(DRAFT) TE-I Hazardous Material Authorization Request.pdf

PDF 611 KB Posted

Attached to
Pre-Solicitation Notice Solid Waste Services Fort Hood, Texas
Solicitation number
W91151-26-R-A003
Issued by

About this file

The Fort Cavazos Form 200-19 is a Hazardous Material Authorization Request form designed for contractors to obtain approval for using non-government furnished hazardous materials at Fort Cavazos. The form requires detailed documentation about the hazardous material, including its nomenclature, stock number, quantity, monthly requirement, source of supply, manufacturer information, and specific work process description. Contractors are strongly encouraged to purchase hazardous materials at the Base Supply Center, and when using non-government materials, they must submit this form along with a Safety Data Sheet (SDS) for tracking purposes.

The form's comprehensive instructions guide users through each section, emphasizing the importance of providing specific details about the material's intended use, application method, equipment interaction, and processing conditions. The form includes routing sections for various programs like Air, Water, Industrial Hygiene, Pest Management, Safety, and Hazardous Materials Team to review and approve the request. Each block of the form requires precise information to facilitate a thorough review of the hazardous material's potential use and environmental impact.

View the file

Other files

File Type Posted
(DRAFT) TE-R Fort Hood Main Cantonment Map.pdf PDF
(DRAFT) TE-X SPILL PREVENTION CONTROL AND.pdf PDF
(DRAFT) TE-K Org Chart.pdf PDF
(DRAFT) TE-Z Government Furnished Property.xlsx XLSX spreadsheet
(DRAFT) TE-V Solid Waste Performance Standards.xlsx XLSX spreadsheet
(DRAFT) Pre-Solicitation - W9115126RA003.pdf PDF
(DRAFT) TE-U BLORA (Belton Lake Outdoor Recreation Area) Map.pdf PDF
(DRAFT) TE-A Landfill Permit.docx DOCX document
(DRAFT) TE-S West Fort Hood Cantonment Map.pdf PDF
(DRAFT) Attachment 1 PWS - Fort Hood Solid Waste Services.pdf PDF
(DRAFT) TE-Q Fort Hood Landfill Site Plan.pdf PDF
(DRAFT) TE-L Wage Determination 2015-5237 Rev. 29_3 Dec 2025.pdf PDF
(DRAFT) TE-N Baseline Staffing.docx DOCX document
(DRAFT) TE-P Container Placement Maps.pdf PDF
(DRAFT) TE-AA 2024-2029_Hood_INRMP_Final.pdf PDF
(DRAFT) TE-Y FRP Facility Response Plan.pdf PDF
(DRAFT) TE-D Bid Schedule.xlsx XLSX spreadsheet
(DRAFT) TE-M WD Pricing Spreadsheet.xlsx XLSX spreadsheet
(DRAFT) TE-T North Fort Hood Cantonment Map.pdf PDF
(DRAFT) TE-H Landfill Image.pdf PDF
(DRAFT) TE-G Landfill Disposal Data.xlsx XLSX spreadsheet
(DRAFT) TE-J Sample Report Form.xlsx XLSX spreadsheet
(DRAFT) TE-B Cantonment Refuse Container Locations.xlsx XLSX spreadsheet
(DRAFT) TE-E Customer ID.xlsx XLSX spreadsheet
(DRAFT) TE-F Grease Trap Inventory.xlsx XLSX spreadsheet
(DRAFT) TE-C Cantonment Roll Off-Compactor Container Locations.xlsx XLSX spreadsheet
(DRAFT) TE-O Equipment Listing.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APD PE v1.00

Page 1 of 2FORT CAVAZOS FORM 200-19, NOV 2023

HAZARDOUS MATERIAL AUTHORIZATION REQUEST

(For use of this form, see Fort Cavazos Regulation 200-1. The proponent of this form is DPW-ENV.)

SECTION l - REQUESTOR USE

1. NOMENCLATURE/TRADE NAME:

2. STOCK NUMBER (NSN, LSN, NCN, etc.): 3. PART NUMBER:

4. QUANTITY REQUESTED: 5. MONTHLY REQUIREMENT:

(estimate monthly usage or a one-time purchase)

6. UNIT OF ISSUE (each, gallon, can, etc.): 7. UNIT OF MEASURE (must be weight or volume):

8. UNIT OF USE 9. TYPE OF CONTAINER

(can, bottle, tube, plastic, metal, glass, aerosol, etc):(must be weight or volume, e.g., pounds, gallons, etc):

10. SUGGESTED SOURCE OF SUPPLY: 11. MANUFACTURE INFORMATION (complete if different than supplier):

a. COMPANY NAME: a. COMPANY NAME:

b. ADDRESS: b. ADDRESS:

c. TELEPHONE/FAX: c. TELEPHONE/FAX:

SECTION ll - WORK PROCESS

12. DESCRIBE THE WORK OR PROCESS IN WHICH THE MATERIAL WILL BE USED:

REPLACES FHT FORM 210-X19 (NOV 2006) WHICH IS OBSOLETE

13. LIST BUILDING OR AREA WHERE

MATERIAL WILL BE USED:

14. COST CENTER/DODAAC

AUTHORIZED TO USE THIS

MATERIAL:

15. PROCESS:

(check one):

NEW

CURRENT

16. TECHNICAL REFERENCE REQUIRING

SPECIFIC USE:

17. REQUESTER NAME AND

TELEPHONE NUMBER:

18. TECHNICAL POC AND

TELEPHONE NUMBER:

19. ORGANIZATION: 20. DATE REQUESTED:

SECTION lll - DPW ENVIRONMENTAL USE ONLY

21. HMMS

CONTROL

NUMBER:

22. SDS

SERIAL

NUMBER:

23. REMARKS (alternate material available?):

SECTION lV - ROUTING

PROGRAM REQUIRED DATE

REC'D

DATE ROUTED

TO

ROUTED

TO

APPROVAL

PROGRAM REMARKS

fedcba g

AIR

WATER

IH

PEST MGT

SAFETY

HAZMAT TEAM

YES NO

YES NO

YES NO

YES NO

YES NO

YES NO

APD PE v1.00

Page 2 of 2FORT CAVAZOS FORM 200-19, NOV 2023

INSTRUCTIONS

NOTE: Contractors are strongly encouraged to purchase hazardous materials at the Base Supply Center (BSC). On those rare occasions that short-term contractors use non-government furnished HAZMAT, they must use the Hazardous Material Authorization Request (Fort Cavazos Form 200-19) to notify Fort Cavazos of HAZMAT usage and submit a Safety Data Sheet (SDS) for all materials. In these cases, SDS are used for tracking purposes and does not imply endorsement of any product by Fort Cavazos.

BLOCK DESCRIPTION INFORMATION REQUIRED

1 Nomenclature If not a government source NSN, enter a descriptive noun for the item you are purchasing, for example, SAE 30 oil, yellow spray paint, lead acid battery, etc.

2 NSN Enter NSN if item is from a government source of supply. If it is, skip to block 4.

3 Part Number Enter as appropriate, using the most specific information available.

4 Quantity Requested Make every effort to enter only how much you will need to sustain your process for 7-10 days. The only exceptions should be for those items where the smallest size procurable (UI) lasts longer in your process.

5 Monthly Requirement How much do you use per MONTH ? Enter a quantity and select the appropriate unit: FL OZ, Gallon, Gram, KG, LB, Liter, OZ, Pint, Quart, Troy OZ. An example would be using 5 qts to change oil in car.

6 Unit of Issue Unit of issue. Examples are EA, GAL, PT, OZ.

7 Unit of Measure Enter the quantity of the size and selet the appropriate measuring unit: Fluid OZ, gallon, gram, KG, LB, liter, OZ, pint, quart, Troy OZ.

8 Unit of Use If decanting, what unit will you issue/use?

9 Type Container Select the appropriate container description: bottle, box, can, cartridge, drum. If not listed, fill in the container type next to "other"

10 Suggested Source of Supply

Name of brand name or source of supply.

11 Manufacturer Information Enter the manufacturer information. This is very important to determine the correct SDS and chemical formulation.

You may also find this on the container.

12 Work or Process Description

A full description of the work activity and process in which the HAZMAT is used. More detail in this block enhances your chances of approval. For example, application method, such as hand, brush, spray gun/nozzle, or vapor condensation; type of industrial equipment, such as open tanks, closed tanks, vapor degreaser, spray booth mechanical equipment, or other system.

If the HAZMAT is transferred to industrial equipment, list the equipment number and specify whether the transfer will occur by pouring, pumping, or another method.

Explain what will happen to the HAZMAT in the process, such as heated in an oven, soldering iron, torch, or heated to facilitate parts washing, or even used to facilitate removal of other HAZMAT by wire brush, sander, or grinder.

The important thing is to be as specific as possible, which can shave days off the approval process: use additional paper if necessary and remember reviewers don't do your work; explain it so they can understand it.

13 Where is the product used?

Provide a building number or location.

14 DODAAC/Cost Center Enter your DODAAC for your unit/activity.

15 Process Circle the appropriate answer.

16 Technical Reference Where is the authorization to use this HAZMAT, for example, TM, LO, etc?

17 Requestor Name Your name.

18 Technical POC Who can answer questions about the process using the HAZMAT?

19 Organization Where do you come from?

20 Date Requested Date hazardous material authorization request (Fort Cavazos Form 200-19) complete.

1 NOMENCLATURETRADE NAME:
2 STOCK NUMBER NSN LSN NCN etc:
3 PART NUMBER:
4 QUANTITY REQUESTED:
5 MONTHLY REQUIREMENT estimate monthly usage or a onetime purchase:
6 UNIT OF ISSUE each gallon can etc:
7 UNIT OF MEASURE must be weight or volume:
8 UNIT OF USE must be weight or volume eg pounds gallons etc:
9 TYPE OF CONTAINER can bottle tube plastic metal glass aerosol etc:
10 SUGGESTED SOURCE OF SUPPLY:
11 MANUFACTURE INFORMATION complete if different than supplier:
a COMPANY NAME:
a COMPANY NAME_2:
b ADDRESS:
b ADDRESS_2:
c TELEPHONEFAX:
c TELEPHONEFAX_2:
12 DESCRIBE THE WORK OR PROCESS IN WHICH THE MATERIAL WILL BE USED:
13 LIST BUILDING OR AREA WHERE MATERIAL WILL BE USED:
14 COST CENTERDODAAC AUTHORIZED TO USE THIS MATERIAL:
NEW:
CURRENT: Off
16 TECHNICAL REFERENCE REQUIRING SPECIFIC USE:
17 REQUESTER NAME AND TELEPHONE NUMBER:
18 TECHNICAL POC AND TELEPHONE NUMBER:
19 ORGANIZATION:
20 DATE REQUESTED:
22 SDS SERIAL NUMBER:
REQUIRED bAIR:
DATE RECD cAIR:
DATE ROUTED TO dAIR:
ROUTED TO eAIR:
undefined: Off
PROGRAM REMARKS gYES NO:
REQUIRED bWATER:
DATE RECD cWATER:
DATE ROUTED TO dWATER:
ROUTED TO eWATER:
undefined_2: Off
PROGRAM REMARKS gYES NO_2:
REQUIRED bIH:
DATE RECD cIH:
DATE ROUTED TO dIH:
ROUTED TO eIH:
undefined_3: Off
PROGRAM REMARKS gYES NO_3:
REQUIRED bPEST MGT:
DATE RECD cPEST MGT:
DATE ROUTED TO dPEST MGT:
ROUTED TO ePEST MGT:
undefined_4: Off
PROGRAM REMARKS gYES NO_4:
REQUIRED bSAFETY:
DATE RECD cSAFETY:
DATE ROUTED TO dSAFETY:
ROUTED TO eSAFETY:
undefined_5: Off
PROGRAM REMARKS gYES NO_5:
REQUIRED bHAZMAT TEAM:
DATE RECD cHAZMAT TEAM:
DATE ROUTED TO dHAZMAT TEAM:
ROUTED TO eHAZMAT TEAM:
undefined_6: Off
PROGRAM REMARKS gYES NO_6:
21 HMMS CONTROL NUMBER:
23 REMARKS (ALTERNATE MATERIAL AVAILABLE?):

File details come from the government source that posted it. Updated .