J-17_DB_Wage_Determinations_Gary.pdf

PDF 391 KB Posted

Attached to
Operation of the Gary Job Corps Center with OA/CTS
Solicitation number
DOL-ETA-16-R-00059
Issued by

About this file

DB Wage Determinations Gary

View the file

Other files

File Type Posted
Sol_DOL-ETA-16-R-00059_Amd_000006.pdf PDF
Sol_DOL-ETA-16-R-00059_Amd_000005.pdf PDF
DOL-ETA-16-R-00059_Amendment_5_Questions_and_Answers.pdf PDF
DOL-ETA-16-R-00059_Amendment_4_Q_and_As.pdf PDF
Sol_DOL-ETA-16-R-00059_Amd_000004.pdf PDF
DOL-ETA-16-R-00059_Amendment_4_Revised_Sections_L_and_M.pdf PDF
DOL-ETA-16-R-00059_Amendment_3.pdf PDF
DOL-ETA-16-R-00059_Amendment_3_Q_and_As.pdf PDF
Sol_DOL-ETA-16-R-00059_Amd_000003.pdf PDF
Sol_DOL-ETA-16-R-00059_Amd_000002.pdf PDF
Vehicle_Lease_Report_Gary_JCC.pdf PDF
Vehicle_Fuel_Log_Gary_JCC.pdf PDF
DOL-ETA-16-R-00059_Amendment_2_Questions_and_Answers.pdf PDF
Sol_DOL-ETA-16-R-00059_Amd_000001.pdf PDF
J-7_Past_Performance_Questionnaire.pdf PDF
J-6_Subcontracting_Plan_Summary_Sheet.pdf PDF
J-2_Statement_of_Financial_Capability_ETA_8554.pdf PDF
J-15_Dallas_Region_Career_Pathway_Plan.pdf PDF
J-9_Facility_Survey_2014_Vol_2_Part_1.pdf PDF
J-8_Standard_Form_1413_Statement_and_Acknowledgement.pdf PDF
J-4_STAFFING_CHART.pdf PDF
J-3_Financial_Display_ETA_2110.pdf PDF
J-9_Facility_Survey_2012_Vol_2_Part_2.pdf PDF
Sol_DOL-ETA-16-R-00059.pdf PDF
J-5_CTST.pdf PDF
J-9_Facility_Survey_2012_Vol_2_Part_3.pdf PDF
J-10_Gary_Property_Summary_Rpt.pdf PDF
J-9_Facility_Survey_2014_Vol_1.pdf PDF
J-10_Gary_Master_Property_Rpt.pdf PDF
J-13_National_Staff_Compensation_Report_GARY.pdf PDF
J-11_Gary_Inventory_Estimate.pdf PDF
J-1_Cost_Detail_Template.pdf PDF
J-12_Utilities_and_Energy_Usage_Information.pdf PDF
J-18_SCA_Wage_Determinations_01_12_2016.pdf PDF
PRE-SOLICITATION_NOTICE_Gary_JCC.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: TX160016 01/08/2016 TX16

Superseded General Decision Number: TX20150016

State: Texas

Construction Types: Heavy and Highway

Counties: Atascosa, Bandera, Bastrop, Bell, Bexar, Brazos, Burleson, Caldwell, Comal, Coryell, Guadalupe, Hays, Kendall, Lampasas, McLennan, Medina, Robertson, Travis, Williamson and

Wilson Counties in Texas.

HEAVY (excluding tunnels and dams, not to be used for work on

Sewage or Water Treatment Plants or Lift / Pump Stations in

Bell, Coryell, McClennon and Williamson Counties) and HIGHWAY

Construction Projects

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/08/2016

* SUTX2011-006 08/03/2011

Rates Fringes

CEMENT MASON/CONCRETE

FINISHER (Paving and

Structures)......................$ 12.56

ELECTRICIAN......................$ 26.35

FORM BUILDER/FORM SETTER

Paving & Curb...............$ 12.94

Structures..................$ 12.87

LABORER

Asphalt Raker...............$ 12.12

Flagger.....................$ 9.45

Laborer, Common.............$ 10.50

Laborer, Utility............$ 12.27

Pipelayer...................$ 12.79

Work Zone Barricade

Servicer....................$ 11.85

PAINTER (Structures).............$ 18.34

POWER EQUIPMENT OPERATOR:

Agricultural Tractor........$ 12.69

Asphalt Distributor.........$ 15.55

Asphalt Paving Machine......$ 14.36

Boom Truck..................$ 18.36

Broom or Sweeper............$ 11.04

Concrete Pavement

Finishing Machine...........$ 15.48

Crane, Hydraulic 80 tons or less.....................$ 18.36

Crane, Lattice Boom 80 tons or less................$ 15.87

Crane, Lattice Boom over

80 tons.....................$ 19.38

Crawler Tractor.............$ 15.67

Directional Drilling

Locator.....................$ 11.67

Directional Drilling

Operator....................$ 17.24

Excavator 50,000 lbs or

Less........................$ 12.88

Excavator over 50,000 lbs...$ 17.71

Foundation Drill, Truck

Mounted.....................$ 16.93

Front End Loader, 3 CY or

Less........................$ 13.04

Front End Loader, Over 3 CY.$ 13.21

Loader/Backhoe..............$ 14.12

Mechanic....................$ 17.10

Milling Machine.............$ 14.18

Motor Grader, Fine Grade....$ 18.51

Motor Grader, Rough.........$ 14.63

Pavement Marking Machine....$ 19.17

Reclaimer/Pulverizer........$ 12.88

Roller, Asphalt.............$ 12.78

Roller, Other...............$ 10.50

Scraper.....................$ 12.27

Spreader Box................$ 14.04

Trenching Machine, Heavy....$ 18.48

Servicer.........................$ 14.51

Steel Worker

Reinforcing.................$ 14.00

Structural..................$ 19.29

TRAFFIC SIGNAL INSTALLER

Traffic Signal/Light Pole

Worker......................$ 16.00

TRUCK DRIVER

Lowboy-Float................$ 15.66

Off Road Hauler.............$ 11.88

Single Axle.................$ 11.79

Single or Tandem Axle Dump

Truck.......................$ 11.68

Tandem Axle Tractor w/Semi

Trailer.....................$ 12.81

WELDER...........................$ 15.97

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: TX160016 01/08/2016 TX16

Superseded General Decision Number: TX20150016

Construction Types: Heavy and Highway

Counties: Atascosa, Bandera, Bastrop, Bell, Bexar, Brazos, Burleson, Caldwell, Comal, Coryell, Guadalupe, Hays, Kendall, Lampasas, McLennan, Medina, Robertson, Travis, Williamson and

Wilson Counties in Texas.

HEAVY (excluding tunnels and dams, not to be used for work on

Sewage or Water Treatment Plants or Lift / Pump Stations in

Bell, Coryell, McClennon and Williamson Counties) and HIGHWAY

Construction Projects subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

* SUTX2011-006 08/03/2011

CEMENT MASON/CONCRETE

FINISHER (Paving and

Structures)......................$ 12.56

ELECTRICIAN......................$ 26.35

FORM BUILDER/FORM SETTER

Paving & Curb...............$ 12.94

Structures..................$ 12.87

LABORER

Asphalt Raker...............$ 12.12

Flagger.....................$ 9.45

Laborer, Common.............$ 10.50

Laborer, Utility............$ 12.27

Pipelayer...................$ 12.79

Work Zone Barricade

Servicer....................$ 11.85

PAINTER (Structures).............$ 18.34

POWER EQUIPMENT OPERATOR:

Agricultural Tractor........$ 12.69

Asphalt Distributor.........$ 15.55

Asphalt Paving Machine......$ 14.36

Boom Truck..................$ 18.36

Broom or Sweeper............$ 11.04

Concrete Pavement

Finishing Machine...........$ 15.48

Crane, Hydraulic 80 tons or less.....................$ 18.36

Crane, Lattice Boom 80 tons or less................$ 15.87

Crane, Lattice Boom over

80 tons.....................$ 19.38

Crawler Tractor.............$ 15.67

Directional Drilling

Locator.....................$ 11.67

Directional Drilling

Operator....................$ 17.24

Excavator 50,000 lbs or

Less........................$ 12.88

Excavator over 50,000 lbs...$ 17.71

Foundation Drill, Truck

Mounted.....................$ 16.93

Front End Loader, 3 CY or

Less........................$ 13.04

Front End Loader, Over 3 CY.$ 13.21

Loader/Backhoe..............$ 14.12

Mechanic....................$ 17.10

Milling Machine.............$ 14.18

Motor Grader, Fine Grade....$ 18.51

Motor Grader, Rough.........$ 14.63

Pavement Marking Machine....$ 19.17

Reclaimer/Pulverizer........$ 12.88

Roller, Asphalt.............$ 12.78

Roller, Other...............$ 10.50

Scraper.....................$ 12.27

Spreader Box................$ 14.04

Trenching Machine, Heavy....$ 18.48

Servicer.........................$ 14.51

Steel Worker

Reinforcing.................$ 14.00

Structural..................$ 19.29

TRAFFIC SIGNAL INSTALLER

Traffic Signal/Light Pole

Worker......................$ 16.00

TRUCK DRIVER

Lowboy-Float................$ 15.66

Off Road Hauler.............$ 11.88

Single Axle.................$ 11.79

Single or Tandem Axle Dump

Truck.......................$ 11.68

Tandem Axle Tractor w/Semi

Trailer.....................$ 12.81

WELDER...........................$ 15.97

cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

General Decision Number: TX160019 01/08/2016 TX19

Superseded General Decision Number: TX20150019

Construction Type: Residential

Counties: Bastrop, Caldwell, Hays, Travis and Williamson

Counties in Texas.

RESIDENTIAL CONSTRUCTION PROJECTS consisting of single family homes and garden type apartments up to and including 4 stories.

subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

* SUTX1983-003 03/01/1983

Air Conditioning Mechanic........$ 7.25

BRICKLAYER.......................$ 10.00

CARPENTER........................$ 7.265

CEMENT MASON/CONCRETE FINISHER...$ 8.00

ELECTRICIAN......................$ 7.50

FLOOR LAYER: CARPET (SOFT)

FLOOR............................$ 7.25

Form Setter......................$ 7.25

Insulation Installer.............$ 7.25

IRONWORKER.......................$ 7.25

Laborers:

Laborers....................$ 7.25

Pipelayers..................$ 7.25

PAINTER..........................$ 7.94

PLUMBER..........................$ 7.50

Power equipment operators:

Backhoe.....................$ 7.25

Front end loaders...........$ 7.25

Graders.....................$ 7.25

Rollers.....................$ 7.25

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 10.00

Sheet metal worker...............$ 10.00

Sheet Rocker.....................$ 8.00

TRUCK DRIVER.....................$ 7.25

cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

General Decision Number: TX160304 06/17/2016 TX304

Superseded General Decision Number: TX20150304

Construction Type: Building

County: Hays County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

1 01/15/2016

2 03/18/2016

3 05/27/2016

4 06/17/2016

ASBE0087-014 01/01/2016

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Duct, Pipe and

Mechanical System Insulation)....$ 21.57 10.02

BOIL0074-003 01/01/2014

BOILERMAKER......................$ 23.14 21.55

ELEC0520-004 06/01/2015

ELECTRICIAN (Low Voltage

Wiring Only).....................$ 27.15 8%+5.71

ELEV0133-002 01/01/2016

ELEVATOR MECHANIC................$ 37.76 29.985+a

Footnote: A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.

New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Veterans Day.

ENGI0450-002 04/01/2014

POWER EQUIPMENT OPERATOR

Cranes......................$ 34.85 9.85

IRON0084-011 06/01/2015

IRONWORKER, ORNAMENTAL...........$ 23.02 6.35

IRON0482-012 06/01/2015

IRONWORKER, STRUCTURAL...........$ 21.90 5.90

* PLUM0286-009 05/30/2016

HVAC MECHANIC (HVAC Unit

Installation Only)...............$ 28.03 12.43

PIPEFITTER (Including HVAC

Pipe Installation)...............$ 28.03 12.43

SFTX0669-002 01/01/2016

SPRINKLER FITTER (Fire

Sprinklers)......................$ 27.43 22.52

SHEE0067-006 07/01/2015

SHEET METAL WORKER (Excludes

HVAC Duct Installation)..........$ 24.38 13.74

SUTX2014-030 07/21/2014

BRICKLAYER.......................$ 20.86 0.00

CARPENTER (Acoustical Ceiling

Installation Only)...............$ 14.00 0.00

CARPENTER (Form Work Only).......$ 15.62 0.05

CARPENTER, Excludes

Acoustical Ceiling

Installation, Drywall

Hanging, Form Work, and Metal

Stud Installation................$ 13.99 0.00

CEMENT MASON/CONCRETE FINISHER...$ 15.71 0.00

DRYWALL FINISHER/TAPER...........$ 16.96 4.34

DRYWALL HANGER AND METAL STUD

INSTALLER........................$ 14.00 0.00

ELECTRICAL INSTALLER (Sound and Communication Systems

Only)Excludes Wiring.............$ 12.50 0.65

ELECTRICIAN, Excludes Low

Voltage Wiring...................$ 24.00 3.66

FLOOR LAYER: Carpet.............$ 21.88 0.00

GLAZIER..........................$ 12.83 0.00

IRONWORKER, REINFORCING..........$ 12.27 0.00

LABORER: Common or General......$ 10.43 0.00

LABORER: Mason Tender - Brick...$ 11.00 0.00

LABORER: Mason Tender -

Cement/Concrete..................$ 11.85 0.00

LABORER: Pipelayer..............$ 12.45 0.00

LABORER: Roof Tearoff...........$ 11.28 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 19.43 3.49

OPERATOR: Bobcat/Skid

Steer/Skid Loader................$ 13.00 0.00

OPERATOR: Bulldozer.............$ 14.00 0.00

OPERATOR: Drill.................$ 14.50 0.00

OPERATOR: Forklift..............$ 15.68 0.00

OPERATOR: Grader/Blade..........$ 19.30 0.00

OPERATOR: Loader................$ 14.00 0.00

OPERATOR: Mechanic..............$ 18.75 5.12

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 0.00

OPERATOR: Roller................$ 11.25 0.00

PAINTER (Brush, Roller, and

Spray)...........................$ 18.76 6.35

PLUMBER, Excludes HVAC Pipe

Installation.....................$ 21.58 2.88

ROOFER...........................$ 12.00 0.00

SHEET METAL WORKER (HVAC Duct

Installation Only)...............$ 17.84 3.26

TILE FINISHER....................$ 11.32 0.00

TILE SETTER......................$ 15.38 0.00

TRUCK DRIVER: Dump Truck........$ 12.39 1.18

TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57

TRUCK DRIVER: Semi-Trailer

Truck............................$ 12.50 0.00

TRUCK DRIVER: Water Truck.......$ 12.00 4.11

WATERPROOFER.....................$ 16.30 0.06

cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

General Decision Number: TX160045 01/08/2016 TX45

Superseded General Decision Number: TX20150045

Construction Types: Heavy

PIPELINE - ON-SHORE PIPELINE CONSTRUCTION:

Counties: Texas Statewide.

PIPELINE - ON-SHORE CONSTRUCTION

subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

SUTX1997-002 01/01/1997

Drillers....................$ 16.08 2.01

Hot Pay.....................$ 15.58 2.01

Jackhammermen...............$ 15.58 2.01

Loaders.....................$ 16.08 2.01

Powderman, blasters & shooters....................$ 16.58 2.01

Unskilled...................$ 15.08 2.01

Pipefitter.....................$ 36.49 7.45

Group 1.....................$ 22.95 6.05

Group 2.....................$ 17.54 4.80

Group 3.....................$ 12.37 3.55

Truck drivers:

Group 1.....................$ 18.82 a

Group 2.....................$ 18.82 a

Group 3.....................$ 16.81 a

Group 4.....................$ 16.04 a

Group 5.....................$ 15.71 a

FOOTNOTE

a - $2.52 PER HOUR PLUS $41.00 PER WEEK

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Truck Mechanics

GROUP 2 - Lowboy, rollagon or similar type equipment

GROUP 3 - A-Frame, Gin pole, Tandem float (4 & 5 axle) , rubber- tired tractor, fork lift, winch truck, track truck equipment, stringing truck

GROUP 4 - Single axle float (3 axle), flat bed truck (3 axle) dump truck (3 axle), skid truck (3 axle), hot pass (2 axle), Flat bed truck (2 axle) dump truck (2 axle), skid truck (2 axle) water truck (2 axle), pick up, bus jeep, staion wagon, swamp buggy or similar type equipment.

GROUP 5 - Stringer bead & hot pass (2 axle, flat bed truck (2 axle), dump truck (2 axle), skid truck (2 axle), water truck

(2 axle), pick-up, bus jeep, station wagon, swamp buggy or similar type equipment.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1 - Backhoe, dragline, clam, crane, ditching machine, side booms (except those in

GROUP 2), mechanic, operator on dredges, bulldozer, cleaning machine, coating machine, back filler, motor grader, end loader (3 yd. & over), blending machine, wate-kote machine,equipment welder, track tractor

GROUP 2 - Pipe dream, gin truck or winch truck with poles when used for hoisting, side boom (cradling rock drill), tow tractor,, farm tractor, road boring machine, end loader

(under 3 y.d), fork lift (industrial type), pot fireman

(power agitated); straightening machine, boring machine, bombardier (track or tow rig), mobile lubrication & service engineer, hydrostatic testing operator, rollagon or similar type equipment

GROUP 3 Fuel man, oiler or swamper (on trenching machine or shovel- type equipment) cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

General Decision Number: TX160046 01/08/2016 TX46

Superseded General Decision Number: TX20150046

Construction Type: Heavy

Pipeline-Off-Shore Construction subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

* SUTX1990-021 01/31/1990

Anchor Operator..................$ 10.75 .68

Cook, Chief......................$ 7.59 .48

Cook, Second.....................$ 7.25 .41

Crane Operator...................$ 11.50 .72

Deckhand.........................$ 7.25 .32

Ditches & Sideboom Operator......$ 11.55 .73

Diver............................$ 11.62 1.75

ELECTRICIAN......................$ 11.40 .72

Hoist & Deck Engine, Fork

Lift & Mixer Operator, Pot

Firemen..........................$ 8.45 .53

LABORER..........................$ 7.25 .35

MECHANIC.........................$ 11.40 .72

Orderly..........................$ 7.25 .35

Pipeline Welder..................$ 14.00 .88

RIGGER...........................$ 8.50 .54

Semi-Skilled Laborer.............$ 7.25 .41

Spacer...........................$ 12.25 .77

Spray Painter, Barge.............$ 8.25 .52

Spray Painter, Fabrication.......$ 10.16 .64

Stabber..........................$ 7.25 .46

Stalking Machine Operator........$ 9.75 .61

Tender...........................$ 7.25 .93

Utility Welder...................$ 11.00 .69 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

General Decision Number: TX160075 01/08/2016 TX75

Superseded General Decision Number: TX20150075

Construction Type: Heavy Dredging

DREDGING PROJECTS ALONG THE TEXAS GULF COAST AREA INCLUDING ALL

PUBLIC CHANNELS, HARBORS, RIVERS, TRIBUTARIES AND THE GULF

INTRACOASTAL WATERWAYS

subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

* SUTX1994-001 01/18/1994

Derrick Operator.................$ 7.25

Dozer Operator...................$ 7.25

Dredge 16" and Over

DECKHAND....................$ 7.25

DREDGE TENDER OPERATOR......$ 7.25

FIREMAN.....................$ 7.25

FIRST ASSISTANT ENGINEER....$ 7.25

LEVERMAN....................$ 7.25

OILER.......................$ 7.25

SECOND ASSISTANT ENGINEER...$ 7.25

SHOREMAN....................$ 7.25

THIRD ASSISTANT ENGINEER....$ 7.25

TRUCK DRIVER................$ 7.25

WELDER......................$ 7.25

Dredge Under 16"

DECKHAND....................$ 7.25

DREDGE TENDER OPERATOR......$ 7.25

LEVERMAN....................$ 7.25

OILER.......................$ 7.25

WELDER......................$ 7.25

Hydraulic Dredging

FIRST COOK..................$ 7.25

HANDYMAN....................$ 7.25

JANITOR - CABIN PERSON......$ 7.25

MESS PERSON.................$ 7.25

SECOND COOK.................$ 7.25

Marsh Buggy Dragline

OILER.......................$ 7.25

OPERATOR....................$ 7.25

cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

General Decision Number: TX160081 01/08/2016 TX81

Superseded General Decision Number: TX20150081

Construction Type: Heavy Tunnel

Counties: Bell, Bexar, Bowie, Brazoria, Brazos, Cameron, Collin, Comal, Coryell, Dallas, Denton, Ector, El Paso, Ellis, Fort Bend, Galveston, Grayson, Gregg, Guadalupe, Hardin, Harris, Harrison, Hays, Hidalgo, Jefferson, Johnson, Kaufman, Liberty, Lubbock, McLennan, Midland, Montgomery, Nueces, Orange, Parker, Potter, Randall, Rockwall, San Patricio, Smith, Tarrant, Taylor, Tom Green, Travis, Victoria, Waller, Webb, Wichita and Williamson Counties in Texas.

TUNNEL CONSTRUCTION PROJECTS (BORED, 48" IN DIAMETER OR MORE)

subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor

* SUTX1992-010 01/15/1992

CARPENTER (Including Form

Setting - Wood Forms ONLY)......$ 10.67 .92

ELECTRICIAN......................$ 12.21 .92

IRONWORKER, REINFORCING

(Shaft Collar & Surface ONLY)....$ 12.03 4.09

Miner.......................$ 11.77 1.28

Surface.....................$ 7.53

Tunnel......................$ 9.24

MECHANIC (Maintenance and repair on trucks and power equipment).......................$ 11.77 .92

Oiler (Services trucks and power equipment).................$ 9.69 1.50

Backhoe Operator (1 1/2 CY or more)....................$ 11.40 1.50

Backhoe Operator (Less than 1 1/2 CY)..............$ 10.68

Bulldozer...................$ 13.00

Crane (1 1/2 CY or more)....$ 12.82 1.50

Crane (Less than 1 1/2 CY)..$ 11.89

Front End Loader (2 1/2 CY or more)....................$ 12.17

Front End Loader (less than 2 1/2 CY)..............$ 10.16

Locomotive Operator.........$ 9.00 1.50

Road Head Operator..........$ 14.12 1.21

Tunnel/Boring Machine

Operator....................$ 13.61

Truck drivers:

Semi........................$ 7.25 1.05

Single Axle, Light..........$ 7.55

WELDER...........................$ 11.58

LABORER CLASSIFICATIONS

SURFACE - Air Tool Operator (Surface Only), Batch Plant

Laborer, Changehouseman, Dumpman (Outside, Tool Man).

TUNNEL - Air Tool Operator (Tunnel Only), Bull Gang

(Muckers/Trackmen), Cabletender, Concrete Crew

(Rodders/Spreaders), Concrete Finisher in Tunnel, Concrete

Screed Man, Conveyor Operator, Headerman, High Pressure

Nozzleman, Hoist Operator, Jumbo Man, Loading/Unloading

Agitator Cars, Nipper, Nozzleman-Slice Line, Pot Tender, Primer Man, Reboundman, Shaft/Raise Work (Below Ground), Shotcrete Man, Slusher Operator, Steel Form

Raisers/Setters, (metal forms only) Swamper

(Brakeman/Switchman), Timberman, Troweling/Grout Machine

Operator, Tugger, Vibratorman, Jack Hammer, Pneumatic Tools

(Except Driller), Vibratorman, Pavement Breakers.

MINER - Drill Doctor, Bit Sharpener, Bit Grinder, Rebar

(Tunnel Only), Jack Leg Miner, Shaft Drill Operator cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

File details come from the government source that posted it. Updated .