This document is a Summary of Pay Items and Quantities for the I395 HOV Rehab project solicitation DCKA-2024-B-0011, which involves the rehabilitation of the existing fifteen-span concrete deck slab supported on continuous steel girders, concrete beams, and reinforced concrete substructure piers carrying I-395 HOV Freeway Bridge (Bridge No. 169-1) over the Potomac River. The project also includes approach roadway work at the District of Columbia and Virginia ends, streetlight upgrading work, and other related tasks. The Summary itemizes the various work components, including quantities for concrete crack repair, joint reconstruction, pressure cleaning, and expansion joint closure. No specific response dates, bid submission details, or contract term information is provided in this document.
The Summary does not contain pricing terms, set-asides, incumbent information, funding sources, or other salient commercial details. This appears to be a technical document detailing the scope of work and quantities for the rehabilitation project, which is being solicited by the District of Columbia for work within the District of Columbia and the City of Washington jurisdictions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCKA-2024-B-0011_Att1.pdf | ||
| DCKA-2024-B-0011_Amd1.pdf | ||
| DCKA-2024-B-0011_Amd2.pdf | ||
| DCKA-2024-B-0011_Amd5.pdf | ||
| DCKA-2024-B-0011_Amd6.pdf | ||
| DCKA-2024-B-0011_Amd3.pdf | ||
| DCKA-2024-B-0011_Amd4.pdf | ||
| DCKA-2024-B-0011_Att2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KSN
EJM
KSN
AAH
SQ-01
SUMMARY OF PAY ITEMS
AND QUANTITIES
SUMMARY OF QUANTITIES
ITEM NO. DESCRIPTION UNIT QTY.
SUMMARY OF QUANTITIES
ITEM NO. DESCRIPTION UNIT QTY.
719993
718992
717991
716992
716991
716022
716020
716016
716012
716010
716008
716004
715993
715991
714004
710007
709023
708995
708992
708991
708022
708021
707011
706999
706997
706995
706993
706991
705993
705991
704991
703991
703010
703008
701999
701995
701994
701993
701992
701991
618002
614995
614568
614993
22994
22994
22994
19684
21780
LF
LF
LF
LF
LF
LF
LF
SF
LF
SF
SF
SF
SY
SY
SY
LF
LF
SF
LF
LF
LF
CY
LS
EA
EA
EA
EA
LS
EA
EA
LBS
CY
CY
CY
LS
LF
LF
LF
LF
LF
LS
EA
EA
EA
CY 2874.3
SPECIAL ITEM - REPAIR AND PRESSURE CLEAN FINGER JOINTS
SPECIAL ITEM - PIER A - EXPANSION JOINT CLOSURE (VESC)
SPECIAL ITEM - RECONSTRUCT DECK JOINT WITH NEOPRENE STRIP SEAL
SPECIAL ITEM - REPAIR Type 3, SEAL RIVER PIER CONC CRACKS > 1/32"
SPECIAL ITEM - REPAIR Type 3, SEAL RIVER PIER CONC CRACKS < 1/32"
REPAIR TYPE 4, SEAL PIER/ABUT CONC CRACKS >1/32"
REPAIR TYPE 4, SEAL PIER/ABUT CONC CRACKS <1/32"
REPAIR TYPE 1 - PIER/ABUT SPALL REPAIR
REPAIR TYPE 3 - DECK UNDERSIDE
REPAIR TYPE 2 - DECK UNDERSIDE
REPAIR TYPE 1 - DECK UNDERSIDE
REPAIR TYPE 1 - CONCRETE DIAPHRAGM REPAIR
SPECIAL ITEM - HYDRO-DEMOLITION OF EXISTING DECK AND OVERLAY - 2 IN
SPECIAL ITEM - MILLING 2.5 IN OF EXISTING DECK OVERLAY
LATEX MODIFIED CONCRETE OVERLAY - 4.5IN
SPECIAL ITEM - REPLACE DAMAGED DRAINAGE PIPES UNDER THE BRIDGE
UNASSIGNED SPECIAL ITEM - REPAIR EXIST. RAILING
SPECIAL ITEM - PRESSURE CLEAN STONE CLADDING - PIERS 3, 6, 9, 12, B and C
SPECIAL ITEM - SEAL CRACKED STONE CLADDING
SPECIAL ITEM - REPLACE MISSING/DETERIORATED MORTAR
SPECIAL ITEM - PCC PARAPET REPAIR - Type 3
SPECIAL ITEM - PCC PARAPET REPAIR - Type 1
SPECIAL ITEM - CLEAN AND PAINT EXISTING STEEL
SPECIAL ITEM - BEARING PADS - REPLACE EXIST BRGS W/ ELASTOMERIC BRGS
SPECIAL ITEM - BRIDGE BEARINGS - CLEAN AND PAINT EXIST. BEARINGS
SPECIAL ITEM - REPLACE MISSING NUTS FOR MEDIAN BARRIER
SPECIAL ITEM - REPLACE MISSING ANCHOR BOLTS FOR MEDIAN BARRIER
SPECIAL ITEM - REPAIR STRUCTURAL STEEL - GRADE 36
SPECIAL ITEM - REPAIR PRESTRESSED CONCRETE BEAM ENDS - TYPE B
SPECIAL ITEM - REPAIR PRESTRESSED CONCRETE BEAM ENDS - TYPE A
SPECIAL ITEM - PIER A CAP CORROSION RESISNTANT REINCORCING STEEL - (MMFX-2)
SPECIAL ITEM - PCC - PIER A CAP REPLACEMENT
PCC SUPERSTRUCTURE - JOINT RECONSTRUCTION CONC. (CLASS C)
PCC SUPERSTRUCTURE - REPLACE MEDIANS
SPECIAL ITEM - DOLPHIN REPAIR
SPECIAL ITEM - FENDER REPLACEMENT - 6x10 FRPL
SPECIAL ITEM - FENDER REPLACEMENT - 6x12 FRPL
SPECIAL ITEM - FENDER REPLACEMENT - 12x12 FRPL
SPECIAL ITEM - FENDER REPLACEMENT - 8x12-4F08 FRPL
SPECIAL ITEM - FENDER REPLACEMENT - 12x12-4F08 FRPL
EROSION AND SEDIMENT CONTROL
SPECIAL ITEM - REMOVE AND RE-INSTALL LED LUMINAIRE ON STEEL POLE
REMOVE PENDANT POLE 30 FT. HEIGHT OR LESS
SPECIAL ITEM - FURNISH AND INSTALL 25' STEEL PENDANT POLE WITH UP TO 8' ARM
AMENDMENT 4 - CORRECTION AAH 01/19/24
AAH
KSN
613398
612106
612104
612100
612096
612092
613000
612999
612998
612997
612993
612086
612066
612064
612060
612058
612054
612038
612036
612034
612028
612022
612018
612014
612010
612008
612006
610014
610014
607020
606064
606054
603054
603030
603002
602991
600017
600017
600017
506006
402008
402002
410002
403002
311002
209002
202004
205991
205010
205008
202002
108992
108016
108013
108012
108006
108004
108002
105002
000507
000506
PEPCO SERVICE CONNET, DISCONNECT, & PEPCO MANHOLE ENTRY FEES
REPAIR OF DAMAGED MAJOR TRAFFIC CONTROL DEVICES
STEEL PROTECTION PLATE
PORTABLE CHANGEABLE MESSAGE SIGN
CONSTRUCTION ZONE ATTENUATOR
TRUCK MOUNTED ATTENUATOR
SPECIAL ITEM - PREFORMED PAVEMENT MARKINGS, 24 INCH
SPECIAL ITEM - PREFORMED PAVEMENT MARKINGS, 12 INCH
SPECIAL ITEM - PREFORMED PAVEMENT MARKINGS, 6 INCH DASH
SPECIAL ITEM - PREFORMED PAVEMENT MARKINGS, 6 INCH
TOWING AND RECOVERY SERVICE
PAINTED LANE MARKING, 6 INCH
THERMOPLASTIC PAVEMENT MARKING, 24 INCH
THERMOPLASTIC PAVEMENT MARKING, 12 INCH
THERMOPLASTIC PAVEMENT MARKING, 6 INCH DASH
THERMOPLASTIC PAVEMENT MARKING, 6 INCH
THERMOPLASTIC PAVEMENT MARKING, 4 INCH
SINGLE-FACED YELLOW SNOW PLOWABLE REFLECTIVE PAVEMENT MARKERS
SINGLE-FACED WHITE SNOW PLOWABLE REFLECTIVE PAVEMENT MARKERS
TRAFFIC DRUMS
TYPE III PVC BARRICADE
SEQUENTIAL ARROW BOARDS
FLASHING AMBER WARNING LIGHTS, TYPE "B"
CONSTRUCTION WARNING AND DETOUR SIGNS
TEMPORARY CONSTRUCTION SIGN SUPPORTS
REMOVE LANE MARKINGS
CONSTRUCTION LANE CLOSING
MOVE WATER FILLED PLASTIC JERSEY BARRIER
INSTALL WATER FILLED PLASTIC JERSEY BARRIER
SOD WITH 4 INCH TOPSOIL
FURNISH AND SET 8"X12" GRANITE STRAIGHT CURB
REPAIR-REPLACE PCC CIRCULAR CURB AND/OR GUTTER
CRASH CUSHION ATTENUATING TERMINAL (CAT)
W BEAM/TRHIE BEAM TRANSITION PANEL
TYPE I: W-BEAM (STANDARD BLOCK-OUT)
SPECIAL ITEM - REPAIR SLOPE PROTECTION IN FRONT OF PIER 1
SPECIAL ITEM - MOVE PORTABLE SINGLE FACE F SHAPE PRECAST PCC BARRIER
SPECIAL ITEM - PORTABLE SINGLE FACE F SHAPE PRECAST PCC BARRIER
SPECIAL ITEM - CHAIN LINK FENCE WITH FABRIC, 8 FT. HT.
PCC DIRECTIONAL ISLAND
HMA SURFACE COURSE, 9.5 MM
HMA BASE COURSE, 19 MM
PAVEMENT PROFILING (MILLING)
TACK COAT
ADJUST SEWER-WATER-UTILITY MANHOLE FRAME
AGGREGATE BASE COURSE
HARD SURFACE PAVEMENT EXCAVATION
SPECIAL ITEM - PIER A EXCAVATION TO PILE CAP
STRUCTURE HARD SURFACE EXCAVATION - EXIST. MEDIANS
SPECIAL ITEM - DEMOLITION OF PIER A CAP
COMMON EXCAVATION
SPECIAL ITEM - ENGINEER'S BOAT
MOBILIZATION - FLOAT-IN CONSTRUCTION PLATFORMS
FURNISH AND EQUIP ENGINEER'S FIELD FACILITIES
ENGINEER'S FIELD FACILITIES
RECORD DRAWINGS AND AS - BUILT DRAWINGS
PROGRESS PHOTOGRAPHS
MOBILIZATION
COOPERATION WITH THIRD PARTY UTILITY RELOCATION
SPECIAL ITEM - REPLACE DOWNSPOUTS
SPECIAL ITEM - PRESSURE CLEAN SCUPPERS
LS
LS
EA
EA
EA
EA
LF
LF
LF
LF
EA
LF
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
SF
EA
SF
LS
LF
LF
SY
LF
CY
EA
EA
LF
LS
LF
LF
LF
CY
TON
TON
SY
SY
EA
CY
CY
CY
CY
LS
CY
DAYS
LS
LS
LS
LS
LS
LS
LS
EA
EA
10281
71829
11288
14424
11429
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P E
N
T A
B L E
D D
O T n a m e s u b .t b l
W e d n e s d a y J a n u a ry
1, :1
M p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g to n
D C D o c u m e n ts I-
H O
V
B ri d g e e s ig n
C
A D
G e n e ra l\
P ri n t_ fi le s p
G N S
Q 1- I- P
A Y
IT
E M
S R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P L
R
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
p005679B Proprietary
ST-GN-01
KSN
GJR
BRIDGE GENERAL NOTES
P
B L E
D D
O T n a m e s u b .t b l p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
G e n e ra l\
P ri n t_ fi le s p
G N N I- S tr u c t_
G e n e ra l_
N o te s R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
COMPONENTS AFTER REMOVAL OF THE TEMPORARY COMPONENT BOLTS.
9. INSTALL A NEW BOLT IN ANY OPEN HOLE LEFT IN THE PERMANENT
8. REMOUNT NEW COMPONENTS AND TIGHTEN BOLTS. CLEAN EXCESS EPOXY-GEL.
COMPONENTS WITH EXISTING STEEL TO MAINTAIN FULL CONTACT.
APPLY EPOXY-GEL REPAIR MATERIAL TO THE MATING SURFACES OF NEW
7. WHERE DESIGNATED ON THE DRAWINGS AND WHERE DIRECTED BY THE ENGINEER,
REPAIR MATERIALS USED REQUIRE APPLICATION TO BARE METAL.
THAT SATISFIES CLASS B COATING REQUIREMENTS. DO NOT APPLY PRIMER WHERE
REQUIREMENTS OF THE PAINT SECTION IN THE SPECIAL PROVISIONS. USE PRIMER
STEEL CONTACT SURFACES AFTER THEY ARE CLEANED FOLLOWING THE
6. APPLY PRIMER COAT TO ALL SURFACES OF THE NEW STEEL AND ALL EXISTING
CLEAN ALL FAYING SURFACES TO REMOVE CUTTING OILS.
5. DETACH THE NEW COMPONENTS TO REMOVE DRILL CUTTINGS AND SOLVENT
FIELD REAMING THROUGH UNDERSIZED HOLES SHOP-DRILLED IN THE COMPONENTS.
4. MOUNT NEW COMPONENTS BY DRILLING ALL NEW HOLES IN THE FIELD OR BY
PORTIONS OF STEEL AS DIRECTED BY THE ENGINEER.
COMPONENTS AND A BAND 2" WIDE (MIN.) WILL BE CLEANED. REMOVE DETERIORATED
SYSTEM. CONTACT SURFACES BETWEEN EXISTING STEEL AND NEW OR REPAIRED
SECTION OF THE SPECIAL PROVISIONS AND USING AN APPROVED COLLECTION
3. CLEAN REPAIR AREA FOLLOWING THE METHODS INDICATED IN THE PAINTING
REPLACED OR REPAIRED.
OF THE STRUCTURE AND REMOVE EXISTING COMPONENTS THAT WILL BE
2. INSTALL ANY TEMPORARY COMPONENTS NEEDED TO MAINTAIN THE STABILITY
MATERIALS.
1. VERIFY ALL DIMENSIONS OF EXISTING STEEL FOR PROPER FIT OF NEW REPAIR
BRIDGE GENERAL NOTES
KSN
AAH
ADJUSTING ALL UTILITY COVER REQUIRED TO MEET NEW ROADWAY AND MEDIAN GRADE.
FOR PROVIDING HIS OWN POWER SOURCE. THE CONTRACTOR IS RESPONSIBLE FOR
TAP INTO EXISTING UTILITIES ON THE BRIDGE. THE CONTRACTOR SHALL BE RESPONSIBLE
PERMISSION FROM THE UTILITY OWNER. THE CONTRACTOR SHALL NOT BE ALLOWED TO
CONTRACTOR BACKFILL AN EXCAVATION AFFECTING SAID UTILITY WITHOUT FIRST RECEIVING
OWNER AT THE CONTRACTOR'S EXPENSE. UNDER NO CIRCUMSTANCE SHALL THE
BELOW GROUND SHALL BE REPAIRED BY OR UNDER THE DIRECTION OF THE UTILITY
OWNER OF THE SAID UTILITY. ANY DAMAGED SUSTAINED TO THE UTILITIES ABOVE OR
IS DAMAGED, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER AND THE
ALL NECESSARY PRECAUTIONS TO AVOID DAMAGE TO EXISTING UTILITIES. IF A UTILITY
CONSTRUCTION MAY CONFLICT WITH EXISTING UTILITIES, THE CONTRACTOR SHALL TAKE
OPERATIONS WHICH COULD DAMAGE THESE FACILITIES. IN THE AREA WHERE PROPOSED
EXISTENCE OF ALL THE UTILITIES WELL IN ADVANCE OF CONDUCTING CONSTRUCTION
APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
IS NOT NECESSARILY COMPLETE AND THE LOCATION OF THE UTILITIES SHOWN IS
DATA AND/OR RECORD DRAWINGS OF THE ORIGINAL LOCATIONS. THE INFORMATION SHOWN
THE LOCATIONS OF THE UTILITIES SHOWN ON THE PLANS ARE BASED ON FIELD SURVEY
NOTIFY MISS UTILITY @ 1-800-257-7777 SEVENTY-TWO HOURS PRIOR TO CONSTRUCTION.
SEE THE SPECIAL PROVISION "UTILITIES PROTECTIVE ALERT."
REQUIRED DURING CONSTRUCTION. FOR FULL INFORMATION REGARDING UTILITIES PROTECTION, FOR MAINTENANCE OF ALL EXISTING UTILITIES AND PROVIDE TEMPORARY SUPPORT AS
THE EXISTENCE OF OTHER UTILITIES IS UNKNOWN. CONTRACTOR SHALL BE RESPONSIBLE
3. TRANSURBAN
2. AT&T INC.
1. VERIZON COMMUNICATIONS
THE FOLLOWING UTILITIES ARE KNOWN TO HAVE FACILITIES IN THE CONTRACT AREA:
CONSTRUCTION SPECIFICATIONS
AMENDED BY SPECIAL PROVISIONS.
THE DISTRICT OF COLUMBIA DEPARTMENT OF TRANSPORTATION. EXCEPT AS
SPECIFICATIONS FOR HIGHWAYS AND STRUCTURES DATED 2013, ISSUED BY
ALL WORK SHALL CONFORM TO PROJECT SPECIAL PROVISIONS, STANDARD
DESIGN SPECIFICATIONS
ALL WELDING SHALL CONFORM TO D1.5M/D1.5 BRIDGE WELDING CODE, 2020.
THE ABOVE ORDER UNLESS OTHERWISE INDICATED IN THE SPECIAL PROVISIONS.
ELASTOMERIC BEARING DESIGN AND PIER A CAP REPLACEMENT. PRIORITIES ARE IN
AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 8TH EDITION, 2017 FOR
2002 UNLESS OTHERWISE NOTED AND PRODUCT MANUFACTURER'S SPECIFICATIONS.
AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, 17TH EDITION,
ELEVATIONS AND COORDINATES
PLANE OF REFERENCE, FOR WHICH -2.11 FT. IS MEAN LOW WATER.
PLANE COORDINATE SYSTEM. ALL ELEVATIONS REFERENCED TO THE D.C. ENGINEER'S
COORDINATES SHOWN ON THESE PLANS ARE BASED ON THE MARYLAND STATE
STRUCTURAL STEEL - MATERIAL
SHALL BE MADE FOR THESE BOLTS.
BE CONSIDERED INCIDENTAL TO THE REPAIRS AND NO SEPARATE PAYMENT
INSTALLED IN HOLES LEFT OPEN AFTER PERFORMING THE REPAIRS, SHALL
ASSOCIATED WITH REPAIRS SHOWN ON THESE DRAWINGS, INCLUDING BOLTS
UNIT PRICE BID. PAYMENT FOR FURNISHING AND INSTALLING BOLTS
INSTALLING THESE HIGH-STRENGTH BOLTS SHALL BE MADE AT THE CONTRACT
DEEMED NECESSARY BY THE ENGINEER. PAYMENT FOR FURNISHING AND
WITH EQUIVALENT DIAMETER HIGH-STRENGTH BOLTS, NUTS AND WASHERS IF
ASSOCIATED WITH REPAIRS SHOWN ON THESE DRAWINGS SHALL BE REPLACED
EXISTING MISSING AND/OR DETERIORATED FASTENERS THAT ARE NOT
AND INSTALLING THE BOLT, NUT AND WASHER AND TIGHTENING THE BOLT.
CONNECTIONS. ON THESE DRAWINGS INSTALLING A BOLT MEANS FURNISHING
NOTED. PREVIOUSLY USED BOLTS SHALL NOT BE USED FOR PERMANENT
GRADE C NUTS AND ASTM F436 HARDENED WASHERS, UNLESS OTHERWISE
ALL NEW BOLTS SHALL BE ASTM A325, 7/8" DIAMETER WITH ASTM A563
GRADE WITH THE WRITTEN APPROVAL OF THE ENGINEER.
STEEL IS PERMITTED TO BE REPLACED WITH A BETTER AASHTO APPROVED
ALL NEW STEEL SHALL BE ASTM A36 UNLESS OTHERWISE NOTED. ASTM
"TEMPORARY".
ALL MATERIAL SHOWN IS EXISTING, UNLESS DESIGNATED AS "NEW" OR
FIELD WELDING
APPROVAL OF THE ENGINEER.
SPECIFIED ON THE CONTRACT PLANS IS PERMITTED WITHOUT PRIOR WRITTEN
NO WELDING ON ELEMENTS OF THE EXISTING STRUCTURE OTHER THAN THAT
REINFORCING STEEL
REINFORCED CONCRETE
MINIMUM CONCRETE COVER
JOINTS SHALL BE ROUGHENED OVER THE ENTIRE SURFACE TO A ‚" MINIMUM AMPLITUDE.
BE MADE ONLY WITH THE APPROVAL OF THE ENGINEER. ROUGHENED CONSTRUCTION
JOINTS SHALL BE MADE ONLY WHERE SHOWN IN THE PLANS. ADDITIONAL JOINTS SHALL
EXPOSED EDGES SHALL BE CHAMFERED ƒ"xƒ", EXCEPT AS NOTED. CONSTRUCTION
JOINT CLOSURE 1•" MIN. ALL OTHER LOCATIONS 2" (UNLESS OTHERWISE NOTED). ALL
TOP OF DECK SLAB AT DECK JOINT CLOSURE 2•". BOTTOM OF DECK SLAB AT DECK
COUPLERS
SUGGESTED CONCRETE BEAM PROCEDURE
MAINTENANCE OF TRAFFIC (MOT)
COORDINATE ALL REPAIR WORK REQUIRING MOT TO MINIMIZE THE USE OF MOT SETUP.
CONSTRUCTION WORK.
BE SUBJECT TO APPROVAL OF THE ENGINEER PRIOR TO THE BEGINNING OF
PROVISIONS. IF THE CONTRACTOR DEVELOPS AN ALTERNATIVE MOT PLAN, IT SHALL
DOCUMENTS. FOR LANE CLOSURES, WORK HOURS, SEE MOT PLANS AND SPECIAL
SIGN MOUNTINGS SHALL CONFORM TO THE DDOT STANDARDS AND THE CONTRACT
ALL MAINTENANCE AND PROTECTION OF TRAFFIC PROCEDURES, DEVICES, SIGNS AND
TEMPORARY SUPPORT DURING CONSTRUCTION
OF PROVIDING SUFFICIENT TEMPORARY SUPPORTS.
METHODS OF ERECTION DOES NOT ABSOLVE THE CONTRACTOR OF THE RESPONSIBILITY
REVIEW AND APPROVAL BY THE ENGINEER OF CONTRACTOR'S CALCULATIONS AND
BY HIS OPERATIONS.
INTEGRITY OF THOSE PORTIONS OF THE EXISTING STRUCTURE WHICH MAY BE
THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE STABILITY AND STRUCTURAL
RECONSTRUCTION NOTES
OUTLINE OF THE CONSTRUCTION WORK TO BE PERFORMED.
REPAIR PROCEDURES INCLUDED WITH VARIOUS DETAILS ARE A SUGGESTED GENERAL
PERFORM THE WORK IN ACCORDANCE WITH FIELD CONDITIONS.
DETERIORATED CONCRETE THAT WAS NOT INDICATED ON THE CONTRACT DRAWINGS.
QUANTITIES. IMMEDIATELY REPORT TO THE ENGINEER ANY SIGNIFICANT AMOUNT OF
FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS AND WORK
ALWAYS BE ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. ACTUAL
OF RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF RECONSTRUCTION WORK CANNOT
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE FACT THAT DUE TO THE NATURE
REFERENCE DRAWINGS (AS-BUILT DRAWINGS)
CONTRACTOR'S RISK.
DRAWINGS ARE INCLUDED AT THE END OF THIS SET FOR REFERENCE AT THE
A NUMBER OF ORIGINAL CONSTRUCTION DRAWINGS AND SUBSEQUENT REHABILITATION
PAINT
SECTION OF THE SPECIAL PROVISIONS.
REPAINTING ON THE DRAWINGS FOLLOWING THE METHODS INDICATED IN THE PAINTING
CLEAN AND PAINT ALL NEW STEEL AND EXISTING STEELWORK DESIGNATED FOR
SUGGESTED STRUCTURAL STEEL REPAIR PROCEDURE
VERIFICATION OF EXISTING DIMENSIONS AND ELEVATIONS
VARY AND REQUIRE FIELD VERIFICATION BY THE CONTRACTOR.
ANY DEGREE OF PRECISION. THESE +/- MARKS INDICATE EXISTING DIMENSIONS THAT MAY
OF CONSTRUCTION WORK. ANY +/- MARKS SHOWN WITH DIMENSIONS DOES NOT INDICATE
STRUCTURE SHALL BE CHECKED IN FIELD BY THE CONTRACTOR BEFORE COMMENCEMENT
ALL DIMENSIONS AFFECTED BY THE GEOMETRICS AND/OR LOCATION OF EXISTING
DRAWINGS OF THE ORIGINAL CONSTRUCTION OF I-395 HOV BRIDGE OVER POTOMAC RIVER.
THIS PLAN SET IS PREPARED BASED ON THE INFORMATION SHOWN ON THE CONTRACT
DRILLING HOLES IN CONCRETE
IN THE PRICE BID FOR THE RESPECTIVE PCC ITEMS.
THE COST OF DRILLING HOLES IN EXISTING CONCRETE AND GROUTING SHALL BE INCLUDED
ANCHOR BOLT HOLES
EPOXY MORTAR SHALL BE USED TO FILL HOLES AROUND ANCHOR BOLTS.
UNFILLED HOLES SHALL BE PROTECTED AGAINST RUPTURE IN FREEZING WEATHER.
TEMPLATES SHALL BE USED FOR DRILLING HOLES AND INSTALLING ANCHOR BOLTS.
GROUT
BY ENGINEER.
AND NON-SHRINK GROUT WITH f'c=3,000 PSI MIN. IN 24 HOURS AND APPROVED
GROUT USED FOR SELF LEVELING PADS SHALL BE PRE-PACKED, RAPID STRENGTH
UTILITIES
BE TO CENTER OF BARS UNLESS OTHERWISE NOTED.
OUT-TO-OUT FOR BARS. ALL PLACEMENT DIMENSIONS FOR REINFORCING STEEL SHALL
UNLESS NOTED OTHERWISE. ALL BEND DIMENSIONS FOR REINFORCING STEEL SHALL BE
BENDS AND HOOKS SHALL MEET THE REQUIREMENTS OF AASHTO ARTICLE 5.10.2
60) AND SHALL BE EPOXY COATED, UNLESS OTHERWISE NOTED. AT PIER A CAP, ALL
ALL NEW CONCRETE REINFORCING STEEL SHALL BE AASHTO M31 (ASTM A615, GRADE
ALL MATERIAL SHOWN IS EXISTING, UNLESS DESIGNATED AS "NEW" OR "TEMPORARY".
OF TRAFFIC (MOT) PLANS.
IN CONJUNCTION WITH SUGGESTED SEQUENCE OF CONSTRUCTION AND MAINTENANCE
CONCRETE BEAMS AND REPLACEMENT OF EXISTING BEARINGS SHALL BE PERFORMED
DETAILS REFER TO DRAWING NUMBER ST-DE-68. CONCRETE REPAIR OF PRESTRESSED
ENDS OF PRESTRESSED CONCRETE BEAMS ARE SUBJECT TO REPAIR. FOR REPAIR
SPECIFIED ON THE STANDARD DRAWINGS.
OF THE YIELD STRENGTH OF THE ELEMENTS BEING CONNECTED OR AS
COUPLERS SHALL CONFORM TO ASTM A1035 TENSILE STRENGTH OF 125%
CLASS A (4500 PSI).
(4500 PSI). NEW CONCRETE FOR DIRECTIONAL MEDIANS ON BRIDGE DECK SHALL BE
PSI MIN. IN 24 HOURS. NEW CONCRETE FOR PIER A CAP SHALL BE CLASS B
SHALL BE REPAIR CONCRETE CLASS C (HIGH EARLY STRENGTH) WITH f'c = 3000 f'c = 4500 PSI. NEW CONCRETE AT EXPANSION JOINTS, PIER AND ABUTMENTS
DECK OVERLAY SHALL BE LATEX MODIFIED CONCRETE OVERLAY (CLASS I) WITH
ALL MATERIAL SHOWN IS EXISTING, UNLESS DESIGNATED AS "NEW" OR "TEMPORARY".
AAH 01/19/24AMENDMENT 4-CLARIFICATION ADDED
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
W e d n e s d a y J a n u a ry
:4 p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
G e n e ra l\
P ri n t_ fi le s p
G N N I- S tr u c t_
G e n e ra l_
N o te s R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
PLAN
SPAN 15
130'-0"+
SPAN 14
165'-0"+
SPAN 13
165'-0"+
SPAN 12
145'-0"+
SPAN 11
145'-0"+
SPAN 10
145'-0"+
SPAN 9
165'-0"+
SPAN 8
165'-0"+
SPAN 7
165'-0"+
SPAN 6
165'-0"+
SPAN 5
165'-0"+
SPAN 4
165'-0"+
SPAN 3
165'-0"+
SPAN 2
133'-0"+
3'-0"+
L BRG. S. ABUTMENTC
C C
C L PIER 13C L PIER 12C L PIER 11C L PIER 10C C C C C C C C CL PIER 9
L PIER 8 L PIER 7 L PIER 6 L PIER 5 L PIER 4 L PIER 3 L PIER 2
CL PIER 1
CONCRETE BEAMS
L BRG. PIER C
STEEL GIRDERS
L BRG. PIER C
C
C
CONCRETE BEAMS
L BRG. PIER B
STEEL GIRDERS
L BRG. PIER B
3'-0"+
ELEVATION
ST-GP-02
L PIER AC
C
N. ABUTMENT
L BRG.
UNIT 5 UNIT 4 UNIT 3 UNIT 2 UNIT 1
SPAN C
65'-0"+-
SPAN 1
82'-0"+
SPAN B
60'-9"+
SPAN A
60'-9"+- - - - - - - - - - - - - - - - -
L BRG.
S. ABUTMENT
C C L PIER 14C L PIER 13C L PIER 12C L PIER 11C L PIER 10C C C C C C C C
C
L PIER 9 L PIER 8 L PIER 7 L PIER 6 L PIER 5 L PIER 4 L PIER 3
L PIER BCL PIER 1
CL PIER A C
CL PIER 2
L BRG.
N. ABUTMENT
SCALE: 1" = 100'-0"
SCALE: 1" = 100'-0"
L PIER 14
460'-0"+ 435'-0"+ 495'-0"+ 495'-0"+ 380'-0"+
2457'-6"+-
SPAN 14 SPAN 13 SPAN 12 SPAN 11 SPAN 10 SPAN 9 SPAN 8 SPAN 7 SPAN 6 SPAN 5 SPAN 4 SPAN 3 SPAN 2 SPAN 1 SPAN B SPAN A
EJM
AAH
F E E E F E E E E E F E E E E E F F E
SEA WALL
C
SPAN C SPAN 15
E
L BRG.
PIER C
F E F E E F
AAH
KSN
GENERAL PLAN AND ELEVATION
TO ARLINGTON, VA.
MOUNT VERNON TRAIL
PARK TRAIL
ROCK CREEK
L OHIO DRIVE SW
D C
W
S H
IN
G T
ELEV. -2.11
WATER
MEAN LOW
APPROXIMATE RIVERBED
KSN
100' 100'0 200'
SCALE: 1"=100'
(DOLPHINS AT PIERS 10 AND 11 ARE NOT SHOWN FOR CLARITY)
CLEARANCE
14'-0‚" MIN. VERT.
OHIO DRIVE SW HAS NOT BEEN SURVEYED.
EXISTING 6" DIAMETER WATER PIPE UNDER
20'-0" APPROACH SLAB
SLAB
APPROACH
20'-0"
STA. 10+26.25
PROJECT LIMIT
STA. 35+51.22
PROJECT LIMIT
ISLAND
DIRECTIONAL
AAH 01/19/24AMENDMENT 4-CLARIFICATION ADDED
6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00
32+00
33+00
34+00
35+00
36+
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
W e d n e s d a y J a n u a ry p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I-
G n e ra l P la n a n d
E le v a ti o n R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
SCALE: …" = 1'-0"
ST-DE-13
EJM
NAH
KSN
(TYP.)
JACKING BEAM
SCALE: …" = 1'-0"
(TYP.)
JACKING BEAM
(BEAMS AND PILES NOT SHOWN FOR CLARITY)
(TYP.)
COLUMN
JACKING
(TYP.)
BRACING
SUGGESTED JACKING AND TEMPORARY SUPPORT FRAME
PARTIAL PLAN
(TYP.)
BRACING
C
B1B2B3B4B5B6B7B8B9
A1A2A3A4A5A6A7A8
(TYP.)
FOOTING BEAM
PIER A
JACKING AND TEMPORARY SUPPORT
PARTIAL PLAN AND ELEVATION - 1
(TYP.)
JACK
4' 4'0 8'
SCALE: 3/8"=1'-0"
(TYP.)
COLUMN
JACKING
(TYP.)
L BEAM C
(TYP.)
L BEAMS C
CAP
EXISTING
(TYP.)
COLUMN
L EXISTING
FOOTING
EXISTING
BOTTOM OF
ST-DE-16
B A
NOTES:
LOCATION
JACKING AND BLOCKING DATA TABLE
PIER A - SPAN A
PIER A - SPAN B
DC
DEAD LOAD
BEAM REACTIONS (KIPS)*
* ALL LOADING BASED ON WORST CASE FOR EACH SPAN.
KSN
AAH
SUGGESTED JACKING AND TEMPORARY SUPPORT FRAME
NORTH ELEVATION
(TYP.)
BLOCKING
JACK AND
BLOCKING (TYP.)
DESIGN LL
HS-20
50 1
NO. OF
JACKS
PER GIRDER**
MINIMUM JACK CAPACITY SHALL BE 200% OF THE
CALCULATED LIFTING LOAD
ST-DE-13
ST-DE-15ST-DE-13
ST-DE-15ST-DE-13
ST-DE-16ST-DE-13
M A
T C
H L
IN
E
S
A W
IN
U
M B
S
D E
M A
T C
H L
IN
E
S
A W
M B
D E
AT NO ADDITIONAL COST TO THE DEPARTMENT.
RECONSTRUCT THE OPENING AT PIER B TO IT'S ORIGINAL SIZE
RECONSTRUCTION WORK, THE CONTRACTOR IS RESPONSIBLE TO
THE REMAINING PORTION OF PIER B. UPON COMPLETION OF
OF THE ADJUSTED OPENING FOR SAFE LOAD TRANSFER THROUGH
IN THE DISTRICT OF COLUMBIA TO DEMONSTRATE THE ADEQUACY
DRAWINGS STAMPED BY A PROFESSIONAL ENGINEER REGISTERED
DOOR, THE CONTRACTOR SHALL SUBMIT CALCULATIONS AND SHOP
AREA. PRIOR TO MAKING ANY MODIFICATIONS TO THE ENTRANCE
TO ACCOMODATE THE INGRESS AND EGRESS TO THE ENCLOSED
EQUIPMENT, THE ENTRANCE DOOR AT PIER B MAY BE WIDENED
IN CASE OF USE OF LIGHT EXCAVATION MACHINERY AND
FOR ADDITIONAL NOTES, SEE DRAWING NUMBER ST-DE-14.
BLOCKING SHALL NOT BE GREATER THAN 1/8".
IN ELEVATION BETWEEN ADJACENT BEAMS DURING JACKING AND
THAN 1/4" OR AS DIRECTED BY THE ENGINEER. THE DIFFERENCE
BEAMS TO BE JACKED AND BLOCKED WILL BE JACKED MORE
BEEN BLOCKED.
(9:30PM TO 4:00AM) AND MAY BE OPENED AFTER BEAMS HAVE
BRIDGE SHALL BE BRIEFLY STOPPED DURING OVER NIGHT HOURS
CONDITIONS. DURING LIFTING/JACKING OF BEAMS, TRAFFIC ON THE
JACKING SHALL NOT BE PERFORMED DURING ACTIVE TRAFFIC
NUMBER ST-DE-15 FOR EXCAVATION DETAILS.
ACCESS TO EXISTING FOOTING FOR SUPPORT. SEE DRAWING
EXISTING GROUND SHALL BE EXCAVATED AS SHOWN TO ALLOW
(EXISTING SOIL REMOVED TO TOP OF FOOTING)
TEMPORARY SUPPORT SYSTEM NO EARTH SURCHARGE PRESSURE
OF TEMP SUPPORT MAXIMUM 750 PLF FOR SELF-WEIGHT OF
MAXIMUM 4'-6" ECCENTRICITY FROM C.L. OF FOOTING TO C.L.
95 TON PILE CAPACITY (SERVICE)
JACKS.
TOTAL AND MAXIMUM TWO LOADED LANES SUPPORTED BY
DESIGN LIVE LOAD: HS-20 MAXIMUM OF FOUR LOADED LANES
PILE ANALYSIS METHOD: ASD PER AASHTO 2002
ANALYSIS OF THE EXISTING FOUNDATION PILES:
FOR SUPPORT, ASSUME THEFOLLOWING DESIGN PARAMETERS FOR
THE CONCEPTUAL DETAILS SHOWN, USING THE EXISTING FOUNDATION
17TH EDITION.
PER AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES,
BEAMS. THE TEMPORARY SUPPORT SYSTEM SHALL BE DESIGNED
LOADING DURING WORK REQUIRING THE JACKING AND BLOCKING OF
TEMPORARY CONSTRUCTION LOADS AND ALL OTHER ANTICIPATED
BE DESIGNED TO SUPPORT MAXIMUM LIVE LOAD, DEAD LOAD,
DISTRICT OF COLUMBIA. THE TEMPORARY SUPPORT SYSTEM SHALL
STAMPED BY A PROFESSIONAL ENGINEER REGISTERED IN THE
FOR THEIR PROPOSED JACKING AND TEMPORARY SUPPORT SYSTEM,
RESPONSIBLE FOR SUBMITTING CALCULATIONS AND SHOP DRAWINGS
FOR ILLUSTRATIVE PURPOSES ONLY. THE CONTRACTOR IS
THE SUGGESTED JACKING AND TEMPORARY SUPPORT DETAILS ARE
7.
6.
5.
4.
3.
2.
1.
GROUND PROFILE
PROPOSED
EXISTING AND
APPROXIMATE
AAH 01/19/24AMENDMENT 4-CLARIFICATION ADDED
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
W e d n e s d a y J a n u a ry p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I- P ie r
A J a c k in g
T e m p o ra ry
S u p p o rt P a rt ia l P la n a n d
E le v a ti o n
1-
R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
ST-DE-14
EJM
NAH
KSN
SCALE: …" = 1'-0"
(TYP.)
JACKING BEAM
(TYP.)
BEAM
FOOTING
(BEAMS AND PILES NOT SHOWN FOR CLARITY)
(TYP.)
COLUMN
JACKING
(TYP.)
BRACING
PIER A
JACKING AND TEMPORARY SUPPORT
PARTIAL PLAN AND ELEVATION - 2
SCALE: …" = 1'-0"
SUGGESTED JACKING AND TEMPORARY SUPPORT FRAME
PARTIAL PLAN
A20 A19 A18 A17 A16 A15 A14 A13 A12 A11 A10 A9
B19B20 B18 B17 B16 B15 B14 B13 B12 B11 B10
(TYP.)
JACKING BEAM
(TYP.)
JACKING COLUMN
( TYP.)
BRACING
I-395 HOV
EXIST. L B
C
(TYP.)
JACK
(TYP.)
BEAM
BLOCKING
4' 4'0 8'
SCALE: 3/8"=1'-0"
L BEAM (TYP.)C
A
B
(TYP.)
L BEAMS C
CAP
EXISTING
COLUMN (TYP.)
L EXISTING
EXISTING FOOTING
BOTTOM OF
SUGGESTED JACKING AND TEMPORARY SUPPORT FRAME
NORTH ELEVATION
LEVEL AND STABLE TEMPORARY SUPPORTS.
THE JACKS AND THE JACKING SUPPORTS SHALL BE STRAIGHT, PLUMB AND PLACED AT LOCATIONS OF
THE CONTRACTOR SHALL PROTECT ALL UTILITIES DURING SHORING AND JACKING OPERATIONS.
ACTIONS AND NOTIFY THE ENGINEER IMMEDIATELY.
JACKING OPERATIONS AT ANY LOCATION ALONG THE SPAN, THE CONTRACTOR SHALL TAKE CORRECTIVE
TO ANY LOCATION ALONG THE SPAN. IF THERE IS ANY EVIDENCE OF DAMAGE OCCURING DURING THE
THE JACKING PROCEDURE SHALL BE MONITORED TO ENSURE THAT JACKING DOES NOT CAUSE DAMAGE1.
2.
3.
NOTES:
KSN
AAH
(TYP.)
BLOCKING
JACK AND
ST-DE-16ST-DE-14
ST-DE-16ST-DE-14
ST-DE-15ST-DE-14
ST-DE-15ST-DE-14
M A
T C
H L
IN
E
S
A W
M B
D E
M A
T C
H L
IN
E
S
A W
M B
D E
GROUND PROFILE
PROPOSED
EXISTING AND
APPROXIMATE
AAH 01/19/24AMENDMENT 4-CLARIFICATION ADDED
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
W e d n e s d a y J a n u a ry
:5 p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I- P ie r
A J a c k in g
T e m p o ra ry
S u p p o rt P a rt ia l P la n a n d
E le v a ti o n
R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
ST-DE-15
NAH
KSN
SUPPORT (TYP.)
L OF TEMPORARYC
C
TOP OF DECK
BEAM (TYP.)
EXISTING
BEAM (TYP.)
JACKING
(TYP.)
COLUMN
JACKING
(TYP.)
BRACING
(TYP.)
BEAM
FOOTING
EXISTING FOOTING
MIN.
2'-0"
SCALE: •" = 1'-0"
SUPPORT (TYP.)
L OF TEMPORARYC
C
TOP OF DECK
BEAM (TYP.)
EXISTING
BEAM (TYP.)
JACKING
(TYP.)
COLUMN
JACKING
(TYP.)
BEAM
FOOTING
EXISTING FOOTING
MIN.
2'-0"
BRACKET
(TYP.)
BRACING
PIER A
JACKING AND TEMPORARY SUPPORT
DETAILS - 1
2' 2'0 4'
SCALE: 1/2"=1'-0"
L PIER A
END OF BEAM
RECONSTRUCTED
BE DEMOLISHED AND
EXISTING CAP TO
JACK OR BLOCKING (TYP.)
(SEE NOTE 2)(TYP.)
ANCHOR, DRILLED AND GROUTED
ST-DE-16
ASECTION
SCALE: •" = 1'-0"
SECTION B
END OF BEAM
RECONSTRUCTED
BE DEMOLISHED AND
EXISTING CAP TO
(SEE NOTE 2)(TYP.)
ANCHOR, DRILLED AND GROUTED
JACK OR BLOCKING (TYP.)
NOTES:
KSN
AAH
L PIER A
SPAN B
4'-6" MAX.
SPAN A
4'-6" MAX.
SPAN B
4'-6" MAX.
SPAN A
4'-6" MAX.
ST-DE-13
ST-DE-14
ST-DE-15 ST-DE-13
ST-DE-14
ST-DE-15
ST-DE-15 ST-DE-16ST-DE-15
ST-DE-15ST-DE-16
TYP.
1.5
1.5
EXCAVATION DETAIL
4' 4'0 8'
SCALE: 1/4"=1'-0"
SCALE: ‚" = 1'-0"
2' 2'0 4'
SCALE: 1/2"=1'-0"
7'-6"±
BE PERFORMED CONCURRENTLY.
OF PIER A. DISENGAGEMENT OF JACKING SYSTEM ON BOTH SIDES OF PIER A SHALL ALSO
JACKING AND LIFTING OF THE BEAMS SHALL BE PERFORMED CONCURRENTLY ON BOTH SIDES
AND OBSERVE ALL PHASES OF CHEMICAL ANCHOR INSTALLATION INCLUDING HOLE CLEANING.
OF MANUFACTURER TRAINING AND/OR A MANUFACTURER REPRESENTATIVE SHALL BE ONSITE
COMPLIANCE WITH THE MANUFACTURER REQUIREMENTS. INSTALLERS SHALL FURNISH EVIDENCE
DIAMETER, ANCHORAGE LENGTH, INSTALLATION AND CLEANING PROCEDURE SHALL BE IN STRICT
SHALL BE USED TO BOND THE ANCHOR RODS INTO EXISTING CONCRETE. THE DRILLED HOLE
AN APPROVED CHEMICAL ANCHOR SYSTEM, IN COMPLIANCE WITH PROJECT SPECIAL PROVISIONS
SEE DRAWING NUMBERS ST-DE-13 AND ST-DE-14 FOR ADDITIONAL NOTES.
3.
2.
1.
AND BEARING REPLACEMENT
CAP RECONSTRUCTION
COMPLETION OF PIER
BACKFILLED UPON
EXCAVATED AND
GROUNDLINE TO BE
APPROXIMATE EXISTING
AAH 01/19/24
AND BEARING REPLACEMENT
CAP RECONSTRUCTION
COMPLETION OF PIER
BACKFILLED UPON
EXCAVATED AND
GROUNDLINE TO BE
APPROXIMATE EXISTING
AMENDMENT 4-CLARIFICATION ADDED
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
W e d n e s d a y J a n u a ry
:5
A
M p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I- P ie r
A J a c k in g a n d
T e m p o ra ry
S u p p o rt
D e ta ils
1-
R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
ST-DE-68
SCALE: 1" = 1'-0"
PRESTRESSED CONCRETE BEAM
REPAIR DETAILS
AAH
KSN
BAP
NAH
EJM
1' 1'0 2'
SCALE: 1"=1'-0"
CONCRETE BEAM END REPAIR
LIMITS OF PRESTRESSED
2'-6" MAX.
C
END OF BEAM
1'-0"±
DIAPHRAGM
CONCRETE END
BE REPLACED
EXISTING CAP TO
L PIERC
L BRG. SPAN A
CONCRETE BEAM END REPAIR
LIMITS OF PRESTRESSED
END OF BEAM
L BRG.C
1'-0"±
DIAPHRAGM
CONCRETE END
ABUTMENT
PIER B OR NORTH
SCALE: 1" = 1'-0"
1' 1'0 2'
SCALE: 1"=1'-0"
(PIER B SHOWN, NORTH ABUTMENT SIMILAR)(SPAN A SHOWN, SPAN B SIMILAR)
A
A
A
A
CONCRETE BEAM END REPAIR
LIMITS OF PRESTRESSED
1'-6" MAX.
C
END OF BEAM
B
B
L BRG.
1'-0"±
DIAPHRAGM
CONCRETE END
SCALE: 1" = 1'-0"
1' 1'0 2'
SCALE: 1"=1'-0"
(PIER C SHOWN, SOUTH ABUTMENT SIMILAR)
NOTES FOR PRESTRESSED CONCRETE BEAM END REPAIRS:
1.
2.
3.
4.
5.
6.
7.
8.
9.
NOTES:
IN THE FIELD
TO BE DETERMINED
IN THE FIELD
TO BE DETERMINED
IN THE FIELD
TO BE DETERMINED
IN THE FIELD
TO BE DETERMINED
SECTION A-A
2' 2'0 4'
SCALE: 1/2"=1'-0"
SECTION A-A
2' 2'0 4'
SCALE: 1/2"=1'-0"
(BEAMS B2 THRU B19)(BEAMS A1 THRU A20
BEAMS B1 AND B20)
SECTION B-B
2' 2'0 4'
SCALE: 1/2"=1'-0"
(BEAMS C1 AND C13)
SECTION B-B
2' 2'0 4'
SCALE: 1/2"=1'-0"
(BEAMS C2 THRU C12)
2'-6" MAX.*
WHICH THE MAXIMUM LENGTH IS 4'-3"
* EXCEPT FOR BEAM 2 AT PIER B,
ABUTMENT
PIER C OR SOUTH
NUMBER ST-DE-69.
REPLACED. SEE DRAWING
EXISTING BEARING TO BE
TYPE A REPAIR PIER A ELEVATION
NUMBER ST-DE-69.
REPLACED. SEE DRAWING
EXISTING BEARING TO BE
TYPE A REPAIR PIER B ELEVATION
SEE DRAWING NUMBER ST-DE-69.
SOUTH ABUTMENT TO BE REPLACED.
ST-DE-70. EXISTING BEARING AT
BE REPAIRED. SEE DRAWING NUMBER
EXISTING BEARING AT PIER C TO
TYPE B REPAIR PIER C ELEVATION
PRESTRESSED CONCRETE BEAM END REPAIR
AREAS TO BE REPAIRED AS PART OF
DENOTES TYPICAL SPALLED OR DELAMINATED
LEGEND
ABUTMENTS AND PIER B, SEE DRAWING NUMBERS ST-DE-71 AND ST-DE-72.
AND BEARING REPLACEMENT. FOR JACKING AND BLOCKING DETAILS AT NORTH AND SOUTH
REPAIR AT NORTH AND SOUTH ABUTMENTS AND PIER B SHOULD OCCUR AFTER JACKING
SEE DRAWING NUMBER ST-DE-52 FOR BEAM END REPAIR LOCATIONS.
STRENGTH.
HIGHWAY OR VEHICULAR TRAFFIC UNTIL THE CONCRETE HAS OBTAINED 3,000 PSI
THE REPAIRED BEAM ENDS SHALL NOT BE SUBJECT TO THE LOADING EFFECTS OF
REPAIR CONSISTENT WITH SECTION 703.26 OF THE SPECIFICATIONS.
COMPRESSIVE STRENGTH OF 3,000 PSI (24 HOURS), SHALL BE USED FOR BEAM END
SELF CONSOLIDATING CONCRETE, CLASS C HIGH EARLY STRENGTH WITH 28 DAY
PLASTIC CONCRETE.
IN A MANNER AS TO PROVIDE ADEQUATE VIBRATION AND CONSOLIDATION FOR THE
MEANS. A 3/4" CHAMFER SHALL BE ON ALL CORNERS. FORMS SHALL BE FABRICATED
PLACED UNDER A SLIGHT "HEAD" OF PRESSURE BY MEANS OF A "HOPPER" OR OTHER
FORMING SHALL BE DONE IN A MANNER SUCH THAT THE TOP CONCRETE CAN BE
SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGED REINFORCING STEEL.
BY NEW SIMILAR SIZED REBAR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR
REBAR WITH SECTION LOSS OF 25% OR MORE DUE TO CORROSION SHALL BE LAPPED
EXPOSED EXISTING REINFORCEMENT SHALL BE SAND BLASTED AND CLEANED. ANY
AFTER REMOVAL OF ALL DETERIORATED, SPALLED AND DELAMINATED CONCRETE, ALL
BE EXACTLY IN ACCORDANCE WITH THE ORIGINAL PLAN.
THE ACTUAL LOCATIONS AND CONDITION OF THE EXPOSED REINFORCING STEEL MAY NOT
SHALL BE CLEAN, DRY AND FREE OF OIL, GREASE AND OTHER FOREIGN MATTER.
THE METHOD OF REMOVAL SHALL BE AT THE APPROVAL OF THE ENGINEER. SURFACE
REMAINING CONCRETE AND REINFORCING STEEL WILL NOT BE DAMAGED.
EXISTING MATERIAL SHALL BE DONE WITH LIGHT POWER TOOLS IN A MANNER THAT THE
CONTRACTOR HAS REMOVED THE LOOSE OR SPALLED MATERIAL. FINAL REMOVAL OF THE
TO VERTICAL AND HORIZONTAL PATTERN AS ESTABLISHED BY THE ENGINEER AFTER THE
OF CONCRETE TO BE REMOVED. THE PATTERN OF THE REMOVAL SHALL GENERALLY BE
POSSIBLE OR LINE DRILLED WITH 5/8" DIAMETER DRILL TO "SQUARE" OUT THE SECTION
BEAMS SHALL BE CAREFULLY AND NEATLY SAWN TO A DEPTH OF 1" ALL AROUND WHERE
SHORING IS PLACED ON BOTH SIDES OF THE PIER.
ST-DE-11 THRU ST-DE-18. BEAM REPAIR AT PIER A SHALL BE PERFORMED AFTER TEMPORARY
BEAM END REPAIRS AT PIER A SHALL BE PERFORMED CONSISTENT WITH DRAWING NUMBERS
REPAIR.
EXACT. FINAL DETAILS WILL BE DETERMINED BY THE ENGINEER FOR EACH BEAM END
THE ILLUSTRATIONS IN THESE VIEWS ARE GENERAL AND SHOULD NOT BE CONSIDERED
SUPPORT
AMENDMENT 4 - CORRECTION AAH 01/19/24
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
T u e s d a y J a n u a ry
:3 p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s 1-p B
R S T I-
P re s tr e s s d o n c re te
B e a m p a ir R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
ST-DE-73
BRIDGE SCUPPER REPAIR DETAILS - 1
1.
1.
8" PIPE
EXIST.
8" PIPE
EXIST.
LINE C
LINE B
LINE A
65'-0"±
SPAN C
EXIST.
M.H.
#B-13
8" PIPE
REPLACED
130'-0"±
SPAN 15
165'-0"±
SPAN 14
165'-0"±
SPAN 13
145'-0"±
SPAN 12
145'-0"±
SPAN 11
145'-0"±
SPAN 10
165'-0"±
SPAN 9
165'-0"±
SPAN 8
165'-0"±
SPAN 7
165'-0"±
SPAN 6
165'-0"±
SPAN 5
165'-0"±
SPAN 4
165'-0"±
SPAN 3
133'-0"±
SPAN 2
82'-0"±
SPAN 1
60'-9"±
SPAN B
60'-9"±
SPAN A
REPLACED
8" PIPE
REPLACED
8" PIPE
REPLACED
8" PIPE
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
M A
T
E
S
T A
M A
T
E
S
T A
SOUTH ABUTMENT PIER C PIER 14 PIER 13 PIER 12 PIER 11 PIER 10 PIER 9 PIER 8
PIER 7 PIER 6 PIER 5 PIER 4 PIER 3
PIER 2
PIER 1
PIER B
PIER A
NORTH ABUTMENT
EXISTING SCUPPER (PIPE CONNECTED)
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A 1+
.0
S T
A
.0
S T
A 1+
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
STA. 29+50.00
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A 1+
.0
S
T A 1+
.0
0 S T
A 1+
.0
S T
A 1+
.0
S T
A .0
S T
A .0
S T
A .0
STA. 33+27.00
S T
A .0
S T
A .0
S T
A .0
LINE D
S T
A .0
S T
A .0
S T
A .0
STA. 33+77.00
STA. 34+38.00
STA. 34+89.00
END
BARRIER
L CAPC
CONNECT
TO 8"
PIPE
19'-6"
REPLACED 8" PIPE
REPLACE DOWNSPOUT
BELOW SCUPPER, TYP.
19'-6"
REPLACED 8" PIPE
END OF 10"
TROUGH, TYP.
STA. 32+77.00
REPLACED
8" PIPE
DRAINAGE SYSTEM
DISCONNECTED FROM
EXIST. LINE TO BE
NEW LINE E
EXISTING SCUPPER (DRAINED TO RIVER)
40' 40'0 80'
SCALE: 1"=40'
M A
T
E
S
T A
M A
T
E
S
T A
N
AAH
KSN
YL
KSN
EJM
8" PIPE
REPLACED
AAH 01/19/24
ABANDONED
ABANDONED
NOTE:
FOR DRAINAGE REPLACEMENT DETAILS, SEE DRAWING NUMBERS ST-DE-74
AND ST-DE-75.
THE PROPOSED DRAIN PIPES MAY BE RELOCATED TO MISS THE BEAM.
STATIONS ARE GIVEN WITH RESPECT TO CORRESPONDING BASE LINES OR
WORKING LINE.
FOR SEQUENCE OF CONSTRUCTION, SEE DRAWING NUMBERS ST-SC-05
THRU ST-SC-08.
DRAIN PIPE AND SCUPPER SHALL BE GRAY IRON CASTINGS MEETING THE
REQUIREMENTS OF AASHTO M 105, CLASS 30A (ASTM A48, CLASS 30A).
ELEVATIONS PROVIDED ARE APPROXIMATE. CONTRACTOR SHALL VERIFY
ACTUAL FIELD CONDITIONS AND MAKE ADJUSTMENTS AS REQUIRED FOR
PROPER FIT.
THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS DETAILING ALL
COMPONENTS OF THE DRAINAGE COLLECTOR PIPE ASSEMBLIES AND OTHER
DETAILS AS REQUIRED.
AMENDMENT 4 - SHEET UPDATED
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
T u e s d a y J a n u a ry
:4
P
M p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I-
B ri d g e
S c u p p e r
R e p a ir D e ta ils 1-
R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
22+00 23+00 25+00 26+00 27+00 28+00 30+00
B A
NA
32+00
33+00
36+
KSN
YL
ST-DE-74
BRIDGE SCUPPER REPAIR DETAILS - 2
DRAINAGE PIPE DETAIL
TYPICAL SOUTH ABUTMENT
LINE A - NORTH ABUTMENT
LINE B - NORTH ABUTMENT
PIPE TYP.
REPLACE 8"
COUPLING
EXPANSION
REPLACE PIPE
PIER C
C
ROD TYP.
REPLACE ‡"o
SCUPPER TYP.
REPLACE 8" PLUG
TYP.
HANGER 10' C/C MAX.
REPLACE SPLIT RING
PIPE TYP.
REPLACE 8"
PIER A
C.I. WYE TYP.
REPLACE 8"X8"
C.I. WYE TYP.
REPLACE 8"X8"
TYP.
HANGER 10' C/C MAX.
REPLACE SPLIT RING
PIER B
PIER 1
C
ROD TYP.
REPLACE ‡"o
C C C C
PIPE TYP.
REPLACE 8"
COUPLING
EXPANSION
REPLACE PIPE
C.I. WYE TYP.
REPLACE 8"X8"
PIER A
PIER B PIER 1
ROD TYP.
REPLACE ‡"o
TYP.
HANGER 10' C/C MAX.
REPLACE SPLIT RING
A
BEND
8" C.I. ‚
REPLACE
ABUTMENT
SOUTH
REPLACE 8" PIPE TYP.
DRAINAGE SYSTEM
DISCONNECTED FROM
EXIST. LINE E TO BE
ABUTMENT
NORTH
NEW LINE E
WYE WITH 8" PLUG
REPLACE 8" C.I.
EXPANSION COUPLING
REPLACE PIPE
C C C
SCUPPER TYP.
REPLACE 8" PLUG
REPLACE 8" PIPE TYP.
ABUTMENT
NORTH
NEW LINE E
SCUPPER TYP.
REPLACE 8" PLUG
REPLACE 8" PIPE TYP.
DIRECTION
FLOW
10" C.I.P.
LINE A
INLET FROM
LINE B
INLET FROM
LINE C
INLET FROM
LINE D
INLET FROM
10" C.I.P.
NEW LINE E
10" PLUG
NORTH ABUTMENT
OF BACKWALL
FRONT FACE
8"X10" C.I. WYE
PLAN - NEW LINE E
INSERT TYP.
SCREW-TYPE CONCRETE
10" C/C MAX.
‡" o ROD, TYP.
TYP.
SPLIT RING
LINE A 8" C.I.P.
L INLET FROMC
LINE B 8" C.I.P.
L INLET FROMC
LINE C 8" C.I.P.
L INLET FROMC
LINE D 8" C.I.P.
L INLET FROMC
10" PLUG
HANGER, TYP.
SPLIT RING
10" C.I.P.
NEW LINE E
FOUNDATION
ELEVATION - NEW LINE E
OUTLET 10" C.I.P.
NEW LINE E
VIEW C-C
4' 4'0 8'
SCALE: 1/4"=1'-0"
ST-DE-74 ST-DE-75
2% MIN. SLOPE
ELEV. 29.56±
STA. 11+25.00
DRAIN INLET
L EXISTING
ELEV. 30.29±
STA. 11+75.00
L EXISTING DRAIN INLET
2% MIN. SLOPE
ELEV. 24.50±
STA. 33+77.00
DRAIN INLET
L EXISTING
ELEV. 25.40±
STA. 33+27.00
DRAIN INLET
L EXISTING
ELEV. 26.07±
STA. 32+77.00
L EXISTING DRAIN INLET
2% MIN. SLOPE
ELEV. 23.00±
STA. 34+89.00
DRAIN INLET
L EXISTING
ELEV. 24.77±
STA. 34+38.00
DRAIN INLET
L EXISTING
ELEV. 26.18±
STA. 33+87.00
DRAIN INLET
L EXISTING
ELEV. 27.27±
STA. 33+37.00
L EXISTING DRAIN INLET
2% MIN. SLOPE
M A
X
1'
FINISH GRADE
BLOCK
CONCRETE SPLASH
THRU THE WALL
DRILL 12" OPENING
OF AASHTO M 105, CLASS 30A (ASTM A48, CLASS 3DAI).
DRAIN PIPE SHALL BE GRAY IRON CASTINGS MEETING THE REQUIREMENTS
MATERIAL:
SEE DRAWING NUMBER ST-DE-73.
FOR LOCATION OF PIPE BETWEEN GIRDERS,
NOTE:
AAH 01/19/24AMENDMENT 4 - SHEET UPDATED
VERTICAL DRAINAGE PIPE.
THE LOCATION OF EXISTING
IRON PIPE (C.I.P.) SHALL MATCH
THE LOCATION OF VERTICAL CAST
EXIST.
DRAINAGE SYSTEM
DISCONNECTED FROM
EXIST. LINE E TO BE
EXIST.
EXIST.
EXIST. GROUND
TYP.
VERTICAL PIPE
REPLACE EXIST.
TYP.
HORIZONTAL PIPE
REPLACE EXIST.
REPLACEMENT
REPLACEMENT
8" PIPE
REPLACE
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
F ri d a y J a n u a ry
:4
P
M p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I-
B ri d g e
S c u p p e r
R e p a ir D e ta ils R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
KSN
YL
ST-DE-75
BRIDGE SCUPPER REPAIR DETAILS - 3
REPLACE 8"
PIPE TYP.
REPLACE PIPE
EXPANSION
COUPLING
PIER A
C C
C C
C
C
REPLACE 8"X8"
C.I. WYE TYP.
PIER B
REPLACE ‡"o
ROD TYP.
SCUPPER TYP.
REPLACE 8"
PIPE TYP.
REPLACE 8" PLUG
REPLACE SPLIT RING
HANGER 10' C/C MAX.
TYP.
PIER 1
PIER A
SCUPPER TYP.
REPLACE 8"
PIPE TYP.
REPLACE 8" PLUG
REPLACE SPLIT RING
HANGER 10' C/C MAX.
TYP.
LINE C - NORTH ABUTMENT
LINE D - NORTH ABUTMENT
SCUPPER
REPLACE 8"
„ BEND
REPLACE SPLIT-RING
HANGER
REPLACE 8" PIPE
DRAIN TO RIVER
L EXTERIOR
GIRDER
C
REPLACE SPLIT-RING
HANGER
REPLACE 8" PIPE
REPLACE
2•"x•" BAR
1'
DOWNSPOUT DETAIL
REPLACE 6"x8"
SANITARY BRANCH
C L DRAIN
INLET TYP.
FLOW LINE
REPLACE 8" PIPE
REPLACE 8"X8"
C.I. WYE TYP.
REPLACE
ˆ BEND
10'-0"
C E
N T
F
S
C U
P P
E R
S T
A
.0
REPLACE
ˆ BEND
W.I. PIPE
REPLACE 4"
6" W.I. TROUGH
REPLACE 6" PIPE
SANITARY BRANCH
REPLACE 6"x8"
VIEW B
6" W.I. TROUGH
W.I. PIPE
REPLACE 4"
REPLACE 6" PIPE
SANITARY BRANCH
REPLACE 6"x8"
REPLACE 8" PLUG
REPLACE 8" PIPE
DRAIN TO RIVER
PIER 3 AND 9
DRAIN PIPE DETAILS
DRAINAGE SYSTEM
DISCONNECTED FROM
EXIST. LINE E TO BE
NORTH
ABUTMENT
NEW LINE E
NORTH
ABUTMENT
NEW LINE E
1'-5‡"±
B B
A
ST-DE-74
SCALE: ƒ" = 1'-0"
DETAIL - PLAN
(ELEVATION)
(ELEVATION)SCALE: ƒ" = 1'-0" SCALE: ƒ" = 1'-0"
SCALE: …" = 1'-0"
SCALE: …" = 1'-0"
SCALE: ƒ" = 1'-0"
2' 2'0 4'
SCALE: 3/4"=1'-0"
2' 2'0 4'
SCALE: 3/4"=1'-0"
2' 2'0 4'
SCALE: 3/4"=1'-0"
2' 2'0 4'
SCALE: 3/4"=1'-0"
4' 4'0 8'
SCALE: 3/8"=1'-0"
4' 4'0 8'
SCALE: 3/8"=1'-0"
ST-DE-75
2% MIN. SLOPE
L EXISTING DRAIN INLET
STA. 34+75.00
ELEV. 24.83±
L EXISTING DRAIN INLET
STA. 34+25.00
ELEV. 26.45±
L EXISTING DRAIN INLET
STA. 33+75.00
ELEV. 28.80
L EXISTING DRAIN INLET
STA. 33+25.00
ELEV. 28.87±
L EXISTING DRAIN INLET
STA. 32+75.00
ELEV. 29.62±
2% MIN. SLOPE
L EXISTING DRAIN INLET
STA. 34+83.00
ELEV. 27.07±
6" MIN.
BOTTOM OF FLANGE
MAIN GIRDER
6" MIN.
FOR LOCATION OF PIPE BETWEEN GIRDERS, SEE DRAWING NUMBER ST-DE-73.
NOTE:
EXIST.
AAH 01/19/24AMENDMENT 4 - SHEET UPDATED
DRAINAGE SYSTEM
DISCONNECTED FROM
EXIST. LINE E TO BE
EXIST.
L PIER C C
VERTICAL DRAINAGE PIPE.
THE LOCATION OF EXISTING
IRON PIPE (C.I.P.) SHALL MATCH
THE LOCATION OF VERTICAL CAST
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
F ri d a y J a n u a ry
:5
P
M p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I-
B ri d g e
S c u p p e r
R e p a ir D e ta ils R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
I-395 HOV
PLAN - PIER 10
(LOOKING NORTH)
(LOOKING NORTH)
I-395 HOV
ELEVATION - PIER 10
(LOOKING NORTH)
I-395 SOUTHBOUND
PLAN - PIER 10
(LOOKING NORTH)
I-395 SOUTHBOUND
ELEVATION - PIER 10
EL. 13.26±
TOP OF FENDER
EL. -4.61±
EL. 15.26±
KSN
MRA
EJM
AAH
11'-0"±
A
ST-DE-77
TYP.
(SEE NOTES)
DETAIL
PILE JACKETING
8' 8'0 16'
SCALE: 1/8"=1'-0"
FENDER DEMOLITION
ST-DE-76
N
CLR.
5'-0"±
B
REMOVED AND REPLACED
10 AND 11 TO BE
CHANNEL SIDE OF PIERS
FENDERS LOCATED ON
6"x10" FRPL LAGS
TO BE REPLACED BY
EXISTING TIMBER LAGGING
TO BE REPLACED (TYP.)
EXISTING PLANK WALK (3-3"x8")
2'-6"±
6'-0"±
2'-10•"± 4'-0"± 2'-6"±
6'-0"±
3'-0"±
INSPECTION REPORT)
AND 2021 UNDERWATER
(ACCORDING TO 2017
AT PIER 11 NORTH FACE
APPROXIMATE MUDLINE
(TYP.)
NAVIGATION LIGHT
TO BE REPLACED (TYP.)
EXISTING ALUMINUM PLATES
L PIERC
4'-2"±
L EXIST. LADDERC
PILE REPAIR (TYP.)
GALV. WIRE ROPE AFTER
REPLACED BY 12 TURNS OF
EXISTING WIRE ROPE TO BE
NOTES:
L PIERC
INSPECTION REPORT)
AND 2021 UNDERWATER
(ACCORDING TO 2017
AT PIER 10 SOUTH FACE
APPROXIMATE MUDLINE
17'-3"±
EXISTING LADDER RUNGS (TYP.)
FACE OF EXISTING PIER (TYP.)
17'-4•"±
CLR.
5'-0"±
1' (T
Y P
(T
Y P
3'-4•"±
= 24'-0"±
4 SPA. @ 6'-0"±
= 24'-0"±
4 SPA. @ 6'-0"±
F
E N
D E
R S
C L
R
F A
C E
= 84'-0"±
14 SPA. @ 6'-0"±
3'-4•"±
EL. 0.00±
EL. -28.00±
EL. -34.00±
EL. -47.00±
EL. -31.00±
EL. -37.00±
EL. -47.00±
L PIERC
4'-2"±
L EXIST. LADDERC
EXISTING STRUCTURE
NEW STRUCTURE
YL
M.L.W. EL. -2.11±
ST-DE-76
ST-DE-77ST-DE-76
(TYP.)
PILE DOLPHIN
EXISTING 19
12"x12" FRPL SHAPE (TYP.)
TO BE REPLACED BY
EXISTING FILLER BLOCK
SHAPES (TYP.)
BY 12"x12"-4F08 FRPL
POSTS TO BE REPLACED
EXISTING 12"x12" TIMBER
SHAPES (TYP.)
TO BE REPLACED BY 12"x12" FRPL
EXISTING 12"x12" TIMBER SUPPORT
FRPL SHAPES (TYP.)
BY (2-8"x12"-4F08)
TO BE REPLACED
TIMBER SUPPORTS
EXISTING 2-6"x12"
FRPL SHAPES (TYP.)
BE REPLACED BY 12"x12"-4F08
EXISTING 12"x12" TIMBER TIES TO
7.
6.
5.
4.
3.
2.
1.
FOR DOLPHIN PILE JACKETING DETAILS, SEE DRAWING NUMBER ST-DE-78.
FOR FENDER REPLACEMENT DETAILS, SEE DRAWING NUMBER ST-DE-77.
THE CONTRACTOR SHALL PRESERVE ALL UTILITY LINES AND THEIR SUPPORTS.
THE CORRESPONDING TIMBER COMPONENTS TO RESIST IMPACT FORCES.
THE FENDER SYSTEM HAVE EQUIVALENT OR HIGHER MECHANICALSTRENGTH COMPARED TO
THE CONTRACTOR SHALL VERIFY ALL FRP COMPONENTS THAT ARE USED TO REPLACE
AND PROPERTIES.
SEE SPECIAL PROVISIONS FOR FIBERGLASS REINFORCED PLASTIC LUMBER (FRPL) MATERIALS
FRPL LAGS SHALL HAVE WEATHERED WOOD COLOR.
SHALL BE REMOVED AND REPLACED BY FRP COMPOSITE COMPONENTS. THE FRONT 6"x10"
THE ENTIRE FENDER SYSTEM INCLUDING TIMBER LAGS, WALES, SUPPORTS AND BLOCKS
PIER 10 SOUTH FACE FENDER SYSTEM SHOWN. PIER 11 NORTH FACE IS SIMILAR.
10 AND 12 TO BE DEMOLISHED
EXISTING FENDER SYSTEM AT SPANS
AMENDMENT 4 - CORRECTION AAH 01/19/24
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
T u e s d a y J a n u a ry
:3 p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I-
F e n d e r
D e m o lit io n R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
ELEV. 15.26±
ELEV. 13.26±
FACE OF PIER
ELEV. 13.26±
ELEV. 12.76±
2'-6"±
ST-DE-77
FENDER REPLACEMENT DETAILS
KSN
MRA
EJM
AAH
(TYP.)
PLATES TO BE REPLACED
EXISTING 12"x…" ALUMINUM
NOTES:
2.
1.
EXISTING 1„"o BOLTS (TYP.)
BLOCK TO BE REPLACED (TYP.)
EXISTING 12"x12" TIMBER SUPPORT
TO BE REPLACED
EXISTING PLANK WALK
L PIERC
TO REMAIN SEE NOTE 1 (TYP.)
EXISTING FENDER PILE
TO BE REPLACED (TYP.)
EXISTING TIMBER SUPPORTS (2-6"x12")
TO BE REPLACED (TYP.)
EXISTING 6"x10" TIMBER LAGS
1'-3"± 1'-3"±
3'-7"± 3'-7"±
ASECTION
ST-DE-76
SCALE: ‚" = 1'-0"
L PIERC
NEW PLANK WALK
SUPPORT BLOCK (TYP.)
NEW 12"x12" FRPL SHAPE
TO REMAIN SEE NOTE 1 (TYP.)
EXISTING FENDER PILE
@ 11" C/C (TYP.)
NEW 6"x10" FRPL LAGS
EXISTING
TO BE REPLACED
EXISTING TIMBER (2-6"x10")
TO BE REPLACED (TYP.)
EXISTING 6"x10" TIMBER LAGS
BLOCK TO BE REPLACED
EXISTING 6"x12" TIMBER SUPPORT
TO BE REPLACED (TYP.)
EXISTING 12"x12" TIMBER WALES
TO BE REPLACED (TYP.)
EXISTING 12"x12" TIMBER SUPPORTS
EXISTING NEW
SECTION
SCALE: ‚" = 1'-0"
B
ELEV. 13.26±
ELEV. 12.76±
PLATES (TYP.)
NEW 12"x…" ALUMINUM
@ 11" C/C (TYP.)
NEW 6"x10" FRPL LAGS 2'-6"±
EXISTING STRUCTURE
NEW STRUCTURE
4' 4'0 8'
SCALE: 1/4"=1'-0"
ELEV. 15.26±
ELEV. 13.26±
EXISTING 1„"o BOLTS (TYP.)
YL
ST-DE-77
ST-DE-76 ST-DE-77
1'-3"± 1'-3"±
3'-7"± 3'-7"±
NEW
SHAPE SUPPORT (TYP.)
NEW (2-8"x12"-4F08) FRPL
SHAPES (TYP.)
NEW (2-6"x10") FRPL
SUPPORT BLOCK
NEW 6"x12" FRPL SHAPE
SHAPE WALES (TYP.)
NEW 12"x12"-4F08 FRPL
SHAPE SUPPORT (TYP.)
NEW 12"x12"-4F08 FRPL
LIGHTS AND THEIR SUPPORTS AT PIERS 10 AND 11 EAST END.
THE CONTRACTOR SHALL REPLACE NON-FUNCTIONING NAVIGATIONAL
OF RECORD FOR FURTHER EVALUATION.
SECTION LOSS IN EXISTING FENDER PILES TO THE ENGINEER
THE CONTRACTOR SHALL REPORT ANY DEFICIENCY AND/OR
(SEE NOTE 2)
EXISTING NAVIGATION LIGHT (SEE NOTE 2)
EXISTING NAVIGATION LIGHT
AAH 01/19/24AMENDMENT 4-CLARIFICATION ADDED
T Y
P
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
W e d n e s d a y J a n u a ry
:0 p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I-
F e n d e r
R e p la c e m e n t D e ta ils R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
RW-GN-01
GENERAL NOTES
CIVIL AND MAINTENANCE OF TRAFFIC
EXISTING PAVEMENT BASE
N.T.S.
SUGGESTED SEQUENCE OF CONSTRUCTION:ROADWAY GENERAL NOTES: MAINTENANCE OF TRAFFIC NOTES:
ROADWAY TO TRAFFIC.
TRAILS IN NATIONAL PARK SERVICE PROPERTY; AND PERMANENT OPENING OF THE
MAINTAINING ALL MODES OF TRAFFIC ON THE BRIDGE, ON OHIO DRIVE, AND ON
FINAL SIGNING AND PAVEMENT MARKINGS PLANS UNDER TRAFFIC, WHILE
INSTALLATION OF PERMANENT SIGNING AND PAVEMENT MARKINGS AS SHOWN ON
PHASE 4 INCLUDES COMPLETE REMOVAL/CLEAN UP OF THE WORK ZONE;
PHASE 4:
REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.
PERFORM NECESSARY UTILITY REPAIR WORK, OUTSIDE LIGHTING UPGRADING, AND
PLANS AND PHASE 3 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE WORK ZONE,
ON INSIDE LANES, AS SHOWN ON THE BRIDGE SEQUENCE OF CONSTRUCTION
NORTHBOUND AND SOUTHBOUND OUTSIDE LANES WHILE TRAFFIC IS MAINTAINED
BRIDGE DECK, APPROACH SLABS AND APPROACH RODWAY SEGMENTS ALONG I-395
PHASE 3 CONSISTS OF MILL AND OVERLAY AS WELL AS REPAIR/REPLACE EXISTING
PHASE 3:
AND REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.
WORK ZONE, PERFORM NECESSARY UTILITY REPAIR WORK, LIGHTING UPGRADING,
CONSTRUCTION PLANS AND PHASE 2 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE
ON SPLIT OUTSIDE LANES, AS SHOWN ON THE BRIDGE SEQUENCE OF
NORTHBOUND AND SOUTHBOUND MIDDLE LANES WHILE TRAFFIC IS MAINTAINED
BRIDGE DECK, APPROACH SLABS AND APPROACH RODWAY SEGMENTS ALONG I-395
PHASE 2 CONSISTS OF MILL AND OVERLAY AS WELL AS REPAIR/REPLACE EXISTING
PHASE 2:
UPGRADING, AND REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.
WORK ZONE, PERFORM NECESSARY UTILITY REPAIR WORK, MEDIAN LIGHTING
CONSTRUCTION PLANS AND PHASE 1 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE
MAINTAINED ON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .