JPATS_Industry_Day_Final_Powerpoint_Presentation.pdf
PDF 9 MB Posted
- Attached to
- AIRCRAFT AVIONICS SUITE UPGRADE Federal contract opportunity
- Solicitation number
- DJM-17-A37-Q-0192
About this file
INDUSTRY DAY PRESENTATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT_0002_-_QUESTIONS_&_RESPONSES.pdf | ||
| AMENDMENT_0001_-_QUESTIONS_&_RESPONSES.pdf | ||
| DJM-17-A37-Q-0192_-_Request_for_Quote_-_N279AD_Avionics_Suite.pdf | ||
| Q&A_SSN-RFI.doc | DOC document | |
| Draft_SOW_with_Attachments.pdf | ||
| Industry_Day_Attendees.docx | DOCX document | |
| Industry_Day_Questions-Responses.docx | DOCX document | |
| DJM-17-A37-Q-0192_-_Draft_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N279AD Avionics Upgrade Requirements
Justice Prisoner and Alien Transportation System
(JPATS)
Industry Day 9‐10 May 2017
AGENDA
• INTRODUCTIONS
• PURPOSE
• TIMELINE
• GOALS
• RULES OF ENGAGEMENT
• TWO‐DAY SCHEDULE
• SAFETY BRIEFING
Welcome
• Team Intro
– Arlene Dee Carlson – JPATS Contracting Officer
– Luke Pingrey – JPATS Flight Standards
– Rich Deagle – JPATS Maintenance Manager
– Ernest Benford – JPATS Contracting Representative
• Vendor Participants
Industry Day Purpose
Open up a meaningful dialog with industry to assist us in determining a best value solution to upgrade our Boeing 737‐400 avionics suite.
JPATS Operation What we do…
• JPATS transports prisoners in support of Federal judicial process for the Federal Bureau of Prisons (BOP) and the United States Marshals Service (USMS).
• JPATS aircraft are engaged in PUBLIC AIRCRAFT OPERATIONS (PAO) and are not restricted by FAA civil aircraft regulation REF: Title 49 of the United States Code (49 U.S.C.) §§ 40102 (a)(41) and 40125 (the statute) or FAA's Advisory Circular on Public Aircraft
Modification Timeline
• December 4th begin work on site.
• Aircraft returned to service NLT Jan 8th
• Feasible????
GOALS ‐ OUTCOMES
• Gather industry input prior to solicitation.
‐ is scope of work effort feasible?
• Finalize Statement of Work.
• Identify any long lead items.
• Standardize fleet avionics & component interchangeability
• Ensure all work effort is complete within time frame.
Rules of Engagement
• No photocopies of any technical data
• Photos inside aircraft are encouraged
– NO PHOTOS OUTSIDE AIRCRAFT
– NO PHOTOS OUTSIDE OF HANGAR (OPSEC)
• Collaboration is encouraged…ALL WORK DONE AT ONE SHOT…open up aircraft once.
Schedule – TWO DAY Day 1
• JPATS Fleet Configuration & Differences (0+45)
• Review SOW scope (0+15)
• Hangar Safety & POCs (0+10)
• 1030‐1500: N279AD Aircraft Viewing Period
• 1530‐1600: Day 1 Recap Day 2
• N640CS Aircraft View Period: 0900‐1100
• SOW Review: 1100‐1200
USV Fleet Data Airplane Number
Registry Number
Serial Number
Tab Number
Model Data
1 N639CS 26073 PM557 737‐4Y0
2 N640CS 26078 PM560 737‐4Y0
3 N279AD 26279 PW261 737‐4Q8
ALL DUAL FMS
ALL DUAL GPS
• ONLY 639 & 640 aircraft certified for RNP-AR and LPV/LP
ALL modifications under Boeing SBs except for SLS LPV/LP system
• N279AD Dual GPS only certified for RNP > 0.3 nm IAPs
SB Number Title Release Date Rev Rev Status Revision Type
ATA
SB 737‐34‐2705 NAVIGATION ‐ Dependent Position Determining ‐ Installation of Global Positioning System Sensor Unit (GPSSU)
20‐Apr‐16 4 CURRENT Revision 3450
SB 737‐34‐2807 NAVIGATION ‐ Flight Management Computer System (FMCS) ‐ Installation of Software to Activate the GPS FMC
7‐Jan‐16 0 CURRENT Original 3458 3461
SB 737‐34‐2815 NAVIGATION ‐ FMCS‐ Installation of Second Flight Management Computer
10‐Mar‐16 0 CURRENT Original 3461
PW261 – N279AD
PM557–N639CS & PM560–N640CS
SB 737‐24‐1220 ELECTRICAL POWER ‐ Standby Power
System ‐ Standby Bus Loads Addition 2‐Dec‐15 0 CURRENT Original 2454
SB 737‐24‐1221 ELECTRICAL POWER ‐ DC Generation System ‐ Replacement of 36 Amp‐Hour Battery and Charger with a 40 Amp‐Hour Battery and Charger
12‐Dec‐16 1 CURRENT Revision 2431
SB 737‐34‐2517 NAVIGATION ‐ Global Positioning System ‐ Installation of Honeywell Global Positioning System Sensor Unit
30‐Sep‐14 1 CURRENT Revision 3458 3462
SB 737‐34‐2519 NAVIGATION ‐ Flight Management Computer System ‐ Installation and Activation of Second Flight Management Computer
30‐Sep‐14 1 CURRENT Revision 3462
SB 737‐34A2217 NAVIGATION ‐ Flight Management Computer System ‐ Flight Management Computer Operational Program Software U10.8A Installation
9‐Jun‐10 0 CURRENT Original 3461
Boeing RNP Certification
• REQUIRED EQUIPMENT
AFM References Number Change Office Title Date Replaced by
Date Cancelled
20‐129 0 AIR‐120 Airworthiness Approval of Vertical Navigation (VNAV) Systems for use in the U.S. National Airspace System (NAS) and Alaska (Cancelled ‐ 5/8/2012)
9/12/1988 AC 20‐138C
D in effect on 3/28/14
28‐Mar‐14
20‐130A 0 AIR‐130 Airworthiness Approval of Navigation or Flight Management Systems Integrating Multiple Navigation Sensors (Cancelled ‐ 05‐08‐2012)
6/14/1995 AC 20‐138C
D in effect on 3/28/14
28‐Mar‐14
Airworthiness Approval of Positioning and Navigation Systems (Including Change 2)
3/28/201420‐138D AIR‐130
This revision adds minor clarifications and new guidance material based on issues and questions since revision ‘C’ was published. There are several new changes such as: equipment capability versus installed limitations;
clarifying database configuration versus equipment capability; adding step‐ down fixes to navigation databases; a new appendix for demonstrating radius to fix (RF) leg capability; and, including required navigation performance (RNP) prediction guidance for RNP authorization required approach (RNP AR APCH).
Overview of Aircraft Operator Enablers:
Performance Based Navigation (PBN)
RNAV SID‐STAR
RNP SID‐STAR
Performance Based Navigation (PBN) https://www.faa.gov/nextgen/delivering/oiaa/investments/pbn/
RNP‐AR
LPV
RNP
FAA Certification
RNAV (RNP) Approaches Minimum Equipment
RNAV (GPS) Approaches Minimum Equipment
JPATS Failure Matrix
RNAV SID‐STAR
RNP‐1 SID‐STAR
LNAV Only GPS Approaches LNAV‐VNAV GPS Approaches LPV/LP Final Approach Segment (FAS) ‐Has ONBOARD STATUS Annunciators
FUTURE
RNAV (RNP) = RNP‐AR Approaches http://www.esterline.com/
1 ‐ GPS Sensor 2 ‐ Satellite Landing System
Cockpit Components
LPV/LP Installation
SBAS SEL ‐ ON
GPS #1 LPV High Speed Data BUSS is ACTIVE
Independent Switch SLS#1 = Capt | SLS#2 = F/O
REVIEW:
DRAFT STATEMENT OF WORK
DJM‐17‐A37‐Q‐0192_‐_Draft_SOW
Day 1 JPATS Fleet Configuration & Differences (0+45) Review SOW scope (0+15)
SOW Actions
• ADD: Relocation of AirCell 3100 LRU to EE compartment
HANGAR SAFETY
Hazards POCs
JPATS HANGAR
• Must have escort anywhere in building
SECOND FLOOR OFF LIMITS
• Stay inside hangar – RAMP is restricted!
• Tech Data held in 3rd Floor Conf Rm.
• MX Shack alternate Tech Data review area.
• Restroom located near center on each floor.
• Turn‐in visitor badge at Security Office [sign‐in and sign‐out each day with escort]
Schedule Day 1
• JPATS Fleet Configuration & Differences (0+45)
• Review SOW scope (0+15)
• Hangar Safety & POCs (0+10)
• 1030‐1500: N279AD Aircraft Viewing Period
• 1530‐1600: Day 1 Recap Day 2
• N639CS Aircraft View Period: 0900‐1100
• SOW Review: 1100‐1200 with DAY 2 Recap
File details come from the government source that posted it. Updated .