(SIZED AS REQUIRED)
SEE NOTE 2
COLUMN OR WALL
MOUNTED
4"
"A"
4"
"A"
6"x6"x3/8" THICK
STEEL PLATE
W/ FOUR 1/2"
DIA. HOLES
3"x3"x1/4"
ANGLE
STEEL PLATE
(SEE NOTE 4)
3" PIPE CAP
(SEE NOTE 1)
(TYP.)
DUAL PEDESTAL
(SEE NOTE 5)
4' -6
(S
E E
N O
T E
4' -6
(S
E E
N O
T E
NOTES:
1. ALL OPEN ENDS OF PIPE TO BE CLOSED WITH A PIPE CAP OR PLATE.
2. USE 3/8" x 2-3/4" HILTI KWIK BOLTS TO ATTACH PLATE TO CONCRETE WALL. WHEN SUPPORTING FROM STEEL COLUMN, OMIT PLATE AND BOLTS AND WELD TO COLUMN.
3. HEIGHT OF VERTICAL SUPPORTS TO BE AS REQUIRED TO PLACE THE CENTERLINE OF THE INSTRUMENT 4'-6".ABOVE GRADE
OR PLATFORM. CENTERLINE OF THE INSTRUMENT TO BE DEFINED AS THE CENTERLINE OF THE INDICATING INSTRUMENTS
DISPLAY OR THE CENTERLINE OF THE INSTRUMENTS BODY IF IT IS NON-INDICATING.
4. FIELD TO SIZE PLATE AS REQUIRED FOR SUPPORT OF INSTRUMENT NOT FURNISHED WITH MOUNTING YOKE.
5. 1'-3" C TO C FOR SMALL CASE INSTRUMENTS AND 1'-8" C TO C FOR LARGE CASE INSTRUMENTS.
SECTION "A-A" LOCAL SURFACE
MOUNTING
MULTIPLE
PEDESTAL
(SEE
NOTE 5)
2" PIPE CAP
(SEE NOTE 1)
(TYP.)
WELD ALL
AROUND (TYP.) 4'
-6
(S E
E N
O T
E
WELD ALL
AROUND (TYP.)
2" PIPE CAP
(SEE NOTE 1)
(TYP.)
2" SCH.
80 PIPE
3" PIPE CAP
(SEE NOTE 1)
(TYP.)
3" SCH.
40 PIPE
TOE KICK
GRATING
PLATFORM
BRACKET
2"x2"x1/4" THICK ANGLE
WELDED TO PLATFORM
DECKING AND TO
INSTRUMENT PEDESTAL
HANDRAIL POST
TACK WELD (TYP.)
ELEVATION
PLATFORM
PLAN
3"x4"x3/8" THK. 4" LONG
WELD TO PLATFORM BRACKET
SCHEDULE 40 PIPE
(SIZE AS REQUIRED)
1" MIN.GROUT
GRADE
(TYP.)
LEVELING
NUT (TYP.)
HILTI KWIK BOLT
1/2"x5-1/2" (TYP.)
CONCRETE AND
PAVED GRADE
7"
7"
PLATE DETAIL
1'-0"
ASPHALT AND
UNPAVED GRADE
2'-0"
9"x9"x1/2" THICK
STEEL PLATE W/
FOUR 5/8" DIA.
HOLES
STEAM SUPPLY
STEAM CONDENSATE RETURN
STEAM TRAP. SEE STEAM
TRAP ASSEMBLY DETAIL.
PRESSURE GAUGE
INCREASER IF REQUIRED
REDUCER IF REQUIRED
STRAINER
CONTROL VALVE
GATE VALVE
1/2" CHECK VALVE
VACUUM
BREAKER
PIPE HANGER
SHALL SUPPORT
PIPING
INDEPENDENT OF
COIL (TYP.)
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATOR UNITS, THE
RUNOUT PIPING FOR CONNECTIONS TO COIL SHALL BE INSTALLED WITH SWING JOINTS TO
ALLOW FOR THE VIBRATION.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR
USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF
FILTERS, VALVES, OR EQUIPMENT.
3. TRAP EACH COIL SEPARATELY WHEN INSTALLED IN A BANK OF TWO OR MORE HIGH. ALSO
PROVIDE SEPARATE VACUUM BREAKER FOR EACH COIL.
4. SUPPLY & RETURN PIPES ARE SHOWN FROM SAME END. STEAM COIL MAY HAVE SUPPLY &
RETURN PIPES FROM OPPOSITE ENDS.
STEAM SUPPLY AND
RETURN SHALL BE FULL
SIZE AT CONNECTIONS
NC
INVERT BUCKET TRAP
ASSEMBLY (TYP.)
ECCENTRIC REDUCER
IF REQUIRED (TYP.)
SEE NOTE 7
SEE NOTE 3
SEE NOTE 1
PILOT CONTROL LINE
(TYP.)
ECCENTRIC REDUCER
(TYP.) IF REQUIRED
5xD1 MIN.
(TYP.)
V
VENT TO
ATMOSPHERE
NO
10xD2 MIN.
FROM ANY FITTING (TYP.)
SIPHON (TYP.)
SEE NOTE 6
NOTES:
1. SEE P&ID / M-702 FOR PIPE SIZES.
2. SEE EQUIPMENT SCHEDULES FOR VALVE DATA. INSTALL VALVES AS RECOMMENDED BY
MANUFACTURER.
3. BYPASS WILL BE SIZED TO MEET THE CAPACITY OF THE COMBINED CAPACITIES OF THE TWO PRV'S.
4. PROVIDE NECESSARY UNION FOR THE REMOVAL OF VALVE WITH THREADED CONNECTIONS.
5. SLOPE PILOT CONTROL LINE FROM THE PRESSURE REDUCING VALVE TO DOWNSTREAM STEAM
PIPING. MIN. SLOPE WILL BE 1"/12".
6. PROVIDE MINIMUM 5 PIPE DIAMETERS STRAIGHT PIPE UPSTREAM AND MINIMUM 10 PIPE DIAMETERS
STRAIGHT PIPE DOWNSTREAM OF ALL PRV'S.
7. ALL UPSTREAM REDUCERS WILL BE ECCENTRIC IF REQUIRED.
OUTSIDE AIRHOOD
PREFAB CURB BY EQUIP. MFR.
STRUCTURAL FRAMING (SEE
DETAIL 8 ON M-502)
REUSE EXISTING ROOF PENETRATION
AND PACK OPENING WITH FIBERGLASS
INSULATION (TYP.)
30x26 SA
J-BOX
CONDUIT & WIRE BY
DIV. 26
CONDUIT AND
WIRE
ROOF DECK CONTINUOUS
EXCEPT AT PENETRATIONS
24" MIN.
EX ROOF INSULATION
EX ROOF
MAKEUP
AIR UNIT
ELECTRICAL
DISCONNECT AND
SERVICE RECEPTACLE
FLEXIBLE DUCT
CONNECTION &
DUCT TRANSITION
SD
DUCT SMOKE
DETECTOR
STEAM PIPING UP
THROUGH BASE TO UNIT
CONNECTIONS
42"x42" ALUMINUM DRUM DIFFUSER TO BE
MOUNTED AT 25'-0" AFF.
GASKET MATERIAL
HVAC EQUIPMENT
MECHANICAL CONTRACTOR SHALL
INSTALL HVAC UNIT AND
ASSOCIATED ROOF CURB PER
MANUFACTURERS WRITTEN
INSTRUCTIONS AND LOCAL
BUILDING CODE
FLASHING MEMBRANE
(8" MINIMUM HEIGHT)
WOOD NAILER
GASKETED
FASTENERS
REMOVABLE SHEET METAL
COUNTERFLASHING
EX ROOF MEMBRANE
EX THERMAL INSULATION
EX ROOF DECK
4"x4"x1/4" ANGLE FRAME
3/16"
TYP.
3/16" 1" MIN.
FIELD WELD AS NEEDED
TYP.
ROOF BEAM OR JOIST,
REFER TO PLAN
3"x5"x1/4" PLATE, TYP.
3/16"
FIELD WELD AS NEEDED
TYP.
METAL ROOF DECK
SECTION
ROOF BEAM OR JOIST
ROOF BEAM OR JOIST
4"x4"x1/4"
ANGLE, TYP.
PLAN
MECHANICAL EQUIPMENT CURB, BOLT
TO STRUCTURE PER MANUFACTUER'S
REQUIREMENTS
NOTE:
AT JOISTS, WHERE THE LOAD DOES NOT OCCUR WITHIN 6" OF
PANEL POINT REINFORCE JOIST WITH STRUT ANGLES, REFER
TO TYPICAL DETAIL.
ROOF TOP
UNIT
PROVIDE WOOD BLOCKING OR
LIGHT WEIGHT GROUT IN DECK
FLUTES UNDER CURB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V
A D e tr o it B o ile r C o n tr o l R e p l.
R
M E
.r v t
/1
/2
:1
:5
P
M
M-502
MECHANICAL DETAILS &
DIAGRAMS
REPLACE BOILER CONTROL
SYSTEMS
DETROIT, MICHIGAN
553-19-103
04/17/2023 GSC ZC
BID DOCUMENTS
N.T.S.
BLOWDOWN PIPING FOR PRESSURE AND DIFFERENTIAL PRESSURE
INSTRUMENTS DETAIL
N.T.S.
INSTALLATION DETAILS 1
N.T.S.
INSTALLATION DETAILS 2
N.T.S.
STEAM COIL DETAIL
N.T.S.
STEAM PRESSURE REDUCING STATION DIAGRAM
N.T.S.
ROOFTOP MAKEUP AIR UNIT INSTALLATION DETAIL
N.T.S.
RTU INSTALLATION
Revisions Date
1 SCHEMATIC DESIGN 05.15.2020
2 65% DESIGN DEVELOPMENT 08.21.2020
3 95% CONSTRUCTION DOCUMENTS 12.11.2020
4 100% CONSTRUCTION DOCUMENTS 02.19.2021
5 100% CONSTRUCTION DOCUMENTS-REVISED 12.10.2021
6 100% CONSTRUCTION DOCUMENTS-REVISION 2 03.03.2023
7 BID DOCUMENTS 04.17.2023
8 ADDENDUM NO. 1 09.11.2023
1" = 1'-0"
ROOF OPENING FRAME DETAIL
ADDED ADDITIONAL
DETAILS
8ADDED DETAIL