About this file
This is a set of electrical construction drawings for an Airmen Dormitory project at Little Rock Air Force Base prepared by Solutions AEC for the US Army Corps of Engineers.
The drawings depict electrical power plans for multiple residential units and common areas within the facility. The unit types include 3-bedroom, 4-bedroom, and 5-bedroom dormitory configurations, each with dedicated electrical panelboards (LC12, LC22, and LC10 respectively) rated at 125 amperes, 120/208 volts, single-phase service. The 3-bedroom unit (Unit 126, Panelboard LC12) supports a total connected load of 12 kilovolt-amperes with estimated demand of 9 kilovolt-amperes and 87 amperes. The 4-bedroom unit (Unit 215, Panelboard LC22) has a total connected load of 14 kilovolt-amperes with estimated demand of 12 kilovolt-amperes and 115 amperes. The 5-bedroom unit (Unit 128, Panelboard LC10) maintains a total connected load of 18 kilovolt-amperes with estimated demand of 14 kilovolt-amperes and 132 amperes. Each unit includes kitchen receptacles, refrigerator/microwave circuits, bedroom receptacles, living room circuits, smoke detectors, range hoods, and electric ranges with AFCI and GFCI circuit protection as required. The common area power plans detail service for utility rooms including elevator power provisions, HVAC equipment, fire alarm systems, and emergency lighting infrastructure. All drawings reference interconnected controls and branch circuit requirements per relevant electrical codes.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R GFCI
AC
GFCI
AC
RN MRH
GFCI
AC
R /M
1D/1VR/M
1D/1V
D
/1 V
G F
C I
A C
G F
C I
A C
R /M
1D/1V
D
D D
BDRM 2
126-2
BDRM 1
126-1
BATH
126-1A
UNIT
BDRM 3
126-3
BATH
126-3A
11 11 9 1,3 75
LC12- 2,4
FCU 126-3
LC12- 2,4
BS-126
LC12- 2,4
FCU 126C
LC12- 2,4
FCU 126-2
LC12- 2,4
FCU 126-1
LC12
18 16
60" AFF
M a u re r In d u s tr ia l D ri ve
S u it e
S t.
L o u is
M
O
.9
.6
S o lu tio n s A
E C
L L C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
EP401
E L E
C T
R
IC
A L E
N L A
R G
E D
T Y
P
IC
A L U
N
IT
P O
W E
R P
L A
N
B
E D
L
IT
T L E
R O
C K
A
IR
F O
R C
E B
A S
E
L
IT
T L E
R O
C K
D
IS
T R
IC
T
S
W L
L
IT
T L E
R O
C K
A
IR
F O
R C
E B
A S
E A
R K
A N
S A
S
J M
S
J M
S
K M
K
J C
D
/2
/2
W S
R
W S
C
R E
C T
IF
IE
D S
E T
A
IR
M E
N D
O R
M
IT
O R
Y
1/4" = 1'-0"1
ELECTRICAL ENLARGED TYPICAL 3BED UNIT POWER PLAN
PLAN NORTH
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
* = AFCI CIRCUIT BREAKER ~ = GFCI CIRCUIT BREAKER
*~ = COMBINATION AFCI/GFCI CIRCUIT BREAKER
NOTES:
SPEC 9824 VA 40.00% 3930 VA
Receptacle 9780 VA 100.00% 9780 VA EST. DEMAND CURRENT: 72 A
Motor 125 VA 125.00% 156 VA CONNECTED CURRENT: 100 A
Lighting 717 VA 125.00% 897 VA ESTIMATED DEMAND: 15004 VA
HVAC 333 VA 100.00% 333 VA CONNECTED LOAD: 20697 VA
Fire Alarm 0 VA 0.00% 0 VA
LOAD CLASSIFICATION CONNECTED DEMAND ESTIMATED PANEL TOTALS
TOTAL AMPS: 108 A 87 A
TOTAL LOAD: 12 kVA 9 kVA
Spare 20 1 39 0 0 40 1 20 Spare
Spare 20 1 37 0 0 38 1 20 Spare Spare 20 1 35 0 0 36 1 20 Spare
Spare 20 1 33 0 0 34 1 20 Spare
Spare 20 1 31 0 0 32 1 20 Spare
Spare 20 1 29 0 0 30 1 20 Spare Spare 20 1 27 0 0 28 1 20 Spare
Spare 20 1 25 0 0 26 1 20 Spare
Spare 20 1 23 0 0 24 1 20 Spare
*BDRM 3 FRIDGE/MICRO RCPT 20 1 21 1944 0 22 1 20 Spare
*BDRM 2 FRIDGE/MICRO RCPT 20 1 19 1944 1331 20 1 20 *A/C UNIT - BDRM 3
*BDRM 1 FRIDGE/MICRO RCPT 20 1 17 1944 1331 18 1 20 *A/C UNIT - BDRM 2
*SMOKE DETECTORS 20 1 15 0 1331 16 1 20 *A/C UNIT - BDRM 1
*LIVING RM RCPT/LTG 20 1 13 1215 1263 14 1 20 *BDRM 3 RCPT/LTG
*~KITCHEN RCPT 20 1 11 360 1263 12 1 20 *BDRM 2 RCPT/LTG
*~RANGE HOOD 20 1 9 180 1083 10 1 20 *BDRM 1 RCPT/LTG
*~MICROWAVE 20 1 7 720 360 8 1 20 *BDRM 2/3 BATH RCPT
*~REFRIGERATOR 20 1 5 720 180 6 1 20 *BDRM 1 BATH RCPT
3 1560 229 4
ELECTRIC RANGE 30 2
1 1560 229 2
2 15 FCU/BS
LOAD DESCRIPTION BKR POLES CKT A B CKT POLES BKR LOAD DESCRIPTION
Supply From: MSB
Mains Rating: 125 A MLO SPECIAL:
Mounting: RECESSED NEMA1 A.I.C. RATING: 10,000 AMPS SYMMETRICAL
Location: UNIT 126 VOLTAGE: 120\208V 1Ø
PANELBOARD: LC12
ELECTRICAL POWER KEYED NOTES
A
S I
D
E C
A S
I
/5 /2
A S
I
/9 /2
1. PROVIDE 208V, 30A RECEPTACLE (NEMA 10-30R) FOR GFGI ELECTRIC
OVEN RANGE. NEMA 10-30P FOR ELECTRIC OVEN RANGE MUST BE
SPECIFIED.
2. PROVIDE 120V, 20A RECEPTACLE IN CABINET SPACE ABOVE RANGE FOR
RANGE HOOD POWER CHORD CONNECTION.
A. REFER TO E-001 FOR ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS,
NOTES, AND APPLICABLE CODES.
B. REFER TO E-002 FOR ELECTRICAL ONE-LINE DIAGRAM.
C. REFER TO E-003 FOR ELECTRICAL SITE PLAN.
D. REFER TO E-601 FOR ELECTRICAL EQUIPMENT SCHEDULES.
E. REFER TO E-602 AND E-603 FOR ELECTRICAL PANEL SCHEDULES.
F. REFER TO EP401 THRU EP403 FOR ENLARGED TYPICAL UNIT POWER
PLANS.
G. REFER TO EP404 THRU EP406 FOR ENLARGED COMMON AREA POWER
PLANS.
H. PROVIDE ARC-FAULT CIRCUIT-INTERRUPTER PROTECTION IN DORMITORY
UNITS PER NEC 210.12 (B) WHICH STATES ALL 120-VOLT, SINGLE-PHASE, 15-
AND 2O- AMPERE BRANCH CIRCUITS SUPPLYING OUTLETS AND DEVICES
INSTALLED IN DORMITORY UNIT BEDROOMS, LIVING ROOMS, HALLWAYS,
CLOSETS, BATHROOMS, AND SIMILAR ROOMS SHALL BE PROTECTED BY
ANY OF THE MEANS DESCRIBED IN 210.12(A)(1) THROUGH (6).
GENERAL NOTES
GFCI
GFCI
AC
RN MRHR
D
/1 V
1D/1V 1D/1V
D
/1 V
R/M
GFCI
AC
GFCI
AC
G F
C I
A C
G F
C I
A C
R /M
R /M
1D/1V
R/M
D
D
D
D
LC22
LC22- 2,4
FCU 215-4
LC22- 2,4
FCU 215-3
LC22- 2,4
FCU 215-2 LC22- 2,4
FCU 215-1
LC22- 2,4
FCU 215C
LC22- 2,4
BS-215
5 11 11 9 1,3 7
BDRM 4
215-4
UNIT
BDRM 1
215-1
BDRM 2
215-2
BDRM 3
215-3
BATH 1
215-1A
BATH 2
215-2A
BATH 3
215-3A
BATH 4
215-4A
60" AFF
M a u re r In d u s tr ia l D ri ve
S u it e
S t.
L o u is
M
O
.9
.6
S o lu tio n s A
E C
L L C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
EP402
E L E
C T
R
IC
A L E
N L A
R G
E D
T Y
P
IC
A L U
N
IT
P O
W E
R P
L A
N
B
E D
L
IT
T L E
R O
C K
A
IR
F O
R C
E B
A S
E
L
IT
T L E
R O
C K
D
IS
T R
IC
T
S
W L
L
IT
T L E
R O
C K
A
IR
F O
R C
E B
A S
E A
R K
A N
S A
S
J M
S
J M
S
K M
K
J C
D
/2
/2
W S
R
W S
C
R E
C T
IF
IE
D S
E T
A
IR
M E
N D
O R
M
IT
O R
Y
1/4" = 1'-0"1
ELECTRICAL ENLARGED TYPICAL 4BED UNIT POWER PLAN
PLAN NORTH
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
* = AFCI CIRCUIT BREAKER ~ = GFCI CIRCUIT BREAKER
*~ = COMBINATION AFCI/GFCI CIRCUIT BREAKER
NOTES:
SPEC 13099 VA 40.00% 5240 VA
Receptacle 11220 VA 94.56% 10610 VA EST. DEMAND CURRENT: 84 A
Motor 125 VA 125.00% 156 VA CONNECTED CURRENT: 123 A
Lighting 892 VA 125.00% 1115 VA ESTIMATED DEMAND: 17427 VA
HVAC 416 VA 100.00% 416 VA CONNECTED LOAD: 25652 VA
Fire Alarm 0 VA 0.00% 0 VA
LOAD CLASSIFICATION CONNECTED DEMAND ESTIMATED PANEL TOTALS
TOTAL AMPS: 129 A 115 A
TOTAL LOAD: 14 kVA 12 kVA
Spare 20 1 39 0 0 40 1 20 Spare
Spare 20 1 37 0 0 38 1 20 Spare Spare 20 1 35 0 0 36 1 20 Spare
Spare 20 1 33 0 0 34 1 20 Spare
Spare 20 1 31 0 0 32 1 20 Spare
Spare 20 1 29 0 0 30 1 20 Spare Spare 20 1 27 0 0 28 1 20 Spare
Spare 20 1 25 0 0 26 1 20 Spare
*BDRM 4 FRIDGE/MICRO RCPT 20 1 23 1944 1331 24 1 20 *A/C UNITS BDRM 4
*BDRM 3 FRIDGE/MICRO RCPT 20 1 21 1944 1331 22 1 20 *A/C UNITS BDRM 3
*BDRM 2 FRIDGE/MICRO RCPT 20 1 19 1944 1331 20 1 20 *A/C UNITS BDRM 2
*BDRM 1 FRIDGE/MICRO RCPT 20 1 17 1944 1331 18 1 20 *A/C UNITS BDRM 1
*SMOKE DETECTORS 20 1 15 0 1083 16 1 20 *BDRM 4 RCPT/LTG
*LIVING RM RCPT/LTG 20 1 13 1574 1263 14 1 20 *BDRM 3 RCPT/LTG
*~KITCHEN RCPT 20 1 11 360 1083 12 1 20 *BDRM 2 RCPT/LTG
*~RANGE HOOD 20 1 9 180 1246 10 1 20 *BDRM 1 RCPT/LTG
*~MICROWAVE 20 1 7 720 360 8 1 20 *BDRM 3/4 BATH RCPT
*~REFRIGERATOR 20 1 5 720 360 6 1 20 *BDRM 1/2 BATH RCPT
3 1560 270 4
ELECTRIC RANGE 30 2
1 1560 270 2
2 15 FCU/BS
LOAD DESCRIPTION BKR POLES CKT A B CKT POLES BKR LOAD DESCRIPTION
Supply From: MSB
Mains Rating: 125 A MLO SPECIAL:
Mounting: RECESSED NEMA1 A.I.C. RATING: 10,000 AMPS SYMMETRICAL
Location: UNIT 215 VOLTAGE: 120\208V 1Ø
PANELBOARD: LC22
A
S I
D
E C
A S
I
/5 /2
A S
I
/9 /2
ELECTRICAL POWER KEYED NOTES
1. PROVIDE 208V, 30A RECEPTACLE (NEMA 10-30R) FOR GFGI ELECTRIC
OVEN RANGE. NEMA 10-30P FOR ELECTRIC OVEN RANGE MUST BE
SPECIFIED.
2. PROVIDE 120V, 20A RECEPTACLE IN CABINET SPACE ABOVE RANGE FOR
RANGE HOOD POWER CHORD CONNECTION.
A. REFER TO E-001 FOR ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS,
NOTES, AND APPLICABLE CODES.
B. REFER TO E-002 FOR ELECTRICAL ONE-LINE DIAGRAM.
C. REFER TO E-003 FOR ELECTRICAL SITE PLAN.
D. REFER TO E-601 FOR ELECTRICAL EQUIPMENT SCHEDULES.
E. REFER TO E-602 AND E-603 FOR ELECTRICAL PANEL SCHEDULES.
F. REFER TO EP401 THRU EP403 FOR ENLARGED TYPICAL UNIT POWER
PLANS.
G. REFER TO EP404 THRU EP406 FOR ENLARGED COMMON AREA POWER
PLANS.
H. PROVIDE ARC-FAULT CIRCUIT-INTERRUPTER PROTECTION IN DORMITORY
UNITS PER NEC 210.12 (B) WHICH STATES ALL 120-VOLT, SINGLE-PHASE, 15-
AND 2O- AMPERE BRANCH CIRCUITS SUPPLYING OUTLETS AND DEVICES
INSTALLED IN DORMITORY UNIT BEDROOMS, LIVING ROOMS, HALLWAYS,
CLOSETS, BATHROOMS, AND SIMILAR ROOMS SHALL BE PROTECTED BY
ANY OF THE MEANS DESCRIBED IN 210.12(A)(1) THROUGH (6).
GENERAL NOTES
GFCI
R RH RNM
GFCI
AC
D
/1 V
1D/1V
GFCI
AC
G F
C I
A C 1D/1V
D
/1 V
1D/1V
G F
C I
A C
G F
C I
A C
R /M
R /M
R /M
R/M
R/M
1D/1V
D
D
D D
D
LC10- 2,4
FCU 128-3
LC10- 2,4
FCU 128-2
LC10- 2,4
FCU 128-5
LC10- 2,4
FCU 128-1
LC10- 2,4
FCU 128-4
LC10- 2,4
FCU 128C
LC10- 2,4
BS-128
BDRM 4
128-4
UNIT
BDRM 3
128-3
BDRM 2
128-2
BDRM 1
128-1
BDRM 5
128-5
BATH
128-4A
BATH
128-3A
BATH
128-2A
BATH
128-1A
5 9117 1,3
18 18
LC10
2 1
60" AFF
M a u re r In d u s tr ia l D ri ve
S u it e
S t.
L o u is
M
O
.9
.6
S o lu tio n s A
E C
L L C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
EP403
E L E
C T
R
IC
A L E
N L A
R G
E D
T Y
P
IC
A L U
N
IT
P O
W E
R P
L A
N
B
E D
L
IT
T L
E R
O C
K A
IR
F
O R
C E
B A
S E
L
IT
T L E
R O
C K
D
IS
T R
IC
T
S
W L
L
IT
T L E
R O
C K
A
IR
F O
R C
E B
A S
E A
R K
A N
S A
S
J M
S
J M
S
K M
K
J C
D
/2
/2
W
S
R
W
S
C
R E
C T
IF
IE
D S
E T
A
IR
M E
N D
O R
M
IT
O R
Y
1/4" = 1'-0"1
ELECTRICAL ENLARGED TYPICAL 5BED UNIT POWER PLAN
PLAN NORTH
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
* = AFCI CIRCUIT BREAKER ~ = GFCI CIRCUIT BREAKER
*~ = COMBINATION AFCI/GFCI CIRCUIT BREAKER
NOTES:
SPEC 16374 VA 40.00% 6550 VA
Receptacle 13200 VA 87.88% 11600 VA EST. DEMAND CURRENT: 97 A
Motor 125 VA 125.00% 156 VA CONNECTED CURRENT: 150 A
Lighting 1130 VA 125.00% 1413 VA ESTIMATED DEMAND: 20092 VA
HVAC 499 VA 100.00% 499 VA CONNECTED LOAD: 31214 VA
Fire Alarm 0 VA 0.00% 0 VA
LOAD CLASSIFICATION CONNECTED DEMAND ESTIMATED PANEL TOTALS
TOTAL AMPS: 164 A 132 A
TOTAL LOAD: 18 kVA 14 kVA
Spare 20 1 39 0 0 40 1 20 Spare
Spare 20 1 37 0 0 38 1 20 Spare Spare 20 1 35 0 0 36 1 20 Spare
Spare 20 1 33 0 0 34 1 20 Spare
Spare 20 1 31 0 0 32 1 20 Spare
Spare 20 1 29 0 0 30 1 20 Spare Spare 20 1 27 0 1331 28 1 20 *A/C UNIT - BDRM 5
*BDRM 5 FRIDGE/MICRO RCPT 20 1 25 1944 1331 26 1 20 *A/C UNIT - BDRM 4
*BDRM 4 FRIDGE/MICRO RCPT 20 1 23 1944 1331 24 1 20 *A/C UNIT - BDRM 3
*BDRM 3 FRIDGE/MICRO RCPT 20 1 21 1944 1331 22 1 20 *A/C UNIT - BDRM 2
*BDRM 2 FRIDGE/MICRO RCPT 20 1 19 1944 1331 20 1 20 *A/C UNIT - BDRM 1
*BDRM 1 FRIDGE/MICRO RCPT 20 1 17 1944 1442 18 1 20 *BDRM 5 RCPT/LTG
*SMOKE DETECTORS 20 1 15 0 1263 16 1 20 *BDRM 4 RCPT/LTG
*LIVING RM RCPT/LTG 20 1 13 1607 1442 14 1 20 *BDRM 3 RCPT/LTG
*~KITCHEN RCPT 20 1 11 180 1263 12 1 20 *BDRM 2 RCPT/LTG
*~RANGE HOOD 20 1 9 180 1442 10 1 20 *BDRM 1 RCPT/LTG
*~MICROWAVE 20 1 7 720 540 8 1 20 *BDRM 3/4/5 BATH RCPT
*~REFRIGERATOR 20 1 5 720 360 6 1 20 *BDRM 1/2 BATH RCPT
3 1560 312 4
ELECTRIC RANGE 30 2
1 1560 312 2
2 15 FCU/BS
LOAD DESCRIPTION BKR POLES CKT A B CKT POLES BKR LOAD DESCRIPTION
Supply From: MSB
Mains Rating: 125 A MLO SPECIAL:
Mounting: RECESSED NEMA1 A.I.C. RATING: 10,000 AMPS SYMMETRICAL
Location: UNIT 128 VOLTAGE: 120\208V 1Ø
PANELBOARD: LC10
A
S I
D
E C
A S
I
/5 /2
A S
I
/9 /2
ELECTRICAL POWER KEYED NOTES
1. PROVIDE 208V, 30A RECEPTACLE (NEMA 10-30R) FOR GFGI ELECTRIC
OVEN RANGE. NEMA 10-30P FOR ELECTRIC OVEN RANGE MUST BE
SPECIFIED.
2. PROVIDE 120V, 20A RECEPTACLE IN CABINET SPACE ABOVE RANGE FOR
RANGE HOOD POWER CHORD CONNECTION.
A. REFER TO E-001 FOR ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS,
NOTES, AND APPLICABLE CODES.
B. REFER TO E-002 FOR ELECTRICAL ONE-LINE DIAGRAM.
C. REFER TO E-003 FOR ELECTRICAL SITE PLAN.
D. REFER TO E-601 FOR ELECTRICAL EQUIPMENT SCHEDULES.
E. REFER TO E-602 AND E-603 FOR ELECTRICAL PANEL SCHEDULES.
F. REFER TO EP401 THRU EP403 FOR ENLARGED TYPICAL UNIT POWER
PLANS.
G. REFER TO EP404 THRU EP406 FOR ENLARGED COMMON AREA POWER
PLANS.
H. PROVIDE ARC-FAULT CIRCUIT-INTERRUPTER PROTECTION IN DORMITORY
UNITS PER NEC 210.12 (B) WHICH STATES ALL 120-VOLT, SINGLE-PHASE, 15-
AND 2O- AMPERE BRANCH CIRCUITS SUPPLYING OUTLETS AND DEVICES
INSTALLED IN DORMITORY UNIT BEDROOMS, LIVING ROOMS, HALLWAYS,
CLOSETS, BATHROOMS, AND SIMILAR ROOMS SHALL BE PROTECTED BY
ANY OF THE MEANS DESCRIBED IN 210.12(A)(1) THROUGH (6).
GENERAL NOTES
G F
C I
W P
G F
C I
W P
GFCI
D D
G F
C I
W P
GFCI
WP
DDC
GFCI
WP
J
D
J
F G H
MECH/ RISER
121-3
JAN
ELEV
COMM
121-2
ELEC
CP1N MP1N
H P
N
TGMB
SEGB
M S
B -N
ELEV-N
1 2
CP1N- 1
CP1N- 2
C P
N
C P
N
HP1N- 18
CP-1
HP1N- 20
HP1N- 21
HP1N- 27
HP1N- 16
MSB-N- 22
MP1N- 24,26
HP1N- 23
H P
N
H P
N
2 7
800A MAIN SERVICE
DISCONNECT SWITCH
800A CT CABINET
METER
UTILITY XFMR.
BY ENTERGY.
1' - 6"
(3)4"C
(4)4"C IN DUCTBANK TO
SOUTH BUIDLING MAIN
SERVICE DISCONNECT
SWITCH
(2) 4"C (PRIMARY) SEE SITE
PLAN FOR CONTINUATION.
P
S
F G H
MECH/ RISER
121-3
JAN
ELEV
COMM
121-2
ELEC
CP1N MP1N
HP1N
MSB-N
DWH-1ADWH-1B
MP1N- 19,21
DSOU-1
MP1N- 19,21
DSIU-1
CP-1
MP1N- 20,22
FCU 121-3
MP1N- 20,22
BS-120
DDC
MP1N- 30
EF-1
MP1N- 20,22
FCU 120
MP1N- 29 MP1N- 27
MP1N- 19,21
MP1N- 24,26
MP1N- 20,22
MP1N- 23,25
DSOU-3
MP1N- 23,25
M a u re r In d u s tr ia l D ri v e
S u it e
S t.
L o u is
M
O
.9
.6
S o lu ti o n s A
E C
L L C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
EP404
E L E
C T
R
IC
A L E
N L A
R G
E D
N O
R T
H B
L D
G
C O
M M
O N
A R
E A
P O
W E
R P
L A
N S
L
IT
T L E
R O
C K
A
IR
F O
R C
E B
A S
E
L
IT
T L E
R O
C K
D
IS
T R
IC
T
S
W L
L
IT
T L E
R O
C K
A
IR
F O
R C
E B
A S
E A
R K
A N
S A
S
J M
S
J M
S
K M
K
J C
D
/2
/2
W S
R
W S
C
R E
C T
IF
IE
D S
E T
A
IR
M E
N D
O R
M
IT
O R
Y
1/4" = 1'-0"1
ELECTRICAL ENLARGED POWER PLAN - NORTH BLDG UTILITY ROOMS
PLAN NORTH
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
ELECTRICAL POWER KEYED NOTES
1.
2.
3.
4.
5.
6.
7.
PROVIDE NEW NEMA 1, 208V, 3 PHASE COOPER BUSSMAN POWER
MODULE SWITCH FOR ELEVATOR CONNECTION. SWITCH SHALL BE RATED
FOR A 10HP ELEVATOR MOTOR. PROVIDE WITH SHUNT TRIP FEATURES,
CONTROL POWER TRANSFORMER WITH FUSES AND BLOCKS, FIRE
SAFETY INTERFACE RELAY, PILOT LIGHT "ON" AND MECHANICALLY
INTERLOCKED AUXILIARY CONTACT. CONFIRM EXACT CONTROL AND
FUSING REQUIREMENTS WITH ELEVATOR PROVIDER.
PROVIDE (1) 20A BRANCH CIRCUIT FOR CONNECTION OF ELEVATOR CAB
LIGHTS AND CONTROLS.
PROVIDE ADDITIONAL 208V, 3 PHASE DISCONNECT AND WP GFCI
RECEPTACLE AT TOP OF HOISTWAY NEAREST TO ELEVATOR
CONTROLLER.
PROVIDE WIRING TO DUCTLESS SPLIT INDOOR UNIT AT TOP OF ELEVATOR
SHAFT.
PROVIDE SINGLE-PLEX RECEPTACLE AND DEDICATED GFCI CIRCUIT FOR
ELEVATOR SUMP PUMP.
PROVIDE POWER FOR FIRE ALARM MASS NOTIFICATION SYSTEM
CONTROL PANEL.
PROVIDE POWER FOR FIRE ALARM MASS NOTIFICATION SYSTEM RADIO
TRANSCEIVER.
1/4" = 1'-0"2
ELECTRICAL ENLARGED HVAC POWER PLAN - NORTH BLDG UTILITY ROOMS
PLAN NORTH
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
GENERAL NOTES
A. REFER TO E-001 FOR ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS,
NOTES, AND APPLICABLE CODES.
B. REFER TO E-002 FOR ELECTRICAL ONE-LINE DIAGRAM.
C. REFER TO E-003 FOR ELECTRICAL SITE PLAN.
D. REFER TO E-601 FOR ELECTRICAL EQUIPMENT SCHEDULES.
E. REFER TO E-602 AND E-603 FOR ELECTRICAL PANEL SCHEDULES.
F. REFER TO EP401 THRU EP403 FOR ENLARGED TYPICAL UNIT POWER
PLANS.
G. REFER TO EP404 THRU EP406 FOR ENLARGED COMMON AREA POWER
PLANS.
A
S I
J U
L
| GENERAL |
| G-001 - COVER SHEET |
| G-002 - SHEET INDEX, GENERAL NOTES, ANNOTATIONS |
| G-003 - ABBREVIATIONS |
| G-004 - STANDARD MOUNTING HEIGHTS |
| FS-100 - LIFE SAFETY INFORMATION |
| FS-101 - FIRST FLOOR EGRESS PLAN |
| FS-102 - SECOND FLOOR EGRESS PLANS |
| FS-103 - THIRD FLOOR EGRESS PLANS |
| CIVIL |
| C-011 - CIVIL COVER SHEET |
| C-012 - OVERALL AND HORIZONTAL CONTROL PLAN |
| C-021 - CIVIL COVER SHEET |
| C-022 - OVERALL AND HORIZONTAL CONTROL PLAN |
| CD111 - DEMOLITION PLAN |
| CE111 - TEMPORARY EROSION SEDIMENT CONTROL PLAN |
| CE511 - TEMPORARY EROSION SEDIMENT CONTROL DETAILS |
| CE512 - ARDOT TEMPORARY EROSION SEDIMENT CONTROL DETAILS |
| CG111 - MASS GRADING AND STORM DRAINAGE PLAN |
| CG112 - MASS GRADING AND STORM DRAINAGE PLAN |
| CG121 - GRADING AND STORM DRAINAGE PLAN |
| CG122 - GRADING AND STORM DRAINAGE PLAN |
| CG211 - STORM DRAINAGE PROFILES |
| CG311 - MASS GRADING SECTIONS |
| CG421 - POND GRADING ENLARGEMENT PLAN |
| CG422 - CURB RAMP GRADING ENLARGEMENT PLAN |
| CG511 - STORM DRAINAGE DETAILS |
| CG512 - ARDOT STORM DRAINAGE DETAILS |
| CG521 - STORM DRAINAGE DETAILS |
| CS121 - PAVING PLAN |
| CS122 - PAVING PLAN |
| CS521 - PAVING DETAILS |
| CS522 - PAVING DETAILS |
| CU111 - UTILITY PLAN |
| CU112 - UTILITY PLAN |
| CU211 - SANITARY SEWER PROFILE |
| CU212 - WATERMAIN PROFILE |
| CU511 - UTILITY DETAILS |
| CU512 - JACKSONVILLE WATER WORKS UTILITY DETAILS |
| CU513 - JACKSONVILLE WATER WORKS UTILITY DETAILS |
| CU514 - JACKSONVILLE WATER WORKS UTILITY DETAILS AND GENERAL NOTES |
| V-001 - SURVEY |
| LANDSCAPE |
| L-101 - LANDSCAPE_PLAN |
| L-501 - LANDSCAPE_DETAILS |
| L-502 - LANDSCAPE_DETAILS |
| STRUCTURAL |
| S-001 - STRUCTURAL NOTES AND SHEET INDEX |
| S-002 - STRUCTURAL NOTES AND SPECIAL INSPECTIONS |
| S-003 - STRUCTURAL ABBREVIATIONS AND DRAWING SYMBOLS |
| S-011 - LOAD MAPS |
| S-012 - LOAD MAPS |
| S-013 - LOAD MAPS |
| S-014 - LOAD MAPS |
| S-015 - FOUNDATION CRITERIA |
| S-101 - OVERALL FOUNDATION PLANS |
| S-102 - OVERALL SECOND FLOOR PLANS |
| S-103 - OVERALL THIRD FLOOR PLANS |
| S-111 - FOUNDATION PLAN -AREAS A AND B |
| S-112 - SECOND FLOOR PLAN -AREAS A AND B |
| S-113 - THIRD FLOOR PLAN -AREAS A AND B |
| S-121 - FOUNDATION PLAN -AREAS C AND D |
| S-122 - SECOND FLOOR PLAN -AREAS C AND D |
| S-123 - THIRD FLOOR PLAN -AREAS C AND D |
| S-131 - OVERALL ROOF PLANS |
| S-132 - ROOF PLAN -AREAS A AND B |
| S-133 - ROOF PLAN -AREAS C AND D |
| S-134 - OVERALL ROOF EMBED PLAN |
| S-201 - PARTIAL PLANS |
| S-301 - MASONRY SHEAR WALL ELEVATIONS |
| S-302 - MASONRY SHEAR WALL ELEVATIONS |
| S-303 - MASONRY SHEAR WALL ELEVATIONS |
| S-304 - MASONRY SHEAR WALL ELEVATIONS |
| S-305 - MASONRY SHEAR WALL ELEVATIONS |
| S-306 - MASONRY SHEAR WALL ELEVATIONS |
| S-307 - MASONRY SHEAR WALL ELEVATIONS |
| S-308 - MASONRY SHEAR WALL ELEVATIONS |
| S-309 - MASONRY SHEAR WALL ELEVATIONS |
| S-401 - TYPICAL CONCRETE DETAILS |
| S-402 - TYPICAL CONCRETE DETAILS |
| S-403 - TYPICAL CONCRETE DETAILS |
| S-501 - TYPICAL MASONRY DETAILS |
| S-502 - TYPICAL MASONRY DETAILS |
| S-601 - TYPICAL STEEL DETAILS |
| S-602 - TYPICAL STEEL DETAILS |
| S-603 - STEEL DETAILS |
| S-604 - STEEL DETAILS |
| S-605 - STEEL DETAILS |
| S-701 - SITE DETAILS |
| S-702 - SITE DETAILS |
| ARCHITECTURAL |
| A-140 - ROOF PLAN AND DETAILS |
| A-100 - OVERALL FLOOR PLAN |
| A-101 - OVERALL FIRST FLOOR PLANS |
| A-102 - OVERALL SECOND FLOOR PLANS |
| A-103 - OVERALL THIRD FLOOR PLANS |
| A-111 - FIRST FLOOR PLAN -AREAS A & B |
| A-112 - SECOND FLOOR PLAN -AREAS A & B |
| A-113 - THIRD FLOOR PLAN -AREAS A & B |
| A-121 - FIRST FLOOR PLAN -AREAS C & D |
| A-122 - SECOND FLOOR PLAN -AREAS C & D |
| A-123 - THIRD FLOOR PLAN -AREAS C & D |
| A-140 - ROOF PLAN AND DETAILS |
| A-141 - ROOF DETAILS |
| A-151 - FIRST FLOOR REFLECTED CEILING PLAN - AREAS A & B |
| A-152 - SECOND FLOOR REFLECTED CEILING PLAN-AREAS A & B |
| A-153 - THIRD FLOOR REFLECTED CEILING PLAN -AREAS A & B |
| A-161 - FIRST FLOOR REFLECTED CEILING PLAN -AREAS C & D |
| A-162 - SECOND FLOOR REFLECTED CEILING PLAN -AREAS C & D |
| A-163 - THIRD FLOOR REFLECTED CEILING PLAN -AREAS C & D |
| A-200 - NORTH BUILDING OVERALL ELEVATIONS |
| A-201 - NORTH BUILDING -NORTH ELEVATION -AREAS A & B |
| A-202 - NORTH BUILDING -EAST & WEST ELEVATIONS -AREA A & B |
| A-203 - NORTH BUILDING -SOUTH ELEVATION -AREAS A & B |
| A-210 - SOUTH BUILDING OVERALL ELEVATIONS |
| A-211 - NORTH ELEVATION -AREAS C & D |
| A-212 - EAST & WEST ELEVATIONS -AREAS C & D |
| A-213 - SOUTH BUILDING -SOUTH ELEVATION -AREAS C & D |
| A-301 - BUILDING SECTIONS -NORTH BUILDING |
| A-302 - BUILDING SECTION -SOUTH BUILDING |
| A-310 - WALL SECTIONS |
| A-311 - WALL SECTIONS |
| A-401 - ENLARGED PLANS |
| A-402 - INTERIOR ELEVATIONS |
| A-403 - INTERIOR ELEVATIONS |
| A-501 - EXTERIOR DETAILS |
| A-510 - WALL DETAILS |
| A-520 - INTERIOR DETAILS |
| A-540 - CASEWORK DETAILS |
| A-601 - PARTITION TYPES & DETAILS |
| A-602 - DOOR SCHEDULE AND DETAILS |
| A-603 - EXTERIOR DOOR DETAILS |
| A-605 - WINDOW TYPES AND DETAILS |
| A-611 - MATERIALS SCHEDULES |
| A-612 - ROOM FINISH SCHEDULES AND FINISH PLANS |
| A-613 - FINISH PLANS AND FINISH DETAILS |
| A-701 - STAIR PLANS AND SECTIONS |
| A-702 - STAIR AND RAILING DETAILS |
| A-703 - ELEVATOR PLANS AND SECTIONS |
| A-705 - MECHANICAL AND TRASH ENCLOSURE PLANS, ELEVATIONS AND DETIALS |
| A-801 - AIR BARRIER PLANS |
| A-802 - AIR BARRIER SECTIONS |
| A-803 - AIR BARRIER DETAILS |
| A-901 - SIGNAGE SCHEDULE AND MOUNTING LOCATIONS |
| A-902 - SIGNAGE DETAILS |
| A-911 - FIRST FLOOR SIGNAGE PLAN |
| A-912 - SECOND FLOOR SIGNAGE PLAN |
| A-913 - THIRD FLOOR SIGNAGE PLAN |
| A-921 - OVERALL FIRST FLOOR FURNITURE PLAN (FOR REFERENCE ONLY) |
| A-922 - OVERALL SECOND FLOOR FURNITURE PLAN (FOR REFERENCE ONLY) |
| A-923 - OVERALL THIRD FLOOR FURNITURE PLAN (FOR REFERENCE ONLY) |
| A-611 - MATERIALS SCHEDULES |
| A-612 - ROOM FINISH SCHEDULES AND FINISH PLANS |
| A-613 - FINISH PLANS AND FINISH DETAILS |
| FIRE ALARM |
| FA001 - FIRE ALARM SYMBOLS AND NOTES LI |
| FA002 - FIRE ALARM RISER DIAGRAM LI |
| FA003 - FIRE ALARM SYSTEM MATRIX LI |
| FA101 - FIRE ALARM OVERALL FIRST FLOOR PLAN LI |
| FA102 - FIRE ALARM OVERALL SECOND FLOOR PLAN LI |
| FA103 - FIRE ALARM OVERALL THIRD FLOOR PLAN LI |
| FA401 - FIRE ALARM ENLARGED TYPICAL UNIT PLAN -3/4 BED LI |
| FA402 - FIRE ALARM ENLARGED TYPICAL UNIT PLAN -5 BED LI |
| FA403 - FIRE ALARM ENLARGED COMMON AREAS PLAN LI |
| FA404 - FIRE ALARM ENLARGED COMMON AREAS PLAN |
| FA102 - FIRE ALARM OVERALL SECOND FLOOR PLAN LI |
| FA103 - FIRE ALARM OVERALL THIRD FLOOR PLAN LI |
| FA403 - FIRE ALARM ENLARGED COMMON AREAS PLAN LI |
| FIRE PROTECTION |
| F-001 - FIRE PROTECTION SITE PLAN |
| F-002 - SHEET INDEX & DETAILS |
| F-101 - OVERALL FIRST FLOOR FIRE PROTECTION PLANS |
| F-102 - OVERALL SECOND FLOOR FIRE PROTECTION PLANS |
| F-103 - OVERALL THIRD FLOOR FIRE PROTECTION PLANS |
| F-111 - FIRST FLOOR FIRE PROTECTION PLAN -AREAS A & B |
| F-112 - SECOND FLOOR FIRE PROTECTION PLAN -AREAS A & B |
| F-113 - THIRD FLOOR FIRE PROTECTION PLAN -AREAS A & B |
| F-121 - FIRST FLOOR FIRE PROTECTION PLAN -AREAS C & D |
| F-122 - SECOND FLOOR FIRE PROTECTION PLAN -AREAS C & D |
| F-123 - THIRD FLOOR FIRE PROTECTION PLAN -AREAS C & D |
| PLUMBING |
| P-001 - PLUMBING NOTES, SYMBOLS, AND ABBREVIATIONS LI |
| P-100 - PLUMBING OVERALL UNDERGROUND PLAN LI |
| P-101 - PLUMBING OVERALL FIRST FLOOR PLAN LI |
| P-102 - PLUMBING OVERALL SECOND FLOOR PLAN LI |
| P-103 - PLUMBING OVERALL THIRD FLOOR PLAN LI |
| P-104 - PLUMBING OVERALL ROOF PLAN LI |
| P-110 - PLUMBING UNDERGROUND PLAN -AREAS A & B LI |
| P-111 - PLUMBING FIRST FLOOR PLAN -AREAS A & B LI |
| P-112 - PLUMBING SECOND FLOOR PLAN -AREAS A & B LI |
| P-113 - PLUMBING THIRD FLOOR PLAN -AREAS A & B LI |
| P-114 - PLUMBING ROOF PLAN -AREAS A & B LI |
| P-120 - PLUMBING UNDERGROUND PLAN -AREAS C & D LI |
| P-121 - PLUMBING FIRST FLOOR PLAN -AREAS C & D LI |
| P-122 - PLUMBING SECOND FLOOR PLAN -AREAS C & D LI |
| P-123 - PLUMBING THIRD FLOOR PLAN -AREAS C & D LI |
| P-124 - PLUMBING ROOF PLAN -AREAS C & D LI |
| P-401 - PLUMBING ENLARGED TYPICAL UNIT PLAN -3BED LI |
| P-402 - PLUMBING ENLARGED TYPICAL UNIT PLAN -4BED LI |
| P-403 - PLUMBING ENLARGED TYPICAL UNIT PLAN -5BED LI |
| P-404 - PLUMBING ENLARGED MECH/ RISER 121-3 LI |
| P-405 - PLUMBING ENLARGED MECH 112-4 LI |
| P-406 - PLUMBING ENLARGED LAUNDRY 110 LI |
| P-407 - PLUMBING ENLARGED 111, 111-1, 111-2, AND 111-3 LI |
| P-408 - PLUMBING ENLARGED 111-4, 111-5, 111-6 LI |
| P-501 - PLUMBING DETAILS LI |
| P-502 - PLUMBING DETAILS LI |
| P-601 - PLUMBING SCHEDULES LI |
| P-901 - OVERALL WASTE AND VENT ISOMETRIC -AREAS A & B LI |
| P-902 - OVERALL WASTE AND VENT ISOMETRIC -AREAS C & D LI |
| P-903 - WASTE AND VENT ISOMETRIC -RISERS LI |
| P-904 - OVERALL SUPPLY ISOMETRIC -AREAS A & B LI |
| P-905 - OVERALL SUPPLY ISOMETRIC -AREAS C & D LI |
| P-906 - OVERALL NATURAL GAS ISOMETRIC LI |
| MECHANICAL |
| M-001 - MECHANICAL NOTES, ABBREVIATIONS, AND SYMBOLS LI |
| M-101 - MECHANICAL OVERALL FIRST FLOOR PLAN LI |
| M-102 - MECHANICAL OVERALL SECOND FLOOR PLAN LI |
| M-103 - MECHANICAL OVERALL THIRD FLOOR PLAN LI |
| M-111 - MECHANICAL HVAC FIRST FLOOR PLAN -AREAS A & B LI |
| M-112 - MECHANICAL HVAC SECOND FLOOR PLAN -AREAS A & B LI |
| M-113 - MECHANICAL HVAC THIRD FLOOR PLAN -AREAS A & B LI |
| M-121 - MECHANICAL HVAC FIRST FLOOR PLAN -AREAS C & D LI |
| M-122 - MECHANICAL HVAC SECOND FLOOR PLAN -AREAS C & D LI |
| M-123 - MECHANICAL HVAC THIRD FLOOR PLAN -AREAS C & D LI |
| M-211 - MECHANICAL PIPING FIRST FLOOR PLAN -AREAS A & B LI |
| M-212 - MECHANICAL PIPING SECOND FLOOR PLAN -AREAS A & B LI |
| M-213 - MECHANICAL PIPING THIRD FLOOR PLAN -AREAS A & B LI |
| M-221 - MECHANICAL PIPING FIRST FLOOR PLAN -AREAS C & D LI |
| M-222 - MECHANICAL PIPING SECOND FLOOR PLAN -AREAS C & D LI |
| M-223 - MECHANICAL PIPING THIRD FLOOR PLAN -AREAS C & D LI |
| M-401 - MECHANICAL ENLARGED TYPICAL UNIT PLAN -3BED & 5BED LI |
| M-402 - MECHANICAL ENLARGED TYPICAL UNIT PLAN -4BEDLI |
| M-403 - MECHANICAL ENLARGED LAUNDRY 110 PLAN LI |
| M-501 - MECHANICAL DETAILS LI |
| M-502 - MECHANICAL DETAILS LI |
| M-503 - MECHANICAL REFRIGERANT PIPING DETAILS LI |
| M-504 - MECHANICAL REFRIGERANT PIPING DETAILS LI |
| M-505 29 - MECHANICAL REFRIGERANT PIPING DETAILS LI |
| M-506 29 - MECHANICAL REFRIGERANT PIPING DETAILS LI |
| M-507 29 - MECHANICAL REFRIGERANT PIPING DETAILS LI |
| M-508 29 - MECHANICAL REFRIGERANT PIPING DETAILS LI |
| M-601 - MECHANICAL SCHEDULES LI |
| M-602 - MECHANICAL SCHEDULES LI |
| M-603 - MECHANICAL SCHEDULES LI |
| M-701 - MECHANICAL SEQUENCES OF OPERATION LI |
| M-702 - MECHANICAL CONTROL DIAGRAMS LI |
| M-703 - MECHANICAL POINTS LISTS LI |
| M-704 - MECHANICAL POINTS LISTS LI |
| M-705 - MECHANICAL POINTS LISTS LI |
| M-113 - MECHANICAL HVAC THIRD FLOOR PLAN -AREAS A & B LI |
| ELECTRICAL |
| E-001 - ELECTRICAL SYMBOLS AND NOTES LI |
| E-002 - ELECTRICAL ONE-LINE DIAGRAM LI |
| E-003 - ELECTRICAL SITE PLAN LI |
| E-004 - ELECTRICAL SITE LIGHTING PLAN LI |
| E-005 - ELECTRICAL SITE DETAILS LI |
| E-600 - ELECTRICAL LIGHTING SCHEDULES LI |
| E-601 - ELECTRICAL EQUIPMENT SCHEDULES LI |
| E-602 - LI ELECTRICAL PANEL SCHEDULES A k |
| E-603 - LI ELECTRICAL PANEL SCHEDULES A k |
| E-602 - ELECTRICAL PANEL SCHEDULES LI |
| E-603 - ELECTRICAL PANEL SCHEDULES LI |
| EG101 - LIGHTNING PROTECTION SYSTEMS PLAN LI |
| EG501 - GROUNDING DETAILS LI |
| EG502 - GROUNDING DETAILS LI |
| EL101 - ELECTRICAL LIGHTING OVERALL FIRST FLOOR PLAN LI |
| EL102 - ELECTRICAL LIGHTING OVERALL SECOND FLOOR PLAN LI |
| EL103 - ELECTRICAL LIGHTING OVERALL THIRD FLOOR PLAN LI |
| EL111 - ELECTRICAL LIGHTING FIRST FLOOR PLAN -AREAS A & B LI |
| EL112 - ELECTRICAL LIGHTING SECOND FLOOR PLAN -AREAS A & B LI |
| EL113 - ELECTRICAL LIGHTING THIRD FLOOR PLAN -AREAS A & B LI |
| EL121 - ELECTRICAL LIGHTING FIRST FLOOR PLAN -AREAS C & D LI |
| EL122 - ELECTRICAL LIGHTING SECOND FLOOR PLAN -AREAS C & D LI |
| EL123 - ELECTRICAL LIGHTING THIRD FLOOR PLAN -AREAS C & D LI |
| EL401 - ELECTRICAL ENLARGED TYPICAL UNIT LIGHTING PLAN -3 BED LI |
| EL402 - ELECTRICAL ENLARGED TYPICAL UNIT LIGHTING PLAN -4 BED LI |
| EL403 - ELECTRICAL ENLARGED TYPICAL UNIT LIGHTING PLAN -5 BED LI |
| EL404 - ELECTRICAL ENLARGED NORTH BLDG. LIGHTING PLAN LI |
| EL405 - ELECTRICAL ENLARGED SOUTH BLDG. LIGHTING PLAN LI |
| EP101 - ELECTRICAL POWER OVERALL FIRST FLOOR PLAN LI |
| EP102 - ELECTRICAL POWER OVERALL SECOND FLOOR PLAN LI |
| EP103 - ELECTRICAL POWER OVERALL THIRD FLOOR PLAN LI |
| EP111 - LI ELECTRICAL POWER FIRST FLOOR PLAN - AREAS A& B A k |
| EP112 - ELECTRICAL POWER SECOND FLOOR PLAN -AREAS A & B LI |
| EP113 - ELECTRICAL POWER THIRD FLOOR PLAN -AREAS A & B LI |
| EP121 - LI ELECTRICAL POWER FIRST FLOOR PLAN - AREAS C&D A k |
| EP122 - ELECTRICAL POWER SECOND FLOOR PLAN -AREAS C & D LI |
| EP123 - ELECTRICAL POWER THIRD FLOOR PLAN -AREAS C & D LI |
| EP401 - ELECTRICAL ENLARGED TYPICAL UNIT POWER PLAN -3 BED LI |
| EP402 - ELECTRICAL ENLARGED TYPICAL UNIT POWER PLAN -4 BED LI |
| EP403 - ELECTRICAL ENLARGED TYPICAL UNIT POWER PLAN -5 BED LI |
| EP404 - ELECTRICAL ENLARGED NORTH BLDG. COMMON AREA POWER PLANS LI |
| EP405 - LI' ELECTRICAL ENLARGED SOUTH BLDG. COMMON AREA POWER PLANS A k |
| EP406 - ELECTRICAL ENLARGED SOUTH BLDG. COMMON AREA HVAC POWER PLAN LI |
| ET101 ET101 - TELECOMMUNICATIONS OVERALL FIRST FLOOR PLAN LI TELECOMMUNICATIONS OVERALL FIRST FLOOR PLAN LI |
| ET102 - TELECOMMUNICATIONS OVERALL SECOND FLOOR PLAN LI |
| ET103 - TELECOMMUNICATIONS OVERALL THIRD FLOOR PLAN LI |
| ET111 - TELECOMMUNICATIONS FIRST FLOOR PLAN -AREAS A & B LI |
| ET112 - TELECOMMUNICATIONS SECOND FLOOR PLAN -AREAS A & B LI |
| ET113 - TELECOMMUNICATIONS THIRD FLOOR PLAN -AREAS A & B LI |
| ET121 - TELECOMMUNICATIONS FIRST FLOOR PLAN -AREAS C & D LI |
| ET122 - TELECOMMUNICATIONS SECOND FLOOR PLAN -AREAS C & D LI |
| ET123 - TELECOMMUNICATIONS THIRD FLOOR PLAN -AREAS C & D LI |
| ET401 - TELECOMMUNICATIONS ENLARGED TYPICAL UNIT PLAN -3 BED LI |
| ET402 - TELECOMMUNICATIONS ENLARGED TYPICAL UNIT PLAN -4 BED LI |
| ET403 - TELECOMMUNICATIONS ENLARGED TYPICAL UNIT PLAN -5 BED LI |
| ET404 - TELECOMMUNICATIONS ENLARGED COMMON AREAS PLAN LI |
| ET405 - TELECOMMUNICATIONS ENLARGED PLAN -NORTH BLDG MECH SPACES LI |
| ET501 - TELECOMMUNICATIONS DETAILS LI |
| ET601 - TELECOMMUNICATIONS RISER DIAGRAM LI |
| EP401 - ELECTRICAL ENLARGED TYPICAL UNIT POWER PLAN -3 BED LI |
| EP402 - ELECTRICAL ENLARGED TYPICAL UNIT POWER PLAN -4 BED LI |
| EP403 - ELECTRICAL ENLARGED TYPICAL UNIT POWER PLAN -5 BED LI |
| ET602 24 - CATV RISER -SOUTH BUIDLING LI |
| ET603 24 - CATV RIESR -NORTH BUILDING LI |
| GEOPIER |
| GP0.1 0 - GEOPIER NOTES AND DETAILS |
| GP0.2 - GEOPIER SCHEDULES |
| GP1.1 - GEOPIER LOCATION PLAN |
File details come from the government source that posted it. Updated .