DRAFT 640-23-104_B520_PSU_DRAWINGS.pdf

PDF 39 MB Posted

Attached to
Z2DZ-- Building 520 Correct Mental Health Deficiencies
Solicitation number
36C26125R0042
Issued by

About this file

These architectural design drawings detail the renovation and mental health deficiencies corrections for Building 520 at the VA Palo Alto Healthcare System located at 3801 Miranda Avenue in Palo Alto, California. The comprehensive set of drawings includes floor plans, demolition plans, enlarged plans, and door schedules for multiple wards (A, B, C, D) and administrative areas, with specific focus on improving patient safety and facility functionality. Key modifications include replacing doors with ligature-resistant and breakaway designs, updating casework and cabinetry, installing new plumbing fixtures, upgrading electrical components, and refurbishing patient care spaces with enhanced safety features.

The project is classified as a pre-solicitation construction contract with an estimated value between $2-5 million, using NAICS code 236220 for Commercial and Institutional Building Construction. The solicitation will be a full and open competition, restricted to Service-Disabled Veteran Owned Small Businesses (SDVOSB) verified through Network Contracting Office 21 (NCO 21). The draft solicitation is expected to be released in mid-late May 2025, with a site visit date to be determined. Potential bidders must be registered in the System for Award Management (SAM) and have current online representations and certifications.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACCESSIBILITY CODE

FEDERAL ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABASS), REV 2015

PG-18-13 VA FIRE BARRIER (A SUPPLEMENT TO FEDERAL BARRIERS ACT ACCESSIBILITY

STANDARDS) FIRE DESIGN GUIDE, DEC 2011

BUILDING CODES

INTERNATIONAL CODE COUNCIL (ICC)

IBC—INTERNATIONAL BUILDING CODE, 2021

IMC—INTERNATIONAL MECHANICAL CODE, 2021

IPC—INTERNATIONAL PLUMBING CODE, 2021

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) LATEST EDITIONS

NFPA 1 FIRE CODE

NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHER

NFPA 13 STANDARDS FOR INSTALLATION ON SPRINKLER SYSTEMS

NFPA 70 NATIONAL ELECTRICAL CODE (NEC) ESSENTIALS

NFPA 70E ELECTRICAL SAFETY IN THE WORKPLACE

NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE

NFPA 75 STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT

NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS

NFPA 99 HEALTHCARE FACILITIES CODE

NFPA 101 LIFE SAFTY CODE ESSENTIALS

NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION ALTERATION AND DEMOLITION OPERATIONS

NFPA 780 STANDARD FOR THE INSTALLATION OF LIGHTNING PROTECTION

NFPA 855 STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE SYSTEMS

NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS

VA DESIGN MANUALS

VA OFFICE OF CONSTRUCTION AND FACILITY MANAGEMENT DESIGN MANUAL: AUGUST 1, 2014

TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATIONS SYSTEMS: FEBRUARY 1, 2016

VA FIRE PROTECTION DESIGN MANUAL: NINTH EDITION - NOVEMBER 01, 2023

VA HVAC DESIGN MANUAL: NOVEMBER 1, 2017, REV. MARCH 1, 2024

VA PLUMBING DESIGN MANUAL - FEBRUARY 2024

VA INTERIOR DESIGN MANUA: NOVEMBER 1, 2020

VA ELECTRICAL DESIGN MANUAL: ECEMBER 1, 2019

VA LIGHTING DESIGN MANUAL: JANUARY 1, 2022

VA STRUCTURAL DESIGN MANUAL: OCTOBER 1, 2022, REV JULY 1, 2023

VA SUSTAINABLE DESIGN MANUAL MANUAL – REV 1 AUGUST 18, 2017,

VA-JOINT COMMISSION CLARIFICATION DOCUMENTS

SUMMARY OF DISCUSSION ISSUES RELATED TO VHA IMPLEMENTATION OF THE JOINT COMMISSION

ENVIRONMENT OF CARE (EC) AND LIFE SAFETY (LS) STANDARDS, MAY 2021 REVISION.

VA ASBESTOS ABATEMENT DESIGN MANUAL FOR NEW HOSPITALS, REPLACEMENT HOSPITALS, AMBULATORY CARE, CLINICAL ADDITIONS, ENERGY CENTERS, OUTPATIENT CLINICS, ANIMAL RESEARCH FACILITIES, LABORATORY BUILDINGS – JULY 2011

NATIONAL INSTITUTE OF HEALTH

DESIGN REQUIREMENTS MANUAL - MARCH 2020

MECHANICAL DESIGN STANDARDS

AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD 52.2 – METHOD OF TESTING - GENERAL VENTILATION AIR-CLEANING DEVICES FOR REMOVAL

EFFICENCY BY PARTICLE SIZE, 2017

STANDARD 62.1 – VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY, 2017

STANDARD 90.1 - ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS, 2013

STANDARD 170 - VENTILATION OF HEALTH CARE FACILITIES, 2021

SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION

HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE

HVAC SYSTEMS COMMISSIONING MANUAL, 2ND EDITION, 2013

SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEMS, 3RD EDITION, 2008

ELECTRICAL DESIGN STANDARDS

UNDERWRITER’S LABORATORY, INC (UL) STANDARDS – 2019

ANSI/TIA-568-D SERIES, COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING STANDARD, AND ITS

PUBLISHED ADDENDA. -2017

ANSI/TIA 568.0-E, GENERIC TELECOMMUNICATIONS CABLING FOR CUSTOMER PREMISES, AND ITS PUBLISHED

ADDENDA. – 2017

ANSI/TIA 568.1-E, COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING STANDARD, AND ITS PUBLISHED

ADDENDA. – 2017

ANSI/TIA 568.2-D, BALANCED TWISTED-PAIR TELECOMMUNICATIONS CABLING AND COMPONENTS. 2017

ANSI/TIA 568.3-D, OPTICAL FIBER CABLING COMPONENTS STANDARD, AND ITS PUBLISHED

ADDENDA. – 2017

ANSI/TIA 568.4-D BROADBAND COAXIAL CABLING AND COMPONENTS STANDARD

ANSI/TIA-569-C, COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS PATHWAYS AND SPACES, AND

ITS PUBLISHED ADDENDA. – 2017

ANSI/TIA-606-A, ADMINISTRATION STANDARD FOR THE TELECOMMUNICATIONS INFRASTRUCTURE OF

COMMERCIAL BUILDINGS, AND ITS PUBLISHED ADDENDA – 2017

ANSI/J-STD-607-A, COMMERCIAL BUILDING GROUNDING (EARTHING) AND BONDING REQUIREMENTS FOR

TELECOMMUNICATIONS, AND ITS PUBLISHED ADDENDA. – 2017

BUILDING INDUSTRIES CONSULTING SERVICES INTERNATIONAL (BICSI) – 2019

TELECOMMUNICATIONS DISTRIBUTION METHODS MANUAL (TDMM) -2020

NFPA 70E, 2021

STRUCTURAL ENGINEERING DESIGN STANDARDS

AMERICAN CONCRETE INSTITUTE (ACI 2019)

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC 15TH EDITION)

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE 7-16)

CIVIL ENGINEERING DESIGN STANDARDS

VA SITE DEVELOPMENT DESIGN MANUAL — APRIL 1, 2021

INTERNATIONAL BUILDING CODE (IBC) — 2018

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

CONSULTANT

CONSULTANT: A/E:

GDM of Oregon 1308 NE 134th ST. SUITE A

VANCOUVER, WA 98685

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

VA PROJECT NUMBER:

PROJECT TEAM

APPLICABLE CODES, REGULATIONS AND DESIGN MANUALS

OWNER

NOT FOR CONSTRUCTION

FOR OFFICIAL USE ONLY (FOUO)

ARCHITECTURAL PLUMBING ELECTRICAL

MECHANICAL LOW VOLTAGE

COST ESTIMATOR

FIRE PROTECTION

VA CONTRACT NUMBER:

US DEPARTMENT OF VETERAN AFFAIRS

35% DESIGN DEVELOPMENT 05/07/2024

07/17/202465% DESIGN DEVELOPMENT

10/29/202495% CONSTRUCTION DOCUMENTS

01/11/2025100% CONSTRUCTION DOCUMENTS

03/20/2025100% CONSTRUCTION DOCUMENTS - Revision 01

A u to d e s k D o c s /2

-1

C o rr e c t

M e n ta l H e a lt h

D e fi c ie n c ie s

P a lo A lt o C

A /2

-1

B

L D

G

A R

C H

R

.r v t

G-001

MA BS03/20/2025

COVER SHEET BUILDING 520 MENTAL HEALTH

DEFICIENCIES

3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304

100% CONSTRUCTION

DOCUMENTS

3801 MIRANDA AVENUE

VA PALO ALTO HEALTHCARE SYSTEM

BUILDING 520 MENTAL HEALTH DEFICIENCIES

100% CONSTRUCTION DOCUMENTS

640-23-104

GDM-AE

VAPAHCS

3801 Miranda Avenue

Palo Alto, CA 94304

GDM-AE

Scotten Blair

4317 6th Avenue SE Suite 300

Lacey, WA 98503

GDM-AE

POC: John Wasierski

1308 NE 134th Street Suite A

Vancouver, WA 98685

GDM-AE

Scotten Blair

4317 6th Avenue SE, Suite 300

Lacey, WA 98503

GDM-AE

Dave Clem

4317 6th Avenue SE Suite 300

Lacey, Wa 98503

POC: Mark Aylward

1308 NE 134th Street, Suite A

Vancouver, WA 98685

PRO Dims Dennis Teschlog

520 Kirkland Way, Suite 301

Kirkland WA 98033

GDM-AE

Conrad Chandler

1308 NE 134th Street Suite A

Vancouver, WA 98685

PALO ALTO, CALIFORNIA 94304

03/20/2025

640-23-104

36C26123D0039

Revisions: Date

DRAFT

NORTH ARROW

STRUCTURAL GRIDLINE

BUILDING SECTION /

WALL SECTION

ID

DWG#

DWG#

ID

EXTERIOR ELEVATIONS

INTERIOR ELEVATIONS DWG#

ID

DWG#

ENLARGED DETAIL DRAWING

ROOM NAME AND NUMBER

WINDOW TYPE

PARTITION TYPE

ELEVATION MARK

DOOR NUMBER

0' - 0"

X00

ARCHITECTURAL SYMBOLS LEGEND

NORTH

NORTH

EAST

SOUTH

WEST

REVISION TAG

DETAIL CALLOUT

ID

DWG#

Room name

REVISION CLOUD

REFERENCE KEYNOTE 00.00

SHEET KEYNOTE

ID

DIVISION

NOTE NUMBER

EQUIPMENT LABEL 1iA1000

A1

1. The contractor shall visit the project site prior to bidding to become familiar with the existing site conditions, security provisions, laydown area and other site-specific general conditions which may affect the bid value for this project.

2. The contractor shall arrange for and obtain all VA issued permits (hot work, ICRA, weekend work, holiday's, shutdown, etc.), certificates, inspections and department approvals for work performed under this contract and provide copies of the same to the COR.

3. Construction signage, font and size shall be consistent with the facility's existing signage systems.

4. Work is not to commence until approval of a cost loaded project schedule seperated by definable features of the work.

5. The contractor shall schedule, coordinate, and facilitate all power outages and shutdowns. Power outages and shutdowns must be scheduled with the COR, fourteen calendar days prior to the outage.

6. All required existing exits from occupied portions of the buildings must be always maintained.

7. The contractor shall establish procedures which minimize the circulation of construction personnel and materials through occupied portions of the building.

8. Prior to the delivery of materials to the construction zone and removal of waste from construction zones the contractor shall establish acceptable access routes and times with the COR.

9. Areas adjacent to the designated work areas shall be kept clean and free of obstructions.

10. Under no circumstances shall any areas outside the construction zone be utilized by the contractors without prior approval from the cor.

11. Construction materials shall not be stored in corridors at any time.

12. Trash shall be removed from the buildings daily. Contractor to provide and empty dumpsters as required. No construction related waste to be placed in existing VA trash removal apparatus.

13. All approved interior staging areas shall be protected with fire resistant enclosures.

14. If scope of work results in long-term ceiling removal, contractor to discuss with COR whether a rated enclosure must be constructed, or temporary upright sprinklers installed to meet NFPA requirements. Refer to NFPA 241 (2019), paragraph 8.6.2

15. Protect-in-place fire suppression systems during construction.

16. If penetrations through rated floors or walls cannot be fire-stopped at the end of the work shift, temporary firestopping composed of mineral wool should be installed in the penetration to provide temporary protection against fire/smoke spread through the unsealed penetration.

17. Notify the COR of any planned construction activities that may generate excessive noise. Schedule such work only with the consent of the COR.

18. Exercise care during construction and coordinate the sequence of work and phasing with the COR to prevent disruption of the medical center routine. Some aspects of the work and work in some areas will require the work to be performed only at night, weekends, or holidays at no additional cost to the government.

19. The project manual, which includes general conditions, supplemental conditions, and technical specifications is complementary to the drawings. Together these documents describe the project requirements, if there are discrepancies in requirements between the project manual and the drawings, the contractor shall advise the architect and request clarification.

20. The contractor shall provide all necessary materials, tools, equipment, and facilities required and shall perform all labor and services of every description as may be necessary to complete the scope of work defined in the contract documents.

21. Fabricate and install all work in strict accordance with contract documents and all applicable state and local codes.

22. All contractors and subcontractors shall be responsible for the proper performance of their work, coordination with other trades, means and methods of construction and safety and security of materials and personnel on site.

23. Cutting and patching as necessary shall be performed by each trade as required for the performance and installation of the work.

Cutting and patching shall be done in a workmanlike manner consistent with industry standards for the finishes and substrates affected.

24. Unless the materials, equipment or work required are specifically noted as provided or furnished by others, they shall be provided under this contract.

25. All work shall be performed by skilled workers in a workmanlike and professional manner consistent with industry standards.

26. Materials and components as specified constitute an expected standard of quality. Substitutions require the written approval of the contracting officer. Substitution requests must receive approval a minimum of seven days prior to submission of bids. Do not assume product equality and submit shop drawings from alternate vendors without prior written approval. In this event the submittal will be rejected, and the contractor will be required to provide the system specified as the basis of design at no additional cost to the owner.

27. All equipment and piping shall be supported or braced in accordance with the provisions of the technical specifications.

28. The contractor shall protect the facility from the weather and maintain security throughout construction.

29. The contractor shall maintain the site and all buildings and structures in proper working order and shall, without additional charge, replace any work, materials, or equipment furnished and installed under the contract which develop defects, within one (1) year from the date of final acceptance by the COR.

30. Protect all existing conditions during construction. The contractor will repair or replace at no additional charge to the owner any existing work damaged by construction activities.

33. All items noted to be removed and reinstalled shall be handled with proper care and stored safely to prevent damage; if damage does occur items shall be replaced at no expense to the VA.

34. The design adequacy, safety, and erection of bracing, shoring, scaffolding, and temporary supports and restrains is the sole responsibility of the contractor.

35. Any construction installed in non-compliance with the contract documents shall be corrected at no expense to the VA.

36. All drawings, though noted with scale, are for illustration only. Do not scale the drawings. Items incorrectly located due to scaling of drawings shall be corrected.

37. These drawings were produced from existing as-built drawings and field observations and may not accurately or fully represent as-built condition. Discrepancies may be encountered, and it is the contractor’s responsibility to field verify all dimensions, existing conditions, and points of connection. Conrtactor to provide a Differing conditions report to document all design discrepancies or other observations not considered addressed in the contractor proposal and subsequent award. Provide to the CO and COR in advance of any work.

38. The contractor responsibilities for field verification shall include all existing conditions including but not limited to regulated materials, architecture, structure, mechanical, electrical, plumbing, equipment, and all other existing systems; make necessary provisions to maintain the integrity and operation of said systems prior to the commencement of demolition where required.

39. See mechanical, electrical, telecommunications & architectural drawings for any system or portions thereof to be removed, relocated, revised, or abandoned. Notify the COR of any systems that may be affected, require demolition or alteration that are not shown on design drawings prior to commencing demolition.

40. Prior to drilling or coring existing concrete, contractors shall locate existing reinforcement using non-destructive testing (NDT) and maintain adequate clearances to avoid damage to existing reinforcement. Whenever feasible, contractors shall use ground penetrating radar (GPR) or means other than x-ray. Where x-ray is required, contractor shall provide written request at least three (3) weeks prior to event; work may be required to be performed outside normal work hours and shall be documented on the three (3) week look ahead schedule.

GENERAL NOTES DRAWING INDEX

PG SHEET DRAWING TITLE

PROJECT GENERAL INFORMATION

1 G-001 COVER SHEET

2 G-002 DRAWING INDEX, LEGEND, ABBREVIATIONS

ARCHITECTURE

3 A-100 OVERALL FLOOR PLAN - LEVEL 1

4 AD-110 DEMOLITION PLAN - ADMIN

5 AD-111 DEMOLITION PLAN - WARD A

6 AD-112 DEMOLITION PLAN - WARD B

7 AD-113 DEMOLITION PLAN - WARD C

8 AD-114 DEMOLITION PLAN - WARD D

9 A-110 FLOOR PLAN - ADMIN 1ST FLOOR

10 A-111 FLOOR PLAN - WARD A

11 A-112 FLOOR PLAN - WARD B

12 A-113 FLOOR PLAN - WARD C

13 A-114 FLOOR PLAN - WARD D

14 A-200 LEVEL 2 FLOOR PLAN

15 A-400 ENLARGED PLANS AND ELEVATIONS

16 A-401 ENLARGED PLANS AND ELEVATIONS

17 A-402 ENLARGED PLANS AND ELEVATIONS

18 A-600 DOOR SCHEDULE AND TYPES

PLUMBING

19 PP-001 LEGEND, ABBREVIATION LIST AND GENERAL NOTES

20 PP-002 SCHEDULES

21 PP-101 LEVEL 1 OVERALL PLAN

22 PD-111 ENLARGED DEMOLITION PLAN - UNIT A

23 PD-112 ENLARGED DEMOLITION PLAN - UNIT B

24 PD-113 ENLARGED DEMOLITION PLAN - UNIT C

25 PD-114 ENLARGED DEMOLITION PLAN - UNIT D

26 PP-111 ENLARGED PLAN - UNIT A

27 PP-112 ENLARGED PLAN - UNIT B

28 PP-113 ENLARGED PLAN - UNIT C

29 PP-114 ENLARGED PLAN - UNIT D

ELECTRICAL

30 EG-101 LEGEND, ABBREVIATIONS, & GENERAL NOTES

31 ED-101 WARD B DEMOLITION FLOOR PLAN

32 ED-102 WARD C DEMOLITION FLOOR PLAN

33 ED-103 WARD D DEMOLITION FLOOR PLAN

34 EN-101 WARD B NEW FLOOR PLAN

35 EN-102 WARD C NEW FLOOR PLAN

36 EN-103 WARD D NEW FLOOR PLAN

37 EJ-001 ELECTRICAL DETAILS

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT

CONSULTANT: A/E:

GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

03-20-2025

FULLY

SPRINKLEDNOT FOR CONSTRUCTION

FOR OFFICIAL USE ONLY (FOUO)

07.17.2024DESIGN DEVELOPMENT 65%

11.12.2024CONSTRUCTION DOCUMENTS 95%

01.11.2025CONSTRUCTION DOCUMENTS 100%

03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01

A u to d e s k D o c s /2

-1

C o rr e c t

M e n ta l H e a lt h

D e fi c ie n c ie s

P a lo A lt o C

A /2

-1

B

L D

G

A R

C H

R

.r v t

G-002

DRAWING INDEX, LEGEND,

ABBREVIATIONS

M.A. A.M.

BUILDING 520 MENTAL HEALTH

DEFICIENCIES

3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304

100% CONSTRUCTION

DOCUMENTS

640-23-104

EXT

EXP

EXIST

ENGR

EQUIP

EQ

ELEV

EMER

EXPANSION OR EXPOSED

EXTERIOR, EXTERNAL, OR

EXISTING

EQUIPMENT

ELEVATION, OR ELEVATOR

EMERGENCY

ENGINEER

EQUAL

INSUL

IN

ID

HTG

HW

IDENTIFICATION, INSIDE DIAMETER, OR

INCHES

HEATING

HOT WATER

OD

BLK

CJ

CFM

BW

CAB

BTWN

BTU

BOT

BM

BLDG

BKG

BITUM

BFF

BD

AVE

CUBIC FEET PER MINUTE

BRITISH THERMAL UNIT

CONSTRUCTION OR CONTROL JOINT

BOTH WAYS

CABINET

BETWEEN

EIFS

EJ

EF

EB

EA

DS

DTL

DR

DN

BELOW FINISHED FLOOR

BUILDING

BEAM OR BENCH MARK

BLOCK

BOTTOM

BITUMINOUS

BACKING

AVENUE

BOARD

DEMO

DIM

DIA

DEPT

DF

DET

DBL

D

CU YD

APPROX

AHU

ASTM

AV

ARCH

ALT

ALUM

AIB

ADJ

AFF

A/C

AIR INFILTRATION BARRIER

ABOVE FINISHED FLOOR

TESTING AND MATERIALS

AMERICAN SOCIETY FOR

AIR HANDLING UNIT

ALTERNATE

ALUMINUM

ARCHITECT

APPROXIMATE

AUDIO VISUAL

ADJACENT, ADJOINING, OR

AIR CONDITIONING

CONC

CTB

CORR

CT

CPT

CONT

CONF

COL

CMU

CLO

CLR

CLG

CL

EXTERIOR INSULATION &

FINISH SYSTEM

EXPANSION JOINT

EXHAUST FAN

EXPANSION BOLT

EACH

DOWNSPOUT

DETAIL

DOOR, DRAIN, DRESSING ROOM

DOWN

HGT

HM

HORIZ

HP

HDPE

HDW

HDR

HD

HB

HC

H

GYP

GYM

DEMOLITION

DEPARTMENT

DRINKING FOUNTAIN

DIMENSION

DIAMETER

DETAIL

CUBIC YARD

DEPTH OR PENNY (NAIL)

DOUBLE

GALV

GLU LAM

GFI

GA

GAL

G

FRT

FURN

FTG

FT

FRP

FOM

FOS

FOF

MRG

HIGH DENSITY POLYETHYLENE

HOLLOW METAL OR HECTOMETER

HORIZONTAL

HORSEPOWER OR

HEIGHT

HARDWARE

HEADER

HEAD

HOSE BIBB

HIGH

HOLLOW CORE

GYPSUM

GYMNASIUM

OC

NTS

NOM

NIC

NO

MTL

N/A

N

MTD

MTG

FIRE RETARDENT TREATMENT

GROUND FAULT INTERRUPTER

FIBER REINFORCED POLYESTER OR

GAUGE OR GAGE OR

GLUE LAMINATED BEAM

GALVANIC OR GALVANIZED

GALLON

GAS

FOOT OR FEET

FACE OF MASONRY

FACE OF STUD

FACE OF FINISH

FOOTING

FURNISH OR FURNITURE

MISC

MEZZ

MET

MEMB

MAX

MECH RM

MDO

MB

MACH

MATL

M

CONCRETE MASONRY UNIT

CONCRETE

CORRIDOR

CERAMIC TILE

CONTINUOUS

CONFERENCE

CERAMIC TILE BASE

CARPET

OCCUPANCY, CLEANOUT, OR COMPANY

CENTERLINE

COLUMN

CLOSET

CEILING

CLEAR

FEC

FL

FLUOR

FOC

FG

FF

FD

FDTN

FE

FDC

FCO

FA

F

FIRE DEPARTMENT CONNECTION

FIRE EXTINGUISHER & CABINET

FACE OF CONCRETE OR

FLUORESCENT

FINISH FACE

FINISH GRADE

FLOORLINE

FIRE ALARM

FIRE EXTINGUISHER

FLOOR CLEANOUT

FOUNDATION

FLOOR DRAIN

FAHRENHEIT OR FEMALE

LT GA

LAV

LBS

LAB

L

JT

JST

JAN

SIM SIMILAR

WD WOOD

OUTSIDE DIAMETER

STRUCTURAL INSULATED PANEL

SLAB-ON-GRADE

SPECIFICATION

SANITARY SEWER ORSS

SOG

SQ

SPEC

SMK

SIP

SL

SQUARE

SHEET METAL

SILL

WELDED WIRE FABRIC

WEIGHTWT

WWF

MOISTURE RESISTANT GYP. BRD.

NUMBER

ON CENTER

NOMINAL

NOT IN CONTRACT

NOT TO SCALE

METAL

MOUNTED

NOT APPLICABLE

NORTH

MOUNTING

MEDIUM DENSITY OVERLAY

MEZZANINE

MEMBRANE

MISCELLANEOUS

METAL

MECHANICAL ROOM

MACHINE BOLT

MACHINE

MATERIAL

MAXIMUM

MALE

RESILIENTRESIL

RIGHT HAND

RIGHT HAND REVERSE

SHOP DRAWINGS, SMOKE DETECTOR OR

SQUARE FOOT (FEET)

SD

SEP

SHT

SF

SA

S

SEPARATION

SHEET

SUPPLY AIR

SOUTH

RH

RHR

RFP

REV REVISION

REQUEST FOR PROPOSAL

POUNDS PER SQUARE FOOT

RUBBER BASE OR RESILIENT BASE

REFLECTED CEILING PLAN

REINFORCE

RECESSED

REF

REQD

REINF

RD

REC

RB

RCP

REFERENCE

REQUIRED

ROAD OR ROOF DRAIN

RA

R

QA

PSF

PROP

PROJ

QUALITY ASSURANCE

RETURN AIR

RADIUS OR RISER

PROPERTY

PROJECT

LABORATORY

LAVATORY

LIGHT GAGE

POUND

ANGLE

JANITOR

JOINT

JOIST

PROFESSIONAL ENGINEER

POINT OF CONNECTION

PLASTIC LAMINATEPLAM

PREFIN

PR

POC

PLYWD

PREFINISH

PAIR

PLYWOOD

PKG

P.E.

PC

PAVT

PACKAGE

PAVEMENT

PIECE, POLYCARBONATE OR

THK THICKNESS

UNITED STATES

UTILITY

VINYL COMPOSITION TILE

WATER CLOSET OR

VESTIBULE

VERTICAL

VEST

W

WC

W/

WEST OR WIDE

WITH

VERT

VCT

V

UTIL

US

VOLT

TOP OF JOIST

TOP OF BEAM

TOP OF FOOTING

TOP OF CONCRETE

TYPICAL

TENSILE STRENGTH OR

TELEVISION

TOP OF STEEL

HEAT TRANSFER COEFFICIENT

UNDERWRITER'S LABORATORY

TYP

UL

U

TOJ

TV

TS

TOS

TOC

TOF

TOB

STANDARD

STRUCTURAL

SUSPENDED

STORAGE

STAIRS OR STREET

TONGUE & GROOVE

TEMPERATURE OR TEMPORARY

TELEPHONE

TOP OF CURB

T & G

TEMP

TEL

TC

STRUCT

SUSP

STOR

STD

ST

(E) EXISTING

GYP BRD GYPSUM BOARD

PORTLAND CEMENT

OR DRIVE

FACE OF CURB

ACT

AE

ACOUSTICAL CEILING TILE

ARCHITECT/ENGINEER

ADA AMERICANS WITH DISABILITIES ACT

ADJUSTABLE

AFC ABOVE FINISHED COUNTER

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

APA AMERICAN PLYWOOD ASSOCIATION

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASPH ASPHALT

AUTO AUTOMATIC

AUX AUXILIARY

AVG AVERAGE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVER'S

ASSOCIATION

B PL BASE PLATE

BALC BALCONY

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BI-FOLDING DOORS

BLD BUILD

BRCG BRACING

BRDG BRIDGING

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BSMT BASEMENT

C TO C CENTER TO CENTER

CCTV CLOSED CIRCUIT TELEVISION

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CHEM CHEMICAL

CIP CASE IN PLACE

CIR CIRCLE

CIRC CIRCULAR

CLG HT CEILING HEIGHT

CO CARBON MONOXIDE, CERTIFICATE OF

COORD COORDINATE

CPRS COMPRESSIBLE

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSMT CASEMENT

CSWK CASEWORK

CTF CERAMIC TILE FLOOR

CTRL CONTROL

CTV CABEL TELEVISION

CU FT CUBIC FEET

CU IN CUBIC INCH

CW COLD WATER

DAT DATUM

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DIFF DIFFERENCE OR DIFFUSER

DISP DISPENSER

DOC DOCUMENT

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DW DISHWASHER

DWG DRAWING

EFS EXTERIOR FINISH SYSTEM

ELAST ELASTOMERIC

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE

MONOMER

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQL SP EQUALLY SPACED

ESMT EASEMENT

EST ESTIMATE

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXTINGUISHER

EXT GR EXTERIOR GRADE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FHC FIRE HOSE CABINET

FIG FIGURE

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FLASH FLASHING

FLEX FLEXIBLE

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FO FINISHED OPENING

FOW FACE OF WALL

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FIBER REINFORCED PLASTIC

FRZ FREEZER

FSTNR FASTENER

FURG FURRING

GYPSUM ASSOCIATON

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GT GROUT

GUT GUTTER

GYP PLAS GYPSUM PLASTER

H PLAM HIGH PRESSURE

HAZ MAT HAZARDOUS MATERIALS

PLASTIC LAMINATE

HCWD HOLLOW CORE WOOD DOOR

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HOSP HOSPITAL

HIGH PRESSURE

HQ HEADQUARTERS

HT HEIGHT

HVAC HEATING, VENTILATION, AND

AIR CONDITIONING

IBC INTERNATIONAL BUILDING CODE

INTERIOR DESIGN

INCL INCLUDED

INFO INFORMATION

INSULATION

KPL KICKPLATE

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LBR LUMBER

LED LIGHT EMITTING DIODE

LH LEFT HAND

LHR LEFT HAND REVERSE

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LS LUMP SUM

LT WT LIGHTWEIGHT

LVD LOUVERED

LVR LOUVER

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MD METAL DECK

MEAS MEASURE

MEMO MEMORANDUM

MFD MANUFACTURED

MFG MANUFACTURING

MFR REC MANUFACTURER'S RECOMMENDATION

MID MIDDLE

MLDG MOLDING (MOULDING)

MLWK MILLWORK

MOD MODEL, MODIFY OR MODULE

MR MOISTURE RESISTANT

MULL MULLION

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING CONTRACTORS

ASSOCIATION

OPNG OPENING

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

OZ. OUNCE

PART PARTIAL

PAT PATTERN

PBD PARTICLEBOARD

PCA PORTLAND CEMENT ASSOCIATION

PEDESTALPED

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PHOTO PHOTOGRAPH

PL PROPERTY LINE

PL GL PLATE GLASS

PLASTER OR PLASTICPLAS

PLUMBINGPLBG

PRCST PRECAST

PREFAB PREFABRICATE

PRELIM PRELIMINARY

PREP PREPARATION

PREV PREVIOUS

POLYVINYL CHLORIDE (PLASTIC)PVC

PT PAINT, PNEUMATIC TUBE, OR

POUNDS PER SQUARE INCHPSI

PRESSURE TREATED

PAVINGPVG

POWERPWR

QC QUALITY CONTROL

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

RADIATORRAD

RECEPTACLERECPT

RECTANGLERECT

REGISTERREG

REPAIRREP

REPLACEREPL

REQ REQUIRE

RETURNRET

RFI REQUEST FOR INFORMATION

RLG RAILING

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

SALV SALVAGE

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SCHED SCHEDULE

OR SOAP DISPENSER

SECTIONSECT

SINGLESGL

SHT MTL SHEET METAL

SHTHG SHEATHING

SHV SHELVING

SJ SCORED JOINT

SLNT SEALANT

SM

SMOKE

SPRINKLERSPKLR

SPEAKERSPKR

SUPPLYSPLY

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SERVICE SINK

STAINLESS STEELSST

SOUND TRANSMISSION CLASSSTC

STL STEEL

STL PL STEEL PLATE

SUBSTITUTESUB

SUSPENDED CEILIINGSUSP CLG

SYMBOLSYM

TREADT

TIME AND MATERIALST & M

TILE COUNCIL OF AMERICATCA

THERM THERMAL

TOP OF ___TO

TOP OF FOUNDATIONTO FDN

TOP OF MASONRYTOM

TOP OF PARAPETTOP

TOP OF WALLTOW

TREATEDTRTD

TUBE STEEL

THERMOSTATTSTAT

UNINTERRUPTIBLEUPS

POWER SUPPLY

URINALUR

ULTRAVIOLETUV

VARIESVAR

OR VITRIFIED CLAY TILE

VENTILATIONVENT

VIDEOVID

VERIFY IN FIELDVIF

VOLATILE ORGANIC COMPOUNDVOC

VOLUMEVOL

VOLTAGEVOLT

W/O WITHOUT

WALL COVERING

WDW WINDOW

WATER HEATERWH

WELDEDWLD

WATERPROOFINGWP

WEATHER RESISTANTWR

WAINSCOTWSCT

EXTRUDED POLYSTYRENEXPS

YARDYD

YEARYR

BOARD (INSULATION)

TYPICAL ABBREVIATIONS

Revisions: Date:

ADMIN WING

SEE A-110

WARD A

SEE A-111

WARD B

SEE A-112

WARD C

SEE A-113

WARD D

SEE A-114

COURTYARD

MECH/HACSTORAGEGROUP STORAGE OFFICE OFFICE

HALLWAY

EXAM ROOM

EXAM ROOM

OFFICE

EXAM ROOM

HALLWAY

HALLWAY

OFFICE

BATH

BED

BATH

BED

BED

BED

EXERCISE

BED

BATH

BED

TOILET

BATH

BATH

BATH

BATH

BATH

BED

BATH

GROUP RM. CONFERENCE

INTERVIEW

BATH

BREAK

LOUNGE/LOCKERS

BATH BATH DATA

TOILET

HALLWAY

BED

BED

BATHBATH

ANTE

BED

BATH

BATH

MEDS

CONFERENCE

SOILED UTIL PERS STORAGE

RESTRAINT

TOILET

DINING

GARDEN STORAGE

COURTYARD

SHARED OFFICE

OFFICE

OFFICE

TOILET

FOOD CARTS

HAC

HALLWAY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

CLEAN STORAGE

BED

HAC ELEC

BATH

BED

BED

BED

BED

BED

BATH

BED

BATH

BEDBED

TOILET

BATH

BATH

BATH

BATH

BED

BATH

TOILET

VESTIBULE

BED

BATH BATH

BED BED

ANTE

BATH

BATH

GARDEN

CONFERENCE

SOILED UTIL PERS STORAGE

RESTRAINT

TOILET

STORAGE

TOILET

OFFICE

OFFICE

HALLWAY

SHARED OFFICE

EXAM

CLEAN LINEN

CLEAN STORAGE

BED

HALLWAY

HALLWAY

DATA

EXERCISE

BATH

DAYROOM

INTERVIEW

CONFERENCE

BATH

OFFICE

OFFICE

BATH

LOUNGE LOCKERS

VEST C

TOILET

COURTYARD

BATH

BED

BED

BED BED

BED

BATH

BED

BATH

BED

BED

TOILETBATH

BATHBATH

BATH

BED

BATH

OFFICE

TOILET

MILIEU

BED

BED

BATH

BATH

ANTE

BED

BATHBATH

GARDEN

MEDS

CONFERENCE

SOILED UTIL

PERS STORAGECLEAN STORAGE

BATH

EXERCISE

LAUNDRY

LACTATION

OFFICEOFFICEOFFICEOFFICEOFFICE

WAITING

GARDEN STORAGE

COURTYARD

ELEC

TOILET

HAC

COURTYARD

VESTIBULE B

HALLWAY

INTERVIEWBATH

CONFERENCE

GROUP ROOM

TOILET

COURTYARD

DINING

TOILET

HAC

FOOD CARTS

GARDEN STORAGE

HALLWAY

OFFICEOFFICEOFFICEOFFICE OFFICE

HALLWAY

OFFICE SHARED OFFICEOFFICE

TOILET

DAYROOM

BED

BATH

BATH

BED

BED

PERS STORAGE

BATH BATH

BED BED

BED

BATH

BED

BATH BATH

BATH

BED

BATH

BATHLAUNDRY

BATH

BED

GARDEN

BATH

BED

BED

BEDRESTRAINT ACC. BED

CLEAN LINENEXAM

HALLWAY

HALLWAY

DATA EXAM

SOILED UTIL

VESTIBULE

CLEAN STORAGE

ELEC

HAC

PROG STORAGE

MEDS

CONFERENCE

SAHRED OFFICE

OBSERVATION

BATH

BATH

EXERCISE

THERAPY TUB BATH

HALLWAY

HALLWAY

DAYROOM

CONFERENCE

OFFICE COPY

LOUNGE LOCKERS

WOMEN'S

BATH

HALLWAY

HALLWAY

TOILET

WAITING

HALLWAY

NOURISHMENT

VENDING

DATAMECH

ELEC

STAIR 2

LOADING

HALLWAY

WOMAN TOILETMENS TOILET

BREAK ROOM

OFFICE

WAITING

EXAM ROOM

EXAM ROOM

EXAM ROOM

EXAM ROOM

INTERVIEW Room

INSTRUMENT RM

CONF ROOM 2

HALLWAY

HALLWAY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ELEVATOR

CONF ROOM

HALLWAY

LOBBY

RECEPTION

ELEVATOR

NURSE STATION

ROTUNDA

ELEC

HAC

R.T. STORAGE

R.T. STORAGE

DINING

HALLWAY

WAITING

COURTYARD

HALLWAY

TOILET

SHARED OFFICE

OFFICEOFFICE

BATH BATH

VEST D

BEDBED

HALLWAY

BED

ELEC

ELEC

MECH

RECYCLING

SOILED LINEN

EMS EQUIP

EMS STORAGE

CLEAN LINEN

HAC

UNAS

CT STORAGE

GARDEN

DAYROOM

LAUNRY

OFFICE

DINING

LAUNDRY

OFFICE

HALLWAY

OFFICE

COPY

HALLWAY

NURSE STATION

COPY

MED DISP

HALLWAY

NOURISHMENT

HALLWAYNURSE STATION

NOURISHMENT

VESTIBULE

HALLWAY

DAYROOM

NOURISHMENT NURSE STATION

COPY

VESTIBULE

0' 5' 10' 20' 30'

GENERAL SHEET NOTES

KEYED NOTES

1. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME

DUE TO NOISE AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE

FACILITY.

2. PROVIDE UL LISTED FIRESTOP SYSTEM AT ALL PENETRATIONS THROUGH FIRE

AND/OR SMOKE RATED ASSEMBLIES.

3. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT

LIMITING ABILITY TO ADD OR REMOVE CABLES WITHOUT RESEALING.

4. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING

CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE

THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY

DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.

5. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE

RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT

CONSULTANT: A/E:

GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

03-20-2025

FULLY

SPRINKLEDNOT FOR CONSTRUCTION

FOR OFFICIAL USE ONLY (FOUO)

07.17.2024DESIGN DEVELOPMENT 65%

11.12.2024CONSTRUCTION DOCUMENTS 95%

01.11.2025CONSTRUCTION DOCUMENTS 100%

03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01

A u to d e s k D o c s /2

-1

C o rr e c t

M e n ta l H e a lt h

D e fi c ie n c ie s

P a lo A lt o C

A /2

-1

B

L D

G

A R

C H

R

.r v t

A-100

OVERALL FLOOR PLAN - LEVEL 1

MA BS

BUILDING 520 MENTAL HEALTH

DEFICIENCIES

3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304

100% CONSTRUCTION

DOCUMENTS

640-23-104

1" = 20'-0"F4

OVERALL FLOOR PLAN - LEVEL 1

NORTH

COURTYARD

F-142

MECH/HAC

F-127

STORAGE

F-125

GROUP

STORAGE

F-123

OFFICE

F-121

OFFICE

F-119

EXAM

ROOM

F-131

EXAM

ROOM

F-133

OFFICE

F-135

EXAM

ROOM

F-137

OFFICE

F-117

BREAK

D-105

DATA

D-107

OFFICE

D-181

OFFICE

D-183

OFFICE

D-185

OFFICE

D-189

OFFICE

D-187

OFFICE

C-181

OFFICE

C-183

OFFICE

C-185

OFFICE

C-187

LACTATION

B-190

OFFICE

B-181

OFFICE

B-183

OFFICE

B-185

OFFICE

B-187

OFFICE

B-189

HALLWAY

B-CO80

OFFICE

A-189

OFFICE

A-187

OFFICE

A-185

OFFICE

A-181

OFFICE

A-183

HALLWAY

A-CO80

TOILET

A-10B

WAITING

A-WL1

VENDING

F-101

DATA

F-124

MECH

F-126

ELEC

F-129 STAIR 2

F-128

WOMAN

TOILET

F-122

MENS

TOILET

F-120 BREAK

ROOM

F-118

OFFICE

F-116

WAITING

F-108

EXAM

ROOM

F-130

EXAM

ROOM

F-132

EXAM

ROOM

F-134

EXAM

ROOM

F-136

INTERVIEW

Room F-138

INSTRUMENT

RM

F-139

CONF

ROOM 2

F-140

OFFICE

F-110

OFFICE

F-111

OFFICE

F-112

OFFICE

F-113

OFFICE

F-115

OFFICE

F-114

ELEVATOR

F-104B

CONF

ROOM

F-107

HALLWAY

F-150

LOBBY

F-100

RECEPTION

F-109

ELEVATOR

F-104A

ROTUNDA

F-104

COURTYARD

F-143

ELEC

E-EC2

ELEC

E-EC1

MECH

E-ME1

CLEAN

LINEN

E-109

HAC

E-111

UNAS

E-115

CT

STORAGE

E-TC1

NO WORK IN THESE AREAS

GENERAL SHEET NOTES

KEYED NOTES

1. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING

SIGNIFICANT DISCREPANCIES TO THE ATTENTION OF THE C.O.R. FOR REVIEW.

2. COORDINATE DEMOLITION PHASING AND SCHEDULE WITH THE C.O.R. PRIOR TO

STARTING WORK.

3. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING

DEMOLITION, INCLUDING MECHANICAL & FIRE SUPPRESSION SYSTEMS.

4. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO

RECEIVE NEW FINISH PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE

INCURRED DURING OR PRIOR TO THE START OF WORK TO MATCH EXISTING

CONDITION INCLUDING FIREPROOF MATERIALS.

5. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING

CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE

THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY

DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.

6. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE

RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.

7. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE,

INCLUDED BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA

PORTS, INTERIOR DEVICES, ETC. REFER TO ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT

CONSULTANT: A/E:

GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

03-20-2025

FULLY

SPRINKLEDNOT FOR CONSTRUCTION

FOR OFFICIAL USE ONLY (FOUO)

07.17.2024DESIGN DEVELOPMENT 65%

11.12.2024CONSTRUCTION DOCUMENTS 95%

01.11.2025CONSTRUCTION DOCUMENTS 100%

03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01

A u to d e s k D o c s /2

-1

C o rr e c t

M e n ta l H e a lt h

D e fi c ie n c ie s

P a lo A lt o C

A /2

-1

B

L D

G

A R

C H

R

.r v t

AD-110

DEMOLITION PLAN - ADMIN

Checker Author

BUILDING 520 MENTAL HEALTH

DEFICIENCIES

3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304

100% CONSTRUCTION

DOCUMENTS

640-23-104

1/8" = 1'-0"F4

DEMOLITION PLAN - ADMIN

NORTH

0' 4' 8' 16'

N H

N C N

C

M A

T C

H L

IN

E

S E

E S

H E

E T

A D

-1

COURTYARD

A-CT1

DINING

A-170

TOILET

A-178

HAC

A-176A

FOOD

CARTS

A-176 GARDEN

STORAGE

ACT-1A

OFFICE

A-189

OFFICE

A-187

OFFICE

A-185

OFFICE

A-181

OFFICE

A-183

HALLWAY

A-CO80

OFFICE

A-182

SHARED

OFFICE

A-186

OFFICE

A-184

TOILET

A-140

DAYROOM

A-130

BED

A-135

BATH

A-135A

BATH

A-136A

BED

A-136

BED

A-137

PERS

STORAGE

A-141

BATH

A-143A

BATH

A-137A

BED

A-127

BED

A126

BED

A-123

BATH

A-122A

BED

A-122

BATH

A-126A

BATH

A-125A

BATH

A-123A

BED

A-121

BATH

A-121A

BATH

A-127A

LAUNDRY

A-128

BATH

A-133A

BED

A-134

GARDEN

A-CT2

BATH

A-134A

BED

A-132

BED

A-133

ACC. BED

A-143

DATA

A-SC1

EXAM

A-147

SOILED

UTIL

A-158

VESTIBULE

A-159

CLEAN

STORAGE

A-160

ELEC

A-EC1

HAC

A-146

PROG

STORAGE

A-148

MEDS

A-150B

CONFERENCE

A-152

SAHRED

OFFICE

A-150A

OBSERVATION

A-145

BATH

B-145A

BATH

A-145A

EXERCISE

A-129

THERAPY

TUB

A-131

BATH

A-132A

HALLWAY

A-CO41

HALLWAY

A-CO70

DAYROOM

A-117

CONFERENCE

A-115

OFFICE

COPY

A-111

LOUNGE

LOCKERS

A-109

WOMEN'S

F-102BATH

A-109A

HALLWAY

A-CO60

HALLWAY

A-CO50

TOILET

A-10B

WAITING

A-WL1

VENDING

F-101

HALLWAY

A-CO71

HALLWAY

A-CO40

BED

A-125

OFFICE

A-120

HALLWAY

A-CO20

NURSE

STATION

A-150

NOURISHMENT

A-130A

HALLWAY

A-CO10

16D 16D 16D 16D 16D

16D 16D 16D

16D

16D

16D

16D 16D 16D

16D

16D

16D

16D

16D

16D

16D

16D 16D

NO WORK IN THESE AREAS

A-402

B3

A-402

B7

16D

16D

25D

27D

26D

26D

25D

16D

16D16D

GENERAL SHEET NOTES

KEYED NOTES

1. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING

SIGNIFICANT DISCREPANCIES TO THE ATTENTION OF THE C.O.R. FOR REVIEW.

2. COORDINATE DEMOLITION PHASING AND SCHEDULE WITH THE C.O.R. PRIOR TO

STARTING WORK.

3. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING

DEMOLITION, INCLUDING MECHANICAL & FIRE SUPPRESSION SYSTEMS.

4. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO

RECEIVE NEW FINISH PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE

INCURRED DURING OR PRIOR TO THE START OF WORK TO MATCH EXISTING

CONDITION INCLUDING FIREPROOF MATERIALS.

5. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING

CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE

THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY

DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.

6. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE

RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.

7. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE,

INCLUDED BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA

PORTS, INTERIOR DEVICES, ETC. REFER TO ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT

CONSULTANT: A/E:

GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

03-20-2025

FULLY

SPRINKLEDNOT FOR CONSTRUCTION

FOR OFFICIAL USE ONLY (FOUO)

07.17.2024DESIGN DEVELOPMENT 65%

11.12.2024CONSTRUCTION DOCUMENTS 95%

01.11.2025CONSTRUCTION DOCUMENTS 100%

03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01

A u to d e s k D o c s /2

-1

C o rr e c t

M e n ta l H e a lt h

D e fi c ie n c ie s

P a lo A lt o C

A /2

-1

B

L D

G

A R

C H

R

.r v t

AD-111

DEMOLITION PLAN - WARD A

AG MA

BUILDING 520 MENTAL HEALTH

DEFICIENCIES

3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304

100% CONSTRUCTION

DOCUMENTS

640-23-104

1/8" = 1'-0"F5

DEMOLITION PLAN - WARD A

NORTH

0' 4' 8' 16'

16D REMOVE EXISTING CARPETING AND ADHESIVE TO EXPOSE CLEAN CONCRETE

SLAB

25D SAW CUT AND REMOVE EXISTING FLOOR TILE AND SLAB, REPLACE WITH PROPER

SLOPE

26D REMOVE EXISTING FIXTURES AS REQUIRED TO REPLACE FLOOR SLAB AND

REINSTALL

27D REMOVE EXISTING SHOWER SCREEN

NC

C

N C

N C

N C

N C N

C

NC

N C

N C

N C

N

CNC

N C

NC

NC NC

NC

N C N

C

N C

N C

NC

NC

NC

NC

NC

N C

N C

N C

N C

N C N C

N

CN

C

NC

NC

N H

NH

NH

N H

NC

NC

N C

N C

NC

N C

N C N C N

C N C

NC

N C N

C

N H

N H

N H

NH

CR

C 1

CR

CR

M A

T C

H L

IN

E

S E

E S

H E

E T

A D

-1

M A

TC

H

LI

N E

S E E S

H E E T

A D -1

BATH

B-109B

LOUNGE

LOCKERS

B-109

TOILET

B-109C

BATH

B-133A

BED

B-134

BED

B-125

BED

B-126

BED

B-127

BED

B-123

BATH

B-122A

BED

B-122

BATH

B-134A

BED

B-133

BED

B-132

TOILET

B-131

BATH

B-132A

BATH

B-126A

BATH

B-125A

BATH

B-123A

BED

B-121

BATH

B-121A

OFFICE

B-120

TOILET

B-140

MILIEU

B-130

BED

B-135

BED

B-136

BATH

B-136A

BATH

B-135A

ANTE

B-141

BED

B-137

BATH

B-143A

BATH

B-137A

GARDEN

B-CT2

MEDS

B-150B

CONFERENCE

B-152

SOILED

UTIL

B-148

PERS

STORAGE

B-154

CLEAN

STORAGE

B-160

BATH

B-127A

EXERCISE

B-129

LAUNDRY

B-128

LACTATION

B-190

OFFICE

B-181

OFFICE

B-183

OFFICE

B-185

OFFICE

B-187

OFFICE

B-189WAITING

CWL1

GARDEN

STORAGE

B-CT1A

COURTYARD

B-CT1

ELEC

B-EC1

TOILET

B-178

HAC

B-174

COURTYARD

C-CT3

VESTIBULE

B

B-CO01

INTERVIEW

B-111

BATH

B-111A

CONFERENCE

B-115

GROUP

ROOM

B-117

TOILET

B-170B

HALLWAY

B-CO80

BED

B-145

RESTRAINT

B-143

CLEAN

LINEN

B-146

EXAM

B-147

HALLWAY

B-CO41

HALLWAY

B-CO50

DATA

A-SC1

BATH

B-145A

BATH

A-145A

HALLWAY

A-CO70

HALLWAY

A-CO60

HALLWAY

A-CO71

R.T.

STORAGE

B-172

DINING

B-170

TOILET

B-188

SHARED

OFFICE

B-186

OFFICE

B-182

OFFICE

B-184

HALLWAY

B-CO20

HALLWAY

B-CO10

NURSE

STATION

B-150

COPY

B-150A

MED DISP

B-150C

HALLWAY

B-CO40

NOURISHMENT

B-130A

VESTIBULE

B-170A

5D

13D

23D

4D

8D

3D

3D

2D

13D

24D

4D

10D

8D

8D

9D

8D9D

8D

4D

10D

4D

8D 9D

10D

13D

15D

10D 10D

8D

8D

4D 4D

8D9D 8D9D 8D9D

8D

10D 11D

4D

22D

10D 8D

4D

23D

8D9D

8D9D

10D

8D

4D

10D

8D

4D

8D

9D 8D 9D

10D

8D

4D

10D

8D

4D

8D 9D

8D 9D

10D

8D

NO WORK IN THESE AREAS

A-401

B7

SIM

A-401

F7

SIM

A-400

C7

SIM

A-400

C1

SIM

A-400

C4

SIM

17D

17D

17D

17D

17D24D

7D

7D

8D

8D10D

8D

14D23D

24D

4D

4D

6D

6D

8D

10D

17D

3D

12D

6D 24D

23D

8D

24D

9D

2D

3D

3D

5D

13D

13D

21D 21D

21D

13D

8D4D

7D

8D

13D

24D

24D

7D

4D

21D

17D

24D

13D

4D

23D

22D

12D

22D

22D

22D22D

22D 22D

4D

23D

22D22D

22D

23D

22D

22D

22D

22D

22D

22D

22D

22D

22D

22D

22D

23D

12D

22D

22D

22D 22D

22D 22D

22D

22D

22D

22D 22D

22D

24D

22D

24D

24D

22D

12D

23D

22D

22D 12D

23D

24D

GENERAL SHEET NOTES

KEYED NOTES

1. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING

SIGNIFICANT DISCREPANCIES TO THE ATTENTION OF THE C.O.R. FOR REVIEW.

2. COORDINATE DEMOLITION PHASING AND SCHEDULE WITH THE C.O.R. PRIOR TO

STARTING WORK.

3. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING

DEMOLITION, INCLUDING MECHANICAL & FIRE SUPPRESSION SYSTEMS.

4. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO

RECEIVE NEW FINISH PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE

INCURRED DURING OR PRIOR TO THE START OF WORK TO MATCH EXISTING

CONDITION INCLUDING FIREPROOF MATERIALS.

5. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING

CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE

THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY

DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.

6. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE

RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.

7. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE,

INCLUDED BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA

PORTS, INTERIOR DEVICES, ETC. REFER TO ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT

CONSULTANT: A/E:

GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

03-20-2025

FULLY

SPRINKLEDNOT FOR CONSTRUCTION

FOR OFFICIAL USE ONLY (FOUO)

07.17.2024DESIGN DEVELOPMENT 65%

11.12.2024CONSTRUCTION DOCUMENTS 95%

01.11.2025CONSTRUCTION DOCUMENTS 100%

03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01

A u to d e s k D o c s /2

-1

C o rr e c t

M e n ta l H e a lt h

D e fi c ie n c ie s

P a lo A lt o C

A /2

-1

B

L D

G

A R

C H

R

.r v t

AD-112

DEMOLITION PLAN - WARD B

Checker Author

BUILDING 520 MENTAL HEALTH

DEFICIENCIES

3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304

100% CONSTRUCTION

DOCUMENTS

640-23-104

1/8" = 1'-0"F4

DEMOLITION PLAN - WARD B

NORTH

0' 4' 8' 16'

2D REMOVE EXISTING WINDOW BLINDS AND HARDWARE, PATCH AND REPAIR WALL TO

MATCH EXISTING ADJACENT

3D REMOVE EXISTING WALL MOUNTED PC CABINET. PATCH AND REPAIR WALL

DAMAGED FROM MOUNTING POINTS. PROVIDE BLANK COVER WITH SECURITY

FASTENERS AT JUNCTION BOXES

4D EXISTING PLUMBING FIXTURES TO BE REMOVED AND REPLACED WITH NEW - SEE

PLUMBING PLANS FOR ADDITIONAL INFORMATION

5D EXISTING HALF LIGHT DOOR FRAME AND SIDELIGHT TO BE REMOVED AND

REPLACED. FR FRAME AT 2 HOUR WALL

6D EXISTING CASEWORK TO BE MODIFIED - SEE ENLARGED PLANS

7D EXISTING DOOR AND HOLLOW METAL FRAME TO BE REMOVED AND REPLACED

8D EXISTING NURSE CALL BUTTONS TO BE REMOVED AND REPLACED, SEE

ELECTRICAL PLANS FOR ADDITIONAL INFORMATION

9D WALL MOUNTED LIGHT FIXTURE AND JUNCTION BOX TO BE REMOVED. WALL

PATCHED AND PAINTED TO MATCH EXISTING

10D REMOVE EXISTING RECESSED PAPER TOWEL DISPENSER - PATCH SOLID SURFACE

WALL COVERING TO MATCH EXISTING

11D REMOVE EXISTING BUILT-IN UTILITY COVER AND EQUIPMENT FIXING AND REPLACE

WITH NEW BUILT-IN CASEWORK

12D EXISTING FAUCET TO BE REMOVED AND REPLACED - SEE PLUMBING PLANS FOR

ADDITIONAL INFORMATION

13D EXISTING EXIT SIGNS TO BE REMOVED AND REPLACED - SEE ELECTRICAL PLANS

FOR ADDITIONAL INFORMATION

14D REMOVE PRESSURE SENSOR, INDICATOR AND J-BOXES - SEE MECHANICAL PLANS

FOR ADDITIONAL INFORMATION. PATCH, REPAIR AND PAINT WALL TO MATCH

EXISTING ADJACENT.

15D REMOVE AND REPLACE EXISTING RECESSED FIRE EXTINGUISHER CABINET

17D REMOVE AND REPLACE DOOR AND FRAME, SIDELIGHT TO REMAIN. NEW WOOD

DOOR IN FRAME WITH CONCEALED CLOSER.

21D REMOVE EXISTING DOOR CLOSER. REPLACE WITH NEW CLOSER ON SECURE SIDE

OF DOOR

22D REMOVE AND REPLACE EXISTING SOAP DISPENSER

23D REMOVE AND REPLACE EXISTING PAPER TOWEL DISPENSER

24D EXISTING NURSE CALL TO BE REMOVED. PROVIDE BLANK COVER PLATE WITH

TAMPER RESISTANT SCREWS

NC

N C

N C

NC

NC NC

NC

NC

N C

N C

NC NC

NC NC

N

C

N C

N C

N C

NC

NC

NC

NC

N C

N C

N C

N C

N C

NC

NC NC

NCNC

NC

N C

NC

NC

NC

NC

NC

N C

NC

NH

NH

NH

N H N H

NH

C R

N C

N C

N C

N H

NC NC

NC

NC

NH

C R

C R

C R

M A

TC

H

LI

N E

S E E S

H E E T

A D -1

MATCHLINE

SEE SHEET AD-114

HALLWAY

C-CO70

HALLWAY

C-CO40

HALLWAY

C-CO60

BATH

C-133A

BED

C-134

BED

C-127

BED

C-126

BED

C-125

BED

C-123

BATH

C-123A

BED

C-122

BATH

C-134A BED

C-132

BED

C-133

TOILET

C-131

BATH

C-132A

BATH

C-126A

BATH

C-125A

BATH

C-122A

BED

C-121

BATH

C-121A

TOILET

C-140

VESTIBULE

C-170A

BED

C-135

BATH

C-135A

BATH

C-136A

BED

C-136

BED

C-137

ANTE

C-141

BATH

C-143A

BATH

C-137A

GARDEN

C-CT2

CONFERENCE

C-152

SOILED

UTIL

C-148

PERS

STORAGE

C-154

RESTRAINT

C-143

TOILET

C-170B

STORAGE

C-CT1A

TOILET

C-178 OFFICE

C-181

OFFICE

C-183

HALLWAY

C-CO80

SHARED

OFFICE

C-186

EXAM

C-147

CLEAN

LINEN

C-146

CLEAN

STORAGE

C-160

BED

C-145

HALLWAY

C-CO41

DATA

C-SC1

EXERCISE

C-129 BATH

C-127A

DAYROOM

C-117

INTERVIEW

C-111

CONFERENCE

C-115

BATH

C-111A

OFFICE

C-185

OFFICE

C-187

BATH

B-109B

LOUNGE

LOCKERS

B-109

VEST C

C-CO1

TOILET

B-109C

COURTYARD

C-CT1

LACTATION

B-190

WAITING

CWL1

COURTYARD

C-CT3

HALLWAY

C-CO10

HALLWAY

C-CO50

ELEC

C-EC1

HAC

C-174

R.T.

STORAGE

C-172

HALLWAY

C-CO20

HALLWAY

C-CO71

BATH

C-145A

BATH

D-145A

DINING

C-170

LAUNDRY

C-128

OFFICE

C-120

DAYROOM

C-130

NOURISHMENT

C-130A NURSE

STATION

C-150

COPY

C-150C

1D

10D 8D

NO WORK IN THESE AREAS

4D

10D

1D

4D

8D

8D9D

1D

10D

8D

4D

8D

9D

8D

10D 4D

1D

8D 9D 8D9D 8D

10D

4D 1D

8D9D

8D

10D 4D

1D

8D 9D

1D 4D

8D

10D

1D

9D 8D

4D

10D

8D

4D

1D

10D

9D

8D

8D

8D

4D

1D

9D

8D

4D

10D

8D

9D 8D

8D

4D

10D

1D

9D

8D

1D

10D 8D4D

10D

1D

4D 8D

9D

9D

8D

1D

10D

A-400

C4

SIM

A-401

B7

SIM

A-400

C1

SIM

A-400

C7

SIM

A-401

F7

SIM

3D

12D 11D

3D

23D8D4D

2D

3D

24D

24D

24D

4D

8D

23D

24D

23D

10D

4D

3D

22D

4D

23D

8D 14D

10D 4D

8D

1D

5D

15D

7D

7D

17D

17D

17D

17D 17D

17D

13D

13D

13D

MEDS

C-150B

13D

7D

12D 22D

22D

6D

13D

24D

13D

21D 3D

24D

12D

21D

7D

12D

21D

6D

12D

2D

17D

8D

22D 22D

22D 23D

23D

22D

23D

24D

22D

22D22D

22D

22D

22D 22D

22D 22D

22D

22D

22D

22D

23D

22D 22D

22D 22D

22D

22D

22D

22D

22D 22D

22D 22D

24D

22D22D

5D

24D

24D

22D

22D

23D

23D

22D

24D

6D

13D

13D

GENERAL SHEET NOTES

KEYED NOTES

1. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING

SIGNIFICANT DISCREPANCIES TO THE ATTENTION OF THE C.O.R. FOR REVIEW.

2. COORDINATE DEMOLITION PHASING AND SCHEDULE WITH THE C.O.R. PRIOR TO

STARTING WORK.

3. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING

DEMOLITION, INCLUDING MECHANICAL & FIRE SUPPRESSION SYSTEMS.

4. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO

RECEIVE NEW FINISH PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE

INCURRED DURING OR PRIOR TO THE START OF WORK TO MATCH EXISTING

CONDITION INCLUDING FIREPROOF MATERIALS.

5. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING

CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE

THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY

DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.

6. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE

RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.

7. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE,

INCLUDED BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA

PORTS, INTERIOR DEVICES, ETC. REFER TO ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT

CONSULTANT: A/E:

GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

03-20-2025

FULLY

SPRINKLEDNOT FOR CONSTRUCTION

FOR OFFICIAL USE ONLY (FOUO)

07.17.2024DESIGN DEVELOPMENT 65%

11.12.2024CONSTRUCTION DOCUMENTS 95%

01.11.2025CONSTRUCTION DOCUMENTS 100%

03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01

A u to d e s k D o c s /2

-1

C o rr e c t

M e n ta l H e a lt h

D e fi c ie n c ie s

P a lo A lt o C

A /2

-1

B

L D

G

A R

C H

R

.r v t

AD-113

DEMOLITION PLAN - WARD C

Checker Author

BUILDING 520 MENTAL HEALTH

DEFICIENCIES

3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304

100% CONSTRUCTION

DOCUMENTS

640-23-104

1/8" = 1'-0"F5

DEMOLITION PLAN - WARD C

NORTH

0' 4' 8' 16'

1D DEDUCTIVE ALTERNATE 01: REMOVE EXISTING SOLID CORE WOOD DOOR AND

HARDWARE, HOLLOW METAL FRAME TO REMAIN. EXISTING FRAME HARDWARE

PREP TO BE FILLED SMOOTHED FOR PAINTING

2D REMOVE EXISTING WINDOW BLINDS AND HARDWARE, PATCH AND REPAIR WALL

TO MATCH EXISTING ADJACENT

3D REMOVE EXISTING WALL MOUNTED PC CABINET. PATCH AND REPAIR WALL

DAMAGED FROM MOUNTING POINTS. PROVIDE BLANK COVER WITH SECURITY

FASTENERS AT JUNCTION BOXES

4D EXISTING PLUMBING FIXTURES TO BE REMOVED AND REPLACED WITH NEW - SEE

PLUMBING PLANS FOR ADDITIONAL INFORMATION

5D EXISTING HALF LIGHT DOOR FRAME AND SIDELIGHT TO BE REMOVED AND

REPLACED. FR FRAME AT 2 HOUR WALL

6D EXISTING CASEWORK TO BE MODIFIED - SEE ENLARGED PLANS

7D EXISTING DOOR AND HOLLOW METAL FRAME TO BE REMOVED AND REPLACED

8D EXISTING NURSE CALL BUTTONS TO BE REMOVED AND REPLACED, SEE

ELECTRICAL PLANS FOR ADDITIONAL INFORMATION

9D WALL MOUNTED LIGHT FIXTURE AND JUNCTION BOX TO BE REMOVED. WALL

PATCHED AND PAINTED TO MATCH EXISTING

10D REMOVE EXISTING RECESSED PAPER TOWEL DISPENSER - PATCH SOLID

SURFACE WALL COVERING TO MATCH EXISTING

11D REMOVE EXISTING BUILT-IN UTILITY COVER AND EQUIPMENT FIXING AND

REPLACE WITH NEW BUILT-IN CASEWORK

12D EXISTING FAUCET TO BE REMOVED AND REPLACED - SEE PLUMBING PLANS FOR

ADDITIONAL INFORMATION

13D EXISTING EXIT SIGNS TO BE REMOVED AND REPLACED - SEE ELECTRICAL PLANS

FOR ADDITIONAL INFORMATION

14D REMOVE PRESSURE SENSOR, INDICATOR AND J-BOXES - SEE MECHANICAL PLANS

FOR ADDITIONAL INFORMATION. PATCH, REPAIR AND PAINT WALL TO MATCH

EXISTING ADJACENT.

15D REMOVE AND REPLACE EXISTING RECESSED FIRE EXTINGUISHER CABINET

17D REMOVE AND REPLACE DOOR AND FRAME, SIDELIGHT TO REMAIN. NEW WOOD

DOOR IN FRAME WITH CONCEALED CLOSER.

21D REMOVE EXISTING DOOR CLOSER. REPLACE WITH NEW CLOSER ON SECURE SIDE

OF DOOR

22D REMOVE AND REPLACE EXISTING SOAP DISPENSER

23D REMOVE AND REPLACE EXISTING PAPER TOWEL DISPENSER

24D EXISTING NURSE CALL TO BE REMOVED. PROVIDE BLANK COVER PLATE WITH

TAMPER RESISTANT SCREWS

C

N C

N C

N C N

C

NC NC

NC NC

N C

NC

NC

N C

NC

N C

N C

NC

NC

NC

NC

NC

N C

N C

N C

N C

N C

NC

NC

N C

NC

NC

NC

NC

NC

NC

N C

N C

NC

NC

NC

NC

NC

N C

NC

NC

NC

N C

N C

NC

NH

NH

NH

N H

N H

N H

NH

C R

NC

N H

NH C

R

MATCHLINE

SEE SHEET AD-113

HALLWAY

C-CO70

HALLWAY

C-CO60

BATH

D-133A

BED

D-134

BATH

D-134A

BED

D-125

BED

D-126

BED

D-127

EXERCISE

D-129

BED

D-123

BATH

D-122A

BED

D-122

TOILET

D-131

BATH

D-132A

BATH

D-127A

BATH

D-126A

BATH

D-125A

BATH

D-123A

BED

D-121

BATH

D-121A

GROUP

RM.

D-117

CONFERENCE

D-115 INTERVIEW

D-111

BATH

D-111A

BREAK

D-105

LOUNGE/LOCKERS

D-109

BATH

D-109A

BATH

D-105A

DATA

D-107

TOILET

D-140

HALLWAY

D-CO40

BED

D-135

BED

D-136

BATH

D-136A

BATH

D-135A

ANTE

D-141

BED

D-137

BATH

D-137A

BATH

D-143A

MEDS

D-150B

CONFERENCE

D-152

SOILED

UTIL

D-148

PERS

STORAGE

D-154

RESTRAINT

D-143

TOILET

D-170B

DINING

D-170

GARDEN

STORAGE

D-CT1A

COURTYARD

D-CT1

SHARED

OFFICE

D-168

OFFICE

D-184

OFFICE

D-182

TOILET

D-178

FOOD

CARTS

D-176

HAC

D-176A

HALLWAY

D-CO80

OFFICE

D-181

OFFICE

D-183

OFFICE

D-185

OFFICE

D-189

OFFICE

D-187

EXAM

D-147

CLEAN

STORAGE

D-160

BED

D-145

HAC

D-146

ELEC

D-EC1

HALLWAY

D-CO41

DATA

C-SC1

HALLWAY

D-C010

NOURISHMENT

D-130A

LOADING

E-CO10

HALLWAY

D-CO50

NURSE

STATION

D-150

WAITING

D-WL1

HALLWAY

C-CO71

BATH

C-145A

BATH

D-145A

VEST D

D-C01

BED

D-132

BED

D-133

RECYCLING

E-101

SOILED

LINEN

E-103

EMS

EQUIP

E-105

EMS

STORAGE

E-107

CLEAN

LINEN

E-109

HAC

E-111

UNAS

E-115

CT

STORAGE

E-TC1

GARDEN

D-CT2

DAYROOM

D-130

LAUNRY

D-128

OFFICE

D-120

COPY

D-150C

VESTIBULE

D-170A

1D10D

4D

8D

9D

8D

8D

4D

10D

1D

13D

15D

8D

9D

10D 8D

1D

4D

4D 10D

1D

8D

9D

8D

8D

9D

1D

8D 10D 4D

9D

8D1D

24D

24D

11D 12D

10D

8D

1D

8D 23D

4D

8D9D

1D

4D 8D 10D8D

1D

10D

8D

9D

13D

8D

8D9D

8D

1D

10D4D

4D

1D

10D 8D

8D 9D

10D

8D

9D

23D

4D 8D

1D

1D

1D

6D

24D

4D

22D 3D

14D

14D

8D

9D

23D 3D

3D 2D

13D

4D

8D

23D

22D

12D 23D

12D

6D

13D

24D

24D

2D

4D 23D

5D

NO WORK IN THESE AREAS

10D 8D

8D

4D

4D

8D 9D

4D 4D

A-400

C4

SIM

A-400

C7

SIM

A-401

B7

SIM

A-401

F7

SIM

A-400

C1

SIM

9D

3D 3D

24D

5D

17D 17D

17D…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .