This document is Amendment No. 5 to the Invitation for Bid (IFB) DCKA-2024-B-0011 for the Rehabilitation of the I-395 HOV Bridge over the Potomac River, issued by the District Department of Transportation (DDOT) Office of Contracting and Procurement. The amendment provides revised plans, special provision revisions, responses to supplemental questions, a revised price schedule, a revised Section K, and extends the bid due date to February 21, 2024 at 2:00 PM EST and the bid opening date to February 22, 2024 at 2:00 PM EST. The work under this contract consists of rehabilitation of the existing fifteen-span concrete deck slab supported on continuous steel girders, concrete beams, and reinforced concrete substructure piers carrying I-395 HOV Freeway Bridge over the Potomac River, approach roadway work at the DC and VA ends, streetlight upgrading work, and other related work.

The revised price schedule and Section K are provided as part of this amendment. The contract is funded by the District of Columbia government. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
DCKA-2024-B-0011_Amd1.pdf PDF
DCKA-2024-B-0011_Amd2.pdf PDF
DCKA-2024-B-0011_Amd6.pdf PDF
DCKA-2024-B-0011_Att3.pdf PDF
DCKA-2024-B-0011_Att1.pdf PDF
DCKA-2024-B-0011_Amd3.pdf PDF
DCKA-2024-B-0011_Amd4.pdf PDF
DCKA-2024-B-0011_Att2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

1. Contract Number Page of Pages

1 52

2. Amendment/Modification Number

Amendment No. 5

3. Effective Date 4. Requisition/Purchase Request No.

5. Solicitation Caption

See Box 16C DCKA-2024-B-0011 Rehabilitation of I-395 HOV Bridge over

Potomac River

6. Issued by: Code 7. Administered by (If other than line 6)

District Department of Transportation Office of Contracting and Procurement 55 M Street SE – 7th Floor Washington, DC 20003

District Department of Transportation Office of Contracting and Procurement 55 M Street SE – 7th Floor Washington, DC 20003

8. Name and Address of Contractor (No. street, city, county, state and zip code)

TO ALL PROSPECTIVE OFFERORS

X

9A. Amendment of Solicitation No.

DCKA-2024-B-0011

9B. Dated (See Item 11) December 28, 2023

10A. Modification of Contractor/Order No.

Code Facility 10B. Dated (See Item 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) BY separate letter or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such may be made by letter or fax, provided each letter or telegram makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (If Required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTORS/ORDERS ,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14

A. This change order is issued pursuant to (Specify Authority): 27 DCMR, Chapter 36, Section 3601.2(b) The changes set forth in Item 14 are made in the contract/order no. in item 10A.

B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data etc.) set forth in item 14, pursuant to the authority of:

C. This supplemental agreement is entered into pursuant to authority of: 27 DCMR 3601.2 Change Clause, 27 DCMR 2005.6(d) as amended

D. Other (Specify type of modification and authority) Paragraph 15, Changes, Standard Contract Provisions

E. IMPORTANT: Contractor is not is required to sign this document and return one (1) copy to the issuing office.

14. Description of Amendment/Modification (Organized by UCF Section headings, including solicitation/contract subject matter where feasible.)

This amendment serves as:

1. Revised Plans - see below with instructions pages 3 through 6

2. Special Provision Revisions - see below page 8

3. Responses to Supplemental Questions - see below pages 10 through 14

4. Revised price schedule - see DTAP posted document labeled: KA20240011.002x

5. Revised section K - see below pages 16 through 52

6. Extend bid due date to 21 Feb 2024 @ 2:00pm EST

7. Extend bid opening date to 22 Feb 2024 @ 2:00pm EST

All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document is referenced in Item 9A or 10A remain unchanged and in full force and effect.

15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer

Mohammad Ferdaws

15B. Name of Contractor

(Signature of person authorized to sign)

15C. Date Signed 16B. District of Columbia

(Signature of Contracting Officer)

16C. Date Signed

2/13/2024

Plan Revisions and Instructions

I-395 HOV BRIDG REHAB INVITATION FOR BID DCKA-2024-B-0011

AMENDMENT 5 – PLAN REVISION INSTRUCTIONS

Replace the following plan sheets with the provided sheets, and note the revisions as annotated therein:

1. Sheet 3 (Drawing SQ-01) – Summary of Pay Items and Quan��es

2. Sheet 67 (Drawing ST-DE-64) – Deck Joint Repair At Abutments and Piers B, 6, And 12

3. Sheet 82 (Drawing RW-GN-01) – Civil And Maintenance

KSN

EJM

KSN

AAH

SQ-01

SUMMARY OF PAY ITEMS

AND QUANTITIES

SUMMARY OF QUANTITIES

ITEM NO. DESCRIPTION UNIT QTY.

SUMMARY OF QUANTITIES

ITEM NO. DESCRIPTION UNIT QTY.

719993

718992

717991

716992

716991

716022

716020

716016

716012

716010

716008

716004

715993

715991

714004

710007

709023

708995

708992

708991

708022

708021

707011

706999

706997

706995

706993

706991

705993

705991

704991

703991

703010

703008

701999

701995

701994

701993

701992

701991

618002

614995

614568

614993

22994

22994

22994

19684

21780

LF

LF

LF

LF

LF

LF

LF

SF

LF

SF

SF

SF

SY

SY

SY

LF

LF

SF

LF

LF

LF

CY

LS

EA

EA

EA

EA

LS

EA

EA

LBS

CY

CY

CY

LS

LF

LF

LF

LF

LF

LS

EA

EA

EA

CY 2874.3

SPECIAL ITEM - REPAIR AND PRESSURE CLEAN FINGER JOINTS

SPECIAL ITEM - PIER A - EXPANSION JOINT CLOSURE (VESC)

SPECIAL ITEM - RECONSTRUCT DECK JOINT WITH NEOPRENE STRIP SEAL

SPECIAL ITEM - REPAIR Type 3, SEAL RIVER PIER CONC CRACKS > 1/32"

SPECIAL ITEM - REPAIR Type 3, SEAL RIVER PIER CONC CRACKS < 1/32"

REPAIR TYPE 4, SEAL PIER/ABUT CONC CRACKS >1/32"

REPAIR TYPE 4, SEAL PIER/ABUT CONC CRACKS <1/32"

REPAIR TYPE 1 - PIER/ABUT SPALL REPAIR

REPAIR TYPE 3 - DECK UNDERSIDE

REPAIR TYPE 2 - DECK UNDERSIDE

REPAIR TYPE 1 - DECK UNDERSIDE

REPAIR TYPE 1 - CONCRETE DIAPHRAGM REPAIR

SPECIAL ITEM - HYDRO-DEMOLITION OF EXISTING DECK AND OVERLAY - 2 IN

SPECIAL ITEM - MILLING 2.5 IN OF EXISTING DECK OVERLAY

LATEX MODIFIED CONCRETE OVERLAY - 4.5IN

SPECIAL ITEM - REPLACE DAMAGED DRAINAGE PIPES UNDER THE BRIDGE

UNASSIGNED SPECIAL ITEM - REPAIR EXIST. RAILING

SPECIAL ITEM - PRESSURE CLEAN STONE CLADDING - PIERS 3, 6, 9, 12, B and C

SPECIAL ITEM - SEAL CRACKED STONE CLADDING

SPECIAL ITEM - REPLACE MISSING/DETERIORATED MORTAR

SPECIAL ITEM - PCC PARAPET REPAIR - Type 3

SPECIAL ITEM - PCC PARAPET REPAIR - Type 1

SPECIAL ITEM - CLEAN AND PAINT EXISTING STEEL

SPECIAL ITEM - BEARING PADS - REPLACE EXIST BRGS W/ ELASTOMERIC BRGS

SPECIAL ITEM - BRIDGE BEARINGS - CLEAN AND PAINT EXIST. BEARINGS

SPECIAL ITEM - REPLACE MISSING NUTS FOR MEDIAN BARRIER

SPECIAL ITEM - REPLACE MISSING ANCHOR BOLTS FOR MEDIAN BARRIER

SPECIAL ITEM - REPAIR STRUCTURAL STEEL - GRADE 36

SPECIAL ITEM - REPAIR PRESTRESSED CONCRETE BEAM ENDS - TYPE B

SPECIAL ITEM - REPAIR PRESTRESSED CONCRETE BEAM ENDS - TYPE A

SPECIAL ITEM - PIER A CAP CORROSION RESISNTANT REINCORCING STEEL - (MMFX-2)

SPECIAL ITEM - PCC - PIER A CAP REPLACEMENT

PCC SUPERSTRUCTURE - JOINT RECONSTRUCTION CONC. (CLASS C)

PCC SUPERSTRUCTURE - REPLACE MEDIANS

SPECIAL ITEM - DOLPHIN REPAIR

SPECIAL ITEM - FENDER REPLACEMENT - 6x10 FRPL

SPECIAL ITEM - FENDER REPLACEMENT - 6x12 FRPL

SPECIAL ITEM - FENDER REPLACEMENT - 12x12 FRPL

SPECIAL ITEM - FENDER REPLACEMENT - 8x12-4F08 FRPL

SPECIAL ITEM - FENDER REPLACEMENT - 12x12-4F08 FRPL

EROSION AND SEDIMENT CONTROL

SPECIAL ITEM - REMOVE AND RE-INSTALL LED LUMINAIRE ON STEEL POLE

REMOVE PENDANT POLE 30 FT. HEIGHT OR LESS

SPECIAL ITEM - FURNISH AND INSTALL 25' STEEL PENDANT POLE WITH UP TO 8' ARM

AMENDMENT 4 - CORRECTION AAH 01/19/24

AAH

KSN

613398

612106

612104

612100

612096

612092

613000

612999

612998

612997

612993

612086

612085

612066

612064

612060

612058

612054

612038

612036

612034

612028

612022

612018

612014

612010

612008

612006

610014

610014

607020

606064

606054

603054

603030

603002

602991

600017

600017

600017

506006

402008

402002

410002

403002

311002

209002

202004

205991

205010

205008

202002

108992

108016

108013

108012

108006

108004

108002

105002

000507

000506

LS

LS

EA

EA

EA

EA

LF

LF

LF

LF

EA

LF

LF

LF

LF

LF

LF

LF

EA

EA

EA

EA

EA

EA

SF

EA

SF

LS

LF

LF

SY

LF

CY

EA

EA

LF

LS

LF

LF

LF

CY

TON

TON

SY

SY

EA

CY

CY

CY

CY

LS

CY

DAYS

LS

LS

LS

LS

LS

LS

LS

EA

EA

10281

71829

71829

11288

14424

11429

PEPCO SERVICE CONNET, DISCONNECT, & PEPCO MANHOLE ENTRY FEES

REPAIR OF DAMAGED MAJOR TRAFFIC CONTROL DEVICES

STEEL PROTECTION PLATE

PORTABLE CHANGEABLE MESSAGE SIGN

CONSTRUCTION ZONE ATTENUATOR

TRUCK MOUNTED ATTENUATOR

SPECIAL ITEM - PREFORMED HIGH CONTRAST PAVEMENT MARKINGS, 24 INCH

SPECIAL ITEM - PREFORMED HIGH CONTRAST PAVEMENT MARKINGS, 12 INCH

SPECIAL ITEM - PREFORMED HIGH CONTRAST PAVEMENT MARKINGS, 6 INCH DASH

SPECIAL ITEM - PREFORMED HIGH CONTRAST PAVEMENT MARKINGS, 6 INCH

TOWING AND RECOVERY SERVICE

PAINTED LANE MARKING, 6 INCH

TRAFFIC CONTROL - REMOVABLE PREFORMED LINE STRIPING, 6 INCH

THERMOPLASTIC PAVEMENT MARKING, 24 INCH

THERMOPLASTIC PAVEMENT MARKING, 12 INCH

THERMOPLASTIC PAVEMENT MARKING, 6 INCH DASH

THERMOPLASTIC PAVEMENT MARKING, 6 INCH

THERMOPLASTIC PAVEMENT MARKING, 4 INCH

SINGLE-FACED YELLOW SNOW PLOWABLE REFLECTIVE PAVEMENT MARKERS

SINGLE-FACED WHITE SNOW PLOWABLE REFLECTIVE PAVEMENT MARKERS

TRAFFIC DRUMS

TYPE III PVC BARRICADE

SEQUENTIAL ARROW BOARDS

FLASHING AMBER WARNING LIGHTS, TYPE "B"

CONSTRUCTION WARNING AND DETOUR SIGNS

TEMPORARY CONSTRUCTION SIGN SUPPORTS

REMOVE LANE MARKINGS

CONSTRUCTION LANE CLOSING

MOVE WATER FILLED PLASTIC JERSEY BARRIER

INSTALL WATER FILLED PLASTIC JERSEY BARRIER

SOD WITH 4 INCH TOPSOIL

FURNISH AND SET 8"X12" GRANITE STRAIGHT CURB

REPAIR-REPLACE PCC CIRCULAR CURB AND/OR GUTTER

CRASH CUSHION ATTENUATING TERMINAL (CAT)

W BEAM/TRHIE BEAM TRANSITION PANEL

TYPE I: W-BEAM (STANDARD BLOCK-OUT)

SPECIAL ITEM - REPAIR SLOPE PROTECTION IN FRONT OF PIER 1

SPECIAL ITEM - MOVE PORTABLE SINGLE FACE F SHAPE PRECAST PCC BARRIER

SPECIAL ITEM - PORTABLE SINGLE FACE F SHAPE PRECAST PCC BARRIER

SPECIAL ITEM - CHAIN LINK FENCE WITH FABRIC, 8 FT. HT.

PCC DIRECTIONAL ISLAND

HMA SURFACE COURSE, 9.5 MM

HMA BASE COURSE, 19 MM

PAVEMENT PROFILING (MILLING)

TACK COAT

ADJUST SEWER-WATER-UTILITY MANHOLE FRAME

AGGREGATE BASE COURSE

HARD SURFACE PAVEMENT EXCAVATION

SPECIAL ITEM - PIER A EXCAVATION TO PILE CAP

STRUCTURE HARD SURFACE EXCAVATION - EXIST. MEDIANS

SPECIAL ITEM - DEMOLITION OF PIER A CAP

COMMON EXCAVATION

SPECIAL ITEM - ENGINEER'S BOAT

MOBILIZATION - FLOAT-IN CONSTRUCTION PLATFORMS

FURNISH AND EQUIP ENGINEER'S FIELD FACILITIES

ENGINEER'S FIELD FACILITIES

RECORD DRAWINGS AND AS - BUILT DRAWINGS

PROGRESS PHOTOGRAPHS

MOBILIZATION

COOPERATION WITH THIRD PARTY UTILITY RELOCATION

SPECIAL ITEM - REPLACE DOWNSPOUTS

SPECIAL ITEM - PRESSURE CLEAN SCUPPERS

AMENDMENT 5 - CORRECTION AAH 02/08/24

10,815

DIVISION CHIEF

DATE

FILE

DESIGNED BY

CHECKED BY

DRAWN BY

PROJECT MGR.

STATEREG

SHEETS

TOTAL

NO.

SHEET

PROJECT

NO. DESCRIPTION NAME DATE

REVISIONS

P E

N

T A

B L E

D D

O T n a m e s u b .t b l

F ri d a y F e b ru a ry

:4

P

M p

D p w V

A N

V A 1P

W

IN

T 1.

P a rs o n s .c o m :W a s h in g to n

D C D o c u m e n ts I-

H O

V

B ri d g e e s ig n

C

A D

G e n e ra l\

P ri n t_ fi le s p

G N S

Q 1- I- P

A Y

IT

E M

S R 1.

d g n

D D

O T p d f_

H a lf

M o n o .p lt

P L

R

IV

E R

D.C.

SHEET OF

(202) 775-3300

WASHINGTON, DC 20003

100 M St. SE

PROJECT ENG.

OVER POTOMAC RIVER

REHABILITATION PROJECT

I-395 HOV BRIDGE

DDOT BRIDGE NO. 0169-1

109STP-3951(168)

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION

D.C. DEPARTMENT OF TRANSPORTATION

p005679B Proprietary

SECTION A-A

SECTION D-D

AT MEDIAN BARRIER

SECTION D-D

AT RAILINGS

MOVEMENT TABLE

LOCATION

(THERMAL)

EXPANSION

(THERMAL)

CONTRACTION

(SHRINKAGE)

CONTRACTION

"W" AT 70 F

JOINT WIDTH

MOVEMENT

TOTAL RATED

+/- 10 F

DELTA TEMP.

LENGTH (FT)

JOINT

PIER B

PIER 6

PIER 12

"64 33 "8

52 3"

3"

3" 2"

2"

"64 3 141'-0"

90'-0"

90'-0"

2"

ST-DE-64

S. ABUT 3" 2" 90'-0"

"64 33 "8

52 3" "64

3 155'-0"2"N. ABUT

DECK JOINT REPAIR

AT ABUTMENTS AND PIERS B, 6 AND 12

AAH

KSN

NAH

KSN

EJM

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

NOTES:

12.

13.

14.

DAMAGED OR MISSING ANCHOR BOLTS AND NUTS.

ST-SC-05 THRU ST-SC-08 FOR REPLACEMENT OF

SEE SEQUENCE OF CONSTRUCTION DRAWING NUMBERS

EXPANSION SYSTEM

TOP OF SLAB

ANCHOR STUDS

(TYP.)

GUTTER LINE

12" MAX.

(TYP.)

‚" RECESS

2'-9"

12" MAX.

(TYP.)

B B

COVER PLATE

BRIDGE DECK

EXISTING MEDIAN

BARRIER

PARTIAL PLAN - EXISTING

NOT TO SCALE

PARTIAL PLAN - PROPOSED

A A A

A

W= ‚" GAP @ 70° F

L JOINTL JOINTC

W

W/2 W/2

STRIP SEAL

CONTINUOUS NEOPRENE

•" CHECKERED STEEL

COVER L (GALVANIZED)P

•" RECESS

†" DIA. x 10" ANCHOR

STUDS @ 12" MAX. (TYP.)

†" DIA. x 8" ANCHOR

STUDS @ 12" MAX. (TYP.)

TOOL CONCRETE

EDGES TO •"

RADIUS (TYP.)

FACE OF

EXISTING CURB

NOT TO SCALE

SECTION B-B

C C

L JOINTL JOINTC

W

W/2 W/2

TOOL CONCRETE EDGES

TO ‚" RADIUS

CONTINUOUS NEOPRENE

STRIP SEAL

‚" RECESS

SECTION C-C

NOT TO SCALE

CURB LINE

W W

L MEDIAN BARRIERC

6" MAX.

(TYP.)

D

D

EXISTING BRIDGE

RAILING

STEEL EXTRUSION (TYP.)

STEEL EXTRUSION

(TYP.)

†" DIA. x 10" ANCHOR

STUDS @ 12" MAX. (TYP.)

†" DIA. x 8" ANCHOR

STUDS @ 12" MAX. (TYP.)

*ALTERNATE LOCATION OF STUDS

AS SHOWN IN ELEVATION VIEW

•" RECESS

1" MIN.

6" MAX. (TYP.)

(TYP.)

12" MAX.

(TYP.)

12" MAX.

L JOINT AND L PIERC C

12" 1' 1•

JOINT REMOVAL AT PIERS

CL JOINT

APPROACH SLAB

SECTION A-A

NOT TO SCALE

JOINT REMOVAL AT ABUTMENTS

B

B

COVER PLATE

C C

D

D

W

OPEN JOINT

@ 70° F

1•

1•

L

IM

IT

S

F

C E S

S

•" RECESS (TYP.)

P

STRIP SEAL

NOT TO SCALE

PART PLAN - COVER

PLATE AT SIDEWALK AND SHARED USE PATH

FACE OF BRIDGE

RAILING

L JOINTC

‚" DIA. COUNTERSUNK

FLATHEAD STAINLESS

STEEL SCREWS IN

TAPPED HOLE IN

EXTRUSION @ 6" MAX.

(TYP.)

DECK

TOP OF

SLIDING PLATE

REPLACE WELDED

REMOVE AND

DAM

NEW EXPANSION

•" CHECKERED

STEEL COVER L

(GALVANIZED)

** VERIFY DIMENSION IN THE FIELD

** VERIFY DIMENSION IN THE FIELD

PIER 6 AND PIER 12

SOUTH ABUTMENT,

AND PIER B

NORTH ABUTMENT

(BRIDGE RAILING NOT SHOWN FOR CLARITY)

DECK

TOP OF EXISTING CONCRETE

INCORPORATED INTO NEW

STEEL TO REMAIN AND BE

***EXISTING DECK REINFORCING

SIZED BARS AT NO ADDITIONAL COST TO DDOT.

EXISTING REBAR SHALL BE REPAIRED BY LAPPING SIMILAR

DAMAGING EXISTING REINFORCEMENT. ANY DAMAGE TO

THE CONTRACTOR SHALL TAKE PRECAUTION TO AVOID***

(BRIDGE RAILING NOT SHOWN FOR CLARITY)

RAILING CURB

TOP OF BRIDGE

OF THE NEW CONCRETE.

AREAS MUST BE REMOVED AND REPAIRED PRIOR TO PLACEMENT

EXPOSED DECK TO IDENTIFY DELAMINATED AREAS. DELAMINATED

ADJACENT TO THE JOINT, CONTRACTOR SHALL SOUND THE

UPON REMOVAL OF THE EXISTING PORTION OF THE DECK****

SEQUENCE OF CONSTRUCTION, SEE DRAWING NUMBERS ST-SC-05 THRU ST-SC-08.

THE EXISTING DECK AND OVERLAY WILL BE MILLED AND OVERLAID TO A DEPTH OF 4•". FOR

MATERIALS.

ALL EXISTING DIMENSIONS ARE APPROXIMATE AND SHALL BE FIELD VERIFIED PRIOR TO ORDERING

ALL THE DIMENSIONS ARE IN INCHES UNLESS NOTED OTHERWISE.

DROP OR RISE.

70° F. THE WIDTH 'W' SHALL BE INCREASED OR DECREASED FOR EVERY 10° F TEMPERATURE

JOINT WIDTH 'W' IS THE FINAL JOINT WIDTH OF THE CURED CONCRETE WHEN PLACED AT

AREAS, AND AT PHASE CONSTRUCTION JOINTS.

SEALER SHALL BE INSTALLED IN ONE CONTINUOUS PIECE EXCEPT FOR MEDIAN AND BARRIER

**** 12"**** 12"**** 12"****

AAH 02/08/24AMENDMENT 5 - CORRECTION

C C

D

D

NEW NEW

BRIDGE DECK

MEDIAN ISLAND

NOT TO SCALE

PARTIAL PLAN - PROPOSED

CURB

EXIST. CURB

FACE OF EXISTING

PARAPET

CURB

(SEE NOTE 1)

TO RAILINGS.

ONLY APPLICABLE

THIS DETAIL IS

NOTE 1:

AND MEDIAN ISLAND

DIVISION CHIEF

DATE

FILE

DESIGNED BY

CHECKED BY

DRAWN BY

PROJECT MGR.

STATEREG

SHEETS

TOTAL

NO.

SHEET

PROJECT

NO. DESCRIPTION NAME DATE

REVISIONS

P

B L E

D D

O T n a m e s u b .t b l

T h u rs d a y F e b ru a ry

:3

P

M p

D p w V

A N

V A 1P

W

IN

T 1.

P a rs o n s .c o m :W a s h in g

D o c u m e n ts I-

V

B ri d g e s ig n

C

A D

S tr u c tu re s P ri n t_ fi le s p

B R S T I-c k

J o in t R e p a ir a t

A b u tm e n ts a n d

P ie rs R 1.

d g n

D D

O T p d f_

H a lf

M o n o .p lt

P

IV

E R

D.C.

SHEET OF

(202) 775-3300

WASHINGTON, DC 20003

100 M St. SE

PROJECT ENG.

OVER POTOMAC RIVER

REHABILITATION PROJECT

I-395 HOV BRIDGE

DDOT BRIDGE NO. 0169-1

109STP-3951(168)

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION

D.C. DEPARTMENT OF TRANSPORTATION

STANDARD SPECIFICATIONS. ELECTRICALLY WELD ALL STUDS.

PROVIDE †" DIA. HEADED STUDS THAT MEET THE REQUIREMENTS OF SECTION 717 OF THE

IF M EXTRUSION IS TO BE USED, SIMILAR DETAIL SHALL BE SUBMITTED TO THE ENGINEER.

STRIP SEAL SHALL BE INSTALLED AS PER THE MANUFACTURER'S RECOMMENDATIONS.

GRADE 36.

PROVIDE CHECKERED STEEL COVER PLATE CONFORMING TO THE LATEST AASHTO M 270,

SEAL GLAND MAY BE REMOVED FOR FUTURE MAINTENANCE.

FABRICATE AND CONSTRUCT THE STRIP SEAL MOUNTING IN THE BARRIER SO THAT THE STRIP

SUBMIT THE INSTALLATION PLAN TO THE ENGINEER FOR ACCEPTANCE PRIOR TO INSTALLATION.

BE APPROVED BY THE ENGINEER.

BRIDGES. THE NUMBER OF SPLICES (INCLUDING THE LENGTH OF THE STEEL EXTRUSION) SHALL

AASHTO SPECIFICATIONS AND CURRENT DDOT STANDARD SPECIFICATIONS FOR HIGHWAY &

FABRICATION AND INSTALLATION OF THE EXPANSION JOINTS SHALL BE AS PER THE CURRENT

PROVIDE STRIP SEAL JOINTS THAT CONFORM TO THE CROWN OF THE FINISHED ROADWAY.

THE STANDARD SPECIFICATIONS.

PROVIDE THE STRIP SEAL EXPANSION JOINT IN ACCORDANCE WITH SECTION 717 OF

1 1

Proprietary

RW-GN-01

GENERAL NOTES

CIVIL AND MAINTENANCE OF TRAFFIC

EXISTING PAVEMENT BASE

N.T.S.

SUGGESTED SEQUENCE OF CONSTRUCTION:ROADWAY GENERAL NOTES: MAINTENANCE OF TRAFFIC NOTES:

ROADWAY TO TRAFFIC.

TRAILS IN NATIONAL PARK SERVICE PROPERTY; AND PERMANENT OPENING OF THE

MAINTAINING ALL MODES OF TRAFFIC ON THE BRIDGE, ON OHIO DRIVE, AND ON

FINAL SIGNING AND PAVEMENT MARKINGS PLANS UNDER TRAFFIC, WHILE

INSTALLATION OF PERMANENT SIGNING AND PAVEMENT MARKINGS AS SHOWN ON

PHASE 4 INCLUDES COMPLETE REMOVAL/CLEAN UP OF THE WORK ZONE;

PHASE 4:

REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.

PERFORM NECESSARY UTILITY REPAIR WORK, OUTSIDE LIGHTING UPGRADING, AND

PLANS AND PHASE 3 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE WORK ZONE,

ON INSIDE LANES, AS SHOWN ON THE BRIDGE SEQUENCE OF CONSTRUCTION

NORTHBOUND AND SOUTHBOUND OUTSIDE LANES WHILE TRAFFIC IS MAINTAINED

BRIDGE DECK, APPROACH SLABS AND APPROACH RODWAY SEGMENTS ALONG I-395

PHASE 3 CONSISTS OF MILL AND OVERLAY AS WELL AS REPAIR/REPLACE EXISTING

PHASE 3:

AND REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.

WORK ZONE, PERFORM NECESSARY UTILITY REPAIR WORK, LIGHTING UPGRADING,

CONSTRUCTION PLANS AND PHASE 2 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE

ON SPLIT OUTSIDE LANES, AS SHOWN ON THE BRIDGE SEQUENCE OF

NORTHBOUND AND SOUTHBOUND MIDDLE LANES WHILE TRAFFIC IS MAINTAINED

BRIDGE DECK, APPROACH SLABS AND APPROACH RODWAY SEGMENTS ALONG I-395

PHASE 2 CONSISTS OF MILL AND OVERLAY AS WELL AS REPAIR/REPLACE EXISTING

PHASE 2:

UPGRADING, AND REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.

WORK ZONE, PERFORM NECESSARY UTILITY REPAIR WORK, MEDIAN LIGHTING

CONSTRUCTION PLANS AND PHASE 1 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE

MAINTAINED ON OUTSIDE LANES, AS SHOWN ON THE BRIDGE SEQUENCE OF

NORTHBOUND AND SOUTHBOUND INSIDE/MEDIAN LANES WHILE TRAFFIC IS

BRIDGE DECK, APPROACH SLABS AND APPROACH RODWAY SEGMENTS ALONG I-395

PHASE 1 CONSISTS OF MILL AND OVERLAY AS WELL AS REPAIR/REPLACE EXISTING

PHASE 1:

ABUTMENT WALLS, AND REPAIR/REPLACE EXISTING INLET AND STORMDRAIN SYSTEM.

LIGHTING UPGRADING, WIDENING OF EXISTING ACCESS DOOR OPENINGS ON

WITHIN THE WORK ZONE, PERFORM NECESSARY UTILITY REPAIR WORK, UNDERPASS

TRAIL, AND ROCK CREEK PARK TRAIL ON NATIONAL PARK SERVICE PROPERTY.

WHILE MAINTAINING ALL MODES OF TRAFFIC ON OHIO DRIVE, MOUNT VERNON

AS WELL AS DC AND VIRGINIA SIDE FALSE ABUTMENTS REPAIR/REPLACE WORK

UNDER TRAFFIC (UTILITIZE DDOT STANDARD TEMPORARY TRAFFIC CONTROL #8.7),

AND APPROACH ROADWAYS ALONG THE NORHBOUND AND SOUTHBOUND I-395

EARLY WORK ACTIVITIES CONSISTS OF REMOVING RAISED MEDIAN ON THE BRIDGE

EARLY WORK ACTIVITIES:

UNLESS OTHERWISE APPROVED BY THE ENGINEER.

THURSDAY), AND WEEKEND HOURS (10 AM TO 6 PM SATURDAY AND SUNDAY)

PM, MONDAY THRU FRIDAY), OVERNIGHT HOURS (9 PM TO 5 AM, SUNDAY THRU

THIS WORK SHALL BE PERFORMED DURING OFF-PEAK/MIDDAY HOURS (10 AM TO 3

CORRESPONDING MAINTENECE PLANS MUST BE PRE-APPROVED BY THE ENGINEER.

DEVIATE FROM THESE SEQUENCES, REVISED SEQUENCE OF CONSTRUCTION AND

WITH THE IDENTIFIED BRIDGE REHABILITATION ACTIVITIES. SHOULD THE CONTRACT

FOLLOWING LISTED ARE THE SUGGESTED SEQUENCE OF CONSTRUCTION, ALIGNED

PNP

PR

ES

SEE DETAIL "A"

"16

"4

"16

"8

REFLECTOR SEE NOTE 1

CONRECTE BARRIER

PRE-DRILL HOLES

FOR CON. PAVEMENT

OVER CONC. PAVEMENT

CONC. PAVEMENT, OR ASPHALT

COMPACTED BASE MATERIAL,

ASPHALT CONC. PAVEMENT,

EXIST. PAVEMENT

PORTABLE F SHAPE BARRIER ANCHOR STAKE

STAKE DOWN SIDE ADJACENT TO TRAFFIC

EXIST. PAVEMENT

OVER CONC. PAVEMENT

CONC. PAVEMENT, OR ASPHALT

COMPACTED BASE MATERIAL,

ASPHALT CONC. PAVEMENT,

DETAIL A

UNIT. SEE NOTE 3.

STAKE. 4 PER PRECAST

1" X 24" GALV. A36 STEEL

CONCRETE BARRIER

TEMPORARY SINGLE FACE

MILL AND OVERLAY ROADWAY PAVEMENT

TYPICAL SECTION

N.T.S.

TEMPORARY ROADWAY PAVEMENT

TYPICAL SECTION

2" HMA SUPERPAVE SURFACE COURSE 9.5MM

5" HMA SUPERPAVE BASE COURSE 19.0 mm

6" AGGREGATE BASE COURSE

9.5MM SUPERPAVE SURFACE COURSE

2" HMA MILL AND OVERLAY

TH

MAINTENANCE OF TRAFFIC ESTIMATED QUANTITIES

WEEKDAY

WEEKDAY

11:00 PM (FRIDAY to SATURDAY) to 9:00 AM (SATURDAY to SUNDAY)

9:30 PM (SUNDAY to THURSDAY) to 4:00 AM (MONDAY to FRIDAY)

11:00 PM to 4:00 AM

11:00 PM to 4:00 AM

SINGLE LANE CLOSURES OR SHOULDER

REVERSIBLE LANES (HOV & EXPRESS LANES) *

COMPLETE ROAD CLOSURE **

PERFORM THEIR OWN QUANTITY TAKEOFF.

INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL

SUMMARY OF TRAFFIC/ MOT QUANTITIES FOR

NOTE:

** COMPLETE ROAD CLOSURE ON EXPRESS LANES LIMITED TO 30 MINUTES OR LESS.

ADJUSTED AS NECESSARY TO FACE DIRECTION OF TRAFFIC.

* DIRECTION OF TRAFFIC CONTROL FOR ALL LANE CLOSURES IN REVERSIBLE LANES WILL NEED TO BE

XX/XX/XXXX

STARTS BY

BRIDGE WORK

SHALL BE OFF-PEAK HOURS FROM 10:00 AM TO 3:00 PM.

MAY OCCUPY TRAVEL LANE DURING CONSTRUCTION. WORK HOURS WITH FLAGGING OPERATION

LANE WHILE HAULING SPOILS FROM MILLING AND OVERLAYING AND ANY OTHER ACTIVITIES THAT

CONTRACTOR WILL BE RESPONSIBLE FOR APPROPRIATE FLAGGING WHEN OCCUPYING A TRAVEL

WHEN NOT APPLICABLE.

ALL EXISTING TRAFFIC CONTROL SIGNS AND DEVICES SHALL BE COVERED OVER OR REMOVED

THROUGHOUT THE CONSTRUCTION PHASE.

THE SAFE REMOVAL OF WRECKED OR DISABLE VEHICLE FOR MAINTAINING SMOOTH TRAFFIC FLOW

THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TOWING AND RECOVERY SERVICE FOR

THE SUGGESTED PCMS MESSAGE DISPLAY SHALL BE:

FOR EACH PHASE AND TWO WEEKS AFTER WORK HAS STARTED.

ENGINEER. PCMS SHALL REMAIN OPERATING TWO WEEKS PRIOR TO THE BEGINNING OF WORK

AND SOUTHBOUND IN VIRGINIA AND DC AT STRATEGIC LOCATIONS AS DIRECTED BY THE

PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS) SHALL BE PLACED ALONG I-395 NORTHBOUND

THE TRAFFIC.

XX-XX-XXXXWELL, USE ALTERNATE ROUTES” SOON AFTER THE NOTICE TO PROCEED TO WORN

THE CONTRACTOR SHALL ERECT STATIC SIGNS, "I-395 HOV BRIDGE CONSTRUCTION WILL START ON

PHASE OF CONSTRUCTION.

MAINTAINED AT ALL TIMES AND SHALL BE REPLACED IMMEDIATELY IF DAMAGED DURING ANY

SPECIFICATIONS FOR HIGHWAYS AND STRUCTURES. TEMPORARY PAVEMENT MARKINGS SHALL BE

CONFORMING TO THE REQUIREMENTS OF SECTION 612.14 OF 2013 DDOT STANDARD

ALL TEMPORARY PAVEMENT MARKINGS SHALL BE REMOVABLE PREFORMED LINE STRIPING

END OF WORK ZONE TRANSITIONS.

MARKINGS. TEMPORARY PAVEMENT MARKINGS MUST MEET EXISTING PAVEMENT MARKINGS AT THE

EXISTING PAVEMENT MARKINGS SHALL BE REMOVED AT THE LOCATION OF PROPOSED TEMPORARY

A MINIMUM 11' TRAVEL LANES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION.

POSTED SPEED WILL BE REDUCED TO 35 MPH DURING THE CONSTRUCTION.

DDOT STANDARD SPECIFICATIONS 2013.

WORK SHALL BE CARRIED FORWARD IN ACCORDANCE WITH SECTION 104 AND SECTION 105 OF

SUBJECT TO PRIOR APPROVAL BY THE ENGINEER. TRAFFIC FLOW RESTRICTIONS AND CONTROL OF

OF CONSTRUCTION. THE CONTRACTOR MAY USE ALTERNATIVE MAINTENANCE OF TRAFFIC PLANS

THESE MAINTENANCE OF TRAFFIC PLANS ARE PREPARED BASED ON THE SUGGESTED SEQUENCE

OF ENSURING SAFE CONDITIONS DURING HIS OPERATIONS.

ESSENTIALLY A MINIMUM AND DOES NOT RELEASE THE CONTRACTOR FROM HIS RESPONSIBILITY

INSTALLATION OF TRAFFIC CONTROL SIGNS AND DEVICES SHOWN IN THE PLANS ARE CONSIDERED

REVISIONS, PRIOR TO THE BEGINNING OF HIS OPERATIONS.

THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 2009 EDITION AND SUBSEQUENT

AND STRUCTURES 2013, DDOT UTILITY WORK ZONE TRAFFIC CONTROL PLAN 2007 TYPICALS, AND

MANUAL 2006, DDOT STANDARD DRAWINGS 2015, DDOT STANDARD SPECIFICATIONS FOR HIGHWAYS

OF TRAFFIC CONTROL DEVICES IN CONFORMANCE WITH D.C. TEMPORARY TRAFFIC CONTROL

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THE INSTALLATION AND MAINTENANCE

AND POSITIVE MANNER WHILE APPROACHING AND PASSING THROUGH THE CONSTRUCTION AREA.

WORKERS THROUGHOUT THE CONSTRUCTION PHASE. THE MOTORIST MUST BE GUIDED IN A CLEAR

THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THE SAFETY OF ALL ROAD USERS, AND HIS

BELOW

TEMPORARY WORK WITHIN VDOT JURISDICTION SHALL BE IN ACCORDANCE WITH THE TABLE

THE SPECIAL PROVISIONS.

ALL WORK THAT REQUIRES LANE SHIFTING SHALL BE PERFORMED AT TIMES INDICATED ON

WORK HOURS:

SATISFACTION OF THE ENGINEER

FOR NIGHT WORK, ILLUMINATE THE WORK SITE ADEQUATELY AS NECESSARY AND TO THE

NIGHT WORK:

ANY WORK WITHIN THEIR JURISDICTION.

THEIR RIGHT-OF-WAY USING THEIR ONLINE PORTAL, TWO WEEKS PRIOR TO COMMENCING

THE CONTRACTOR SHALL ACQUIRE VDOT LAND USE PERMIT FOR THE TEMPORARY USE OF

VDOT LAND USE PERMIT:

WITH THE DISTRICT DEPARTMENT OF ENERGY AND ENVIRONMENT (DOEE) BEST PRACTICES.

INSTALLED AND MAINTAINED THROUGHOUT THE CONSTRUCTION PHASE IN ACCORDANCE

UNLESS OTHERWISE NOTED, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE

EROSION AND SEDIMENT CONTROL:

FROM THE ENGINEER.

CONSTRUCTION PROPERLY FITS THE CURRENT CONDITIONS, AFTER OBTAINING APPROVAL

CONTRACTOR SHALL MAKE NECESSARY ADJUSTMENT TO ENSURE THAT THE NEW

THESE DIMENSIONS DO NOT AGREE WITH THOSE SHOWN ON THESE DESIGN PLANS, THE

DRAWINGS, THE CONTRACTOR SHALL CHECK ALL DIMENSIONS IN EXISTING CONDITIONS. IF

TO ORDERING MATERIALS. PRIOR TO CONSTRUCTION AND PREPARATION OF SHOP

SUBSEQUENT REHABILITATION/REPAIRS. CONFIRM ALL THE DIMENSIONS IN THE FIELD PRIOR

PROVIDED 1968 ORIGINAL CONSTRUCTION PLANS AND FROM THE DRAWINGS OF

DIMENSIONS SHOWN ON THE ROADWAY CONTRACT PLANS ARE DERIVED FROM THE DDOT

VERIFICATION OF EXISTING DIMENSIONS:

CONSTRUCTION CONTROL OR FIELD STAKE OUT.

INFORMATION ONLY. THIS INFORMATION SHALL NOT BE USED TO ESTABLISH ANY TYPE OF

MATCH APPROXIMATELY TO DDOT PROVIDED 1968 CONSTRUCTION PLANS, AND PROVIDED FOR

BASELINE ALIGNMENT AND STATIONINGS SHOWN ON THESE PLANS ARE GENERATED TO

BASELINE:

NOT PERFORMED DURING THIS DESIGN PHASE.

NATURE OF THE BRIDGE REHABILITATION WORK, ACTUAL FIELD TOPOGRAPHIC SURVEY WAS

SUPPLEMENTED BY THE DDOT SUPPLIED BRIDGE CONSTRUCTION PLANS. DUE TO THE

AVAILABLE DC GIS MAPPING, ARLINGTON COUNTY GIS MAPPING, AND DC ORTHO SID FILES;

BASE MAP INFORMATION SHOWN ON THESE PLANS IS COMPILED FROM THE LATEST

BASE MAPPING

BEFORE THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES.

STANDARDS OF THE DISTRICT OF COLUMBIA. NOTIFY DOEE AT LEAST SEVEN DAYS

THE CONTRACTOR SHALL MEET THE REQUIREMENT FOR WATER QUALITY

WATER QUALITY:

PROVISIONS.

ADDITIONAL DETAILS OF MB-10A BARRIER REFER TO CONTRACT SPECIAL

DEPARTMENT OF TRANSPORTATION (VDOT), MB-10A TRAFFIC BARRIER. FOR

PORTABLE F SHAPE BARRIER SHALL BE CONSISTENT WITH VIRGINIA 7.

SPACING ON CURVE AND 40' ON TANGENT TRAVEL LANE.

6. FLASHING AMBER WARNING LIGHTS TYPE B SHALL BE INSTALLED AT 20'

AT THE BOTTOM OF THE EPOXY MORTAR.

WITH EPOXY MORTAR. CARE SHALL BE TAKEN NOT TO TRAP AIR WITHIN OR

HOLES AS FOLLOWS OR AS DIRECTED BY THE ENGINEER. CLEAN AND FILL

5. UPON REMOVAL OF THE STAKES AND BARRIERS, REPAIR THE RESULTING

4. CONTRACTOR TO VERIFY PAVEMENT STRUCTURE PRIOR TO PLACING STAKES.

3. DRIVE STAKE HEAD BELOW FACE OF BARRIER TO PREVENT SNAGGING.

LINEAR FOOT OF BARRIER.

2. COST OF BARRIER REFLECTOR SHALL BE INCLUDED IN PRICE BID PER

610.03 AND 610.06.

B SHALL BE INSTALLED IN ACCORDANCE WITH DDOT STANDARD DWG. NO.

1. CONCRETE BARRIER SIDE MOUNTED REFLECTORS AND HAZARD LIGHT TYPE

NOTES:

CONSTRUCTION ACTIVITIES.

TWO WEEKS ADVANCE NOTIFICATION IS REQUIRED PRIOR TO COMMENCING ANY

US ARMY CORPS OF ENGINEERS, NATIONAL PARK SERVICE, AND DC HARBOR POLICE.

COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE UNITED STATES COAST GUARD,

THIS BRIDGE IS OVER THE NAVIGATIONAL WATERWAY. THE CONTRACTOR SHALL

NAVIGATIONAL WATERWAY:

DAMAGE TO ALL EXISTING UTILITIES, AND TO KEEP THEM OPERATIONAL ALL THE TIME.

ACTIVITY. USE CAUTION DURING CONSTRUCTION WORK TO AVOID CONFLICT OR

VERIFY AND LOCATE ALL EXISTING UTILITIES PRIOR TO STARTING ANY CONSTRUCTION

MAINTAINED AND TEMPORARILY SUPPORTED AS REQUIRED DURING THE CONSTRUCTION.

EXISTENCE OF OTHER UTILITIES IS UNKNOWN. ALL EXISTING UTILITIES SHALL BE

BY REALIGNING EXISTING VERIZON, VERIZON BUSINESS AND AT&T CONDUITS.

THE FALSE ABUTMENT ROOM ON DC SIDE FOR SECURING ADEQUATE WORKING SPACE

THE CONTRACTOR SHALL CONTACT VERIZON TWO WEEKS PRIOR TO WORKING WITHIN

VDOT STREET LIGHT, COMMUNICATION AND ITS

DC STREET LIGHT, NAVIGATION LIGHT, COMMUNICATION AND ITS

VERIZON COMMUNICATION

DC WATER

LIMITS:

FOLLOWING UTILITIES ARE KNOWN TO HAVE THEIR FACILITIES WITHIN THE PROJECT

UTILITIES:

INDICATED IN THE SPECIAL PROVISIONS.

SPECIFICATIONS. PRIORITIES ARE IN THE ABOVE-MENTIONED ORDER UNLESS OTHERWISE

FOR HIGHWAY AND BRIDGES, AND WHERE APPLICABLE PRODUCT MANUFACTURER'S

SPECIFICATIONS FOR HIGHWAYS AND STRUCTURES, AASHTO STANDARD SPECIFICATIONS

ALL WORK SHALL CONFORM TO PROJECT SPECIAL PROVISIONS, 2013 DDOT STANDARD

SPECIFICATIONS:

SEE NOTE 3.

UNIT. 1 AT EACH CORNER.

STAKE. 2 PER PRECAST

1" X 24" GALV. A36 STEEL

AMENDMENT 4 - CORRECTION PNP 01/19/24

P R

E F

O R

M

IN

E

S T R

IP

IN

G

IN

C H

T R

A F F

IC

N T R

O L

R

E M

O V

A B

L E

AMENDMENT 5 - CORRECTION PNP 02/08/24

612085

DIVISION CHIEF

DATE

FILE

DESIGNED BY

CHECKED BY

DRAWN BY

PROJECT MGR.

STATEREG

SHEETS

TOTAL

NO.

SHEET

PROJECT

NO. DESCRIPTION NAME DATE

REVISIONS

P

B L E

D D

O T n a m e s u b .t b l

F ri d a y F e b ru a ry

:0

M p

D p w V

A N

V A 1P

W

IN

T 1.

P a rs o n s .c o m :W a s h in g

D o c u m e n ts I-

V

B ri d g e s ig n

C

A D

G e n e ra l\

P ri n t_ fi le s p

G N N 1_ I- R d w y

G e n e ra l_

N o te s R 1.

d g n

D D

O T p d f_

H a lf

M o n o .p lt

P

IV

E R

D.C.

SHEET OF

(202) 775-3300

WASHINGTON, DC 20003

100 M St. SE

PROJECT ENG.

OVER POTOMAC RIVER

REHABILITATION PROJECT

I-395 HOV BRIDGE

DDOT BRIDGE NO. 0169-1

109STP-3951(168)

INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION

D.C. DEPARTMENT OF TRANSPORTATION

1 1

I-395 PS&E_5-23-2023

Special Provisions Revisions

I-395 HOV BRIDGE REHABILITATION – CONSTRUCTION PROCUREMENT – AMENDMENT 5 – REVISIONS

TO SPECIAL PROVISIONS

In SECTION 77 HYDRO-DEMOLITION OF EXISTING DECK OVERLAY – 2 INCH, under MEASUREMENT sec�on, replace the paragraph with the following:

“MEASUREMENT – The unit of measurement for Item 715 993 – HYDRO-DEMOLITION 2.0 IN OF EXISTING DECK OVERLAY will be the square yard for hard surface excavation.”

Questions and Answers

AMENDMENT 5 – BIDDER QUESTIONS AND RESPONSES

119. Traffic Maintenance Notes on Drawing RW-GN-01 state that all temporary traffic control markings shall be Removable Preformed Line Marking. However, the table for Maintenance of Traffic Es�mated Quan��es on the same drawing does not show any item of preformed line marking but includes 71,879 LF of painted lane marking. Please clarify whether temporary lane marking is intended to be painted marking, and if not, where this large quan�ty of paint marking is applied.

Response: The “Painted Lane Marking” descrip�on is consistent with Sec�on 612.14 of the Specifica�ons which covers preformed lane striping. The descrip�on will be updated in the MOT table on Drawing Nos. RW-GN-01 and SQ-01 drawings as part of Amendment 5 to clarify this.

120. Note 6 on Drawings RW-PM-01 to RW-PM-07 states that pavement markings for Portland cement concrete surface (approach slabs and bridges) shall be High Contrast Pavement Marking. The Proposal Schedule of Items does not include any item of High Contrast Pavement Marking. Items 0285 through 0300 are for Preformed Pavement Marking. Please provide new items for High Contrast Pavement marking and inform where Items 0285-0300 are intended to be applied.

Response: The descrip�on of Preformed Pavement Marking and High Contrast Pavement Markings are interchangeable. To clarify this, the “Preformed Pavement Marking- XX” descrip�ons on Drawing No. SQ-01 will be updated to “High Contract Pavement Markings” as part of Amendment 5.

121. It is our understanding that only single face concrete barriers on asphalt pavement need to be pinned to asphalt pavement, and there is no requirement for anchoring the barriers to the exis�ng or overlayed bridge deck. Please confirm.

Response: Per Note 7 on Drawing Number RW-GN-01, VDOT’a MB-10A single face barriers shall be used. The atachment of traffic barrier service concrete parapet (single face or double face) to the concrete bridge deck shall be by means of adhesive anchors provided that the temporary barrier will be in service for less than one year.

122. Reference Page 79 and 81 of the contract drawings (Pile Jacke�ng)

a. We are informed by the subcontractor who has worked in the area in the past that the dolphin piles are not in great shape, which raises some concerns.

Response: No ques�on indicated.

b. The dolphin piles are not currently in the configura�on shown in the drawings. There is a possibility when the cable is removed, at least some of the piles will fall over under their own weight. It does not look like the pile can be separated enough to install the pile wraps shown without breaking a por�on of them.

Response: No ques�on indicated.

c. If during ini�al inspec�on carried in the presence of DDOT representa�ve some piles are found to be broken, will DDOT take responsibility for the broken piles? And if a pile breaks due to sever deteriora�on while trying to access and install the wrap, will the contractor be compensated for replacement pile?

Response: Contractor shall take all necessary measures to preserve the exis�ng �mber dolphins during the removal of damaged and deteriorated materials from each dolphin pile.

d. Would DDOT be willing to remove the jacke�ng detail and change it to removing the dolphin and replacing it in kind? Possibly even using FRP piles.

Response: Current SUP for riverbed, does not allow impac�ng the riverbed. As a result, exis�ng dolphin piles shall be preserved and repaired.

123. Please provide Allowance Figures for Item 0275, Repair of Damaged Major Traffic Control Devices, and Item 0305, PEPCO Service Connect, Disconnect, & PEPCO Manhole Entry Fees.

Response: Per response to comment No. 56 of Amendment 3, the allowance amount is $10,000.00

124. Reviewing Plan Sheet 79, we are coming up with roughly 250 LF of fender x (2) piers = 500 LF of coverage required for the 6x10 lags. Sheet 80 says the 6x10 lags are to be placed at 11” OC so you’d need approximately 550 lags to cover the en�re 500 LF. Assuming the lags are 16.5’ long, that’s a total of over 9,000 LF of 6x10. The engineer’s es�mated quan�ty for Item 0355, 6X10 FRPL, shows only 5,408 LF (approx. 328ea, 6x10 x 16.5’ lags). Please review, verify, and confirm the quan�ty for this item.

Response: The quan�ty of 6x10 lags will be updated as part of Amendment No. 5.

125. Special Provisions Sec�on 75, Latex Modified Concrete Overlay, states that materials to be as specified in Sec�on 714.03(B) of the Standard Specifica�ons with the excep�on that the LMC mix shall atain a minimum compressive strength of 3000 psi within 24 hours. Sec�on 714 .03 of the Standard Specifica�ons under Paragraph B. MATERIALS, it is stated that high early strength cement shall not be permited. It will not be possible to atain 3000 psi in 24 hours without the use of high early strength cement and there seems to be a contradic�on between the Special Provisions and Standard Specifica�ons. Please confirm that the overlay materials shall be High Early Strength Latex Modified Concrete, to sa�sfy the requirements of Special Provisions.

Response: Sec�on 75 of Special Provisions has been updated as a part of Amendment 4. The concrete for LMC shall be class I (with 28-day f’c=4,500 psi) as indicated in plans. The requirement of 3,000 psi in 24 hours is not applicable and is removed.

126. The Special Provisions for replacing the fender system does not address the aluminum plates atached to the �mber lags that are to be replaced. The drawings show only the size of plates and provide no details of how the plates are to be atached to new FRPL lags. Addi�onally, there is no item for removing and replacing exis�ng aluminum plates. Please provide details and inform how this item will be paid.

Response: Size of the aluminum plates is provided on Drawing No. ST-DE-77. The replacement of aluminum plates will be incidental to the 6x12 FRPL fender replacement units.

127. The Item descrip�ons in the Specifica�ons do not match the Item descrip�on in the bid form.

For example, Type 4 Crack Repair is listed as 716991 and 716992 in the specifica�ons. In the bid form, it is listed as 718991 only. Type 3 Crack Repairs are listed as 716012, 716020, 716022 in the specifica�ons, but the bid form has them listed as 716008 and 716020. This needs to be clarified.

Response: Special provisions and table of quan��es are correct. For pay items 716991 and 716992, there are two 718991 items with different descrip�ons for line Items 0104 and 0105 to clarify the pay items and are consistent with Special Provisions for Type 4 repairs. For Type 3 crack repairs, only item 716008 was used with different descrip�ons to specify the nature of repair (i.e. deck underside, pier/abut repairs).

128. Item 701087 Cracked Stone cladding. Some of the stone cladding repairs are in the water with the majority being out of the water, but there are also stone cladding crack repairs that are in the water and the repair is scheduled for a Type 4 repair. What is the criteria that determines the type of repair used for granite block cracks under or above water?

Response: The criteria is the high water level as shown on plans.

129. In Amendment 1 Ques�ons and Answers, ques�on No. 8 addresses the Unit Cost pay item for crack injec�on. The answer states that the bid item should be addressed with two each unit costs, 1 - Preparing the crack for injec�on, and 2 – Measurement and payment by volume of material injected. Is pay item 2 strictly a material cost, or does this include the labor, materials and equipment required for injec�on? Will a revised Unit Cost Bid Schedule be issued in a new amendment?

Response: The response to Ques�on No. 8 is valid as stated: “The unit of measurement (LF) as specified is sufficient. Bid unit price for this item is to be determined by each of the bidders accoun�ng for the structure condi�ons provided in the bid documents.” To further clarify, the notes regarding pay items 1 and 2 are part of the posted ques�on and are not part of the response provided.

130. There appear to be new cover plates required at the fascia curbs. Is this correct?

Response: Confirmed. New cover plates must be used as part of joint reconstruc�on work.

131. Details also mention sidewalk and shared use paths requiring cover plates, but I did not see sidewalks or shared use paths on the current structure. Are there any?

Response: This detail is a standard DDOT detail and will be clarified as part of Amendment No.

5.

132. Is a cover plate required at the median island at North Abutment? If so, are details of the island available?

Response: Cover plate at median island is not required. A detail will be added as part of Amendment No. 5 to clarify joint detail at median island.

133. Are all median barrier cover plates being reused vs. Replaced?

Response: The median barrier cover plates are to be replaced.

134. On February 5th we met with DCDOT representa�ves and reviewed the as-built drawings that were provided to us to review. The plans we reviewed were from the original construc�on of the bridge in the 1960s. Since the original construc�on, we understand that the deck was repaired in approximately the year 2000. We understand it is this surface that will be milled on this Project. It is impera�ve that we understand what materials we may be encountering during the demoli�on of the exis�ng deck. Please provide the as-built drawings of the repairs performed in 2000.

RESPONSE: The exis�ng plans pertaining to the exis�ng deck overlay are not available. It has been determined that the exis�ng overlay is 4.5” on average thick as specified in the IFB plans and special provisions. The compressive strength of the exis�ng overlay is es�mated to be 5000 psi.

135. Amendment 4 modified item 455/714004 LMC Overlay from a SY unit of measure to a CY unit of measure. However, the AASHTOWare file s�ll shows it as SY. Please provide corrected AASHTOWare file.

RESPONSE: Revised AASHTOWare file will be provided.

136. In the special provisions provided in Amendment 4, it notes in sec�on 77 Hydro-demoli�on the unit of measurement is changed to CY. We think this is an error because the AASHTOWare file and revised Summary of Quan��es show it as a SY unit of measure. Please confirm.

RESPONSE: Hydro-demoli�on is in SY as shown on the Table of Quan��es and AASHTOWare file. Sec�on 77 of the Special Provisions will be corrected under Amendment 5.

137. Standard specifica�on for REPAIR OF DAMAGED MAJOR TRAFFIC CONTROL DEVICES, 612.20.D, states the District will insert an es�mate cost for this Work in the Bid Forms and Proposal. The updated special provisions do not include the allowance amount for Item 0275 – Repair of Damaged Major Traffic Control Devices. Please provide the allowance amount.

RESPONSE: See the responses to Ques�ons No. 56 and No. 126.

138. Per Amendment #4, there is an addi�onal sec�on of exis�ng fender shown on ST-DE-76 at spans 10 and 12. Per this drawing, this exis�ng fender por�on is to be demolished. Please confirm that this fender por�on is not to be replaced in kind. If it is only to be demolished, but not replaced with new, please answer these addi�onal ques�ons:

a. Please confirm that the four (4) exis�ng piles to be demolished may be cut off at the mudline.

RESPONSE: Confirmed. 4 exis�ng piles shall be cut off at the mudline.

b. Please confirm that a�er the one exis�ng 12x12 post is removed from the face of the pier, the exis�ng 1-1/8” diameter anchor bolts may be cut off flush with the face of the pier.

RESPONSE: Confirmed.

Updated Section K

K.1

BID BOND

Office of Administrative Services BID BOND Department of Transportation (CONSTRUCTION)

Date Bond Executed (Must Not be later Than Bid Opening Date)

Bid Bond Period Ninety (90) Calendar Days TYPE OF ORGANIZATION (“X”) After Bid Opening

□ INDIVIDUAL □ PARTNERSHIP

PRINCIPAL Name(s) and Address(es)

□ JOINT VENTURE □ CORPORATION

STATE OF INCORPORATION

1. PENAL SUM OF BID

AMOUNT NOT TO EXCEED

SURETY (IES) Name(s) and Address(es) MILLION(S)

THOUSAND(S) HUNDRED(S) CENT(S)

5%

OF BID

2. BID IDENTIFICATION

BID OPENING DATE

INVITATION NO DOC#

KNOW ALL MEN BY THE PRESENTS. That we, the Principal and Surety(ies) hereto, are firmly bound to the District of Columbia Government, a municipal corporation, hereinafter called the District, in above penal sum for the payment of which we bind ourselves, our heirs, executors and successors, jointly and severally Provided, That, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” only for the purpose of allowing a joint action or actions against any or all of us, and for all other purposes each Surety binds itself, jointly and severally with the Principal, for the payment of such sum only as is set forth opposite the name of such Surety, but if no limit of liability is indicated, the limit of liability shall be the full amount of the penal sum.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the bid identified above.

NOW, THEREFORE, if the Principal shall not withdraw said bid within the period specified therein after the opening of the same, or, if no period be specified, within ninety (90) calendar days after said opening, and shall within the period specified therefore, or, if no period be specified, within ten (10) days after being called upon to do so, furnish Performance & Payment bonds with good and sufficient surety, as may be required, for the faithful performance and proper fulfillment of the Contract, and for the protection of all persons supplying labor specified, or the failure to furnish such bond within the time specified, if the Principal shall pay the District the difference between the amount specified in said bid and the amount for which the District may procure the required work and/or supplies, if the latter amount be in excess of the former, then the above obligations shall be void and of no effect, otherwise to remain in full force and virtue.

Each Surety executing this bond hereby agrees that its obligation shall not be impaired by extension(s) of time for acceptance of the bid that the Principal may grant to the District, notice of which extension(s) to the Surety(ies) being hereby waived; provided that such waiver of notice shall apply only with respect to extensions aggregating not more than ninety calendar days in addition to the period originally allowed for acceptance of the bid.

IN WITNESS WHEREOF, the Principal and Surety(ies) have executed this bid bond and have affixed their seals on the date set forth above.

PRINCIPAL

3. Signature

1. Attest

Seal Corporate Name & Title (Typed)

Name & Title (Typed) Seal

2. Signature

2. Attest

Seal Corporate Name & Title (Typed)

Name & Title (Typed) Seal

Form No. DC 2640-5

PRINCIPAL (Continued)

CERTIFICATE AS TO CORPORATION

I,_______________________________________________________ certify that I am ________________________________________ Secretary of the Corporation named as Principal herein, that _____________________________________________________________ who signed this bond on behalf of the Principal was then ________________________________________________________________

Of said corporation; that I know this signature, and his signature thereto is genuine; that said bond was duly signed and sealed for and on behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.

Secretary of Corporation

SURETY(IES)

1. Name & Address (typed) State of

Inc.

Liability Limit

Signature of Attorney-In-Fact Attest (Signature)

Corporate

Seal Name & Address (typed) Name & Address (Typed)

2. Name & Addressed (typed) State of Inc.

Liability Limit

Signature of Attorney-In-Fact Attest (Signature)

Corporate Seal

Name & Address (typed) Name & Address (typed)

4. INSTRUCTIONS

1. This form shall be used whenever a bid guaranty is required in connection with construction, alteration and repair work.

2. Corporation’s name should appear exactly as it does on Corporate Seal and inserted in the space designated “Principal” on the face of this form. If practicable, bond should be signed by President or Vice President; if signed by other official, evident of authority must be furnished. Such evidence should be in the form of an Extract of Minutes of a Meeting of the Board of Directors, or Extract of Bylaws, certified by the Corporate Secretary, or Assistant Secretary and Corporate Seal affixed thereto. CERTIFICATE AS TO CORPORATION must be executed by Corporate Secretary, or Assistant Secretary.

3. Corporations executing the bond as sureties must be among those appearing on the US Treasury Department’s list of approved sureties and must be acting within the limitations set forth therein, and shall also be listed with the “Insurance Administration, Department of Consumer and Regulatory Affairs”, to do business in the District of Columbia. The surety shall attach hereto an adequate Power-of-Attorney for each representative signing the bond.

4. Corporations executing the bond shall affix their Corporate Seals. Individuals shall sign full first name, middle initial and last name opposite the work “seal”, two witnesses must be supplied, and their addresses, under the word “attest”. If executed in Maine or New Hampshire, an adhesive shall be affixed.

5. Names of partners must be set out in body or bond form, with the recital that they are partners composing a firm, naming it, and all members of the firm shall execute the bond as individuals. Each signature must be witnessed by two persons and addresses supplied.

K.2

BID FORM

BID FORM

(CONSTRUCTION CONTRACT)

Read Instructions to Bidders (See Standard Contract Provisions as amended)

Invitation No.: DCKA-2024-B-0011 Issue Date:

TO: CONTRACTING OFFICER, GOVERNMENT OF THE DISTRICT OF COLUMBIA

In compliance with above Invitation, the undersigned proposes to furnish all plant, labor and materials and perform required work per provisions as set forth in the Standard Contract Provisions, as amended, specifications, addenda, drawings, and at the prices named in the Schedule of Prices for:

PROJECT TITLE: I395 HOV Bridge Rehab

The undersigned agrees that if he is awarded the Contract within 90 calendar days after bid opening date and he is notified thereof, he will within 10 days after the prescribed forms are forwarded for execution, or within any authorized extension of time, execute and deliver a Contract on Form No. DC 2640-6 and furnish performance and payment bonds on Form No. DC 2640-7 and Form No. DC 2640-8 with good and sufficient survey; and that if he falls or refuses, required bid guaranty shall be applied as specified in Instructions to Bidders.

Undersigned acknowledges receipt of the following addenda. Failure to acknowledge receipt of all addenda may result in rejection of bid.

Addendum No. 1 2 3 4 5 6 7

Received

Enclosed is bid guaranty consisting of 5% of the total bid Bid Bond Certified Check Other Name of bidder must be shown in full if an individual; and if a partnership, full names of all partners must be shown. If bidder is a corporation, impress corporate seal and furnish name of State where incorporated. If joint venture, all parties must sign.

Bidder represents that he operates as an individual, joint venture, corporation Incorporated in State of Telephone No.

Name of Bidder (Type or print) Corporate Seal

DUNS or RUBS NO________________________________ Business Address (Type or print)

By (Signature in ink) Attest

Title of Person Signing Title of Person Attesting

Bid, guaranty, etc., must be marked and addressed as follows:

Mark envelope in upper left corner as follows:

Invitation No.: DCKA-2024-B-0011 To be opened (date):

Envelopes available from Office of Contracting and Procurement

Address as follows:

Office of Contracting and Procurement Bid Room 250 M Street SE Washington, DC 20003

Form No. DC 2640-13 P-4745 J-3617-74 Oct. 1973

K.3 Price Schedule

K.4

TAX CERTIFICATION AFFIDAVIT

GOVERNMENT OF THE DISTRICT OF COLUMBIA

Office of the Chief Financial Officer

Office of Tax and Revenue

TAX CERTIFICATION AFFIDAVIT

THIS AFFIDAVIT IS TO BE COMPLETED ONLY BY THOSE WHO ARE REGISTERED TO CONDUCT BUSINESS IN

THE DISTRICT OF COLUMBIA.

Date

Authorized Agent Name of Organization/Entity Business Address (include zip code) Business Phone Number

Authorized Agent Principal Officer Name and Title Square and Lot Information Federal Identification Number Contract Number Unemployment Insurance Account No.

I hereby authorize the District of Columbia, Office ofthe Chief Financial Officer, Office of Tax and Revenue to release my tax information to an authorized…