This memorandum provides recommendations for the replacement of the Dickey Creek bridge over the North Fork of the Teanaway River in Kittitas County, Washington. The existing 52-foot bridge is functionally obsolete and load restricted. The new bridge design is to have a minimum 125-foot span with a 105-foot waterway width to improve stream continuity for flows up to the 100-year event. The low chord elevation should be set at 2392.0 feet. Riprap erosion protection is recommended on the abutments with a 4-foot thickness and crest at 2390.0 feet. Preliminary scour estimates for a 100-year event indicate 2.6 feet of abutment scour and 7.2 feet of long-term degradation. The total bridge replacement will be designed and constructed by the Western Federal Lands Highway Division for the Kittitas County and is funded through the Federal Highway Administration solicitation for WA KITTITAS 5880(1)DICKEY CRK BRIDGE to replace the functionally obsolete structure and reduce flood impacts.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DICKEY CREEK BRIDGE REPLACEMENT
WATERWAY DESIGN HYDRAULICS MEMO
To: Michael Traffalis, WFLHD Project Manager From: Matthew Dillin, P.E., WFLHD Hydraulics Engineer Date: October 7, 2020 Project: WA Kittitas 5880(1) - Dickey Creek Bridge Replacement
Background
The project will be replace The North Fork River Bridge (MP 10.06 Dickey Creek) located in Kittitas County, WA (Figure 1). The existing bridge, constructed in 1963, is a 52-foot prestressed girder bridge that is functionally obsolete and currently load restricted. The bridge is owned and maintained by Kittitas County (County). Western Federal Lands Highway Division (WFLHD) is designing the new bridge. Recommendations for the initial bridge waterway width, minimum low chord elevation, and riprap erosion control are presented.
Stream Conditions
The North Fork of the Teanaway River originates within Cascade Mountain Range. The basin for the project site encompasses 82.4 square miles near the crest of the Cascade Mountain Range (Figure 2). The project reach is located in a moderately steep and moderately confined valley. Through the project reach the river is a single thread meandering channel with a sinuosity of 1.4. The valley slope through the project reach is approximately 0.013 ft/ft.
The ordinary-high-water (OHW) was observed to be roughly 65-feet, which is wider than the existing bridge span.
Pool-riffle is the dominant bed form. Sand, gravel, cobble, and small boulders comprise the banks and streambed.
The stream banks appear moderately stable. Based on aerial imagery, the channel has not migrated appreciably over the past decade. The adjacent floodplain is mostly well vegetated with grasses, shrubs, and mature trees. Based on the available woody debris in the system, bank-side vegetation, and expected flood flow depths, the stream can carry a large amount of large woody debris.
Just upstream of the crossing, the river travels through a bend. The bridge is located just downstream of a bend in the river and there are signs of the river eroding the abutment on the outside of the bend. The river has deposited large material upstream of the bridge and scoured around the existing bridge abutments. Downstream of the existing bridge, the adjacent floodplain is roughly 2-feet above the base flow elevation and appears well connected to the channel. Upstream of the existing bridge, the adjacent floodplain is roughly 6-feet above the base flow elevation and appears disconnected from the channel. Bedrock was observed in multiple locations upstream of the bridge, arresting any further channel degradation.
Hydrology
The nearest gaging station to the project site is the United State Geological Survey (USGS) gage Station 12480000 (Teanaway River Below Forks Near Cle Elum, WA). The gage was operated by USGS for nine years, from 1968 to 1976. After 1976, the gage was operated by United States Bureau of Reclamation (USBR). The gage has two additional major tributaries (Middle Fork Teanaway River and West Fork Teanaway River) in the intervening reach between the bridge site and the gage site. Additionally, the contributing watershed for the gage is significantly larger (greater than 25%) than the contributing watershed for the bridge site. Therefore, the transposition of the gage data to the project site is not recommended by FHWA technical guidance (Publication No. FHWA-NHI-02- 001, October 2002) as the hydrology at the gage site is likely not representative of the hydrology at the bridge site.
Western Federal Lands Highway Division
610 E. Fifth Street Vancouver, WA 98661-3801
A hydrologic analysis was performed using USGS regional regression equations to compute peak flow estimates for the ungagged project site. The methodology for calculating peak flows using the regional regression equations is outlined in the Scientific Investigations Report 2016-5118, Version 1.2, November 2017 by USGS. With the lack of gage data for the project site, the regression analysis represents the best available data for the project site.
However, the computed regression analysis flows appeared to underestimate peak flow values when compared to personal accounts from County staff and Yakima Nation Tribal staff who live and work in the basin.
Flows from the FEMA Flood Insurance Study (FIS) were also evaluated as part of this study. The FEMA flows are 50-percent, 60-percent, and 180-percent greater than the flows calculated using the USGS regional regression equations for the 500-year, 100-year, and 2-year flows, respectively. The FEMA flows appear to provide a conservative estimate that is consistent with the personal accounts of flooding at the bridge site over the past 30-years; therefore, the FEMA flows were utilized for the design of the Dickey Creek Bridge Project.
A summary of the hydrologic analyses results can be found in the appendix of this memo (Figure 3).
Mapping
LiDAR mapping for the project was available through the Washington State Department of Natural Resources Lidar portal. The LiDAR data was collected in 2015 and included channel bathymetry. LiDAR mapping was supplemented with some additional ground survey within the project limits collected by Western Federal Lands.
The surface utilized in this study can be found in the appendix (Figure 4).
Hydraulic Model
A two-dimensional, non-uniform, steady-state hydraulic analysis was performed using SRH-2D. The model was developed using Aquaveo’s Surface-Water Modeling System (SMS) interface Version 13.0. The model was used for estimating flow depths, flow velocities, shear stress, and water surface elevations within the North Fork of Teanaway River through the project reach. For large storm events, Manning’s n values of 0.015, 0.02, 0.035, 0.04, 0.05, and 0.06 were utilized for the paved roadway, gravel roadway, bare gravel bars, main channel, grassy floodplain benches, and forested floodplain benches, respectively. For the 2-year event, Manning’s n values of 0.015, 0.02, 0.045, 0.055, 0.055, and 0.08 were utilized for the paved roadway, gravel roadway, bare gravel bars, main channel, grassy floodplain benches, and forested floodplain benches, respectively. The models used a two second time-step and a total run time of one hour, allowing the model to reach a steady-state condition. Both the upstream and downstream boundary conditions were located roughly 3,000-feet from the bridge crossing. The upstream boundary condition was modeled as a constant discharge, conveyed across the main channel. The downstream boundary condition was modeled as a constant water surface elevation, corresponding to the normal water surface depth. The mesh within the main channel and immediately adjacent floodplain generally consists of equilateral triangles and squares with approximately 5 to 6-foot lengths for each side (figure 5). The 2-year event and 100-year events were modeled to evaluate the impacts of the new crossing on the channel floodplain, channel stability, and stream continuity. For the preliminary scour analysis the 100-year and 500-year event were modeled.
A summary of the hydraulic analysis results can be found in the appendix of this memo (Figures 6 to 13).
North Fork Teanaway River Floodplain
The site is located within a Federal Emergency Management Agency (FEMA) special flood hazard Zone A1 (FIRM 530095 0164 B, Figure 14). A detailed FEMA mapping study was completed for the site and base flood elevations (BFEs) are depicted on the FIRM. The FIRM base flood elevations are based on the NGVD 29 Datum and a datum shift of +3.793-feet is necessary to convert the elevations to the NAVD 88 Datum. There are slight differences in water surface elevations between the existing conditions model and the printed FIRM BFEs. The difference in elevations can likely be attributed to updated surface mapping, updated hydrology, and an improved 2-dimenional hydraulic analysis.
The proposed bridge is over two times longer than the existing bridge and provides a significant reduction in the 100-year water surface elevation (WSE) upstream of the existing crossing and a slight increase in the WSE downstream of the existing crossing. Upstream of the existing bridge crossing, the 100-year WSE is decreased roughly 2.5-feet and the decrease extends approximately 300-feet upstream. Downstream of the existing bridge crossing, the wider bridge actually causes a slight increase in the 100-year WSE and the increase extends roughly 100-feet downstream. The increase in WSEs can be attributed to the water going supercritical through the narrow opening of the existing bridge and the realignment of the proposed bridge slightly downstream of the existing bridge. In general, the larger proposed structure decreases the 100-year WSE and floodplain extents. A comparison profile of the existing and proposed conditions models can be found in the appendix (Figure 6).
Stream Continuity
The existing bridge is an undersized structure with an opening that is less than the observed width of the OHW.
The undersized opening has interrupted the natural channel processes through the structure and over time has created a disconnect between upstream and downstream channel processes which is evident in the channel profile, cross-sectional geometry, and sediment gradation. An important design consideration for the new bridge was to improve the natural function of the stream through the crossing by providing a properly sized structure to restore stream continuity. This has multiple wide-ranging benefits including reduced maintenance, improved biological function, and improved health of the overall stream corridor.
The field observed OHW set the minimum opening width to improve stream continuity; however, this width generally corresponds with stream function at relatively small and frequent flow events. To improve continuity for larger more infrequent events, several hydraulic analyses were conducted for a range potential opening sizes and return events. For each opening size and return event, the alternative analysis considered four hydraulic indicators water surface depth, velocity, shear stress, and stream power within the channel both upstream and downstream of the crossing.
Ultimately a 125-foot span was chosen for the design opening as the analysis indicated a continuity through the structure that was evident in the water surface profile, water depths, velocities, shear stresses, and stream power.
Values for the four hydraulic indicators near the structure were within the range of values found in the natural channel outside of the influence of the bridge. The wider proposed opening provides a drastic improvement in stream continuity over the existing condition. A comparison of the existing conditions and proposed conditions for the 2-year and 100-year return events is available in the appendix (Figures 10 to 13).
Recommendations
Bridge
Bridge span and low chord recommendations are based on a preliminary hydraulic analysis.
Bridge low chord should be set to a minimum elevation of 2392.0-feet, in reference to the project datum, which is the approximate 100-year water surface elevation plus 3-feet of freeboard.
Design should allow for a 9.5-foot clearance between stream bed and the low chord.
The design bridge should have a minimum span of 125-feet with 2H:1V sloping abutments.
Design should allow for 105-feet for waterway width.
Scour
Scour estimates are based on a preliminary hydraulic analysis of the proposed 125-foot bridge opening during the 100-year and 500-year events. Long-term degradation was estimated based on 17-years of cross-section data at the existing crossing. It was assumed that the bridge would be supported by deep piles on spread footings. A more detailed scour analysis will be conducted after the geotechnical investigations are complete and the structure size and alignment are established.
100-year abutment scour: 2.6-feet 500-year abutment scour: 3.3-feet Long-term degradation: 7.2-feet Total scour elevation: 2372.0-feet, in reference to project datum (11.0-feet of total scour depth)
Abutment Erosion Protection
Preliminary design based on the hydraulic analysis of the existing bridge opening:
A spill-through abutment is recommended at this location.
Install riprap Class 5 (FHWA FP-14), 4-feet thick, and sloped 2(h):1(v) to an invert elevation of 2376.7-feet (project datum), approximate depth of contraction scour plus long term degradation.
Set riprap crest elevation to 2390.0-feet (project datum) (100-year water surface plus 1-feet of freeboard).
Install geotextile filter under all placed riprap.
Place conserved gravel-cobble streambed material over placed riprap.
A final Hydraulics TSL Report will be prepared when the Bridge TSL is completed.
Attachments: Figure 1 – Site Location Map
Figure 2 – Drainage Area Map
Figure 3 – Hydrology Summary
Figure 4 – Mapped surface
Figure 5 – 2D Hydraulic Model Mesh
Figure 6 – Flow Depth Profile
Figure 7 – Flow Depth
Figure 8 – Flow Velocity
Figure 9 – Shear Stress
Figure 10 – Flow Continuity 2-year event
Figure 11 – Flow Continuity 2-year event
Figure 12 – Flow Continuity 100-year event
Figure 13 – Flow Continuity 100-year event
Figure 14 – FEMA FIRM
Figure 14 – Preliminary Bridge Scour Plot 100-year Event
Figure 15 – Preliminary Bridge Scour Plot 500-year Event
Cc: Sven Leon, Hydraulics Team Lead
Project Site Location Bridge Location
Map from Google Earth Pro, image date 7/2017
N
FIGURE 1
Dickey Creek Bridge
SITE LOCATION
Cle Elum
Dickey Creek Bridge
0 650 feet
Map from Google Earth Pro
FIGURE 2
Dickey Creek Bridge
DRAINAGE AREA
N
0 2 mi
Dickey Creek Bridge
Approximate Drainage Area 82 sq. mi.
FIGURE 3
Sourdough Bridge
HYDROLOGY SUMMARY
SRH2D - Two-Dimensional hydraulic model surface
N
FIGURE 4
Dickey Creek Bridge
MAPPED SURFACE
Dickey Creek Bridge
N F
T ea n aw ay
R iv er
SRH2D - Two-Dimensional hydraulic model mesh
N
FIGURE 5
Dickey Creek Bridge 2D Hydraulic Mesh
SRH2D 2-dimensional hydraulic model results
FIGURE 6
Dickey Creek Bridge
FLOW DEPTH PROFILE
Design Low Chord = 2392.0'
100yr WSE = 2389.0'
100yr WSE =2389.0'
N e w B ri d ge
Design Low Chord= 2392.0' Existing WSE
Proposed WSE
Ground
Ex . B ri d ge
SRH2D 2-dimensional hydraulic model
FIGURE 7
Dickey Creek Bridge
FLOW DEPTH
Bridge, 7'
Depth in feet for 100yr Event
FIGURE 8
Dickey Creek Bridge
FLOW VELOCITY
Bridge, 11 fps
Velocity in feet per second for 100yr Event
FIGURE 9
Sourdough Bridge
SHEAR STRESS
Bridge, 3 lbs/sf
Shear in lbs/SF for 100yr Event
FIGURE 10
Dickey Creek Bridge
FLOW CONTINUITY 2-YEAR
Existing Profile
Proposed Profile
Existing Bridge LocationProposed Bridge Location
FIGURE 11
Dickey Creek Bridge
FLOW CONTINUITY 2-YEAR
Existing Profile
Proposed Profile
Proposed Bridge Location
Existing Bridge Location
FIGURE 12
Dickey Creek Bridge
FLOW CONTINUITY 100-YEAR
Existing Profile
Existing Bridge Location
Proposed Bridge Location
Proposed Profile
FIGURE 13
Dickey Creek Bridge
FLOW CONTINUITY 100-YEAR
Existing Profile
Proposed Profile
Existing Bridge Location
Proposed Bridge Location
FIGURE 14
FEMA FIRM
FIGURE 15
PRELIMINARY BRIDGE SCOUR
100YR EVENT
FIGURE 16
PRELIMINARY BRIDGE SCOUR
500YR EVENT
File details come from the government source that posted it. Updated .