This document is Amendment No. 5 to the Invitation for Bid (IFB) DCKA-2024-B-0011 for the Rehabilitation of the I-395 HOV Bridge over the Potomac River, issued by the District Department of Transportation (DDOT) Office of Contracting and Procurement. The amendment provides revised plans, special provision revisions, responses to supplemental questions, a revised price schedule, a revised Section K, and extends the bid due date to February 21, 2024 at 2:00 PM EST and the bid opening date to February 22, 2024 at 2:00 PM EST. The work under this contract consists of rehabilitation of the existing fifteen-span concrete deck slab supported on continuous steel girders, concrete beams, and reinforced concrete substructure piers carrying I-395 HOV Freeway Bridge over the Potomac River, approach roadway work at the DC and VA ends, streetlight upgrading work, and other related work.
The revised price schedule and Section K are provided as part of this amendment. The contract is funded by the District of Columbia government. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCKA-2024-B-0011_Amd1.pdf | ||
| DCKA-2024-B-0011_Amd2.pdf | ||
| DCKA-2024-B-0011_Amd6.pdf | ||
| DCKA-2024-B-0011_Att3.pdf | ||
| DCKA-2024-B-0011_Att1.pdf | ||
| DCKA-2024-B-0011_Amd3.pdf | ||
| DCKA-2024-B-0011_Amd4.pdf | ||
| DCKA-2024-B-0011_Att2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
1. Contract Number Page of Pages
1 52
2. Amendment/Modification Number
Amendment No. 5
3. Effective Date 4. Requisition/Purchase Request No.
5. Solicitation Caption
See Box 16C DCKA-2024-B-0011 Rehabilitation of I-395 HOV Bridge over
Potomac River
6. Issued by: Code 7. Administered by (If other than line 6)
District Department of Transportation Office of Contracting and Procurement 55 M Street SE – 7th Floor Washington, DC 20003
District Department of Transportation Office of Contracting and Procurement 55 M Street SE – 7th Floor Washington, DC 20003
8. Name and Address of Contractor (No. street, city, county, state and zip code)
TO ALL PROSPECTIVE OFFERORS
X
9A. Amendment of Solicitation No.
DCKA-2024-B-0011
9B. Dated (See Item 11) December 28, 2023
10A. Modification of Contractor/Order No.
Code Facility 10B. Dated (See Item 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one (1) copy of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) BY separate letter or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such may be made by letter or fax, provided each letter or telegram makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (If Required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTORS/ORDERS ,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14
A. This change order is issued pursuant to (Specify Authority): 27 DCMR, Chapter 36, Section 3601.2(b) The changes set forth in Item 14 are made in the contract/order no. in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data etc.) set forth in item 14, pursuant to the authority of:
C. This supplemental agreement is entered into pursuant to authority of: 27 DCMR 3601.2 Change Clause, 27 DCMR 2005.6(d) as amended
D. Other (Specify type of modification and authority) Paragraph 15, Changes, Standard Contract Provisions
E. IMPORTANT: Contractor is not is required to sign this document and return one (1) copy to the issuing office.
14. Description of Amendment/Modification (Organized by UCF Section headings, including solicitation/contract subject matter where feasible.)
This amendment serves as:
1. Revised Plans - see below with instructions pages 3 through 6
2. Special Provision Revisions - see below page 8
3. Responses to Supplemental Questions - see below pages 10 through 14
4. Revised price schedule - see DTAP posted document labeled: KA20240011.002x
5. Revised section K - see below pages 16 through 52
6. Extend bid due date to 21 Feb 2024 @ 2:00pm EST
7. Extend bid opening date to 22 Feb 2024 @ 2:00pm EST
All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document is referenced in Item 9A or 10A remain unchanged and in full force and effect.
15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer
Mohammad Ferdaws
15B. Name of Contractor
(Signature of person authorized to sign)
15C. Date Signed 16B. District of Columbia
(Signature of Contracting Officer)
16C. Date Signed
2/13/2024
Plan Revisions and Instructions
I-395 HOV BRIDG REHAB INVITATION FOR BID DCKA-2024-B-0011
AMENDMENT 5 – PLAN REVISION INSTRUCTIONS
Replace the following plan sheets with the provided sheets, and note the revisions as annotated therein:
1. Sheet 3 (Drawing SQ-01) – Summary of Pay Items and Quan��es
2. Sheet 67 (Drawing ST-DE-64) – Deck Joint Repair At Abutments and Piers B, 6, And 12
3. Sheet 82 (Drawing RW-GN-01) – Civil And Maintenance
KSN
EJM
KSN
AAH
SQ-01
SUMMARY OF PAY ITEMS
AND QUANTITIES
SUMMARY OF QUANTITIES
ITEM NO. DESCRIPTION UNIT QTY.
SUMMARY OF QUANTITIES
ITEM NO. DESCRIPTION UNIT QTY.
719993
718992
717991
716992
716991
716022
716020
716016
716012
716010
716008
716004
715993
715991
714004
710007
709023
708995
708992
708991
708022
708021
707011
706999
706997
706995
706993
706991
705993
705991
704991
703991
703010
703008
701999
701995
701994
701993
701992
701991
618002
614995
614568
614993
22994
22994
22994
19684
21780
LF
LF
LF
LF
LF
LF
LF
SF
LF
SF
SF
SF
SY
SY
SY
LF
LF
SF
LF
LF
LF
CY
LS
EA
EA
EA
EA
LS
EA
EA
LBS
CY
CY
CY
LS
LF
LF
LF
LF
LF
LS
EA
EA
EA
CY 2874.3
SPECIAL ITEM - REPAIR AND PRESSURE CLEAN FINGER JOINTS
SPECIAL ITEM - PIER A - EXPANSION JOINT CLOSURE (VESC)
SPECIAL ITEM - RECONSTRUCT DECK JOINT WITH NEOPRENE STRIP SEAL
SPECIAL ITEM - REPAIR Type 3, SEAL RIVER PIER CONC CRACKS > 1/32"
SPECIAL ITEM - REPAIR Type 3, SEAL RIVER PIER CONC CRACKS < 1/32"
REPAIR TYPE 4, SEAL PIER/ABUT CONC CRACKS >1/32"
REPAIR TYPE 4, SEAL PIER/ABUT CONC CRACKS <1/32"
REPAIR TYPE 1 - PIER/ABUT SPALL REPAIR
REPAIR TYPE 3 - DECK UNDERSIDE
REPAIR TYPE 2 - DECK UNDERSIDE
REPAIR TYPE 1 - DECK UNDERSIDE
REPAIR TYPE 1 - CONCRETE DIAPHRAGM REPAIR
SPECIAL ITEM - HYDRO-DEMOLITION OF EXISTING DECK AND OVERLAY - 2 IN
SPECIAL ITEM - MILLING 2.5 IN OF EXISTING DECK OVERLAY
LATEX MODIFIED CONCRETE OVERLAY - 4.5IN
SPECIAL ITEM - REPLACE DAMAGED DRAINAGE PIPES UNDER THE BRIDGE
UNASSIGNED SPECIAL ITEM - REPAIR EXIST. RAILING
SPECIAL ITEM - PRESSURE CLEAN STONE CLADDING - PIERS 3, 6, 9, 12, B and C
SPECIAL ITEM - SEAL CRACKED STONE CLADDING
SPECIAL ITEM - REPLACE MISSING/DETERIORATED MORTAR
SPECIAL ITEM - PCC PARAPET REPAIR - Type 3
SPECIAL ITEM - PCC PARAPET REPAIR - Type 1
SPECIAL ITEM - CLEAN AND PAINT EXISTING STEEL
SPECIAL ITEM - BEARING PADS - REPLACE EXIST BRGS W/ ELASTOMERIC BRGS
SPECIAL ITEM - BRIDGE BEARINGS - CLEAN AND PAINT EXIST. BEARINGS
SPECIAL ITEM - REPLACE MISSING NUTS FOR MEDIAN BARRIER
SPECIAL ITEM - REPLACE MISSING ANCHOR BOLTS FOR MEDIAN BARRIER
SPECIAL ITEM - REPAIR STRUCTURAL STEEL - GRADE 36
SPECIAL ITEM - REPAIR PRESTRESSED CONCRETE BEAM ENDS - TYPE B
SPECIAL ITEM - REPAIR PRESTRESSED CONCRETE BEAM ENDS - TYPE A
SPECIAL ITEM - PIER A CAP CORROSION RESISNTANT REINCORCING STEEL - (MMFX-2)
SPECIAL ITEM - PCC - PIER A CAP REPLACEMENT
PCC SUPERSTRUCTURE - JOINT RECONSTRUCTION CONC. (CLASS C)
PCC SUPERSTRUCTURE - REPLACE MEDIANS
SPECIAL ITEM - DOLPHIN REPAIR
SPECIAL ITEM - FENDER REPLACEMENT - 6x10 FRPL
SPECIAL ITEM - FENDER REPLACEMENT - 6x12 FRPL
SPECIAL ITEM - FENDER REPLACEMENT - 12x12 FRPL
SPECIAL ITEM - FENDER REPLACEMENT - 8x12-4F08 FRPL
SPECIAL ITEM - FENDER REPLACEMENT - 12x12-4F08 FRPL
EROSION AND SEDIMENT CONTROL
SPECIAL ITEM - REMOVE AND RE-INSTALL LED LUMINAIRE ON STEEL POLE
REMOVE PENDANT POLE 30 FT. HEIGHT OR LESS
SPECIAL ITEM - FURNISH AND INSTALL 25' STEEL PENDANT POLE WITH UP TO 8' ARM
AMENDMENT 4 - CORRECTION AAH 01/19/24
AAH
KSN
613398
612106
612104
612100
612096
612092
613000
612999
612998
612997
612993
612086
612085
612066
612064
612060
612058
612054
612038
612036
612034
612028
612022
612018
612014
612010
612008
612006
610014
610014
607020
606064
606054
603054
603030
603002
602991
600017
600017
600017
506006
402008
402002
410002
403002
311002
209002
202004
205991
205010
205008
202002
108992
108016
108013
108012
108006
108004
108002
105002
000507
000506
LS
LS
EA
EA
EA
EA
LF
LF
LF
LF
EA
LF
LF
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
SF
EA
SF
LS
LF
LF
SY
LF
CY
EA
EA
LF
LS
LF
LF
LF
CY
TON
TON
SY
SY
EA
CY
CY
CY
CY
LS
CY
DAYS
LS
LS
LS
LS
LS
LS
LS
EA
EA
10281
71829
71829
11288
14424
11429
PEPCO SERVICE CONNET, DISCONNECT, & PEPCO MANHOLE ENTRY FEES
REPAIR OF DAMAGED MAJOR TRAFFIC CONTROL DEVICES
STEEL PROTECTION PLATE
PORTABLE CHANGEABLE MESSAGE SIGN
CONSTRUCTION ZONE ATTENUATOR
TRUCK MOUNTED ATTENUATOR
SPECIAL ITEM - PREFORMED HIGH CONTRAST PAVEMENT MARKINGS, 24 INCH
SPECIAL ITEM - PREFORMED HIGH CONTRAST PAVEMENT MARKINGS, 12 INCH
SPECIAL ITEM - PREFORMED HIGH CONTRAST PAVEMENT MARKINGS, 6 INCH DASH
SPECIAL ITEM - PREFORMED HIGH CONTRAST PAVEMENT MARKINGS, 6 INCH
TOWING AND RECOVERY SERVICE
PAINTED LANE MARKING, 6 INCH
TRAFFIC CONTROL - REMOVABLE PREFORMED LINE STRIPING, 6 INCH
THERMOPLASTIC PAVEMENT MARKING, 24 INCH
THERMOPLASTIC PAVEMENT MARKING, 12 INCH
THERMOPLASTIC PAVEMENT MARKING, 6 INCH DASH
THERMOPLASTIC PAVEMENT MARKING, 6 INCH
THERMOPLASTIC PAVEMENT MARKING, 4 INCH
SINGLE-FACED YELLOW SNOW PLOWABLE REFLECTIVE PAVEMENT MARKERS
SINGLE-FACED WHITE SNOW PLOWABLE REFLECTIVE PAVEMENT MARKERS
TRAFFIC DRUMS
TYPE III PVC BARRICADE
SEQUENTIAL ARROW BOARDS
FLASHING AMBER WARNING LIGHTS, TYPE "B"
CONSTRUCTION WARNING AND DETOUR SIGNS
TEMPORARY CONSTRUCTION SIGN SUPPORTS
REMOVE LANE MARKINGS
CONSTRUCTION LANE CLOSING
MOVE WATER FILLED PLASTIC JERSEY BARRIER
INSTALL WATER FILLED PLASTIC JERSEY BARRIER
SOD WITH 4 INCH TOPSOIL
FURNISH AND SET 8"X12" GRANITE STRAIGHT CURB
REPAIR-REPLACE PCC CIRCULAR CURB AND/OR GUTTER
CRASH CUSHION ATTENUATING TERMINAL (CAT)
W BEAM/TRHIE BEAM TRANSITION PANEL
TYPE I: W-BEAM (STANDARD BLOCK-OUT)
SPECIAL ITEM - REPAIR SLOPE PROTECTION IN FRONT OF PIER 1
SPECIAL ITEM - MOVE PORTABLE SINGLE FACE F SHAPE PRECAST PCC BARRIER
SPECIAL ITEM - PORTABLE SINGLE FACE F SHAPE PRECAST PCC BARRIER
SPECIAL ITEM - CHAIN LINK FENCE WITH FABRIC, 8 FT. HT.
PCC DIRECTIONAL ISLAND
HMA SURFACE COURSE, 9.5 MM
HMA BASE COURSE, 19 MM
PAVEMENT PROFILING (MILLING)
TACK COAT
ADJUST SEWER-WATER-UTILITY MANHOLE FRAME
AGGREGATE BASE COURSE
HARD SURFACE PAVEMENT EXCAVATION
SPECIAL ITEM - PIER A EXCAVATION TO PILE CAP
STRUCTURE HARD SURFACE EXCAVATION - EXIST. MEDIANS
SPECIAL ITEM - DEMOLITION OF PIER A CAP
COMMON EXCAVATION
SPECIAL ITEM - ENGINEER'S BOAT
MOBILIZATION - FLOAT-IN CONSTRUCTION PLATFORMS
FURNISH AND EQUIP ENGINEER'S FIELD FACILITIES
ENGINEER'S FIELD FACILITIES
RECORD DRAWINGS AND AS - BUILT DRAWINGS
PROGRESS PHOTOGRAPHS
MOBILIZATION
COOPERATION WITH THIRD PARTY UTILITY RELOCATION
SPECIAL ITEM - REPLACE DOWNSPOUTS
SPECIAL ITEM - PRESSURE CLEAN SCUPPERS
AMENDMENT 5 - CORRECTION AAH 02/08/24
10,815
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P E
N
T A
B L E
D D
O T n a m e s u b .t b l
F ri d a y F e b ru a ry
:4
P
M p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g to n
D C D o c u m e n ts I-
H O
V
B ri d g e e s ig n
C
A D
G e n e ra l\
P ri n t_ fi le s p
G N S
Q 1- I- P
A Y
IT
E M
S R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P L
R
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
p005679B Proprietary
SECTION A-A
SECTION D-D
AT MEDIAN BARRIER
SECTION D-D
AT RAILINGS
MOVEMENT TABLE
LOCATION
(THERMAL)
EXPANSION
(THERMAL)
CONTRACTION
(SHRINKAGE)
CONTRACTION
"W" AT 70 F
JOINT WIDTH
MOVEMENT
TOTAL RATED
+/- 10 F
DELTA TEMP.
LENGTH (FT)
JOINT
PIER B
PIER 6
PIER 12
"64 33 "8
52 3"
3"
3" 2"
2"
"64 3 141'-0"
90'-0"
90'-0"
2"
ST-DE-64
S. ABUT 3" 2" 90'-0"
"64 33 "8
52 3" "64
3 155'-0"2"N. ABUT
DECK JOINT REPAIR
AT ABUTMENTS AND PIERS B, 6 AND 12
AAH
KSN
NAH
KSN
EJM
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
NOTES:
12.
13.
14.
DAMAGED OR MISSING ANCHOR BOLTS AND NUTS.
ST-SC-05 THRU ST-SC-08 FOR REPLACEMENT OF
SEE SEQUENCE OF CONSTRUCTION DRAWING NUMBERS
EXPANSION SYSTEM
TOP OF SLAB
ANCHOR STUDS
(TYP.)
GUTTER LINE
12" MAX.
(TYP.)
‚" RECESS
2'-9"
12" MAX.
(TYP.)
B B
COVER PLATE
BRIDGE DECK
EXISTING MEDIAN
BARRIER
PARTIAL PLAN - EXISTING
NOT TO SCALE
PARTIAL PLAN - PROPOSED
A A A
A
W= ‚" GAP @ 70° F
L JOINTL JOINTC
W
W/2 W/2
STRIP SEAL
CONTINUOUS NEOPRENE
•" CHECKERED STEEL
COVER L (GALVANIZED)P
•" RECESS
†" DIA. x 10" ANCHOR
STUDS @ 12" MAX. (TYP.)
†" DIA. x 8" ANCHOR
STUDS @ 12" MAX. (TYP.)
TOOL CONCRETE
EDGES TO •"
RADIUS (TYP.)
FACE OF
EXISTING CURB
NOT TO SCALE
SECTION B-B
C C
L JOINTL JOINTC
W
W/2 W/2
TOOL CONCRETE EDGES
TO ‚" RADIUS
CONTINUOUS NEOPRENE
STRIP SEAL
‚" RECESS
SECTION C-C
NOT TO SCALE
CURB LINE
W W
L MEDIAN BARRIERC
6" MAX.
(TYP.)
D
D
EXISTING BRIDGE
RAILING
STEEL EXTRUSION (TYP.)
STEEL EXTRUSION
(TYP.)
†" DIA. x 10" ANCHOR
STUDS @ 12" MAX. (TYP.)
†" DIA. x 8" ANCHOR
STUDS @ 12" MAX. (TYP.)
*ALTERNATE LOCATION OF STUDS
AS SHOWN IN ELEVATION VIEW
•" RECESS
1" MIN.
6" MAX. (TYP.)
(TYP.)
12" MAX.
(TYP.)
12" MAX.
L JOINT AND L PIERC C
12" 1' 1•
JOINT REMOVAL AT PIERS
CL JOINT
APPROACH SLAB
SECTION A-A
NOT TO SCALE
JOINT REMOVAL AT ABUTMENTS
B
B
COVER PLATE
C C
D
D
W
OPEN JOINT
@ 70° F
1•
1•
L
IM
IT
S
F
C E S
S
•" RECESS (TYP.)
P
STRIP SEAL
NOT TO SCALE
PART PLAN - COVER
PLATE AT SIDEWALK AND SHARED USE PATH
FACE OF BRIDGE
RAILING
L JOINTC
‚" DIA. COUNTERSUNK
FLATHEAD STAINLESS
STEEL SCREWS IN
TAPPED HOLE IN
EXTRUSION @ 6" MAX.
(TYP.)
DECK
TOP OF
SLIDING PLATE
REPLACE WELDED
REMOVE AND
DAM
NEW EXPANSION
•" CHECKERED
STEEL COVER L
(GALVANIZED)
** VERIFY DIMENSION IN THE FIELD
** VERIFY DIMENSION IN THE FIELD
PIER 6 AND PIER 12
SOUTH ABUTMENT,
AND PIER B
NORTH ABUTMENT
(BRIDGE RAILING NOT SHOWN FOR CLARITY)
DECK
TOP OF EXISTING CONCRETE
INCORPORATED INTO NEW
STEEL TO REMAIN AND BE
***EXISTING DECK REINFORCING
SIZED BARS AT NO ADDITIONAL COST TO DDOT.
EXISTING REBAR SHALL BE REPAIRED BY LAPPING SIMILAR
DAMAGING EXISTING REINFORCEMENT. ANY DAMAGE TO
THE CONTRACTOR SHALL TAKE PRECAUTION TO AVOID***
(BRIDGE RAILING NOT SHOWN FOR CLARITY)
RAILING CURB
TOP OF BRIDGE
OF THE NEW CONCRETE.
AREAS MUST BE REMOVED AND REPAIRED PRIOR TO PLACEMENT
EXPOSED DECK TO IDENTIFY DELAMINATED AREAS. DELAMINATED
ADJACENT TO THE JOINT, CONTRACTOR SHALL SOUND THE
UPON REMOVAL OF THE EXISTING PORTION OF THE DECK****
SEQUENCE OF CONSTRUCTION, SEE DRAWING NUMBERS ST-SC-05 THRU ST-SC-08.
THE EXISTING DECK AND OVERLAY WILL BE MILLED AND OVERLAID TO A DEPTH OF 4•". FOR
MATERIALS.
ALL EXISTING DIMENSIONS ARE APPROXIMATE AND SHALL BE FIELD VERIFIED PRIOR TO ORDERING
ALL THE DIMENSIONS ARE IN INCHES UNLESS NOTED OTHERWISE.
DROP OR RISE.
70° F. THE WIDTH 'W' SHALL BE INCREASED OR DECREASED FOR EVERY 10° F TEMPERATURE
JOINT WIDTH 'W' IS THE FINAL JOINT WIDTH OF THE CURED CONCRETE WHEN PLACED AT
AREAS, AND AT PHASE CONSTRUCTION JOINTS.
SEALER SHALL BE INSTALLED IN ONE CONTINUOUS PIECE EXCEPT FOR MEDIAN AND BARRIER
**** 12"**** 12"**** 12"****
AAH 02/08/24AMENDMENT 5 - CORRECTION
C C
D
D
NEW NEW
BRIDGE DECK
MEDIAN ISLAND
NOT TO SCALE
PARTIAL PLAN - PROPOSED
CURB
EXIST. CURB
FACE OF EXISTING
PARAPET
CURB
(SEE NOTE 1)
TO RAILINGS.
ONLY APPLICABLE
THIS DETAIL IS
NOTE 1:
AND MEDIAN ISLAND
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
T h u rs d a y F e b ru a ry
:3
P
M p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
S tr u c tu re s P ri n t_ fi le s p
B R S T I-c k
J o in t R e p a ir a t
A b u tm e n ts a n d
P ie rs R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATIONS. ELECTRICALLY WELD ALL STUDS.
PROVIDE †" DIA. HEADED STUDS THAT MEET THE REQUIREMENTS OF SECTION 717 OF THE
IF M EXTRUSION IS TO BE USED, SIMILAR DETAIL SHALL BE SUBMITTED TO THE ENGINEER.
STRIP SEAL SHALL BE INSTALLED AS PER THE MANUFACTURER'S RECOMMENDATIONS.
GRADE 36.
PROVIDE CHECKERED STEEL COVER PLATE CONFORMING TO THE LATEST AASHTO M 270,
SEAL GLAND MAY BE REMOVED FOR FUTURE MAINTENANCE.
FABRICATE AND CONSTRUCT THE STRIP SEAL MOUNTING IN THE BARRIER SO THAT THE STRIP
SUBMIT THE INSTALLATION PLAN TO THE ENGINEER FOR ACCEPTANCE PRIOR TO INSTALLATION.
BE APPROVED BY THE ENGINEER.
BRIDGES. THE NUMBER OF SPLICES (INCLUDING THE LENGTH OF THE STEEL EXTRUSION) SHALL
AASHTO SPECIFICATIONS AND CURRENT DDOT STANDARD SPECIFICATIONS FOR HIGHWAY &
FABRICATION AND INSTALLATION OF THE EXPANSION JOINTS SHALL BE AS PER THE CURRENT
PROVIDE STRIP SEAL JOINTS THAT CONFORM TO THE CROWN OF THE FINISHED ROADWAY.
THE STANDARD SPECIFICATIONS.
PROVIDE THE STRIP SEAL EXPANSION JOINT IN ACCORDANCE WITH SECTION 717 OF
1 1
Proprietary
RW-GN-01
GENERAL NOTES
CIVIL AND MAINTENANCE OF TRAFFIC
EXISTING PAVEMENT BASE
N.T.S.
SUGGESTED SEQUENCE OF CONSTRUCTION:ROADWAY GENERAL NOTES: MAINTENANCE OF TRAFFIC NOTES:
ROADWAY TO TRAFFIC.
TRAILS IN NATIONAL PARK SERVICE PROPERTY; AND PERMANENT OPENING OF THE
MAINTAINING ALL MODES OF TRAFFIC ON THE BRIDGE, ON OHIO DRIVE, AND ON
FINAL SIGNING AND PAVEMENT MARKINGS PLANS UNDER TRAFFIC, WHILE
INSTALLATION OF PERMANENT SIGNING AND PAVEMENT MARKINGS AS SHOWN ON
PHASE 4 INCLUDES COMPLETE REMOVAL/CLEAN UP OF THE WORK ZONE;
PHASE 4:
REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.
PERFORM NECESSARY UTILITY REPAIR WORK, OUTSIDE LIGHTING UPGRADING, AND
PLANS AND PHASE 3 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE WORK ZONE,
ON INSIDE LANES, AS SHOWN ON THE BRIDGE SEQUENCE OF CONSTRUCTION
NORTHBOUND AND SOUTHBOUND OUTSIDE LANES WHILE TRAFFIC IS MAINTAINED
BRIDGE DECK, APPROACH SLABS AND APPROACH RODWAY SEGMENTS ALONG I-395
PHASE 3 CONSISTS OF MILL AND OVERLAY AS WELL AS REPAIR/REPLACE EXISTING
PHASE 3:
AND REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.
WORK ZONE, PERFORM NECESSARY UTILITY REPAIR WORK, LIGHTING UPGRADING,
CONSTRUCTION PLANS AND PHASE 2 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE
ON SPLIT OUTSIDE LANES, AS SHOWN ON THE BRIDGE SEQUENCE OF
NORTHBOUND AND SOUTHBOUND MIDDLE LANES WHILE TRAFFIC IS MAINTAINED
BRIDGE DECK, APPROACH SLABS AND APPROACH RODWAY SEGMENTS ALONG I-395
PHASE 2 CONSISTS OF MILL AND OVERLAY AS WELL AS REPAIR/REPLACE EXISTING
PHASE 2:
UPGRADING, AND REPAIR/REPLACE EXISTING SCUPPER AND STORMDRAIN SYSTEM.
WORK ZONE, PERFORM NECESSARY UTILITY REPAIR WORK, MEDIAN LIGHTING
CONSTRUCTION PLANS AND PHASE 1 MAINTENANCE OF TRAFFIC PLANS. WITHIN THE
MAINTAINED ON OUTSIDE LANES, AS SHOWN ON THE BRIDGE SEQUENCE OF
NORTHBOUND AND SOUTHBOUND INSIDE/MEDIAN LANES WHILE TRAFFIC IS
BRIDGE DECK, APPROACH SLABS AND APPROACH RODWAY SEGMENTS ALONG I-395
PHASE 1 CONSISTS OF MILL AND OVERLAY AS WELL AS REPAIR/REPLACE EXISTING
PHASE 1:
ABUTMENT WALLS, AND REPAIR/REPLACE EXISTING INLET AND STORMDRAIN SYSTEM.
LIGHTING UPGRADING, WIDENING OF EXISTING ACCESS DOOR OPENINGS ON
WITHIN THE WORK ZONE, PERFORM NECESSARY UTILITY REPAIR WORK, UNDERPASS
TRAIL, AND ROCK CREEK PARK TRAIL ON NATIONAL PARK SERVICE PROPERTY.
WHILE MAINTAINING ALL MODES OF TRAFFIC ON OHIO DRIVE, MOUNT VERNON
AS WELL AS DC AND VIRGINIA SIDE FALSE ABUTMENTS REPAIR/REPLACE WORK
UNDER TRAFFIC (UTILITIZE DDOT STANDARD TEMPORARY TRAFFIC CONTROL #8.7),
AND APPROACH ROADWAYS ALONG THE NORHBOUND AND SOUTHBOUND I-395
EARLY WORK ACTIVITIES CONSISTS OF REMOVING RAISED MEDIAN ON THE BRIDGE
EARLY WORK ACTIVITIES:
UNLESS OTHERWISE APPROVED BY THE ENGINEER.
THURSDAY), AND WEEKEND HOURS (10 AM TO 6 PM SATURDAY AND SUNDAY)
PM, MONDAY THRU FRIDAY), OVERNIGHT HOURS (9 PM TO 5 AM, SUNDAY THRU
THIS WORK SHALL BE PERFORMED DURING OFF-PEAK/MIDDAY HOURS (10 AM TO 3
CORRESPONDING MAINTENECE PLANS MUST BE PRE-APPROVED BY THE ENGINEER.
DEVIATE FROM THESE SEQUENCES, REVISED SEQUENCE OF CONSTRUCTION AND
WITH THE IDENTIFIED BRIDGE REHABILITATION ACTIVITIES. SHOULD THE CONTRACT
FOLLOWING LISTED ARE THE SUGGESTED SEQUENCE OF CONSTRUCTION, ALIGNED
PNP
PR
ES
SEE DETAIL "A"
"16
"4
"16
"8
REFLECTOR SEE NOTE 1
CONRECTE BARRIER
PRE-DRILL HOLES
FOR CON. PAVEMENT
OVER CONC. PAVEMENT
CONC. PAVEMENT, OR ASPHALT
COMPACTED BASE MATERIAL,
ASPHALT CONC. PAVEMENT,
EXIST. PAVEMENT
PORTABLE F SHAPE BARRIER ANCHOR STAKE
STAKE DOWN SIDE ADJACENT TO TRAFFIC
EXIST. PAVEMENT
OVER CONC. PAVEMENT
CONC. PAVEMENT, OR ASPHALT
COMPACTED BASE MATERIAL,
ASPHALT CONC. PAVEMENT,
DETAIL A
UNIT. SEE NOTE 3.
STAKE. 4 PER PRECAST
1" X 24" GALV. A36 STEEL
CONCRETE BARRIER
TEMPORARY SINGLE FACE
MILL AND OVERLAY ROADWAY PAVEMENT
TYPICAL SECTION
N.T.S.
TEMPORARY ROADWAY PAVEMENT
TYPICAL SECTION
2" HMA SUPERPAVE SURFACE COURSE 9.5MM
5" HMA SUPERPAVE BASE COURSE 19.0 mm
6" AGGREGATE BASE COURSE
9.5MM SUPERPAVE SURFACE COURSE
2" HMA MILL AND OVERLAY
TH
MAINTENANCE OF TRAFFIC ESTIMATED QUANTITIES
WEEKDAY
WEEKDAY
11:00 PM (FRIDAY to SATURDAY) to 9:00 AM (SATURDAY to SUNDAY)
9:30 PM (SUNDAY to THURSDAY) to 4:00 AM (MONDAY to FRIDAY)
11:00 PM to 4:00 AM
11:00 PM to 4:00 AM
SINGLE LANE CLOSURES OR SHOULDER
REVERSIBLE LANES (HOV & EXPRESS LANES) *
COMPLETE ROAD CLOSURE **
PERFORM THEIR OWN QUANTITY TAKEOFF.
INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL
SUMMARY OF TRAFFIC/ MOT QUANTITIES FOR
NOTE:
** COMPLETE ROAD CLOSURE ON EXPRESS LANES LIMITED TO 30 MINUTES OR LESS.
ADJUSTED AS NECESSARY TO FACE DIRECTION OF TRAFFIC.
* DIRECTION OF TRAFFIC CONTROL FOR ALL LANE CLOSURES IN REVERSIBLE LANES WILL NEED TO BE
XX/XX/XXXX
STARTS BY
BRIDGE WORK
SHALL BE OFF-PEAK HOURS FROM 10:00 AM TO 3:00 PM.
MAY OCCUPY TRAVEL LANE DURING CONSTRUCTION. WORK HOURS WITH FLAGGING OPERATION
LANE WHILE HAULING SPOILS FROM MILLING AND OVERLAYING AND ANY OTHER ACTIVITIES THAT
CONTRACTOR WILL BE RESPONSIBLE FOR APPROPRIATE FLAGGING WHEN OCCUPYING A TRAVEL
WHEN NOT APPLICABLE.
ALL EXISTING TRAFFIC CONTROL SIGNS AND DEVICES SHALL BE COVERED OVER OR REMOVED
THROUGHOUT THE CONSTRUCTION PHASE.
THE SAFE REMOVAL OF WRECKED OR DISABLE VEHICLE FOR MAINTAINING SMOOTH TRAFFIC FLOW
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TOWING AND RECOVERY SERVICE FOR
THE SUGGESTED PCMS MESSAGE DISPLAY SHALL BE:
FOR EACH PHASE AND TWO WEEKS AFTER WORK HAS STARTED.
ENGINEER. PCMS SHALL REMAIN OPERATING TWO WEEKS PRIOR TO THE BEGINNING OF WORK
AND SOUTHBOUND IN VIRGINIA AND DC AT STRATEGIC LOCATIONS AS DIRECTED BY THE
PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS) SHALL BE PLACED ALONG I-395 NORTHBOUND
THE TRAFFIC.
XX-XX-XXXXWELL, USE ALTERNATE ROUTES” SOON AFTER THE NOTICE TO PROCEED TO WORN
THE CONTRACTOR SHALL ERECT STATIC SIGNS, "I-395 HOV BRIDGE CONSTRUCTION WILL START ON
PHASE OF CONSTRUCTION.
MAINTAINED AT ALL TIMES AND SHALL BE REPLACED IMMEDIATELY IF DAMAGED DURING ANY
SPECIFICATIONS FOR HIGHWAYS AND STRUCTURES. TEMPORARY PAVEMENT MARKINGS SHALL BE
CONFORMING TO THE REQUIREMENTS OF SECTION 612.14 OF 2013 DDOT STANDARD
ALL TEMPORARY PAVEMENT MARKINGS SHALL BE REMOVABLE PREFORMED LINE STRIPING
END OF WORK ZONE TRANSITIONS.
MARKINGS. TEMPORARY PAVEMENT MARKINGS MUST MEET EXISTING PAVEMENT MARKINGS AT THE
EXISTING PAVEMENT MARKINGS SHALL BE REMOVED AT THE LOCATION OF PROPOSED TEMPORARY
A MINIMUM 11' TRAVEL LANES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION.
POSTED SPEED WILL BE REDUCED TO 35 MPH DURING THE CONSTRUCTION.
DDOT STANDARD SPECIFICATIONS 2013.
WORK SHALL BE CARRIED FORWARD IN ACCORDANCE WITH SECTION 104 AND SECTION 105 OF
SUBJECT TO PRIOR APPROVAL BY THE ENGINEER. TRAFFIC FLOW RESTRICTIONS AND CONTROL OF
OF CONSTRUCTION. THE CONTRACTOR MAY USE ALTERNATIVE MAINTENANCE OF TRAFFIC PLANS
THESE MAINTENANCE OF TRAFFIC PLANS ARE PREPARED BASED ON THE SUGGESTED SEQUENCE
OF ENSURING SAFE CONDITIONS DURING HIS OPERATIONS.
ESSENTIALLY A MINIMUM AND DOES NOT RELEASE THE CONTRACTOR FROM HIS RESPONSIBILITY
INSTALLATION OF TRAFFIC CONTROL SIGNS AND DEVICES SHOWN IN THE PLANS ARE CONSIDERED
REVISIONS, PRIOR TO THE BEGINNING OF HIS OPERATIONS.
THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 2009 EDITION AND SUBSEQUENT
AND STRUCTURES 2013, DDOT UTILITY WORK ZONE TRAFFIC CONTROL PLAN 2007 TYPICALS, AND
MANUAL 2006, DDOT STANDARD DRAWINGS 2015, DDOT STANDARD SPECIFICATIONS FOR HIGHWAYS
OF TRAFFIC CONTROL DEVICES IN CONFORMANCE WITH D.C. TEMPORARY TRAFFIC CONTROL
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THE INSTALLATION AND MAINTENANCE
AND POSITIVE MANNER WHILE APPROACHING AND PASSING THROUGH THE CONSTRUCTION AREA.
WORKERS THROUGHOUT THE CONSTRUCTION PHASE. THE MOTORIST MUST BE GUIDED IN A CLEAR
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THE SAFETY OF ALL ROAD USERS, AND HIS
BELOW
TEMPORARY WORK WITHIN VDOT JURISDICTION SHALL BE IN ACCORDANCE WITH THE TABLE
THE SPECIAL PROVISIONS.
ALL WORK THAT REQUIRES LANE SHIFTING SHALL BE PERFORMED AT TIMES INDICATED ON
WORK HOURS:
SATISFACTION OF THE ENGINEER
FOR NIGHT WORK, ILLUMINATE THE WORK SITE ADEQUATELY AS NECESSARY AND TO THE
NIGHT WORK:
ANY WORK WITHIN THEIR JURISDICTION.
THEIR RIGHT-OF-WAY USING THEIR ONLINE PORTAL, TWO WEEKS PRIOR TO COMMENCING
THE CONTRACTOR SHALL ACQUIRE VDOT LAND USE PERMIT FOR THE TEMPORARY USE OF
VDOT LAND USE PERMIT:
WITH THE DISTRICT DEPARTMENT OF ENERGY AND ENVIRONMENT (DOEE) BEST PRACTICES.
INSTALLED AND MAINTAINED THROUGHOUT THE CONSTRUCTION PHASE IN ACCORDANCE
UNLESS OTHERWISE NOTED, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
EROSION AND SEDIMENT CONTROL:
FROM THE ENGINEER.
CONSTRUCTION PROPERLY FITS THE CURRENT CONDITIONS, AFTER OBTAINING APPROVAL
CONTRACTOR SHALL MAKE NECESSARY ADJUSTMENT TO ENSURE THAT THE NEW
THESE DIMENSIONS DO NOT AGREE WITH THOSE SHOWN ON THESE DESIGN PLANS, THE
DRAWINGS, THE CONTRACTOR SHALL CHECK ALL DIMENSIONS IN EXISTING CONDITIONS. IF
TO ORDERING MATERIALS. PRIOR TO CONSTRUCTION AND PREPARATION OF SHOP
SUBSEQUENT REHABILITATION/REPAIRS. CONFIRM ALL THE DIMENSIONS IN THE FIELD PRIOR
PROVIDED 1968 ORIGINAL CONSTRUCTION PLANS AND FROM THE DRAWINGS OF
DIMENSIONS SHOWN ON THE ROADWAY CONTRACT PLANS ARE DERIVED FROM THE DDOT
VERIFICATION OF EXISTING DIMENSIONS:
CONSTRUCTION CONTROL OR FIELD STAKE OUT.
INFORMATION ONLY. THIS INFORMATION SHALL NOT BE USED TO ESTABLISH ANY TYPE OF
MATCH APPROXIMATELY TO DDOT PROVIDED 1968 CONSTRUCTION PLANS, AND PROVIDED FOR
BASELINE ALIGNMENT AND STATIONINGS SHOWN ON THESE PLANS ARE GENERATED TO
BASELINE:
NOT PERFORMED DURING THIS DESIGN PHASE.
NATURE OF THE BRIDGE REHABILITATION WORK, ACTUAL FIELD TOPOGRAPHIC SURVEY WAS
SUPPLEMENTED BY THE DDOT SUPPLIED BRIDGE CONSTRUCTION PLANS. DUE TO THE
AVAILABLE DC GIS MAPPING, ARLINGTON COUNTY GIS MAPPING, AND DC ORTHO SID FILES;
BASE MAP INFORMATION SHOWN ON THESE PLANS IS COMPILED FROM THE LATEST
BASE MAPPING
BEFORE THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES.
STANDARDS OF THE DISTRICT OF COLUMBIA. NOTIFY DOEE AT LEAST SEVEN DAYS
THE CONTRACTOR SHALL MEET THE REQUIREMENT FOR WATER QUALITY
WATER QUALITY:
PROVISIONS.
ADDITIONAL DETAILS OF MB-10A BARRIER REFER TO CONTRACT SPECIAL
DEPARTMENT OF TRANSPORTATION (VDOT), MB-10A TRAFFIC BARRIER. FOR
PORTABLE F SHAPE BARRIER SHALL BE CONSISTENT WITH VIRGINIA 7.
SPACING ON CURVE AND 40' ON TANGENT TRAVEL LANE.
6. FLASHING AMBER WARNING LIGHTS TYPE B SHALL BE INSTALLED AT 20'
AT THE BOTTOM OF THE EPOXY MORTAR.
WITH EPOXY MORTAR. CARE SHALL BE TAKEN NOT TO TRAP AIR WITHIN OR
HOLES AS FOLLOWS OR AS DIRECTED BY THE ENGINEER. CLEAN AND FILL
5. UPON REMOVAL OF THE STAKES AND BARRIERS, REPAIR THE RESULTING
4. CONTRACTOR TO VERIFY PAVEMENT STRUCTURE PRIOR TO PLACING STAKES.
3. DRIVE STAKE HEAD BELOW FACE OF BARRIER TO PREVENT SNAGGING.
LINEAR FOOT OF BARRIER.
2. COST OF BARRIER REFLECTOR SHALL BE INCLUDED IN PRICE BID PER
610.03 AND 610.06.
B SHALL BE INSTALLED IN ACCORDANCE WITH DDOT STANDARD DWG. NO.
1. CONCRETE BARRIER SIDE MOUNTED REFLECTORS AND HAZARD LIGHT TYPE
NOTES:
CONSTRUCTION ACTIVITIES.
TWO WEEKS ADVANCE NOTIFICATION IS REQUIRED PRIOR TO COMMENCING ANY
US ARMY CORPS OF ENGINEERS, NATIONAL PARK SERVICE, AND DC HARBOR POLICE.
COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE UNITED STATES COAST GUARD,
THIS BRIDGE IS OVER THE NAVIGATIONAL WATERWAY. THE CONTRACTOR SHALL
NAVIGATIONAL WATERWAY:
DAMAGE TO ALL EXISTING UTILITIES, AND TO KEEP THEM OPERATIONAL ALL THE TIME.
ACTIVITY. USE CAUTION DURING CONSTRUCTION WORK TO AVOID CONFLICT OR
VERIFY AND LOCATE ALL EXISTING UTILITIES PRIOR TO STARTING ANY CONSTRUCTION
MAINTAINED AND TEMPORARILY SUPPORTED AS REQUIRED DURING THE CONSTRUCTION.
EXISTENCE OF OTHER UTILITIES IS UNKNOWN. ALL EXISTING UTILITIES SHALL BE
BY REALIGNING EXISTING VERIZON, VERIZON BUSINESS AND AT&T CONDUITS.
THE FALSE ABUTMENT ROOM ON DC SIDE FOR SECURING ADEQUATE WORKING SPACE
THE CONTRACTOR SHALL CONTACT VERIZON TWO WEEKS PRIOR TO WORKING WITHIN
VDOT STREET LIGHT, COMMUNICATION AND ITS
DC STREET LIGHT, NAVIGATION LIGHT, COMMUNICATION AND ITS
VERIZON COMMUNICATION
DC WATER
LIMITS:
FOLLOWING UTILITIES ARE KNOWN TO HAVE THEIR FACILITIES WITHIN THE PROJECT
UTILITIES:
INDICATED IN THE SPECIAL PROVISIONS.
SPECIFICATIONS. PRIORITIES ARE IN THE ABOVE-MENTIONED ORDER UNLESS OTHERWISE
FOR HIGHWAY AND BRIDGES, AND WHERE APPLICABLE PRODUCT MANUFACTURER'S
SPECIFICATIONS FOR HIGHWAYS AND STRUCTURES, AASHTO STANDARD SPECIFICATIONS
ALL WORK SHALL CONFORM TO PROJECT SPECIAL PROVISIONS, 2013 DDOT STANDARD
SPECIFICATIONS:
SEE NOTE 3.
UNIT. 1 AT EACH CORNER.
STAKE. 2 PER PRECAST
1" X 24" GALV. A36 STEEL
AMENDMENT 4 - CORRECTION PNP 01/19/24
P R
E F
O R
M
IN
E
S T R
IP
IN
G
IN
C H
T R
A F F
IC
N T R
O L
R
E M
O V
A B
L E
AMENDMENT 5 - CORRECTION PNP 02/08/24
612085
DIVISION CHIEF
DATE
FILE
DESIGNED BY
CHECKED BY
DRAWN BY
PROJECT MGR.
STATEREG
SHEETS
TOTAL
NO.
SHEET
PROJECT
NO. DESCRIPTION NAME DATE
REVISIONS
P
B L E
D D
O T n a m e s u b .t b l
F ri d a y F e b ru a ry
:0
M p
D p w V
A N
V A 1P
W
IN
T 1.
P a rs o n s .c o m :W a s h in g
D o c u m e n ts I-
V
B ri d g e s ig n
C
A D
G e n e ra l\
P ri n t_ fi le s p
G N N 1_ I- R d w y
G e n e ra l_
N o te s R 1.
d g n
D D
O T p d f_
H a lf
M o n o .p lt
P
IV
E R
D.C.
SHEET OF
(202) 775-3300
WASHINGTON, DC 20003
100 M St. SE
PROJECT ENG.
OVER POTOMAC RIVER
REHABILITATION PROJECT
I-395 HOV BRIDGE
DDOT BRIDGE NO. 0169-1
109STP-3951(168)
INFRASTRUCTURE PROJECT MANAGEMENT ADMINISTRATION
D.C. DEPARTMENT OF TRANSPORTATION
1 1
I-395 PS&E_5-23-2023
Special Provisions Revisions
I-395 HOV BRIDGE REHABILITATION – CONSTRUCTION PROCUREMENT – AMENDMENT 5 – REVISIONS
TO SPECIAL PROVISIONS
In SECTION 77 HYDRO-DEMOLITION OF EXISTING DECK OVERLAY – 2 INCH, under MEASUREMENT sec�on, replace the paragraph with the following:
“MEASUREMENT – The unit of measurement for Item 715 993 – HYDRO-DEMOLITION 2.0 IN OF EXISTING DECK OVERLAY will be the square yard for hard surface excavation.”
Questions and Answers
AMENDMENT 5 – BIDDER QUESTIONS AND RESPONSES
119. Traffic Maintenance Notes on Drawing RW-GN-01 state that all temporary traffic control markings shall be Removable Preformed Line Marking. However, the table for Maintenance of Traffic Es�mated Quan��es on the same drawing does not show any item of preformed line marking but includes 71,879 LF of painted lane marking. Please clarify whether temporary lane marking is intended to be painted marking, and if not, where this large quan�ty of paint marking is applied.
Response: The “Painted Lane Marking” descrip�on is consistent with Sec�on 612.14 of the Specifica�ons which covers preformed lane striping. The descrip�on will be updated in the MOT table on Drawing Nos. RW-GN-01 and SQ-01 drawings as part of Amendment 5 to clarify this.
120. Note 6 on Drawings RW-PM-01 to RW-PM-07 states that pavement markings for Portland cement concrete surface (approach slabs and bridges) shall be High Contrast Pavement Marking. The Proposal Schedule of Items does not include any item of High Contrast Pavement Marking. Items 0285 through 0300 are for Preformed Pavement Marking. Please provide new items for High Contrast Pavement marking and inform where Items 0285-0300 are intended to be applied.
Response: The descrip�on of Preformed Pavement Marking and High Contrast Pavement Markings are interchangeable. To clarify this, the “Preformed Pavement Marking- XX” descrip�ons on Drawing No. SQ-01 will be updated to “High Contract Pavement Markings” as part of Amendment 5.
121. It is our understanding that only single face concrete barriers on asphalt pavement need to be pinned to asphalt pavement, and there is no requirement for anchoring the barriers to the exis�ng or overlayed bridge deck. Please confirm.
Response: Per Note 7 on Drawing Number RW-GN-01, VDOT’a MB-10A single face barriers shall be used. The atachment of traffic barrier service concrete parapet (single face or double face) to the concrete bridge deck shall be by means of adhesive anchors provided that the temporary barrier will be in service for less than one year.
122. Reference Page 79 and 81 of the contract drawings (Pile Jacke�ng)
a. We are informed by the subcontractor who has worked in the area in the past that the dolphin piles are not in great shape, which raises some concerns.
Response: No ques�on indicated.
b. The dolphin piles are not currently in the configura�on shown in the drawings. There is a possibility when the cable is removed, at least some of the piles will fall over under their own weight. It does not look like the pile can be separated enough to install the pile wraps shown without breaking a por�on of them.
Response: No ques�on indicated.
c. If during ini�al inspec�on carried in the presence of DDOT representa�ve some piles are found to be broken, will DDOT take responsibility for the broken piles? And if a pile breaks due to sever deteriora�on while trying to access and install the wrap, will the contractor be compensated for replacement pile?
Response: Contractor shall take all necessary measures to preserve the exis�ng �mber dolphins during the removal of damaged and deteriorated materials from each dolphin pile.
d. Would DDOT be willing to remove the jacke�ng detail and change it to removing the dolphin and replacing it in kind? Possibly even using FRP piles.
Response: Current SUP for riverbed, does not allow impac�ng the riverbed. As a result, exis�ng dolphin piles shall be preserved and repaired.
123. Please provide Allowance Figures for Item 0275, Repair of Damaged Major Traffic Control Devices, and Item 0305, PEPCO Service Connect, Disconnect, & PEPCO Manhole Entry Fees.
Response: Per response to comment No. 56 of Amendment 3, the allowance amount is $10,000.00
124. Reviewing Plan Sheet 79, we are coming up with roughly 250 LF of fender x (2) piers = 500 LF of coverage required for the 6x10 lags. Sheet 80 says the 6x10 lags are to be placed at 11” OC so you’d need approximately 550 lags to cover the en�re 500 LF. Assuming the lags are 16.5’ long, that’s a total of over 9,000 LF of 6x10. The engineer’s es�mated quan�ty for Item 0355, 6X10 FRPL, shows only 5,408 LF (approx. 328ea, 6x10 x 16.5’ lags). Please review, verify, and confirm the quan�ty for this item.
Response: The quan�ty of 6x10 lags will be updated as part of Amendment No. 5.
125. Special Provisions Sec�on 75, Latex Modified Concrete Overlay, states that materials to be as specified in Sec�on 714.03(B) of the Standard Specifica�ons with the excep�on that the LMC mix shall atain a minimum compressive strength of 3000 psi within 24 hours. Sec�on 714 .03 of the Standard Specifica�ons under Paragraph B. MATERIALS, it is stated that high early strength cement shall not be permited. It will not be possible to atain 3000 psi in 24 hours without the use of high early strength cement and there seems to be a contradic�on between the Special Provisions and Standard Specifica�ons. Please confirm that the overlay materials shall be High Early Strength Latex Modified Concrete, to sa�sfy the requirements of Special Provisions.
Response: Sec�on 75 of Special Provisions has been updated as a part of Amendment 4. The concrete for LMC shall be class I (with 28-day f’c=4,500 psi) as indicated in plans. The requirement of 3,000 psi in 24 hours is not applicable and is removed.
126. The Special Provisions for replacing the fender system does not address the aluminum plates atached to the �mber lags that are to be replaced. The drawings show only the size of plates and provide no details of how the plates are to be atached to new FRPL lags. Addi�onally, there is no item for removing and replacing exis�ng aluminum plates. Please provide details and inform how this item will be paid.
Response: Size of the aluminum plates is provided on Drawing No. ST-DE-77. The replacement of aluminum plates will be incidental to the 6x12 FRPL fender replacement units.
127. The Item descrip�ons in the Specifica�ons do not match the Item descrip�on in the bid form.
For example, Type 4 Crack Repair is listed as 716991 and 716992 in the specifica�ons. In the bid form, it is listed as 718991 only. Type 3 Crack Repairs are listed as 716012, 716020, 716022 in the specifica�ons, but the bid form has them listed as 716008 and 716020. This needs to be clarified.
Response: Special provisions and table of quan��es are correct. For pay items 716991 and 716992, there are two 718991 items with different descrip�ons for line Items 0104 and 0105 to clarify the pay items and are consistent with Special Provisions for Type 4 repairs. For Type 3 crack repairs, only item 716008 was used with different descrip�ons to specify the nature of repair (i.e. deck underside, pier/abut repairs).
128. Item 701087 Cracked Stone cladding. Some of the stone cladding repairs are in the water with the majority being out of the water, but there are also stone cladding crack repairs that are in the water and the repair is scheduled for a Type 4 repair. What is the criteria that determines the type of repair used for granite block cracks under or above water?
Response: The criteria is the high water level as shown on plans.
129. In Amendment 1 Ques�ons and Answers, ques�on No. 8 addresses the Unit Cost pay item for crack injec�on. The answer states that the bid item should be addressed with two each unit costs, 1 - Preparing the crack for injec�on, and 2 – Measurement and payment by volume of material injected. Is pay item 2 strictly a material cost, or does this include the labor, materials and equipment required for injec�on? Will a revised Unit Cost Bid Schedule be issued in a new amendment?
Response: The response to Ques�on No. 8 is valid as stated: “The unit of measurement (LF) as specified is sufficient. Bid unit price for this item is to be determined by each of the bidders accoun�ng for the structure condi�ons provided in the bid documents.” To further clarify, the notes regarding pay items 1 and 2 are part of the posted ques�on and are not part of the response provided.
130. There appear to be new cover plates required at the fascia curbs. Is this correct?
Response: Confirmed. New cover plates must be used as part of joint reconstruc�on work.
131. Details also mention sidewalk and shared use paths requiring cover plates, but I did not see sidewalks or shared use paths on the current structure. Are there any?
Response: This detail is a standard DDOT detail and will be clarified as part of Amendment No.
5.
132. Is a cover plate required at the median island at North Abutment? If so, are details of the island available?
Response: Cover plate at median island is not required. A detail will be added as part of Amendment No. 5 to clarify joint detail at median island.
133. Are all median barrier cover plates being reused vs. Replaced?
Response: The median barrier cover plates are to be replaced.
134. On February 5th we met with DCDOT representa�ves and reviewed the as-built drawings that were provided to us to review. The plans we reviewed were from the original construc�on of the bridge in the 1960s. Since the original construc�on, we understand that the deck was repaired in approximately the year 2000. We understand it is this surface that will be milled on this Project. It is impera�ve that we understand what materials we may be encountering during the demoli�on of the exis�ng deck. Please provide the as-built drawings of the repairs performed in 2000.
RESPONSE: The exis�ng plans pertaining to the exis�ng deck overlay are not available. It has been determined that the exis�ng overlay is 4.5” on average thick as specified in the IFB plans and special provisions. The compressive strength of the exis�ng overlay is es�mated to be 5000 psi.
135. Amendment 4 modified item 455/714004 LMC Overlay from a SY unit of measure to a CY unit of measure. However, the AASHTOWare file s�ll shows it as SY. Please provide corrected AASHTOWare file.
RESPONSE: Revised AASHTOWare file will be provided.
136. In the special provisions provided in Amendment 4, it notes in sec�on 77 Hydro-demoli�on the unit of measurement is changed to CY. We think this is an error because the AASHTOWare file and revised Summary of Quan��es show it as a SY unit of measure. Please confirm.
RESPONSE: Hydro-demoli�on is in SY as shown on the Table of Quan��es and AASHTOWare file. Sec�on 77 of the Special Provisions will be corrected under Amendment 5.
137. Standard specifica�on for REPAIR OF DAMAGED MAJOR TRAFFIC CONTROL DEVICES, 612.20.D, states the District will insert an es�mate cost for this Work in the Bid Forms and Proposal. The updated special provisions do not include the allowance amount for Item 0275 – Repair of Damaged Major Traffic Control Devices. Please provide the allowance amount.
RESPONSE: See the responses to Ques�ons No. 56 and No. 126.
138. Per Amendment #4, there is an addi�onal sec�on of exis�ng fender shown on ST-DE-76 at spans 10 and 12. Per this drawing, this exis�ng fender por�on is to be demolished. Please confirm that this fender por�on is not to be replaced in kind. If it is only to be demolished, but not replaced with new, please answer these addi�onal ques�ons:
a. Please confirm that the four (4) exis�ng piles to be demolished may be cut off at the mudline.
RESPONSE: Confirmed. 4 exis�ng piles shall be cut off at the mudline.
b. Please confirm that a�er the one exis�ng 12x12 post is removed from the face of the pier, the exis�ng 1-1/8” diameter anchor bolts may be cut off flush with the face of the pier.
RESPONSE: Confirmed.
Updated Section K
K.1
BID BOND
Office of Administrative Services BID BOND Department of Transportation (CONSTRUCTION)
Date Bond Executed (Must Not be later Than Bid Opening Date)
Bid Bond Period Ninety (90) Calendar Days TYPE OF ORGANIZATION (“X”) After Bid Opening
□ INDIVIDUAL □ PARTNERSHIP
PRINCIPAL Name(s) and Address(es)
□ JOINT VENTURE □ CORPORATION
STATE OF INCORPORATION
1. PENAL SUM OF BID
AMOUNT NOT TO EXCEED
SURETY (IES) Name(s) and Address(es) MILLION(S)
THOUSAND(S) HUNDRED(S) CENT(S)
5%
OF BID
2. BID IDENTIFICATION
BID OPENING DATE
INVITATION NO DOC#
KNOW ALL MEN BY THE PRESENTS. That we, the Principal and Surety(ies) hereto, are firmly bound to the District of Columbia Government, a municipal corporation, hereinafter called the District, in above penal sum for the payment of which we bind ourselves, our heirs, executors and successors, jointly and severally Provided, That, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” only for the purpose of allowing a joint action or actions against any or all of us, and for all other purposes each Surety binds itself, jointly and severally with the Principal, for the payment of such sum only as is set forth opposite the name of such Surety, but if no limit of liability is indicated, the limit of liability shall be the full amount of the penal sum.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the bid identified above.
NOW, THEREFORE, if the Principal shall not withdraw said bid within the period specified therein after the opening of the same, or, if no period be specified, within ninety (90) calendar days after said opening, and shall within the period specified therefore, or, if no period be specified, within ten (10) days after being called upon to do so, furnish Performance & Payment bonds with good and sufficient surety, as may be required, for the faithful performance and proper fulfillment of the Contract, and for the protection of all persons supplying labor specified, or the failure to furnish such bond within the time specified, if the Principal shall pay the District the difference between the amount specified in said bid and the amount for which the District may procure the required work and/or supplies, if the latter amount be in excess of the former, then the above obligations shall be void and of no effect, otherwise to remain in full force and virtue.
Each Surety executing this bond hereby agrees that its obligation shall not be impaired by extension(s) of time for acceptance of the bid that the Principal may grant to the District, notice of which extension(s) to the Surety(ies) being hereby waived; provided that such waiver of notice shall apply only with respect to extensions aggregating not more than ninety calendar days in addition to the period originally allowed for acceptance of the bid.
IN WITNESS WHEREOF, the Principal and Surety(ies) have executed this bid bond and have affixed their seals on the date set forth above.
PRINCIPAL
3. Signature
1. Attest
Seal Corporate Name & Title (Typed)
Name & Title (Typed) Seal
2. Signature
2. Attest
Seal Corporate Name & Title (Typed)
Name & Title (Typed) Seal
Form No. DC 2640-5
PRINCIPAL (Continued)
CERTIFICATE AS TO CORPORATION
I,_______________________________________________________ certify that I am ________________________________________ Secretary of the Corporation named as Principal herein, that _____________________________________________________________ who signed this bond on behalf of the Principal was then ________________________________________________________________
Of said corporation; that I know this signature, and his signature thereto is genuine; that said bond was duly signed and sealed for and on behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.
Secretary of Corporation
SURETY(IES)
1. Name & Address (typed) State of
Inc.
Liability Limit
Signature of Attorney-In-Fact Attest (Signature)
Corporate
Seal Name & Address (typed) Name & Address (Typed)
2. Name & Addressed (typed) State of Inc.
Liability Limit
Signature of Attorney-In-Fact Attest (Signature)
Corporate Seal
Name & Address (typed) Name & Address (typed)
4. INSTRUCTIONS
1. This form shall be used whenever a bid guaranty is required in connection with construction, alteration and repair work.
2. Corporation’s name should appear exactly as it does on Corporate Seal and inserted in the space designated “Principal” on the face of this form. If practicable, bond should be signed by President or Vice President; if signed by other official, evident of authority must be furnished. Such evidence should be in the form of an Extract of Minutes of a Meeting of the Board of Directors, or Extract of Bylaws, certified by the Corporate Secretary, or Assistant Secretary and Corporate Seal affixed thereto. CERTIFICATE AS TO CORPORATION must be executed by Corporate Secretary, or Assistant Secretary.
3. Corporations executing the bond as sureties must be among those appearing on the US Treasury Department’s list of approved sureties and must be acting within the limitations set forth therein, and shall also be listed with the “Insurance Administration, Department of Consumer and Regulatory Affairs”, to do business in the District of Columbia. The surety shall attach hereto an adequate Power-of-Attorney for each representative signing the bond.
4. Corporations executing the bond shall affix their Corporate Seals. Individuals shall sign full first name, middle initial and last name opposite the work “seal”, two witnesses must be supplied, and their addresses, under the word “attest”. If executed in Maine or New Hampshire, an adhesive shall be affixed.
5. Names of partners must be set out in body or bond form, with the recital that they are partners composing a firm, naming it, and all members of the firm shall execute the bond as individuals. Each signature must be witnessed by two persons and addresses supplied.
K.2
BID FORM
BID FORM
(CONSTRUCTION CONTRACT)
Read Instructions to Bidders (See Standard Contract Provisions as amended)
Invitation No.: DCKA-2024-B-0011 Issue Date:
TO: CONTRACTING OFFICER, GOVERNMENT OF THE DISTRICT OF COLUMBIA
In compliance with above Invitation, the undersigned proposes to furnish all plant, labor and materials and perform required work per provisions as set forth in the Standard Contract Provisions, as amended, specifications, addenda, drawings, and at the prices named in the Schedule of Prices for:
PROJECT TITLE: I395 HOV Bridge Rehab
The undersigned agrees that if he is awarded the Contract within 90 calendar days after bid opening date and he is notified thereof, he will within 10 days after the prescribed forms are forwarded for execution, or within any authorized extension of time, execute and deliver a Contract on Form No. DC 2640-6 and furnish performance and payment bonds on Form No. DC 2640-7 and Form No. DC 2640-8 with good and sufficient survey; and that if he falls or refuses, required bid guaranty shall be applied as specified in Instructions to Bidders.
Undersigned acknowledges receipt of the following addenda. Failure to acknowledge receipt of all addenda may result in rejection of bid.
Addendum No. 1 2 3 4 5 6 7
Received
Enclosed is bid guaranty consisting of 5% of the total bid Bid Bond Certified Check Other Name of bidder must be shown in full if an individual; and if a partnership, full names of all partners must be shown. If bidder is a corporation, impress corporate seal and furnish name of State where incorporated. If joint venture, all parties must sign.
Bidder represents that he operates as an individual, joint venture, corporation Incorporated in State of Telephone No.
Name of Bidder (Type or print) Corporate Seal
DUNS or RUBS NO________________________________ Business Address (Type or print)
By (Signature in ink) Attest
Title of Person Signing Title of Person Attesting
Bid, guaranty, etc., must be marked and addressed as follows:
Mark envelope in upper left corner as follows:
Invitation No.: DCKA-2024-B-0011 To be opened (date):
Envelopes available from Office of Contracting and Procurement
Address as follows:
Office of Contracting and Procurement Bid Room 250 M Street SE Washington, DC 20003
Form No. DC 2640-13 P-4745 J-3617-74 Oct. 1973
K.3 Price Schedule
K.4
TAX CERTIFICATION AFFIDAVIT
GOVERNMENT OF THE DISTRICT OF COLUMBIA
Office of the Chief Financial Officer
Office of Tax and Revenue
TAX CERTIFICATION AFFIDAVIT
THIS AFFIDAVIT IS TO BE COMPLETED ONLY BY THOSE WHO ARE REGISTERED TO CONDUCT BUSINESS IN
THE DISTRICT OF COLUMBIA.
Date
Authorized Agent Name of Organization/Entity Business Address (include zip code) Business Phone Number
Authorized Agent Principal Officer Name and Title Square and Lot Information Federal Identification Number Contract Number Unemployment Insurance Account No.
I hereby authorize the District of Columbia, Office ofthe Chief Financial Officer, Office of Tax and Revenue to release my tax information to an authorized…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .