Drawing - Mechanical PartB.pdf
PDF 20 MB Posted
- Attached to
- R-410A LEAK DETECTORS (Bldgs 750, 751 & 768)
- Solicitation number
- FA446027Q0006
About this file
These are mechanical engineering drawings for HVAC and piping systems prepared by the US Army Corps of Engineers. The document set includes seven sheets (M-121 through M-213) depicting first, second, and third floor plans for mechanical HVAC and piping installations across multiple building areas (A, B, C, and D).
The drawings contain detailed mechanical specifications including ductwork layouts, fan coil unit (FCU) locations, refrigerant piping configurations, condensate drain lines, and equipment connections. Key mechanical systems shown include HVAC first, second, and third floor plans for Areas C and D, mechanical piping plans for first, second, and third floors across Areas A and B, with keynote legends and general notes addressing ductwork standards per SMACNA, manual balance dampers, thermostat controls, ductwork transitions, and condensate drainage requirements. The sheets are marked with field annotations and include references to refrigerant piping sizes and specifications. All drawings are prepared for the US Army Corps of Engineers and are not construction documents but rather design/planning documents subject to field coordination with other building disciplines.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .