This addendum modifies drawings and details for a project to replace boiler control systems at Building No. 103 of the Central Utility Plant at the Veterans Affairs Medical Center in Detroit, Michigan. The modifications include adding and revising details to coordinate natural gas vent relocations, duct design and roof curb information on various mechanical floor plans and roof plans, as well as adding a roof opening frame detail. The related federal contract opportunity is a solicitation to provide the replacement of the boiler control system under project number 553-19-103, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE BOILER CONTROL SYSTEMS BUILDING NO. 103

CENTRAL UTILITY PLANT PROJECT NO. 553-19-103

VAMC DETROIT, MI

Above Group, Inc. Page 1 of 1

ADDENDUM NO. 1

to the

CONSTRUCTION DOCUMENTS

April 17, 2023

General

The following changes, additions or deletions shall be made to the following Contract Documents. All other conditions shall remain the same.

I. SPECIFICATIONS

A. No Modifications

II. LIST OF ADDED DRAWINGS

A. No Drawings Added

III. DRAWINGS

A. MD-101 “MECHANICAL FIRST FLOOR PLAN - DEMOLITION”: ADDED Keynote

17 related to NG vent relocation scope. REVISED NG vent designation on piping annotation, typical four locations.

B. MD-102 “MECHANICAL MEZZANINE LEVEL FLOOR PLAN - DEMOLITION”:

ADDED Keynote 5 related to NG vent relocation scope. REVISED NG vent designation on piping annotation, typical four locations.

C. MD-103 “MECHANICAL ROOF PLAN - DEMOLITION”: ADDED Keynote 3 related to NG vent relocation scope. REVISED NG vent designation on piping annotation, typical four locations.

D. M-101 “MECHANICAL FIRST FLOOR PLAN – NEW WORK”: ADDED Keynote 14 related to NG vent relocation scope. REVISED NG vent designation on piping annotation, typical four locations.

E. M-102 “MECHANICAL MEZZANINE LEVEL FLOOR PLAN – NEW WORK”:

ADDED Keynote 15 related to NG vent relocation scope. REVISED NG vent designation on piping annotation, typical four locations. REVISED inlet duct size and notation, typical four locations. REVISED Keynote 1 with duct size and notations.

F. MD-103 “MECHANICAL ROOF PLAN – NEW WORK”: ADDED Keynote 6 related to NG vent relocation scope. REVISED NG vent designation on piping annotation, typical four locations. REVISED inlet duct size and notation, typical four locations.

REVISED Keynote 1 with duct size and notations. MODIFIED orientation of AH-1052 to avoid roof drains. ADDED relocations of NG Vents adjacent to AH-1052 and AH-

1055 so they were not in path of new roof curb.

G. M-502 “MECHANICAL DETAILS & DIGRAMS”: REVISED Detail 6 “ROOFTOP

MAKE-UP AIR UNIT INSTALLATION DETAIL” with duct design and roof curb coordination information. ADDED Detail 8 “ROOF OPENING FRAME DETAIL” which includes response to RFI-01.

END OF ADDENDUM