This document is an Amendment to the Solicitation DCKA-2024-B-0011 for the Rehabilitation of the I-395 HOV Bridge over the Potomac River, issued by the District Department of Transportation (DDOT) of the District of Columbia. The amendment extends the question response deadline to 1/29/2024, the bid due date to 2/9/2024, and the public bid reading date to 2/12/2024. It also provides the first set of responses to submitted questions, including clarification on the need for as-built drawings, confirmation of the correct ASTM standard, details on the National Park Service special use permits, and instructions for accessing the North Abutment area.
The solicitation is for the rehabilitation of the existing fifteen-span concrete deck slab supported on continuous steel girders, concrete beams, and reinforced concrete substructure piers carrying the I-395 HOV Freeway Bridge over the Potomac River, as well as approach roadway work, streetlight upgrades, and other related work. The project is located within the jurisdictions of the District of Columbia and Washington City. No additional details on pricing terms, set asides, incumbents, or funding sources are provided in this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCKA-2024-B-0011_Att1.pdf | ||
| DCKA-2024-B-0011_Amd3.pdf | ||
| DCKA-2024-B-0011_Amd4.pdf | ||
| DCKA-2024-B-0011_Att2.pdf | ||
| DCKA-2024-B-0011_Amd1.pdf | ||
| DCKA-2024-B-0011_Amd5.pdf | ||
| DCKA-2024-B-0011_Amd6.pdf | ||
| DCKA-2024-B-0011_Att3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
1. Contract Number Page of Pages
1 2
3. Effective Date 4. Requisition/Purchase Request No.
5. Solicitation Caption2. Amendment/Modification Number
Amendment No. 2 See Box 16C DCKA-2024-B-0011 Rehabilitation of I-395 HOV Bridge over
Potomac River
6. Issued by: Code 7. Administered by (If other than line 6)
District Department of Transportation Office of Contracting and Procurement 55 M Street SE – 7th Floor Washington, DC 20003
District Department of Transportation Office of Contracting and Procurement 55 M Street SE – 7th Floor Washington, DC 20003
8. Name and Address of Contractor (No. street, city, county, state and zip code)
TO ALL PROSPECTIVE OFFERORS
9A. Amendment of Solicitation No.
DCKA-2024-B-0011
X 9B. Dated (See Item 11) December 28, 2023
10A. Modification of Contractor/Order No.
Code Facility 10B. Dated (See Item 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one (1) copy of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) BY separate letter or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such may be made by letter or fax, provided each letter or telegram makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (If Required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTORS/ORDERS ,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14
A. This change order is issued pursuant to (Specify Authority): 27 DCMR, Chapter 36, Section 3601.2(b) The changes set forth in Item 14 are made in the contract/order no. in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data etc.) set forth in item 14, pursuant to the authority of:
C. This supplemental agreement is entered into pursuant to authority of: 27 DCMR 3601.2 Change Clause, 27 DCMR 2005.6(d) as amended
D. Other (Specify type of modification and authority) Paragraph 15, Changes, Standard Contract Provisions
E. IMPORTANT: Contractor is not is required to sign this document and return one (1) copy to the issuing office.
14. Description of Amendment/Modification (Organized by UCF Section headings, including solicitation/contract subject matter where feasible.)
Invitation No.: DCKA-2024-B-0011 –Rehabilitation of I-395 HOV Bridge over Potomac River is hereby amended as follows:
1. Extend the Question Response date to 1/29/2024
2. Extend the bid due date to 2/9/2024
3. Extend the public bid reading date to 2/12/2024
4. Post first set of question responses in below attachment
5. All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document is referenced in Item 9A or 10A remain unchanged and in full force and effect.
15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer
Mohammad Ferdaws
15B. Name of Contractor
(Signature of person authorized to sign)
15C. Date Signed 16B. District of Columbia
(Signature of Contracting Officer)
16C. Date Signed
1/12/24
GOVERNMENT OF THE DISTRICT OF COLUMBIA
Office of Contracting and Procurement
OCP. Office of Contracting and Procurement
250 M Street SE 7th Floor, Washington DC 20003 – ocp.dc.gov - Telephone: (202) 671-2270
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF TRANSPORTATION
Questions and Answers:
1. Drawing #ST-DE-69, which indicates the need for reference to as-built plans for the specific details of existing bearings and insert plates. Please provide the relevant as-built drawings. Refer to Section 23 “INFORMATIONAL DRAWINGS” of the Specifications for instructions to view and examine the available as-built information.
2. Special Provisions Section 62, the Section calls for ASTM 1-35. Confirm this should be ASTM A1035. The low carbon chromium corrosion resistant reinforcing steel shall conform to ASTM A1035 standards. Correction to Section 62 of the Specifications will be made with an amendment to the Invitation for Bid.
3. Appendices 5 & 6 include unsigned Special Use Permits that designate work and laydown areas within the National Park Service National Mall and George Washington Memorial Parkway properties for specific dates. DC DDOT is the NPS SUP permit requester.
As specified in the bidding documents, the Contractor appears to be responsible for obtaining all permits.
i. Will the successful contractor be required to resubmit these NPS SUP applications, and any other permits already applied for under the contractor’s name? The special use permits for the work and laydown areas for the project have been approved and executed by NPS, and the signed (executed) permits will be provided via an amendment to replace the unsigned permits in the Specifications Appendices. These permits are for the proposed work as specified in the IFB documents including these permits, and do not need to be reapplied for the terms and time indicated in the permits.
ii. Please verify if permit specifics (dates, details) on the permits will/can be adjusted to conform to the updated project needs? The provided permits are approved for the relevant scope of work and project needs specified in the IFB documents, and currently these permits do not require update nor adjustments.
iii. Please indicate if it is acceptable to contact NPS regarding limits of work zones and other permit needs prior to the bid due date? Given the provided SUP’s are approved by NPS and limits of work, laydown area, storage are provided therein and in the IFB documents, there is no need to contact NPS prior to bid due date.
4. We would like to see inside of the North Abutment, Pier A Area. When can access be provided? Refer to Amendment 1 to the Invitation for Bid posted on 12/28/2023 which provides information and instruction regarding the scheduled site visit to view the interior of the North Abutment (false/ cellular abutment).
5. Please provide the as-built drawings. As specified in Section 23 “INFORMATIONAL DRAWINGS” of the Specifications, an interested bidder can view and examine the available as-built information and other documents, such as details for the existing Pier A temporary support system and underwater inspection report, at the DDOT office, Suite 600, 250 M Street, SE Washington DC 20003. To arrange a viewing, send a request to the point of contact identified in the IFB.
6. Please provide special provisions for the specified preformed pavement markings labeled as "TRAFFIC CONTROL SPECIAL ITEMS". Standard Specifications for preformed pavement markings are applicable for these special items, and a special provisions will be provided.
7. Please clarify the payment method for Repair-Replace PCC Circular Curb and/or Gutter. The summary of quantities indicates it's measured in cubic yards (CY), while the special provisions state payment will be based on a linear foot basis. The unit of measurement for REPAIR-REPLACE PCC CIRCULAR CURB AND/OR GUTTER is cubic yards (CY). The unit of measurement specified in the Specification Section 55 will be revised to cubic yards (CY).
8. Can the pay items for the crack injection be broken up into two separate items? In our experience, the volume of material injected into a void can be disproportionate to the crack length. This change has been requested from multiple specialty subcontractors. The unit of measurement (LF) as specified is sufficient. Bid unit price for this item is to be determined by each of the bidders accounting for the structure conditions provided in the bid documents.
i. One bid item for the cleaning and preparation of the injection. Measurement and Payment would be by Linear feet of crack prepared.
ii. One bid item for the volume of grout pumped into the injection port. Measurement and payment would be by volume of material injected.
| DCKA-2024-B-0011_ Amendment# 1 |