This amendment modifies a solicitation for the replacement of the Dickey Creek bridge in Kittitas County, Washington. The Department of Transportation Federal Highway Administration seeks to replace the existing structure with a wider and longer bridge to safely accommodate all vehicles, bicyclists, and pedestrians while reducing flood impacts and restoring natural river processes. Revisions to the solicitation include adding permanent casing as an acceptable material, revising casing thickness requirements in plans, modifying qualifications for drilled shaft experience, and adjusting drilled shaft construction, reinforcement, concrete, and acceptance requirements. Offerors must acknowledge any amendments prior to the extended offer due date.

View the file

Other files for this federal contract opportunity

Other files attached to WA KITTITAS 5880(1)DICKEY CRK BRIDGE, newest first.
File Type Posted
BidTabulation_WA KITTITAS 5880(1).pdf PDF
BidSum_WA Kittias 5880(1).pdf PDF
Interested Vendors List as of 6_17_22.pdf PDF
Q_A 16-jun-22.pdf PDF
Q_A 9-jun-22.pdf PDF
Dickey Creek Bridge - 16203_Teanaway_LoadRating_Final.pdf PDF
CompiledSWPPP_WA KITTITAS 5880signed.pdf PDF
GR15-21 Dickey Creek Bridge Replacement Geotech Recomendations Rev. 1.pdf PDF
Kittitas 5880(1) Subgrade Staking Notes.pdf PDF
Kittitas 5880(1) Superelevation Report - Realign.pdf PDF
DickeyCreekBridge_Floodplain_Memo.pdf PDF
Dickey Creek Bridge - 2019 Bridge Safety Inspection Report.pdf PDF
DickeyCreekBridge_Waterway_Hydraulics_Memo.pdf PDF
Kittitas 5880(1) Clearing Limits.pdf PDF
Kittitas 5880(1) Base Layer Staking Notes.pdf PDF
Kittitas 5880(1) Vt Alignment - Existing.pdf PDF
Kittitas 5880(1) Hz Alignment - Driveway.pdf PDF
waa-kittitas5880-Final Planset.pdf PDF
Dickey Creek Bridge - 1963 Bridge Plans.pdf PDF
DickeyCreekBridge_Scour_Memo.pdf PDF
Kittitas 5880(1) - Final XS.pdf PDF
Kittitas 5880(1) Slope Stakes Notes.pdf PDF
Kittitas 5880(1) Vt Alignment - Realign.pdf PDF
Kittitas 5880(1) Hz Alignment - Existing.pdf PDF
Kittitas 5880(1) Earthwork End Area Volume Report.pdf PDF
Additional physical data.zip ZIP file
IFB_69056722B000006_DickeyCrkBridge.pdf PDF
Dickey Creek Bridge - Repair As-Built.pdf PDF
Kittitas 5880(1) Vt Alignment - Driveway.pdf PDF
Kittitas 5880(1) Hz Alignment - Realign.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 6/10/2022 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056722B000006

9B. DATED (SEE ITEM 11)

05/19/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA KITTITAS 5880(1), Dickey Crk Bridge

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Project No WA KITTITAS 5880(1) Project Name: Dickey Crk Bridge

Amendment No. A001, dated 06/10/2022 Solicitation No.

69056722B000006 Page 2

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page F-20 through F-22, Material Subsection 565.02, Adds Permanent Casing to the material list

PLANS

Plan sheet I.04 Revises: Permanent Casing ¼” thickness, to ¼” minimum thickness

ENCLOSURES

Pages:

F-20 through F-22

Plan Sheets:

I.04

F-20 DIVISION 550

Special Contract Requirements Project: WA KITTITAS 5880(1), Dickey Crk Bridge

Section 565. — DRILLED SHAFTS

04/02/21–FP14

Material

565.02 Add the following to the material list:

Permanent Casing 715.04 and 715.05

Construction Requirements

565.03 Qualifications. Delete the text of Subsection (b) and substitute the following:

(b) A resume for each individual describing their experience on at least 3 drilled shaft projects of similar complexity over the past 3 years. Include project names, locations, and contact information for project owners.

565.04 Construction Plan. Delete the first sentence of Subsection (b) and substitute the following:

(b) Proposed drilling, hole cleaning/preparation/bottom inspection method, and reinforcement/concrete placement equipment and procedures for the ground conditions expected to be encountered.

565.06 Shaft Drilling. Delete text of the fifth paragraph of Subsection (a) and substitute the following:

Remove drill cuttings and other loose debris from the bottom of the hole upon completion of drilling. Clean the drilled hole leaving no more than 2 inches (51 millimeters) of sediment on the bottom of the hole. Reduce the depth of accumulated water to 3 inches (76 millimeters) or less before placing concrete in shafts constructed using the dry method.

565.07 Reinforcing Steel and Crosshole Sonic Logging (CSL) Access Tubes Placement.

Delete this Subsection and substitute the following:

565.07 Reinforcing Steel. Perform reinforcing steel work according to Section 554. Securely wire together contact reinforcing steel lap splices. Tie and support the reinforcing steel so it remains within the required tolerances. Securely tie concrete spacers or other approved spacing devices at fifth points around the cage perimeter and space at intervals not to exceed 10 feet (3 meters) along the length of the cage. Use spacers of approved material at least equal in quality and durability to the shaft concrete.

Revised by Amendment A001

F-21 DIVISION 550

Project: WA KITTITAS 5880(1), Dickey Crk Bridge

F-20

Place the reinforcing steel cage as a unit immediately after the drilled hole is inspected, accepted, and before concrete placement. Remove cage when directed by the CO for re-inspection if concrete is not placed immediately. Handle reinforcing cages in a manner to avoid distortion or racking of the steel.

Provide positive support at the top for the reinforcing steel cage during concrete placement.

Maintain the top of the reinforcing steel cage no more than 6 inches (150 millimeters) above and no more than 3 inches (75 millimeters) below the required elevation. Make acceptable corrections if the reinforcing steel cage is not maintained within tolerances. Do not construct additional shafts until the method of reinforcing steel cage support has been approved.

565.08 Concrete for Drilled Shafts. Delete the fourth paragraph and substitute the following:

Furnish concrete conforming to Section 552, except:

(a) Class A (Drilled Shafts) structural concrete having a slump of 71 inches (18025 millimeters) for shafts constructed without drilling fluid;

(b) Class A (Drilled Shafts) structural concrete having a slump of 81 inches (20025 millimeters) for shafts constructed with drilling fluid; and

(c) Class S concrete for under water placement.

565.09 Integrity Testing. Delete this Subsection.

565.10 Acceptance. Amend as follows:

Delete the text of Subsection (b) and substitute the following:

(b) Construction of drilled shafts will be evaluated under Subsections 106.02, 106.03, and 106.04.

Remove and replace rejected shafts or propose alternatives according to Subsection 106.01.

Submit design modifications to drilled shafts or load transfer mechanisms, foundation elements, and drawings according to Subsection 104.03(b)(2). Do not begin remedial work until drawings have been approved by the CO.

Add the following:

Do not proceed with installation of subsequent shafts until approved in writing by the CO.

Approval to proceed with the construction of subsequent shafts will be based on observations of workmanship during construction of the shaft and the following:

(c) Contractor's conformance with the approved shaft installation plan;

F-22 DIVISION 550

Project: WA KITTITAS 5880(1), Dickey Crk Bridge

(d) Contractor's daily reports and inspector's daily logs of excavation, rebar, and concrete placement; and

(e) Concrete placement logs and volume curves.

The CO will provide written notification to proceed with subsequent shaft construction within 24 hours after completion of the shaft. If the CO determines the shaft to be of questionable quality, discontinue shaft construction and submit a new construction plan. Do not continue shaft construction until approval is received. After the first drilled shaft has been accepted, do not change construction methods, equipment, or material used to construct subsequent shafts, unless otherwise approved.

1 Revised by Amendment A001