About this file
These architectural design drawings detail the renovation and mental health deficiencies corrections for Building 520 at the VA Palo Alto Healthcare System located at 3801 Miranda Avenue in Palo Alto, California. The comprehensive set of drawings includes floor plans, demolition plans, enlarged plans, and door schedules for multiple wards (A, B, C, D) and administrative areas, with specific focus on improving patient safety and facility functionality. Key modifications include replacing doors with ligature-resistant and breakaway designs, updating casework and cabinetry, installing new plumbing fixtures, upgrading electrical components, and refurbishing patient care spaces with enhanced safety features.
The project is classified as a pre-solicitation construction contract with an estimated value between $2-5 million, using NAICS code 236220 for Commercial and Institutional Building Construction. The solicitation will be a full and open competition, restricted to Service-Disabled Veteran Owned Small Businesses (SDVOSB) verified through Network Contracting Office 21 (NCO 21). The draft solicitation is expected to be released in mid-late May 2025, with a site visit date to be determined. Potential bidders must be registered in the System for Award Management (SAM) and have current online representations and certifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26125R0042 0003.docx | DOCX document | |
| 36C26125R0042 0002.pdf | ||
| 640-23-104_100_Submission_DRAWINGS_R1 Full set.pdf | ||
| 36C26125R0042 0001.pdf | ||
| WAGE DETERMINATION CA-HI-NV 5-18-24 for this USE CA20240018.pdf | ||
| Exhibit2_640-23-104_B520_PSU_SPECS.pdf | ||
| Supplemental Price Breakdown by Division Sheet.docx | DOCX document | |
| Exhibit1_640-23-104_B520_PSU_DRAWINGS.pdf | ||
| REQUEST FOR INFORMATION FORM 1.docx | DOCX document | |
| Exhibit3_640-23-104_B520_PSU_Cutsheets.pdf | ||
| 36C26125R0042_1.docx | DOCX document | |
| DRAFT_640-23-104_B520_PSU_SPECS.pdf | ||
| DRAFT Correct B520 SOW.pdf | ||
| 36C26125R0042_2.docx | DOCX document | |
| DRAFT_640-23-104_B520_PSU_Cutsheets.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACCESSIBILITY CODE
FEDERAL ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABASS), REV 2015
PG-18-13 VA FIRE BARRIER (A SUPPLEMENT TO FEDERAL BARRIERS ACT ACCESSIBILITY
STANDARDS) FIRE DESIGN GUIDE, DEC 2011
BUILDING CODES
INTERNATIONAL CODE COUNCIL (ICC)
IBC—INTERNATIONAL BUILDING CODE, 2021
IMC—INTERNATIONAL MECHANICAL CODE, 2021
IPC—INTERNATIONAL PLUMBING CODE, 2021
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) LATEST EDITIONS
NFPA 1 FIRE CODE
NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHER
NFPA 13 STANDARDS FOR INSTALLATION ON SPRINKLER SYSTEMS
NFPA 70 NATIONAL ELECTRICAL CODE (NEC) ESSENTIALS
NFPA 70E ELECTRICAL SAFETY IN THE WORKPLACE
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE
NFPA 75 STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT
NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS
NFPA 99 HEALTHCARE FACILITIES CODE
NFPA 101 LIFE SAFTY CODE ESSENTIALS
NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION ALTERATION AND DEMOLITION OPERATIONS
NFPA 780 STANDARD FOR THE INSTALLATION OF LIGHTNING PROTECTION
NFPA 855 STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE SYSTEMS
NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
VA DESIGN MANUALS
VA OFFICE OF CONSTRUCTION AND FACILITY MANAGEMENT DESIGN MANUAL: AUGUST 1, 2014
TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATIONS SYSTEMS: FEBRUARY 1, 2016
VA FIRE PROTECTION DESIGN MANUAL: NINTH EDITION - NOVEMBER 01, 2023
VA HVAC DESIGN MANUAL: NOVEMBER 1, 2017, REV. MARCH 1, 2024
VA PLUMBING DESIGN MANUAL - FEBRUARY 2024
VA INTERIOR DESIGN MANUA: NOVEMBER 1, 2020
VA ELECTRICAL DESIGN MANUAL: ECEMBER 1, 2019
VA LIGHTING DESIGN MANUAL: JANUARY 1, 2022
VA STRUCTURAL DESIGN MANUAL: OCTOBER 1, 2022, REV JULY 1, 2023
VA SUSTAINABLE DESIGN MANUAL MANUAL – REV 1 AUGUST 18, 2017,
VA-JOINT COMMISSION CLARIFICATION DOCUMENTS
SUMMARY OF DISCUSSION ISSUES RELATED TO VHA IMPLEMENTATION OF THE JOINT COMMISSION
ENVIRONMENT OF CARE (EC) AND LIFE SAFETY (LS) STANDARDS, MAY 2021 REVISION.
VA ASBESTOS ABATEMENT DESIGN MANUAL FOR NEW HOSPITALS, REPLACEMENT HOSPITALS, AMBULATORY CARE, CLINICAL ADDITIONS, ENERGY CENTERS, OUTPATIENT CLINICS, ANIMAL RESEARCH FACILITIES, LABORATORY BUILDINGS – JULY 2011
NATIONAL INSTITUTE OF HEALTH
DESIGN REQUIREMENTS MANUAL - MARCH 2020
MECHANICAL DESIGN STANDARDS
AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD 52.2 – METHOD OF TESTING - GENERAL VENTILATION AIR-CLEANING DEVICES FOR REMOVAL
EFFICENCY BY PARTICLE SIZE, 2017
STANDARD 62.1 – VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY, 2017
STANDARD 90.1 - ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS, 2013
STANDARD 170 - VENTILATION OF HEALTH CARE FACILITIES, 2021
SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION
HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE
HVAC SYSTEMS COMMISSIONING MANUAL, 2ND EDITION, 2013
SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEMS, 3RD EDITION, 2008
ELECTRICAL DESIGN STANDARDS
UNDERWRITER’S LABORATORY, INC (UL) STANDARDS – 2019
ANSI/TIA-568-D SERIES, COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING STANDARD, AND ITS
PUBLISHED ADDENDA. -2017
ANSI/TIA 568.0-E, GENERIC TELECOMMUNICATIONS CABLING FOR CUSTOMER PREMISES, AND ITS PUBLISHED
ADDENDA. – 2017
ANSI/TIA 568.1-E, COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING STANDARD, AND ITS PUBLISHED
ADDENDA. – 2017
ANSI/TIA 568.2-D, BALANCED TWISTED-PAIR TELECOMMUNICATIONS CABLING AND COMPONENTS. 2017
ANSI/TIA 568.3-D, OPTICAL FIBER CABLING COMPONENTS STANDARD, AND ITS PUBLISHED
ADDENDA. – 2017
ANSI/TIA 568.4-D BROADBAND COAXIAL CABLING AND COMPONENTS STANDARD
ANSI/TIA-569-C, COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS PATHWAYS AND SPACES, AND
ITS PUBLISHED ADDENDA. – 2017
ANSI/TIA-606-A, ADMINISTRATION STANDARD FOR THE TELECOMMUNICATIONS INFRASTRUCTURE OF
COMMERCIAL BUILDINGS, AND ITS PUBLISHED ADDENDA – 2017
ANSI/J-STD-607-A, COMMERCIAL BUILDING GROUNDING (EARTHING) AND BONDING REQUIREMENTS FOR
TELECOMMUNICATIONS, AND ITS PUBLISHED ADDENDA. – 2017
BUILDING INDUSTRIES CONSULTING SERVICES INTERNATIONAL (BICSI) – 2019
TELECOMMUNICATIONS DISTRIBUTION METHODS MANUAL (TDMM) -2020
NFPA 70E, 2021
STRUCTURAL ENGINEERING DESIGN STANDARDS
AMERICAN CONCRETE INSTITUTE (ACI 2019)
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC 15TH EDITION)
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE 7-16)
CIVIL ENGINEERING DESIGN STANDARDS
VA SITE DEVELOPMENT DESIGN MANUAL — APRIL 1, 2021
INTERNATIONAL BUILDING CODE (IBC) — 2018
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
CONSULTANT
CONSULTANT: A/E:
GDM of Oregon 1308 NE 134th ST. SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
VA PROJECT NUMBER:
PROJECT TEAM
APPLICABLE CODES, REGULATIONS AND DESIGN MANUALS
OWNER
NOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
ARCHITECTURAL PLUMBING ELECTRICAL
MECHANICAL LOW VOLTAGE
COST ESTIMATOR
FIRE PROTECTION
VA CONTRACT NUMBER:
US DEPARTMENT OF VETERAN AFFAIRS
35% DESIGN DEVELOPMENT 05/07/2024
07/17/202465% DESIGN DEVELOPMENT
10/29/202495% CONSTRUCTION DOCUMENTS
01/11/2025100% CONSTRUCTION DOCUMENTS
03/20/2025100% CONSTRUCTION DOCUMENTS - Revision 01
A u to d e s k D o c s /2
-1
C o rr e c t
M e n ta l H e a lt h
D e fi c ie n c ie s
P a lo A lt o C
A /2
-1
B
L D
G
A R
C H
R
.r v t
G-001
MA BS03/20/2025
COVER SHEET BUILDING 520 MENTAL HEALTH
DEFICIENCIES
3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304
100% CONSTRUCTION
DOCUMENTS
3801 MIRANDA AVENUE
VA PALO ALTO HEALTHCARE SYSTEM
BUILDING 520 MENTAL HEALTH DEFICIENCIES
100% CONSTRUCTION DOCUMENTS
640-23-104
GDM-AE
VAPAHCS
3801 Miranda Avenue
Palo Alto, CA 94304
GDM-AE
Scotten Blair
4317 6th Avenue SE Suite 300
Lacey, WA 98503
GDM-AE
POC: John Wasierski
1308 NE 134th Street Suite A
Vancouver, WA 98685
GDM-AE
Scotten Blair
4317 6th Avenue SE, Suite 300
Lacey, WA 98503
GDM-AE
Dave Clem
4317 6th Avenue SE Suite 300
Lacey, Wa 98503
POC: Mark Aylward
1308 NE 134th Street, Suite A
Vancouver, WA 98685
PRO Dims Dennis Teschlog
520 Kirkland Way, Suite 301
Kirkland WA 98033
GDM-AE
Conrad Chandler
1308 NE 134th Street Suite A
Vancouver, WA 98685
PALO ALTO, CALIFORNIA 94304
03/20/2025
640-23-104
36C26123D0039
Revisions: Date
DRAFT
NORTH ARROW
STRUCTURAL GRIDLINE
BUILDING SECTION /
WALL SECTION
ID
DWG#
DWG#
ID
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS DWG#
ID
DWG#
ENLARGED DETAIL DRAWING
ROOM NAME AND NUMBER
WINDOW TYPE
PARTITION TYPE
ELEVATION MARK
DOOR NUMBER
0' - 0"
X00
ARCHITECTURAL SYMBOLS LEGEND
NORTH
NORTH
EAST
SOUTH
WEST
REVISION TAG
DETAIL CALLOUT
ID
DWG#
Room name
REVISION CLOUD
REFERENCE KEYNOTE 00.00
SHEET KEYNOTE
ID
DIVISION
NOTE NUMBER
EQUIPMENT LABEL 1iA1000
A1
1. The contractor shall visit the project site prior to bidding to become familiar with the existing site conditions, security provisions, laydown area and other site-specific general conditions which may affect the bid value for this project.
2. The contractor shall arrange for and obtain all VA issued permits (hot work, ICRA, weekend work, holiday's, shutdown, etc.), certificates, inspections and department approvals for work performed under this contract and provide copies of the same to the COR.
3. Construction signage, font and size shall be consistent with the facility's existing signage systems.
4. Work is not to commence until approval of a cost loaded project schedule seperated by definable features of the work.
5. The contractor shall schedule, coordinate, and facilitate all power outages and shutdowns. Power outages and shutdowns must be scheduled with the COR, fourteen calendar days prior to the outage.
6. All required existing exits from occupied portions of the buildings must be always maintained.
7. The contractor shall establish procedures which minimize the circulation of construction personnel and materials through occupied portions of the building.
8. Prior to the delivery of materials to the construction zone and removal of waste from construction zones the contractor shall establish acceptable access routes and times with the COR.
9. Areas adjacent to the designated work areas shall be kept clean and free of obstructions.
10. Under no circumstances shall any areas outside the construction zone be utilized by the contractors without prior approval from the cor.
11. Construction materials shall not be stored in corridors at any time.
12. Trash shall be removed from the buildings daily. Contractor to provide and empty dumpsters as required. No construction related waste to be placed in existing VA trash removal apparatus.
13. All approved interior staging areas shall be protected with fire resistant enclosures.
14. If scope of work results in long-term ceiling removal, contractor to discuss with COR whether a rated enclosure must be constructed, or temporary upright sprinklers installed to meet NFPA requirements. Refer to NFPA 241 (2019), paragraph 8.6.2
15. Protect-in-place fire suppression systems during construction.
16. If penetrations through rated floors or walls cannot be fire-stopped at the end of the work shift, temporary firestopping composed of mineral wool should be installed in the penetration to provide temporary protection against fire/smoke spread through the unsealed penetration.
17. Notify the COR of any planned construction activities that may generate excessive noise. Schedule such work only with the consent of the COR.
18. Exercise care during construction and coordinate the sequence of work and phasing with the COR to prevent disruption of the medical center routine. Some aspects of the work and work in some areas will require the work to be performed only at night, weekends, or holidays at no additional cost to the government.
19. The project manual, which includes general conditions, supplemental conditions, and technical specifications is complementary to the drawings. Together these documents describe the project requirements, if there are discrepancies in requirements between the project manual and the drawings, the contractor shall advise the architect and request clarification.
20. The contractor shall provide all necessary materials, tools, equipment, and facilities required and shall perform all labor and services of every description as may be necessary to complete the scope of work defined in the contract documents.
21. Fabricate and install all work in strict accordance with contract documents and all applicable state and local codes.
22. All contractors and subcontractors shall be responsible for the proper performance of their work, coordination with other trades, means and methods of construction and safety and security of materials and personnel on site.
23. Cutting and patching as necessary shall be performed by each trade as required for the performance and installation of the work.
Cutting and patching shall be done in a workmanlike manner consistent with industry standards for the finishes and substrates affected.
24. Unless the materials, equipment or work required are specifically noted as provided or furnished by others, they shall be provided under this contract.
25. All work shall be performed by skilled workers in a workmanlike and professional manner consistent with industry standards.
26. Materials and components as specified constitute an expected standard of quality. Substitutions require the written approval of the contracting officer. Substitution requests must receive approval a minimum of seven days prior to submission of bids. Do not assume product equality and submit shop drawings from alternate vendors without prior written approval. In this event the submittal will be rejected, and the contractor will be required to provide the system specified as the basis of design at no additional cost to the owner.
27. All equipment and piping shall be supported or braced in accordance with the provisions of the technical specifications.
28. The contractor shall protect the facility from the weather and maintain security throughout construction.
29. The contractor shall maintain the site and all buildings and structures in proper working order and shall, without additional charge, replace any work, materials, or equipment furnished and installed under the contract which develop defects, within one (1) year from the date of final acceptance by the COR.
30. Protect all existing conditions during construction. The contractor will repair or replace at no additional charge to the owner any existing work damaged by construction activities.
33. All items noted to be removed and reinstalled shall be handled with proper care and stored safely to prevent damage; if damage does occur items shall be replaced at no expense to the VA.
34. The design adequacy, safety, and erection of bracing, shoring, scaffolding, and temporary supports and restrains is the sole responsibility of the contractor.
35. Any construction installed in non-compliance with the contract documents shall be corrected at no expense to the VA.
36. All drawings, though noted with scale, are for illustration only. Do not scale the drawings. Items incorrectly located due to scaling of drawings shall be corrected.
37. These drawings were produced from existing as-built drawings and field observations and may not accurately or fully represent as-built condition. Discrepancies may be encountered, and it is the contractor’s responsibility to field verify all dimensions, existing conditions, and points of connection. Conrtactor to provide a Differing conditions report to document all design discrepancies or other observations not considered addressed in the contractor proposal and subsequent award. Provide to the CO and COR in advance of any work.
38. The contractor responsibilities for field verification shall include all existing conditions including but not limited to regulated materials, architecture, structure, mechanical, electrical, plumbing, equipment, and all other existing systems; make necessary provisions to maintain the integrity and operation of said systems prior to the commencement of demolition where required.
39. See mechanical, electrical, telecommunications & architectural drawings for any system or portions thereof to be removed, relocated, revised, or abandoned. Notify the COR of any systems that may be affected, require demolition or alteration that are not shown on design drawings prior to commencing demolition.
40. Prior to drilling or coring existing concrete, contractors shall locate existing reinforcement using non-destructive testing (NDT) and maintain adequate clearances to avoid damage to existing reinforcement. Whenever feasible, contractors shall use ground penetrating radar (GPR) or means other than x-ray. Where x-ray is required, contractor shall provide written request at least three (3) weeks prior to event; work may be required to be performed outside normal work hours and shall be documented on the three (3) week look ahead schedule.
GENERAL NOTES DRAWING INDEX
PG SHEET DRAWING TITLE
PROJECT GENERAL INFORMATION
1 G-001 COVER SHEET
2 G-002 DRAWING INDEX, LEGEND, ABBREVIATIONS
ARCHITECTURE
3 A-100 OVERALL FLOOR PLAN - LEVEL 1
4 AD-110 DEMOLITION PLAN - ADMIN
5 AD-111 DEMOLITION PLAN - WARD A
6 AD-112 DEMOLITION PLAN - WARD B
7 AD-113 DEMOLITION PLAN - WARD C
8 AD-114 DEMOLITION PLAN - WARD D
9 A-110 FLOOR PLAN - ADMIN 1ST FLOOR
10 A-111 FLOOR PLAN - WARD A
11 A-112 FLOOR PLAN - WARD B
12 A-113 FLOOR PLAN - WARD C
13 A-114 FLOOR PLAN - WARD D
14 A-200 LEVEL 2 FLOOR PLAN
15 A-400 ENLARGED PLANS AND ELEVATIONS
16 A-401 ENLARGED PLANS AND ELEVATIONS
17 A-402 ENLARGED PLANS AND ELEVATIONS
18 A-600 DOOR SCHEDULE AND TYPES
PLUMBING
19 PP-001 LEGEND, ABBREVIATION LIST AND GENERAL NOTES
20 PP-002 SCHEDULES
21 PP-101 LEVEL 1 OVERALL PLAN
22 PD-111 ENLARGED DEMOLITION PLAN - UNIT A
23 PD-112 ENLARGED DEMOLITION PLAN - UNIT B
24 PD-113 ENLARGED DEMOLITION PLAN - UNIT C
25 PD-114 ENLARGED DEMOLITION PLAN - UNIT D
26 PP-111 ENLARGED PLAN - UNIT A
27 PP-112 ENLARGED PLAN - UNIT B
28 PP-113 ENLARGED PLAN - UNIT C
29 PP-114 ENLARGED PLAN - UNIT D
ELECTRICAL
30 EG-101 LEGEND, ABBREVIATIONS, & GENERAL NOTES
31 ED-101 WARD B DEMOLITION FLOOR PLAN
32 ED-102 WARD C DEMOLITION FLOOR PLAN
33 ED-103 WARD D DEMOLITION FLOOR PLAN
34 EN-101 WARD B NEW FLOOR PLAN
35 EN-102 WARD C NEW FLOOR PLAN
36 EN-103 WARD D NEW FLOOR PLAN
37 EJ-001 ELECTRICAL DETAILS
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT
CONSULTANT: A/E:
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
03-20-2025
FULLY
SPRINKLEDNOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
07.17.2024DESIGN DEVELOPMENT 65%
11.12.2024CONSTRUCTION DOCUMENTS 95%
01.11.2025CONSTRUCTION DOCUMENTS 100%
03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01
A u to d e s k D o c s /2
-1
C o rr e c t
M e n ta l H e a lt h
D e fi c ie n c ie s
P a lo A lt o C
A /2
-1
B
L D
G
A R
C H
R
.r v t
G-002
DRAWING INDEX, LEGEND,
ABBREVIATIONS
M.A. A.M.
BUILDING 520 MENTAL HEALTH
DEFICIENCIES
3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304
100% CONSTRUCTION
DOCUMENTS
640-23-104
EXT
EXP
EXIST
ENGR
EQUIP
EQ
ELEV
EMER
EXPANSION OR EXPOSED
EXTERIOR, EXTERNAL, OR
EXISTING
EQUIPMENT
ELEVATION, OR ELEVATOR
EMERGENCY
ENGINEER
EQUAL
INSUL
IN
ID
HTG
HW
IDENTIFICATION, INSIDE DIAMETER, OR
INCHES
HEATING
HOT WATER
OD
BLK
CJ
CFM
BW
CAB
BTWN
BTU
BOT
BM
BLDG
BKG
BITUM
BFF
BD
AVE
CUBIC FEET PER MINUTE
BRITISH THERMAL UNIT
CONSTRUCTION OR CONTROL JOINT
BOTH WAYS
CABINET
BETWEEN
EIFS
EJ
EF
EB
EA
DS
DTL
DR
DN
BELOW FINISHED FLOOR
BUILDING
BEAM OR BENCH MARK
BLOCK
BOTTOM
BITUMINOUS
BACKING
AVENUE
BOARD
DEMO
DIM
DIA
DEPT
DF
DET
DBL
D
CU YD
APPROX
AHU
ASTM
AV
ARCH
ALT
ALUM
AIB
ADJ
AFF
A/C
AIR INFILTRATION BARRIER
ABOVE FINISHED FLOOR
TESTING AND MATERIALS
AMERICAN SOCIETY FOR
AIR HANDLING UNIT
ALTERNATE
ALUMINUM
ARCHITECT
APPROXIMATE
AUDIO VISUAL
ADJACENT, ADJOINING, OR
AIR CONDITIONING
CONC
CTB
CORR
CT
CPT
CONT
CONF
COL
CMU
CLO
CLR
CLG
CL
EXTERIOR INSULATION &
FINISH SYSTEM
EXPANSION JOINT
EXHAUST FAN
EXPANSION BOLT
EACH
DOWNSPOUT
DETAIL
DOOR, DRAIN, DRESSING ROOM
DOWN
HGT
HM
HORIZ
HP
HDPE
HDW
HDR
HD
HB
HC
H
GYP
GYM
DEMOLITION
DEPARTMENT
DRINKING FOUNTAIN
DIMENSION
DIAMETER
DETAIL
CUBIC YARD
DEPTH OR PENNY (NAIL)
DOUBLE
GALV
GLU LAM
GFI
GA
GAL
G
FRT
FURN
FTG
FT
FRP
FOM
FOS
FOF
MRG
HIGH DENSITY POLYETHYLENE
HOLLOW METAL OR HECTOMETER
HORIZONTAL
HORSEPOWER OR
HEIGHT
HARDWARE
HEADER
HEAD
HOSE BIBB
HIGH
HOLLOW CORE
GYPSUM
GYMNASIUM
OC
NTS
NOM
NIC
NO
MTL
N/A
N
MTD
MTG
FIRE RETARDENT TREATMENT
GROUND FAULT INTERRUPTER
FIBER REINFORCED POLYESTER OR
GAUGE OR GAGE OR
GLUE LAMINATED BEAM
GALVANIC OR GALVANIZED
GALLON
GAS
FOOT OR FEET
FACE OF MASONRY
FACE OF STUD
FACE OF FINISH
FOOTING
FURNISH OR FURNITURE
MISC
MEZZ
MET
MEMB
MAX
MECH RM
MDO
MB
MACH
MATL
M
CONCRETE MASONRY UNIT
CONCRETE
CORRIDOR
CERAMIC TILE
CONTINUOUS
CONFERENCE
CERAMIC TILE BASE
CARPET
OCCUPANCY, CLEANOUT, OR COMPANY
CENTERLINE
COLUMN
CLOSET
CEILING
CLEAR
FEC
FL
FLUOR
FOC
FG
FF
FD
FDTN
FE
FDC
FCO
FA
F
FIRE DEPARTMENT CONNECTION
FIRE EXTINGUISHER & CABINET
FACE OF CONCRETE OR
FLUORESCENT
FINISH FACE
FINISH GRADE
FLOORLINE
FIRE ALARM
FIRE EXTINGUISHER
FLOOR CLEANOUT
FOUNDATION
FLOOR DRAIN
FAHRENHEIT OR FEMALE
LT GA
LAV
LBS
LAB
L
JT
JST
JAN
SIM SIMILAR
WD WOOD
OUTSIDE DIAMETER
STRUCTURAL INSULATED PANEL
SLAB-ON-GRADE
SPECIFICATION
SANITARY SEWER ORSS
SOG
SQ
SPEC
SMK
SIP
SL
SQUARE
SHEET METAL
SILL
WELDED WIRE FABRIC
WEIGHTWT
WWF
MOISTURE RESISTANT GYP. BRD.
NUMBER
ON CENTER
NOMINAL
NOT IN CONTRACT
NOT TO SCALE
METAL
MOUNTED
NOT APPLICABLE
NORTH
MOUNTING
MEDIUM DENSITY OVERLAY
MEZZANINE
MEMBRANE
MISCELLANEOUS
METAL
MECHANICAL ROOM
MACHINE BOLT
MACHINE
MATERIAL
MAXIMUM
MALE
RESILIENTRESIL
RIGHT HAND
RIGHT HAND REVERSE
SHOP DRAWINGS, SMOKE DETECTOR OR
SQUARE FOOT (FEET)
SD
SEP
SHT
SF
SA
S
SEPARATION
SHEET
SUPPLY AIR
SOUTH
RH
RHR
RFP
REV REVISION
REQUEST FOR PROPOSAL
POUNDS PER SQUARE FOOT
RUBBER BASE OR RESILIENT BASE
REFLECTED CEILING PLAN
REINFORCE
RECESSED
REF
REQD
REINF
RD
REC
RB
RCP
REFERENCE
REQUIRED
ROAD OR ROOF DRAIN
RA
R
QA
PSF
PROP
PROJ
QUALITY ASSURANCE
RETURN AIR
RADIUS OR RISER
PROPERTY
PROJECT
LABORATORY
LAVATORY
LIGHT GAGE
POUND
ANGLE
JANITOR
JOINT
JOIST
PROFESSIONAL ENGINEER
POINT OF CONNECTION
PLASTIC LAMINATEPLAM
PREFIN
PR
POC
PLYWD
PREFINISH
PAIR
PLYWOOD
PKG
P.E.
PC
PAVT
PACKAGE
PAVEMENT
PIECE, POLYCARBONATE OR
THK THICKNESS
UNITED STATES
UTILITY
VINYL COMPOSITION TILE
WATER CLOSET OR
VESTIBULE
VERTICAL
VEST
W
WC
W/
WEST OR WIDE
WITH
VERT
VCT
V
UTIL
US
VOLT
TOP OF JOIST
TOP OF BEAM
TOP OF FOOTING
TOP OF CONCRETE
TYPICAL
TENSILE STRENGTH OR
TELEVISION
TOP OF STEEL
HEAT TRANSFER COEFFICIENT
UNDERWRITER'S LABORATORY
TYP
UL
U
TOJ
TV
TS
TOS
TOC
TOF
TOB
STANDARD
STRUCTURAL
SUSPENDED
STORAGE
STAIRS OR STREET
TONGUE & GROOVE
TEMPERATURE OR TEMPORARY
TELEPHONE
TOP OF CURB
T & G
TEMP
TEL
TC
STRUCT
SUSP
STOR
STD
ST
(E) EXISTING
GYP BRD GYPSUM BOARD
PORTLAND CEMENT
OR DRIVE
FACE OF CURB
ACT
AE
ACOUSTICAL CEILING TILE
ARCHITECT/ENGINEER
ADA AMERICANS WITH DISABILITIES ACT
ADJUSTABLE
AFC ABOVE FINISHED COUNTER
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATION
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASPH ASPHALT
AUTO AUTOMATIC
AUX AUXILIARY
AVG AVERAGE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVER'S
ASSOCIATION
B PL BASE PLATE
BALC BALCONY
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BI-FOLDING DOORS
BLD BUILD
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BSMT BASEMENT
C TO C CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CHEM CHEMICAL
CIP CASE IN PLACE
CIR CIRCLE
CIRC CIRCULAR
CLG HT CEILING HEIGHT
CO CARBON MONOXIDE, CERTIFICATE OF
COORD COORDINATE
CPRS COMPRESSIBLE
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSMT CASEMENT
CSWK CASEWORK
CTF CERAMIC TILE FLOOR
CTRL CONTROL
CTV CABEL TELEVISION
CU FT CUBIC FEET
CU IN CUBIC INCH
CW COLD WATER
DAT DATUM
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DIFF DIFFERENCE OR DIFFUSER
DISP DISPENSER
DOC DOCUMENT
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DW DISHWASHER
DWG DRAWING
EFS EXTERIOR FINISH SYSTEM
ELAST ELASTOMERIC
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQL SP EQUALLY SPACED
ESMT EASEMENT
EST ESTIMATE
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXTINGUISHER
EXT GR EXTERIOR GRADE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FO FINISHED OPENING
FOW FACE OF WALL
FR FIRE RATING, FIRE RESISTANT,
OR FRAME
FIBER REINFORCED PLASTIC
FRZ FREEZER
FSTNR FASTENER
FURG FURRING
GYPSUM ASSOCIATON
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GT GROUT
GUT GUTTER
GYP PLAS GYPSUM PLASTER
H PLAM HIGH PRESSURE
HAZ MAT HAZARDOUS MATERIALS
PLASTIC LAMINATE
HCWD HOLLOW CORE WOOD DOOR
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HOSP HOSPITAL
HIGH PRESSURE
HQ HEADQUARTERS
HT HEIGHT
HVAC HEATING, VENTILATION, AND
AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
INTERIOR DESIGN
INCL INCLUDED
INFO INFORMATION
INSULATION
KPL KICKPLATE
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LBR LUMBER
LED LIGHT EMITTING DIODE
LH LEFT HAND
LHR LEFT HAND REVERSE
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LS LUMP SUM
LT WT LIGHTWEIGHT
LVD LOUVERED
LVR LOUVER
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MD METAL DECK
MEAS MEASURE
MEMO MEMORANDUM
MFD MANUFACTURED
MFG MANUFACTURING
MFR REC MANUFACTURER'S RECOMMENDATION
MID MIDDLE
MLDG MOLDING (MOULDING)
MLWK MILLWORK
MOD MODEL, MODIFY OR MODULE
MR MOISTURE RESISTANT
MULL MULLION
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING CONTRACTORS
ASSOCIATION
OPNG OPENING
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
OZ. OUNCE
PART PARTIAL
PAT PATTERN
PBD PARTICLEBOARD
PCA PORTLAND CEMENT ASSOCIATION
PEDESTALPED
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PHOTO PHOTOGRAPH
PL PROPERTY LINE
PL GL PLATE GLASS
PLASTER OR PLASTICPLAS
PLUMBINGPLBG
PRCST PRECAST
PREFAB PREFABRICATE
PRELIM PRELIMINARY
PREP PREPARATION
PREV PREVIOUS
POLYVINYL CHLORIDE (PLASTIC)PVC
PT PAINT, PNEUMATIC TUBE, OR
POUNDS PER SQUARE INCHPSI
PRESSURE TREATED
PAVINGPVG
POWERPWR
QC QUALITY CONTROL
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
RADIATORRAD
RECEPTACLERECPT
RECTANGLERECT
REGISTERREG
REPAIRREP
REPLACEREPL
REQ REQUIRE
RETURNRET
RFI REQUEST FOR INFORMATION
RLG RAILING
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
SALV SALVAGE
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SCHED SCHEDULE
OR SOAP DISPENSER
SECTIONSECT
SINGLESGL
SHT MTL SHEET METAL
SHTHG SHEATHING
SHV SHELVING
SJ SCORED JOINT
SLNT SEALANT
SM
SMOKE
SPRINKLERSPKLR
SPEAKERSPKR
SUPPLYSPLY
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SERVICE SINK
STAINLESS STEELSST
SOUND TRANSMISSION CLASSSTC
STL STEEL
STL PL STEEL PLATE
SUBSTITUTESUB
SUSPENDED CEILIINGSUSP CLG
SYMBOLSYM
TREADT
TIME AND MATERIALST & M
TILE COUNCIL OF AMERICATCA
THERM THERMAL
TOP OF ___TO
TOP OF FOUNDATIONTO FDN
TOP OF MASONRYTOM
TOP OF PARAPETTOP
TOP OF WALLTOW
TREATEDTRTD
TUBE STEEL
THERMOSTATTSTAT
UNINTERRUPTIBLEUPS
POWER SUPPLY
URINALUR
ULTRAVIOLETUV
VARIESVAR
OR VITRIFIED CLAY TILE
VENTILATIONVENT
VIDEOVID
VERIFY IN FIELDVIF
VOLATILE ORGANIC COMPOUNDVOC
VOLUMEVOL
VOLTAGEVOLT
W/O WITHOUT
WALL COVERING
WDW WINDOW
WATER HEATERWH
WELDEDWLD
WATERPROOFINGWP
WEATHER RESISTANTWR
WAINSCOTWSCT
EXTRUDED POLYSTYRENEXPS
YARDYD
YEARYR
BOARD (INSULATION)
TYPICAL ABBREVIATIONS
Revisions: Date:
ADMIN WING
SEE A-110
WARD A
SEE A-111
WARD B
SEE A-112
WARD C
SEE A-113
WARD D
SEE A-114
COURTYARD
MECH/HACSTORAGEGROUP STORAGE OFFICE OFFICE
HALLWAY
EXAM ROOM
EXAM ROOM
OFFICE
EXAM ROOM
HALLWAY
HALLWAY
OFFICE
BATH
BED
BATH
BED
BED
BED
EXERCISE
BED
BATH
BED
TOILET
BATH
BATH
BATH
BATH
BATH
BED
BATH
GROUP RM. CONFERENCE
INTERVIEW
BATH
BREAK
LOUNGE/LOCKERS
BATH BATH DATA
TOILET
HALLWAY
BED
BED
BATHBATH
ANTE
BED
BATH
BATH
MEDS
CONFERENCE
SOILED UTIL PERS STORAGE
RESTRAINT
TOILET
DINING
GARDEN STORAGE
COURTYARD
SHARED OFFICE
OFFICE
OFFICE
TOILET
FOOD CARTS
HAC
HALLWAY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
EXAM
CLEAN STORAGE
BED
HAC ELEC
BATH
BED
BED
BED
BED
BED
BATH
BED
BATH
BEDBED
TOILET
BATH
BATH
BATH
BATH
BED
BATH
TOILET
VESTIBULE
BED
BATH BATH
BED BED
ANTE
BATH
BATH
GARDEN
CONFERENCE
SOILED UTIL PERS STORAGE
RESTRAINT
TOILET
STORAGE
TOILET
OFFICE
OFFICE
HALLWAY
SHARED OFFICE
EXAM
CLEAN LINEN
CLEAN STORAGE
BED
HALLWAY
HALLWAY
DATA
EXERCISE
BATH
DAYROOM
INTERVIEW
CONFERENCE
BATH
OFFICE
OFFICE
BATH
LOUNGE LOCKERS
VEST C
TOILET
COURTYARD
BATH
BED
BED
BED BED
BED
BATH
BED
BATH
BED
BED
TOILETBATH
BATHBATH
BATH
BED
BATH
OFFICE
TOILET
MILIEU
BED
BED
BATH
BATH
ANTE
BED
BATHBATH
GARDEN
MEDS
CONFERENCE
SOILED UTIL
PERS STORAGECLEAN STORAGE
BATH
EXERCISE
LAUNDRY
LACTATION
OFFICEOFFICEOFFICEOFFICEOFFICE
WAITING
GARDEN STORAGE
COURTYARD
ELEC
TOILET
HAC
COURTYARD
VESTIBULE B
HALLWAY
INTERVIEWBATH
CONFERENCE
GROUP ROOM
TOILET
COURTYARD
DINING
TOILET
HAC
FOOD CARTS
GARDEN STORAGE
HALLWAY
OFFICEOFFICEOFFICEOFFICE OFFICE
HALLWAY
OFFICE SHARED OFFICEOFFICE
TOILET
DAYROOM
BED
BATH
BATH
BED
BED
PERS STORAGE
BATH BATH
BED BED
BED
BATH
BED
BATH BATH
BATH
BED
BATH
BATHLAUNDRY
BATH
BED
GARDEN
BATH
BED
BED
BEDRESTRAINT ACC. BED
CLEAN LINENEXAM
HALLWAY
HALLWAY
DATA EXAM
SOILED UTIL
VESTIBULE
CLEAN STORAGE
ELEC
HAC
PROG STORAGE
MEDS
CONFERENCE
SAHRED OFFICE
OBSERVATION
BATH
BATH
EXERCISE
THERAPY TUB BATH
HALLWAY
HALLWAY
DAYROOM
CONFERENCE
OFFICE COPY
LOUNGE LOCKERS
WOMEN'S
BATH
HALLWAY
HALLWAY
TOILET
WAITING
HALLWAY
NOURISHMENT
VENDING
DATAMECH
ELEC
STAIR 2
LOADING
HALLWAY
WOMAN TOILETMENS TOILET
BREAK ROOM
OFFICE
WAITING
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
INTERVIEW Room
INSTRUMENT RM
CONF ROOM 2
HALLWAY
HALLWAY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ELEVATOR
CONF ROOM
HALLWAY
LOBBY
RECEPTION
ELEVATOR
NURSE STATION
ROTUNDA
ELEC
HAC
R.T. STORAGE
R.T. STORAGE
DINING
HALLWAY
WAITING
COURTYARD
HALLWAY
TOILET
SHARED OFFICE
OFFICEOFFICE
BATH BATH
VEST D
BEDBED
HALLWAY
BED
ELEC
ELEC
MECH
RECYCLING
SOILED LINEN
EMS EQUIP
EMS STORAGE
CLEAN LINEN
HAC
UNAS
CT STORAGE
GARDEN
DAYROOM
LAUNRY
OFFICE
DINING
LAUNDRY
OFFICE
HALLWAY
OFFICE
COPY
HALLWAY
NURSE STATION
COPY
MED DISP
HALLWAY
NOURISHMENT
HALLWAYNURSE STATION
NOURISHMENT
VESTIBULE
HALLWAY
DAYROOM
NOURISHMENT NURSE STATION
COPY
VESTIBULE
0' 5' 10' 20' 30'
GENERAL SHEET NOTES
KEYED NOTES
1. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME
DUE TO NOISE AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE
FACILITY.
2. PROVIDE UL LISTED FIRESTOP SYSTEM AT ALL PENETRATIONS THROUGH FIRE
AND/OR SMOKE RATED ASSEMBLIES.
3. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT
LIMITING ABILITY TO ADD OR REMOVE CABLES WITHOUT RESEALING.
4. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING
CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE
THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY
DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.
5. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE
RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT
CONSULTANT: A/E:
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
03-20-2025
FULLY
SPRINKLEDNOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
07.17.2024DESIGN DEVELOPMENT 65%
11.12.2024CONSTRUCTION DOCUMENTS 95%
01.11.2025CONSTRUCTION DOCUMENTS 100%
03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01
A u to d e s k D o c s /2
-1
C o rr e c t
M e n ta l H e a lt h
D e fi c ie n c ie s
P a lo A lt o C
A /2
-1
B
L D
G
A R
C H
R
.r v t
A-100
OVERALL FLOOR PLAN - LEVEL 1
MA BS
BUILDING 520 MENTAL HEALTH
DEFICIENCIES
3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304
100% CONSTRUCTION
DOCUMENTS
640-23-104
1" = 20'-0"F4
OVERALL FLOOR PLAN - LEVEL 1
NORTH
COURTYARD
F-142
MECH/HAC
F-127
STORAGE
F-125
GROUP
STORAGE
F-123
OFFICE
F-121
OFFICE
F-119
EXAM
ROOM
F-131
EXAM
ROOM
F-133
OFFICE
F-135
EXAM
ROOM
F-137
OFFICE
F-117
BREAK
D-105
DATA
D-107
OFFICE
D-181
OFFICE
D-183
OFFICE
D-185
OFFICE
D-189
OFFICE
D-187
OFFICE
C-181
OFFICE
C-183
OFFICE
C-185
OFFICE
C-187
LACTATION
B-190
OFFICE
B-181
OFFICE
B-183
OFFICE
B-185
OFFICE
B-187
OFFICE
B-189
HALLWAY
B-CO80
OFFICE
A-189
OFFICE
A-187
OFFICE
A-185
OFFICE
A-181
OFFICE
A-183
HALLWAY
A-CO80
TOILET
A-10B
WAITING
A-WL1
VENDING
F-101
DATA
F-124
MECH
F-126
ELEC
F-129 STAIR 2
F-128
WOMAN
TOILET
F-122
MENS
TOILET
F-120 BREAK
ROOM
F-118
OFFICE
F-116
WAITING
F-108
EXAM
ROOM
F-130
EXAM
ROOM
F-132
EXAM
ROOM
F-134
EXAM
ROOM
F-136
INTERVIEW
Room F-138
INSTRUMENT
RM
F-139
CONF
ROOM 2
F-140
OFFICE
F-110
OFFICE
F-111
OFFICE
F-112
OFFICE
F-113
OFFICE
F-115
OFFICE
F-114
ELEVATOR
F-104B
CONF
ROOM
F-107
HALLWAY
F-150
LOBBY
F-100
RECEPTION
F-109
ELEVATOR
F-104A
ROTUNDA
F-104
COURTYARD
F-143
ELEC
E-EC2
ELEC
E-EC1
MECH
E-ME1
CLEAN
LINEN
E-109
HAC
E-111
UNAS
E-115
CT
STORAGE
E-TC1
NO WORK IN THESE AREAS
GENERAL SHEET NOTES
KEYED NOTES
1. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING
SIGNIFICANT DISCREPANCIES TO THE ATTENTION OF THE C.O.R. FOR REVIEW.
2. COORDINATE DEMOLITION PHASING AND SCHEDULE WITH THE C.O.R. PRIOR TO
STARTING WORK.
3. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING
DEMOLITION, INCLUDING MECHANICAL & FIRE SUPPRESSION SYSTEMS.
4. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO
RECEIVE NEW FINISH PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE
INCURRED DURING OR PRIOR TO THE START OF WORK TO MATCH EXISTING
CONDITION INCLUDING FIREPROOF MATERIALS.
5. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING
CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE
THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY
DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.
6. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE
RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.
7. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE,
INCLUDED BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA
PORTS, INTERIOR DEVICES, ETC. REFER TO ELECTRICAL, MECHANICAL, AND
PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT
CONSULTANT: A/E:
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
03-20-2025
FULLY
SPRINKLEDNOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
07.17.2024DESIGN DEVELOPMENT 65%
11.12.2024CONSTRUCTION DOCUMENTS 95%
01.11.2025CONSTRUCTION DOCUMENTS 100%
03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01
A u to d e s k D o c s /2
-1
C o rr e c t
M e n ta l H e a lt h
D e fi c ie n c ie s
P a lo A lt o C
A /2
-1
B
L D
G
A R
C H
R
.r v t
AD-110
DEMOLITION PLAN - ADMIN
Checker Author
BUILDING 520 MENTAL HEALTH
DEFICIENCIES
3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304
100% CONSTRUCTION
DOCUMENTS
640-23-104
1/8" = 1'-0"F4
DEMOLITION PLAN - ADMIN
NORTH
0' 4' 8' 16'
N H
N C N
C
M A
T C
H L
IN
E
S E
E S
H E
E T
A D
-1
COURTYARD
A-CT1
DINING
A-170
TOILET
A-178
HAC
A-176A
FOOD
CARTS
A-176 GARDEN
STORAGE
ACT-1A
OFFICE
A-189
OFFICE
A-187
OFFICE
A-185
OFFICE
A-181
OFFICE
A-183
HALLWAY
A-CO80
OFFICE
A-182
SHARED
OFFICE
A-186
OFFICE
A-184
TOILET
A-140
DAYROOM
A-130
BED
A-135
BATH
A-135A
BATH
A-136A
BED
A-136
BED
A-137
PERS
STORAGE
A-141
BATH
A-143A
BATH
A-137A
BED
A-127
BED
A126
BED
A-123
BATH
A-122A
BED
A-122
BATH
A-126A
BATH
A-125A
BATH
A-123A
BED
A-121
BATH
A-121A
BATH
A-127A
LAUNDRY
A-128
BATH
A-133A
BED
A-134
GARDEN
A-CT2
BATH
A-134A
BED
A-132
BED
A-133
ACC. BED
A-143
DATA
A-SC1
EXAM
A-147
SOILED
UTIL
A-158
VESTIBULE
A-159
CLEAN
STORAGE
A-160
ELEC
A-EC1
HAC
A-146
PROG
STORAGE
A-148
MEDS
A-150B
CONFERENCE
A-152
SAHRED
OFFICE
A-150A
OBSERVATION
A-145
BATH
B-145A
BATH
A-145A
EXERCISE
A-129
THERAPY
TUB
A-131
BATH
A-132A
HALLWAY
A-CO41
HALLWAY
A-CO70
DAYROOM
A-117
CONFERENCE
A-115
OFFICE
COPY
A-111
LOUNGE
LOCKERS
A-109
WOMEN'S
F-102BATH
A-109A
HALLWAY
A-CO60
HALLWAY
A-CO50
TOILET
A-10B
WAITING
A-WL1
VENDING
F-101
HALLWAY
A-CO71
HALLWAY
A-CO40
BED
A-125
OFFICE
A-120
HALLWAY
A-CO20
NURSE
STATION
A-150
NOURISHMENT
A-130A
HALLWAY
A-CO10
16D 16D 16D 16D 16D
16D 16D 16D
16D
16D
16D
16D 16D 16D
16D
16D
16D
16D
16D
16D
16D
16D 16D
NO WORK IN THESE AREAS
A-402
B3
A-402
B7
16D
16D
25D
27D
26D
26D
25D
16D
16D16D
GENERAL SHEET NOTES
KEYED NOTES
1. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING
SIGNIFICANT DISCREPANCIES TO THE ATTENTION OF THE C.O.R. FOR REVIEW.
2. COORDINATE DEMOLITION PHASING AND SCHEDULE WITH THE C.O.R. PRIOR TO
STARTING WORK.
3. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING
DEMOLITION, INCLUDING MECHANICAL & FIRE SUPPRESSION SYSTEMS.
4. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO
RECEIVE NEW FINISH PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE
INCURRED DURING OR PRIOR TO THE START OF WORK TO MATCH EXISTING
CONDITION INCLUDING FIREPROOF MATERIALS.
5. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING
CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE
THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY
DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.
6. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE
RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.
7. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE,
INCLUDED BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA
PORTS, INTERIOR DEVICES, ETC. REFER TO ELECTRICAL, MECHANICAL, AND
PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT
CONSULTANT: A/E:
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
03-20-2025
FULLY
SPRINKLEDNOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
07.17.2024DESIGN DEVELOPMENT 65%
11.12.2024CONSTRUCTION DOCUMENTS 95%
01.11.2025CONSTRUCTION DOCUMENTS 100%
03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01
A u to d e s k D o c s /2
-1
C o rr e c t
M e n ta l H e a lt h
D e fi c ie n c ie s
P a lo A lt o C
A /2
-1
B
L D
G
A R
C H
R
.r v t
AD-111
DEMOLITION PLAN - WARD A
AG MA
BUILDING 520 MENTAL HEALTH
DEFICIENCIES
3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304
100% CONSTRUCTION
DOCUMENTS
640-23-104
1/8" = 1'-0"F5
DEMOLITION PLAN - WARD A
NORTH
0' 4' 8' 16'
16D REMOVE EXISTING CARPETING AND ADHESIVE TO EXPOSE CLEAN CONCRETE
SLAB
25D SAW CUT AND REMOVE EXISTING FLOOR TILE AND SLAB, REPLACE WITH PROPER
SLOPE
26D REMOVE EXISTING FIXTURES AS REQUIRED TO REPLACE FLOOR SLAB AND
REINSTALL
27D REMOVE EXISTING SHOWER SCREEN
NC
C
N C
N C
N C
N C N
C
NC
N C
N C
N C
N
CNC
N C
NC
NC NC
NC
N C N
C
N C
N C
NC
NC
NC
NC
NC
N C
N C
N C
N C
N C N C
N
CN
C
NC
NC
N H
NH
NH
N H
NC
NC
N C
N C
NC
N C
N C N C N
C N C
NC
N C N
C
N H
N H
N H
NH
CR
C 1
CR
CR
M A
T C
H L
IN
E
S E
E S
H E
E T
A D
-1
M A
TC
H
LI
N E
S E E S
H E E T
A D -1
BATH
B-109B
LOUNGE
LOCKERS
B-109
TOILET
B-109C
BATH
B-133A
BED
B-134
BED
B-125
BED
B-126
BED
B-127
BED
B-123
BATH
B-122A
BED
B-122
BATH
B-134A
BED
B-133
BED
B-132
TOILET
B-131
BATH
B-132A
BATH
B-126A
BATH
B-125A
BATH
B-123A
BED
B-121
BATH
B-121A
OFFICE
B-120
TOILET
B-140
MILIEU
B-130
BED
B-135
BED
B-136
BATH
B-136A
BATH
B-135A
ANTE
B-141
BED
B-137
BATH
B-143A
BATH
B-137A
GARDEN
B-CT2
MEDS
B-150B
CONFERENCE
B-152
SOILED
UTIL
B-148
PERS
STORAGE
B-154
CLEAN
STORAGE
B-160
BATH
B-127A
EXERCISE
B-129
LAUNDRY
B-128
LACTATION
B-190
OFFICE
B-181
OFFICE
B-183
OFFICE
B-185
OFFICE
B-187
OFFICE
B-189WAITING
CWL1
GARDEN
STORAGE
B-CT1A
COURTYARD
B-CT1
ELEC
B-EC1
TOILET
B-178
HAC
B-174
COURTYARD
C-CT3
VESTIBULE
B
B-CO01
INTERVIEW
B-111
BATH
B-111A
CONFERENCE
B-115
GROUP
ROOM
B-117
TOILET
B-170B
HALLWAY
B-CO80
BED
B-145
RESTRAINT
B-143
CLEAN
LINEN
B-146
EXAM
B-147
HALLWAY
B-CO41
HALLWAY
B-CO50
DATA
A-SC1
BATH
B-145A
BATH
A-145A
HALLWAY
A-CO70
HALLWAY
A-CO60
HALLWAY
A-CO71
R.T.
STORAGE
B-172
DINING
B-170
TOILET
B-188
SHARED
OFFICE
B-186
OFFICE
B-182
OFFICE
B-184
HALLWAY
B-CO20
HALLWAY
B-CO10
NURSE
STATION
B-150
COPY
B-150A
MED DISP
B-150C
HALLWAY
B-CO40
NOURISHMENT
B-130A
VESTIBULE
B-170A
5D
13D
23D
4D
8D
3D
3D
2D
13D
24D
4D
10D
8D
8D
9D
8D9D
8D
4D
10D
4D
8D 9D
10D
13D
15D
10D 10D
8D
8D
4D 4D
8D9D 8D9D 8D9D
8D
10D 11D
4D
22D
10D 8D
4D
23D
8D9D
8D9D
10D
8D
4D
10D
8D
4D
8D
9D 8D 9D
10D
8D
4D
10D
8D
4D
8D 9D
8D 9D
10D
8D
NO WORK IN THESE AREAS
A-401
B7
SIM
A-401
F7
SIM
A-400
C7
SIM
A-400
C1
SIM
A-400
C4
SIM
17D
17D
17D
17D
17D24D
7D
7D
8D
8D10D
8D
14D23D
24D
4D
4D
6D
6D
8D
10D
17D
3D
12D
6D 24D
23D
8D
24D
9D
2D
3D
3D
5D
13D
13D
21D 21D
21D
13D
8D4D
7D
8D
13D
24D
24D
7D
4D
21D
17D
24D
13D
4D
23D
22D
12D
22D
22D
22D22D
22D 22D
4D
23D
22D22D
22D
23D
22D
22D
22D
22D
22D
22D
22D
22D
22D
22D
22D
23D
12D
22D
22D
22D 22D
22D 22D
22D
22D
22D
22D 22D
22D
24D
22D
24D
24D
22D
12D
23D
22D
22D 12D
23D
24D
GENERAL SHEET NOTES
KEYED NOTES
1. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING
SIGNIFICANT DISCREPANCIES TO THE ATTENTION OF THE C.O.R. FOR REVIEW.
2. COORDINATE DEMOLITION PHASING AND SCHEDULE WITH THE C.O.R. PRIOR TO
STARTING WORK.
3. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING
DEMOLITION, INCLUDING MECHANICAL & FIRE SUPPRESSION SYSTEMS.
4. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO
RECEIVE NEW FINISH PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE
INCURRED DURING OR PRIOR TO THE START OF WORK TO MATCH EXISTING
CONDITION INCLUDING FIREPROOF MATERIALS.
5. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING
CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE
THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY
DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.
6. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE
RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.
7. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE,
INCLUDED BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA
PORTS, INTERIOR DEVICES, ETC. REFER TO ELECTRICAL, MECHANICAL, AND
PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT
CONSULTANT: A/E:
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
03-20-2025
FULLY
SPRINKLEDNOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
07.17.2024DESIGN DEVELOPMENT 65%
11.12.2024CONSTRUCTION DOCUMENTS 95%
01.11.2025CONSTRUCTION DOCUMENTS 100%
03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01
A u to d e s k D o c s /2
-1
C o rr e c t
M e n ta l H e a lt h
D e fi c ie n c ie s
P a lo A lt o C
A /2
-1
B
L D
G
A R
C H
R
.r v t
AD-112
DEMOLITION PLAN - WARD B
Checker Author
BUILDING 520 MENTAL HEALTH
DEFICIENCIES
3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304
100% CONSTRUCTION
DOCUMENTS
640-23-104
1/8" = 1'-0"F4
DEMOLITION PLAN - WARD B
NORTH
0' 4' 8' 16'
2D REMOVE EXISTING WINDOW BLINDS AND HARDWARE, PATCH AND REPAIR WALL TO
MATCH EXISTING ADJACENT
3D REMOVE EXISTING WALL MOUNTED PC CABINET. PATCH AND REPAIR WALL
DAMAGED FROM MOUNTING POINTS. PROVIDE BLANK COVER WITH SECURITY
FASTENERS AT JUNCTION BOXES
4D EXISTING PLUMBING FIXTURES TO BE REMOVED AND REPLACED WITH NEW - SEE
PLUMBING PLANS FOR ADDITIONAL INFORMATION
5D EXISTING HALF LIGHT DOOR FRAME AND SIDELIGHT TO BE REMOVED AND
REPLACED. FR FRAME AT 2 HOUR WALL
6D EXISTING CASEWORK TO BE MODIFIED - SEE ENLARGED PLANS
7D EXISTING DOOR AND HOLLOW METAL FRAME TO BE REMOVED AND REPLACED
8D EXISTING NURSE CALL BUTTONS TO BE REMOVED AND REPLACED, SEE
ELECTRICAL PLANS FOR ADDITIONAL INFORMATION
9D WALL MOUNTED LIGHT FIXTURE AND JUNCTION BOX TO BE REMOVED. WALL
PATCHED AND PAINTED TO MATCH EXISTING
10D REMOVE EXISTING RECESSED PAPER TOWEL DISPENSER - PATCH SOLID SURFACE
WALL COVERING TO MATCH EXISTING
11D REMOVE EXISTING BUILT-IN UTILITY COVER AND EQUIPMENT FIXING AND REPLACE
WITH NEW BUILT-IN CASEWORK
12D EXISTING FAUCET TO BE REMOVED AND REPLACED - SEE PLUMBING PLANS FOR
ADDITIONAL INFORMATION
13D EXISTING EXIT SIGNS TO BE REMOVED AND REPLACED - SEE ELECTRICAL PLANS
FOR ADDITIONAL INFORMATION
14D REMOVE PRESSURE SENSOR, INDICATOR AND J-BOXES - SEE MECHANICAL PLANS
FOR ADDITIONAL INFORMATION. PATCH, REPAIR AND PAINT WALL TO MATCH
EXISTING ADJACENT.
15D REMOVE AND REPLACE EXISTING RECESSED FIRE EXTINGUISHER CABINET
17D REMOVE AND REPLACE DOOR AND FRAME, SIDELIGHT TO REMAIN. NEW WOOD
DOOR IN FRAME WITH CONCEALED CLOSER.
21D REMOVE EXISTING DOOR CLOSER. REPLACE WITH NEW CLOSER ON SECURE SIDE
OF DOOR
22D REMOVE AND REPLACE EXISTING SOAP DISPENSER
23D REMOVE AND REPLACE EXISTING PAPER TOWEL DISPENSER
24D EXISTING NURSE CALL TO BE REMOVED. PROVIDE BLANK COVER PLATE WITH
TAMPER RESISTANT SCREWS
NC
N C
N C
NC
NC NC
NC
NC
N C
N C
NC NC
NC NC
N
C
N C
N C
N C
NC
NC
NC
NC
N C
N C
N C
N C
N C
NC
NC NC
NCNC
NC
N C
NC
NC
NC
NC
NC
N C
NC
NH
NH
NH
N H N H
NH
C R
N C
N C
N C
N H
NC NC
NC
NC
NH
C R
C R
C R
M A
TC
H
LI
N E
S E E S
H E E T
A D -1
MATCHLINE
SEE SHEET AD-114
HALLWAY
C-CO70
HALLWAY
C-CO40
HALLWAY
C-CO60
BATH
C-133A
BED
C-134
BED
C-127
BED
C-126
BED
C-125
BED
C-123
BATH
C-123A
BED
C-122
BATH
C-134A BED
C-132
BED
C-133
TOILET
C-131
BATH
C-132A
BATH
C-126A
BATH
C-125A
BATH
C-122A
BED
C-121
BATH
C-121A
TOILET
C-140
VESTIBULE
C-170A
BED
C-135
BATH
C-135A
BATH
C-136A
BED
C-136
BED
C-137
ANTE
C-141
BATH
C-143A
BATH
C-137A
GARDEN
C-CT2
CONFERENCE
C-152
SOILED
UTIL
C-148
PERS
STORAGE
C-154
RESTRAINT
C-143
TOILET
C-170B
STORAGE
C-CT1A
TOILET
C-178 OFFICE
C-181
OFFICE
C-183
HALLWAY
C-CO80
SHARED
OFFICE
C-186
EXAM
C-147
CLEAN
LINEN
C-146
CLEAN
STORAGE
C-160
BED
C-145
HALLWAY
C-CO41
DATA
C-SC1
EXERCISE
C-129 BATH
C-127A
DAYROOM
C-117
INTERVIEW
C-111
CONFERENCE
C-115
BATH
C-111A
OFFICE
C-185
OFFICE
C-187
BATH
B-109B
LOUNGE
LOCKERS
B-109
VEST C
C-CO1
TOILET
B-109C
COURTYARD
C-CT1
LACTATION
B-190
WAITING
CWL1
COURTYARD
C-CT3
HALLWAY
C-CO10
HALLWAY
C-CO50
ELEC
C-EC1
HAC
C-174
R.T.
STORAGE
C-172
HALLWAY
C-CO20
HALLWAY
C-CO71
BATH
C-145A
BATH
D-145A
DINING
C-170
LAUNDRY
C-128
OFFICE
C-120
DAYROOM
C-130
NOURISHMENT
C-130A NURSE
STATION
C-150
COPY
C-150C
1D
10D 8D
NO WORK IN THESE AREAS
4D
10D
1D
4D
8D
8D9D
1D
10D
8D
4D
8D
9D
8D
10D 4D
1D
8D 9D 8D9D 8D
10D
4D 1D
8D9D
8D
10D 4D
1D
8D 9D
1D 4D
8D
10D
1D
9D 8D
4D
10D
8D
4D
1D
10D
9D
8D
8D
8D
4D
1D
9D
8D
4D
10D
8D
9D 8D
8D
4D
10D
1D
9D
8D
1D
10D 8D4D
10D
1D
4D 8D
9D
9D
8D
1D
10D
A-400
C4
SIM
A-401
B7
SIM
A-400
C1
SIM
A-400
C7
SIM
A-401
F7
SIM
3D
12D 11D
3D
23D8D4D
2D
3D
24D
24D
24D
4D
8D
23D
24D
23D
10D
4D
3D
22D
4D
23D
8D 14D
10D 4D
8D
1D
5D
15D
7D
7D
17D
17D
17D
17D 17D
17D
13D
13D
13D
MEDS
C-150B
13D
7D
12D 22D
22D
6D
13D
24D
13D
21D 3D
24D
12D
21D
7D
12D
21D
6D
12D
2D
17D
8D
22D 22D
22D 23D
23D
22D
23D
24D
22D
22D22D
22D
22D
22D 22D
22D 22D
22D
22D
22D
22D
23D
22D 22D
22D 22D
22D
22D
22D
22D
22D 22D
22D 22D
24D
22D22D
5D
24D
24D
22D
22D
23D
23D
22D
24D
6D
13D
13D
GENERAL SHEET NOTES
KEYED NOTES
1. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING
SIGNIFICANT DISCREPANCIES TO THE ATTENTION OF THE C.O.R. FOR REVIEW.
2. COORDINATE DEMOLITION PHASING AND SCHEDULE WITH THE C.O.R. PRIOR TO
STARTING WORK.
3. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING
DEMOLITION, INCLUDING MECHANICAL & FIRE SUPPRESSION SYSTEMS.
4. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO
RECEIVE NEW FINISH PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE
INCURRED DURING OR PRIOR TO THE START OF WORK TO MATCH EXISTING
CONDITION INCLUDING FIREPROOF MATERIALS.
5. CONTRACTOR MUST PATCH, TEXTURE AND PAINT ANY WALLS DAMAGED DURING
CONSTRUCTION TO MATCH EXISTING WALL SURFACE, INCLUDING AREAS WHERE
THE REMOVAL OF EQUIPMENT OR DEVICES IS REQUIRED. AREAS EXPOSED BY
DEVICE REMOVAL MUST BE MADE TO MATCH EXISTING WALLS.
6. EXISTING ITEMS SCHEDULED TO BE REMOVED AND/OR REPLACED SHOULD BE
RETURNED TO THE VA. COORDINATE WITH COR FOR DELIVERY OF ITEMS.
7. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE,
INCLUDED BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA
PORTS, INTERIOR DEVICES, ETC. REFER TO ELECTRICAL, MECHANICAL, AND
PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
DESIGN DEVELOPMENT 35% 05.07.2024 CONSULTANT
CONSULTANT: A/E:
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
03-20-2025
FULLY
SPRINKLEDNOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
07.17.2024DESIGN DEVELOPMENT 65%
11.12.2024CONSTRUCTION DOCUMENTS 95%
01.11.2025CONSTRUCTION DOCUMENTS 100%
03.20.2025CONSTRUCTION DOCUMENTS 100% - Revision 01
A u to d e s k D o c s /2
-1
C o rr e c t
M e n ta l H e a lt h
D e fi c ie n c ie s
P a lo A lt o C
A /2
-1
B
L D
G
A R
C H
R
.r v t
AD-113
DEMOLITION PLAN - WARD C
Checker Author
BUILDING 520 MENTAL HEALTH
DEFICIENCIES
3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA 94304
100% CONSTRUCTION
DOCUMENTS
640-23-104
1/8" = 1'-0"F5
DEMOLITION PLAN - WARD C
NORTH
0' 4' 8' 16'
1D DEDUCTIVE ALTERNATE 01: REMOVE EXISTING SOLID CORE WOOD DOOR AND
HARDWARE, HOLLOW METAL FRAME TO REMAIN. EXISTING FRAME HARDWARE
PREP TO BE FILLED SMOOTHED FOR PAINTING
2D REMOVE EXISTING WINDOW BLINDS AND HARDWARE, PATCH AND REPAIR WALL
TO MATCH EXISTING ADJACENT
3D REMOVE EXISTING WALL MOUNTED PC CABINET. PATCH AND REPAIR WALL
DAMAGED FROM MOUNTING POINTS. PROVIDE BLANK COVER WITH SECURITY
FASTENERS AT JUNCTION BOXES
4D EXISTING PLUMBING FIXTURES TO BE REMOVED AND REPLACED WITH NEW - SEE
PLUMBING PLANS FOR ADDITIONAL INFORMATION
5D EXISTING HALF LIGHT DOOR FRAME AND SIDELIGHT TO BE REMOVED AND
REPLACED. FR FRAME AT 2 HOUR WALL
6D EXISTING CASEWORK TO BE MODIFIED - SEE ENLARGED PLANS
7D EXISTING DOOR AND HOLLOW METAL FRAME TO BE REMOVED AND REPLACED
8D EXISTING NURSE CALL BUTTONS TO BE REMOVED AND REPLACED, SEE
ELECTRICAL PLANS FOR ADDITIONAL INFORMATION
9D WALL MOUNTED LIGHT FIXTURE AND JUNCTION BOX TO BE REMOVED. WALL
PATCHED AND PAINTED TO MATCH EXISTING
10D REMOVE EXISTING RECESSED PAPER TOWEL DISPENSER - PATCH SOLID
SURFACE WALL COVERING TO MATCH EXISTING
11D REMOVE EXISTING BUILT-IN UTILITY COVER AND EQUIPMENT FIXING AND
REPLACE WITH NEW BUILT-IN CASEWORK
12D EXISTING FAUCET TO BE REMOVED AND REPLACED - SEE PLUMBING PLANS FOR
ADDITIONAL INFORMATION
13D EXISTING EXIT SIGNS TO BE REMOVED AND REPLACED - SEE ELECTRICAL PLANS
FOR ADDITIONAL INFORMATION
14D REMOVE PRESSURE SENSOR, INDICATOR AND J-BOXES - SEE MECHANICAL PLANS
FOR ADDITIONAL INFORMATION. PATCH, REPAIR AND PAINT WALL TO MATCH
EXISTING ADJACENT.
15D REMOVE AND REPLACE EXISTING RECESSED FIRE EXTINGUISHER CABINET
17D REMOVE AND REPLACE DOOR AND FRAME, SIDELIGHT TO REMAIN. NEW WOOD
DOOR IN FRAME WITH CONCEALED CLOSER.
21D REMOVE EXISTING DOOR CLOSER. REPLACE WITH NEW CLOSER ON SECURE SIDE
OF DOOR
22D REMOVE AND REPLACE EXISTING SOAP DISPENSER
23D REMOVE AND REPLACE EXISTING PAPER TOWEL DISPENSER
24D EXISTING NURSE CALL TO BE REMOVED. PROVIDE BLANK COVER PLATE WITH
TAMPER RESISTANT SCREWS
C
N C
N C
N C N
C
NC NC
NC NC
N C
NC
NC
N C
NC
N C
N C
NC
NC
NC
NC
NC
N C
N C
N C
N C
N C
NC
NC
N C
NC
NC
NC
NC
NC
NC
N C
N C
NC
NC
NC
NC
NC
N C
NC
NC
NC
N C
N C
NC
NH
NH
NH
N H
N H
N H
NH
C R
NC
N H
NH C
R
MATCHLINE
SEE SHEET AD-113
HALLWAY
C-CO70
HALLWAY
C-CO60
BATH
D-133A
BED
D-134
BATH
D-134A
BED
D-125
BED
D-126
BED
D-127
EXERCISE
D-129
BED
D-123
BATH
D-122A
BED
D-122
TOILET
D-131
BATH
D-132A
BATH
D-127A
BATH
D-126A
BATH
D-125A
BATH
D-123A
BED
D-121
BATH
D-121A
GROUP
RM.
D-117
CONFERENCE
D-115 INTERVIEW
D-111
BATH
D-111A
BREAK
D-105
LOUNGE/LOCKERS
D-109
BATH
D-109A
BATH
D-105A
DATA
D-107
TOILET
D-140
HALLWAY
D-CO40
BED
D-135
BED
D-136
BATH
D-136A
BATH
D-135A
ANTE
D-141
BED
D-137
BATH
D-137A
BATH
D-143A
MEDS
D-150B
CONFERENCE
D-152
SOILED
UTIL
D-148
PERS
STORAGE
D-154
RESTRAINT
D-143
TOILET
D-170B
DINING
D-170
GARDEN
STORAGE
D-CT1A
COURTYARD
D-CT1
SHARED
OFFICE
D-168
OFFICE
D-184
OFFICE
D-182
TOILET
D-178
FOOD
CARTS
D-176
HAC
D-176A
HALLWAY
D-CO80
OFFICE
D-181
OFFICE
D-183
OFFICE
D-185
OFFICE
D-189
OFFICE
D-187
EXAM
D-147
CLEAN
STORAGE
D-160
BED
D-145
HAC
D-146
ELEC
D-EC1
HALLWAY
D-CO41
DATA
C-SC1
HALLWAY
D-C010
NOURISHMENT
D-130A
LOADING
E-CO10
HALLWAY
D-CO50
NURSE
STATION
D-150
WAITING
D-WL1
HALLWAY
C-CO71
BATH
C-145A
BATH
D-145A
VEST D
D-C01
BED
D-132
BED
D-133
RECYCLING
E-101
SOILED
LINEN
E-103
EMS
EQUIP
E-105
EMS
STORAGE
E-107
CLEAN
LINEN
E-109
HAC
E-111
UNAS
E-115
CT
STORAGE
E-TC1
GARDEN
D-CT2
DAYROOM
D-130
LAUNRY
D-128
OFFICE
D-120
COPY
D-150C
VESTIBULE
D-170A
1D10D
4D
8D
9D
8D
8D
4D
10D
1D
13D
15D
8D
9D
10D 8D
1D
4D
4D 10D
1D
8D
9D
8D
8D
9D
1D
8D 10D 4D
9D
8D1D
24D
24D
11D 12D
10D
8D
1D
8D 23D
4D
8D9D
1D
4D 8D 10D8D
1D
10D
8D
9D
13D
8D
8D9D
8D
1D
10D4D
4D
1D
10D 8D
8D 9D
10D
8D
9D
23D
4D 8D
1D
1D
1D
6D
24D
4D
22D 3D
14D
14D
8D
9D
23D 3D
3D 2D
13D
4D
8D
23D
22D
12D 23D
12D
6D
13D
24D
24D
2D
4D 23D
5D
NO WORK IN THESE AREAS
10D 8D
8D
4D
4D
8D 9D
4D 4D
A-400
C4
SIM
A-400
C7
SIM
A-401
B7
SIM
A-401
F7
SIM
A-400
C1
SIM
9D
3D 3D
24D
5D
17D 17D
17D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .