DHA22I Misawa Hospital Modernization IO Bid Schedule 24 Aug 21 .xlsx
XLSX spreadsheet 75 KB Posted
- Attached to
- Building 99 Misawa Air Base Hospital IO Project
- Solicitation number
- W9127S22Q6001
About this file
This document contains a price schedule and commodity list for an initial outfitting project at Misawa Hospital in Japan. The project involves outfitting the Dental, Sterile Processing, Nutritional Medicine, and Pharmacy departments. Offerors must provide pricing for labor, commodities, and any other direct costs for the equipment transition planning and commodity acquisition phases. The price schedule includes over 200 furniture, fixtures and equipment items that must be priced individually. The total estimated value of the contract is between $5-10 million. The simplified acquisition procedures of FAR Part 13 will be used for the procurement. The requirement is set aside for small businesses with a NAICS code of 337127 and size standard of 500 employees. The anticipated proposal due date is October 31, 2021 with an expected award date of April 2024 for items requiring immediate coordination such as a mobile sterilization unit. The agency is the USACE Little Rock District.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
PRICE SCHEDULE Overall CLIN Pricing Summary Project Name: DHA22I Misawa Hospital Modernization IO Contract: #
| CLIN | SCOPE | PROPOSED PERFORMANCE PERIOD (calendar days) | PRICE (Firm-Fixed) | ||
| 0001 | EQUIPMENT & TRANSITION PLANNING (IO-T) | ||||
| Allison Keck: OCC/Cost Account 254.210 | 1380 | $ - 0 | |||
| 0002 | EQUIPMENT (FFE-LVS) (IO-C) |
Allison Keck: OCC/Cost Account 310.800
| 1380 | $ - 0 | |||
| 0003 | PROCUREMENT SERVICES AND EQUIPMENT (EQUIPMENT >$250,000) | 1380 | $ - 0 | |
| $0.00 |
| A. | GENERAL INSTRUCTIONS: Provide a proposed overall Period of Performance (POP) and a price proposal for EACH CLIN listed above. Leave no cells blank. Additional instructions are noted below. NOTE: The Government is not responsible for the accuracy of formulas in this spreadsheet. |
| B. | PRICE: Refer to the Requirements Documents/SOW for what scope is included in each CLIN. Part 1 & 2 outlnes what is considered "Equipment Services". Part 3 outlines what is considered "Transition Services". Part 4 outlines what is considered "Equipment". |
| C. | PERIOD OF PERFORMANCE (POP): Provide a Period of Performance (POP) that includes time for design refinement, phasing/transition, outfitting, closeout and excessing. Base the proposed POP off the proposed Project Schedule (See Division 00, Technical Factors). The Offeror must be able to demonstrate the proposed POP is of best value to the government. If accepted, the Project Schedule submitted at the time of Proposal will become part of the contract. |
| D. | PROPOSAL DURATIONS & OPTION PERIODS: Price proposals (Base Bid and Options) shall remain good for 365-calendar days from receipt of final proposal. |
&"-,Bold"PROJECT: NB Guam/Apra Harbor Hospital &"-,Bold"TAB 1: PRICE SCHEDULE DATE: 24 February 2020&"Calibri (Body),Bold"&KFF0000
&F &P
IO-T
| LABOR PRICING TO SUPPORT INITIAL OUTFITTING - EQUIPMENT & TRANSITION PLANNING (IO-T) TASKS (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3) | Instructions: Offerors shall list all labor categories, the fully burdened (loaded) labor rate, and the proposed hours for each labor category. Multiply the labor rate by the propsed hours to get the total labor pricing by category. | ||
| Labor Category | Fully Burdened Labor Rate | Proposed Hours | Total |
| Program Manager | |||
| Project Manager | |||
| Medical Equip Planner | |||
| Bio-Medical Technician/Asst. MEP | |||
| Quality Control | |||
| Interior Design | |||
| N/A | |||
| Low Voltage Consultant | |||
| Signage Consultant | |||
| N/A | |||
| N/A | |||
| Subtotal: | $0.00 |
| OTHER DIRECT COSTS (ODCs) ASSOCIATED WITH IO-T (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3) | Instructions: Please provide the costs associated with IO-T, if any (i.e. travel, CDs, printing, etc). Insert additional cells as necessary. Sum all costs into cell G28 for the ODC subtotal. | ||
| ODC | Explaination/Brief Description | Cost |
| Profit $ | Profit % | Overhead $ | Overhead % | TOTAL IO-T PRICE | Instructions: Put in profit (in dollars) in cell A29. Put in profit (by percentage) in cell B29. Put in Overhead cost (in dollars) in cell C29. Put in Overhead cost (by percentage) in cell D29. Sum IO-T Labor, ODCs, Profit $, and Overhead $. The total price for IO-T populates in cell E29. |
| $ - 0 | 0.00% | $0.00 | 0.00% | $0.00 |
IO-C
Commodities Total Price: Instructions: Insert total price from the Phase 1 Commodities tab here
| IO-C Labor Pricing | ||||
| LABOR PRICING TO SUPPORT INITIAL OUTFITTING- COMMODITY (IO-C) TASKS (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3) | Instructions: Offerors shall list all labor categories, the fully burdened (loaded) labor rate, and the proposed hours for each labor category. Multiply the labor rate by the proposed hours to get the total labor pricing by category. Sum each labor category pricing into cell D23 for the IO-C labor subtotal. | |||
| Labor Category | Fully Burdened Labor Rate | Proposed Hours | Total | |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 |
| OTHER DIRECT COSTS (ODCs) ASSOCIATED WITH IO-C (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3) | Instructions: List Other Direct Costs associated with IO-C in cells B24-B38. Refer to Statement of Work for specific requirements for each ODC line. This list may be tailored to fit each Offeror's technical approach or accounting strategy. Each Offeror may add/subtract from rows 24-36 as needed. However, profit and overhea must be discretely bid. |
| Installation of New Commodities: | |
| DRMO costs: | |
| Relocation costs: | |
| Public Relation costs: | |
| Shipping costs: | |
| Training costs: | |
| Insurance costs: | |
| Cleaning costs: | |
| Warehousing costs: | |
| Tax: |
| Signage/Wayfinding costs: | |
| Other: | |
| Overhead costs ($): | Overhead % |
| Profit ($): | Profit % |
| TOTAL IO-C PRICE | $0.00 | |
| Instructions: Add Commodity Pricing, IO-C Labor Pricing, and ODCs together to obtain Total Phase 1 IO-C Price. |
JSN SUMMARY
| PRICE SCHEDULE - FFE JSN SUMMARY | PRCL REPORT DATE: 24 Aug 21 | ||||||||
| GENERAL INSTRUCTIONS: Provide pricing for all FFE, for one (1) each JSN listed below. Include raw, extended, taxes, general conditions, and total. In addition, provide total project quantity per JSN and total cost based on the PRCL provided at time of proposal. Do not leave any cell blank. This list only includes new FFE and does not include all reuse items. NOTE: The Government is not responsible for the accuracy of formulas in this spreadsheet. Information in this tab is for support of the bid schedule. The bid schedule is the basis for pricing. | |||||||||
| JSN | NOMENCLATURE | FUNDING CODE RPIE/PP | A. CONTRACTOR'S PROPOSAL PRICE | ||||||
| RAW COST | EXTEND COST | TAXES | GC | TOTAL ($) per EACH JSN | Orig QTY | TOTAL ($) COST | |||
| A1035 | Locker, Single Tier | PP | 40 | ||||||
| A1145 | Shelving, Storage, Movable Aisle, Manual | PP | 3 | ||||||
| A5025 | Bench, Locker Room, Portable | PP | 2 | ||||||
| A5075 | Dispenser, Soap, Disposable | PP | 67 | ||||||
| A5077 | Dispenser, Hand Sanitizer, Hands-Free | PP | 30 | ||||||
| A5107 | Dispenser, Glove, Surgical/Examination, Wall Mntd | PP | 30 | ||||||
| A5108 | Waste Disposal Unit, Sharps | PP | 24 | ||||||
| A5155 | Costumer, Wall, Executive | PP | 2 | ||||||
| A5210 | Bracket, Television, Wall Mounted, w/Adjust Arm | PP | 2 | ||||||
| A5212 | Bracket, Television, Wall-Mounted, Tilt/Angle | PP | 6 | ||||||
| D0100 | Analgesia Unit, Inhalation, Central Gases/Vacuum | PP | 2 | ||||||
| D2520 | Cabinet, Mobile, Storage/Assistant, Dental | PP | 20 | ||||||
| D2580 | Casting Machine, Induction, Bench Mounted | PP | 1 | ||||||
| D3295 | Chair, Rotary, Laboratory, Dental | PP | 6 | ||||||
| D3300 | Chair, Radiographic, Dental | PP | 1 | ||||||
| D3310 | Chair, Procedure, Dental | PP | 2 | ||||||
| D3320 | Chair, Operating, Dental | PP | 20 | ||||||
| D3380 | Stool, Operating, Dental, Doctor | PP | 22 | ||||||
| D3390 | Stool, Operating, Dental, Assistant | PP | 20 | ||||||
| D3565 | Resin Curing Unit, Visible Light | PP | 20 | ||||||
| D4500 | Furnace, Laboratory, Dental, Burnout | PP | 1 | ||||||
| D4560 | Engine, Dental, Bench, Electric | PP | 1 | ||||||
| D6560 | Digital Wax Pot | PP | 3 | ||||||
| D8060 | Furnace, Porcelain, Vacuum | PP | 2 | ||||||
| D8250 | Delivery System, Dental Operating | PP | 20 | ||||||
| D8620 | Bin, Plaster, 3 Compartment | PP | 1 | ||||||
| D8850 | Amalgamator, Dental | PP | 15 | ||||||
| D8950 | Vibrator, Dental, Heavy Duty | PP | 2 | ||||||
| D9051 | Trimmer, Model, Dental, Dual Wheel | PP | 2 | ||||||
| D9058 | Blowgun, Air, Lever Type, With 10 Foot Hose | PP | 1 | ||||||
| D9058 | Blowgun, Air, Lever Type, With 10 Foot Hose | PP | 1 | ||||||
| E0042 | Workcenter, Computer, Free Standing, 48" W | PP | 1 | ||||||
| E0078 | Workstation, L-Shaped w/Peninsula, Free Std, 78x72 | PP | 4 | ||||||
| E0117 | Workstation, Straight, Free Standing, 48" W | PP | 7 | ||||||
| E0120 | Workstation, Straight, Free Standing, 60" W | PP | 2 | ||||||
| E0123 | Workstation, Straight, Free Standing, 72" W | PP | 11 | ||||||
| E0135 | Workstation, Productivity, Central Sterile | PP | 5 | ||||||
| E0314 | Sink Area, Staff Lounge, Wall Mtd, 72" W | PP | 1 | ||||||
| E0820 | Module, Storage, 2-Drw Lateral File & Bookcase | PP | 6 | ||||||
| E0948 | Cart, General Storage, Mobile, 42"H x 32"W x 22"D | PP | 1 | ||||||
| E0963 | Cart, General Storage, Mobile | PP | 2 | ||||||
| F0120 | Bookcase, Executive, 3 Shelf, Wood | PP | 2 | ||||||
| F0205 | Chair, Side With Arms | PP | 21 | ||||||
| F0206 | Chair, Side, Bariatric, With Arms | PP | 5 | ||||||
| F0215 | Chair, Child's | PP | 8 | ||||||
| F0220 | Chair, Conference | PP | 20 | ||||||
| F0225 | Chair, Dining Room | PP | 16 | ||||||
| F0230 | Chair, Drafting, Rotary | PP | 5 | ||||||
| F0235 | Chair, Executive, Side | PP | 4 | ||||||
| F0240 | Chair, Executive, Swivel | PP | 2 | ||||||
| F0275 | Chair, Swivel, High Back | PP | 25 | ||||||
| F0295 | Chair, Stacking | PP | 36 | ||||||
| F0305 | Chair, Waiting Room, Single | PP | 27 | ||||||
| F0405 | Cabinet, Filing, Full Height, 4-5 Drawer | PP | 2 | ||||||
| F0420 | Cabinet, Filing, Lateral, Half Height | PP | 8 | ||||||
| F0465 | Cabinet, Storage, 2 Door, 5 Shelf | PP | 11 | ||||||
| F0510 | Cart, Linen, Soiled | PP | 1 | ||||||
| F0515 | Cart, Supply, Linen | PP | 1 | ||||||
| F0650 | Desk, Executive, Wood | PP | 2 | ||||||
| F0710 | Table, Computer, With Print Shelf | PP | 2 | ||||||
| F0725 | Table, Occasional, Executive, Wood | PP | 2 | ||||||
| F0740 | Table, Occasional, Lamp | PP | 5 | ||||||
| F0755 | Table, Conference, Wood | PP | 2 | ||||||
| F0760 | Table, Child's | PP | 2 | ||||||
| F0795 | Table, Dining | PP | 4 | ||||||
| F2005 | Basket, Wastepaper, Executive, Wood | PP | 2 | ||||||
| F2010 | Basket, Wastepaper, Step-On | PP | 29 | ||||||
| F2015 | Basket, Wastepaper, Metal/Plastic,2 Swinging Doors | PP | 3 | ||||||
| F2020 | Can, Trash, 44 Gallon | PP | 4 | ||||||
| F2300 | Rack, Magazine, Wall Mounted | PP | 2 | ||||||
| F2310 | Rack, Pamphlet, Wall Mounted | PP | 2 | ||||||
| F2420 | Lamp, Table, With Shade | PP | 2 | ||||||
| F2540 | Shredder, Paper, Security | PP | 1 | ||||||
| F3025 | Board, Bulletin, Wood Framed | PP | 1 | ||||||
| F3050 | Whiteboard, Dry Erase | PP | 1 | ||||||
| F3065 | Whiteboard/Bulletin Board, Combination | PP | 1 | ||||||
| K1550 | Brewer, Coffee, Auto, Elect, 3 Burner, Side/Side | PP | 1 | ||||||
| K1910 | Table, Work, Stainless Steel | PP | 7 | ||||||
| K8250 | Toaster, Pop-Up, 4 Slice, Electric | PP | 1 | ||||||
| L0100 | Microscope, Binocular | PP | 1 | ||||||
| L2000 | Purification System, Water | PP | 1 | ||||||
| M0506 | Television, Flat Screen | PP | 6 | ||||||
| M0512 | Television, HDTV, Large Screen, 60" | PP | 2 | ||||||
| M0750 | Flowmeter, Air, Connect w/50 PSI Supply | PP | 2 | ||||||
| M0755 | Flowmeter, Oxygen, Low Flow | PP | 5 | ||||||
| M0765 | Regulator, Vacuum | PP | 3 | ||||||
| M2015 | Cabinet, Storage, Flammable, Freestanding | PP | 1 | ||||||
| M2025 | Rack, Storage, Cylinder, Gas | PP | 1 | ||||||
| M2030 | Cabinet, Storage, Acid, Freestanding | PP | 1 | ||||||
| M2035 | Rack, Storage, Mobile, Wire, CRS | PP | 1 | ||||||
| M2117 | Truck, Hand, 2 Wheel, Gas Cylinder | PP | 1 | ||||||
| M3070 | Hamper, Linen, Mobile, w/Lid | PP | 4 | ||||||
| M3073 | Container, Biohazard Waste, Step-on, Fire Safe | PP | 3 | ||||||
| M3080 | Cabinet, Instrument, CRS, 2 Glass Door, 6 Shelf | PP | 2 | ||||||
| M3085 | Cabinet, Instrument | PP | 1 | ||||||
| M4116 | Monitor, Vital Signs | PP | 10 | ||||||
| M4705 | Wheelchair, Patient Transport, Folding | PP | 1 | ||||||
| M7845 | Monitor, Physiological, Bedside, 4 Channel | PP | 5 | ||||||
| M8805 | Table, Instrument, Straddle | PP | 2 | ||||||
| M8810 | Stand, Mayo | PP | 2 | ||||||
| R7200 | Refrigerator, 20 Cubic Feet | PP | 1 | ||||||
| U0001 | Wireless Door Chime | PP | 1 | ||||||
| U0002 | Waste Disposal, Sharps, Mobile, 8 gal | PP | 6 | ||||||
| U0004 | Waste Can, Open-Top, 14 Quart, Rectangular, Thermoset Polyester, Fire Resistant | PP | 44 | ||||||
| U0010 | Cleaning System, Dual Basin, Ultrasonic, 20-Gallon, 132kHz | PP | 1 | ||||||
| U0012 | Sterilizer, Hydrogen Peroxide Gas, 30L Cham | PP | 1 | ||||||
| U0017 | Cabinet, Storage, Flammable, 12 Gallon, Undercounter | PP | 1 | ||||||
| U0018 | Drying Rack, Cutting Board and Tray | PP | 1 | ||||||
| U0019 | Washer-Disinfector, Transfer Cart | PP | 2 | ||||||
| U0021 | Spill Containment Platform 30 Gal | PP | 1 | ||||||
| U0022 | Clock, Digital Display, Month-Day-4" Time-A/F Temp-Time Zone | PP | 34 | ||||||
| U0025 | Player, Blu Ray, DVD | PP | 2 | ||||||
| U0026 | CAD/CAM Dental Scanner | PP | 1 | ||||||
| U0027 | Bracket, Wall Mount, Physiological | PP | 5 | ||||||
| U0028 | Television, HDTV, Large Screen, 75" | PP | 1 | ||||||
| U0029 | Clock, Digital Display, 6 Zones | PP | 1 | ||||||
| U0030 | Table, Toddler, Magnetic Car | PP | 1 | ||||||
| U0031 | Cabinet, Work, Stainless Steel | PP | 4 | ||||||
| U0032 | Container, Recycling/ Waste Combo | PP | 1 | ||||||
| U0033 | Rack, Wall Mounted, Knife Station | PP | 1 | ||||||
| U0034 | Stool, Step, Interlocking | PP | 2 | ||||||
| U0035 | CAD/CAM Dental Milling/Drilling Unit | PP | 1 | ||||||
| U0042 | Medical Grade Refrigerator, U/C or F/S, 5 Cu Ft | PP | 1 | ||||||
| U0048 | Wall Mounted, Heat Sensory | PP | 1 | ||||||
| U0049 | Mirror, Wall Mounted, Sensory, Childs | PP | 1 | ||||||
| U5001 | Holder, Wellness Center, Freestanding | PP | 2 | ||||||
| X6505 | Radiographic Unit, Dental, Panographic & Cephalo. | PP | 1 | ||||||
| X6600 | Radiographic Unit, Dental, Wall Mounted, 7 mA | PP | 7 | ||||||
| TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&"-,Bold"PROJECT: NB Guam/Apra Harbor Hospital &"-,Bold"TAB 3: FFE JSN SUMMARY DATE: 24 February 2020
&F &P
File details come from the government source that posted it. Updated .