Airport Surveillance Radar – Model 9 (ASR-9) Data Communications Equipment (DCE) Modernization Kits

Statement of Work

693KA7-AAQ210-DCE

Section C Page i i

PART I – SECTION C

STATEMENT OF WORK

Contents PART I – SECTION C .................................................................................................................... i STATEMENT OF WORK .............................................................................................................. i C.1 Background C.2 Scope C.3 Period of Performance C.4 Government-Furnished Material and Government-Furnished Information C.5 Contractor Requirements

5.1 Program Management (CLIN 0001)

5.2 Installation and Infrastructure Kit First Article Units (CLINs 0002 and 0003)

5.2.1 Acquisition of Parts for Installation and Infrastructure Kit First Article Units

5.2.2 Packaging and Labeling Instructions for Installation and Infrastructure Kits

5.2.3 Installation and Infrastructure Kit First Article Units

5.3 Production of Installation and Infrastructure Kits (CLINs 0004 and 0005)

5.3.1 Acquisition of Parts for Installation and Infrastructure Kits

5.3.2 Installation and Infrastructure Kit Production Units

5.4 First Article Installation Wiring Kits and Infrastructure Wiring Kits (CLINs 0006 and 0007)

5.4.1 Acquisition of Cables and Connectors

5.4.2 Test Plan and Procedures for Wiring Kits

5.4.3 Wiring Kit First Article Units

5.5 Production of Installation Wiring Kits and Infrastructure Wiring Kits (CLINs 0008 and 0009)

5.5.1 Acquisition of Cables and Connectors

5.5.2 Wiring Kit Production Units

5.6 Physical Location and Storage of Materials and Fabricated Components

5.7 Option for Increased Quantity

AAQ210-DCE-SIR

Section C Page 1

C.1 BACKGROUND

The purpose of the ASR-9 is to enhance the safety of air travel through timely detection and reporting of aircraft position within 60 nautical miles of a radar location near an airport’s terminal approach and departure zones. Data from ASR-9 is provided to automation systems and used by air traffic controllers to provide positive indication of aircraft within terminal airspace (the airspace surrounding a major airport).

Each ASR-9 system has two distinct sites. The first, the local site, houses the radar equipment, including the antenna and transmitter. The second, the remote site located in the Terminal Radar Approach Control Facilities (TRACONs), is used to distribute data to the end user. The ASR-9 system uses Racal-Milgo modems and an ANS 185 Switch to send surveillance, weather, and system control and monitoring data between the local radar site and the remote site. Failure of more than one modem will reduce radar performance, which could cause a full outage of primary radar, beacon, and weather data.

The Racal-Milgo modems and ANS 185 Switch are obsolete and anticipated to run out of stock within the next five years. The Federal Aviation Administration (FAA) is seeking a contractor to provide key elements of a modernized ASR-9 communications subsystem to replace the legacy ASR-9 communications subsystem that contains the Racal-Milgo modem, ANS 185 Switch, and other ancillary parts. The deliverables represent one element of a larger complex deployment of equipment to modernize ASR-9 communications subsystem to replace the Racal-Milgo modems and ANS 185 Switches.

The ASR-9 DCE Modernization Kit deployment comprises two stages. An initial stage is to add the infrastructure needed to test the communication lines between the local and remote locations. The final stage is the installation of equipment to connect the ASR-9 local site equipment with the new communication infrastructure. As part of the scope of work, the contractor must acquire, assemble, and pack infrastructure kits and installation kits to support these stages of the deployment. A “kit” is defined as an assembly consisting of multiple parts that, when grouped together, meet specific physical, functional and performance parameters.

Each kit constitutes a portion of the overall DCE modernization configuration that will be installed at each ASR-9 site.

C.2 SCOPE

The scope of this DCE Modernization effort consists of acquiring, assembling, and packing parts into the following kits:

a. Installation Kit (CLINs 0002 & 0004)

b. Infrastructure Kit (CLINs 0003 & 0005)

c. Installation Wiring Kit (CLINs 0006 & 0008)

d. Infrastructure Wiring Kit (CLINs 0007 & 0009)

Section C Page 2

The diagram below depicts the kits and their respective sub-kits.

Figure 1: DCE Modernization Kits and Sub-Kits

a. Installation Kit (CLINs 0002 & 0004) - The Installation Kit parts are grouped into three sub-kits; the LCER Rack Installation Sub-Kit, the 4-Bay Installation Sub-Kit, and the Digital Remote SCIP Replacement (DRSR) Rack Installation Sub-Kit.

b. Infrastructure Kit (CLINs 0003 & 0005) - The Infrastructure Kit parts are grouped into two sub-kits; the DRSR Rack Installation Sub-Kit, and the Mobile Rack Infrastructure Sub-Kit.

c. Installation Wiring Kit (CLINs 0006 & 0008) - The Installation Wiring Kit consist of custom cables and connectors grouped under the Local Wiring Sub-Kit.

d. Infrastructure Wiring Kit - (CLINs 0007 & 0009) - The Infrastructure Wiring Kit parts are grouped into two sub-kits; the DRSR Rack Wiring Sub-Kit, and the Mobile Rack Wiring Sub-Kit.

For the Installation Kit, Infrastructure Kit, and Infrastructure Wiring Kit, one (1) each of the sub-kits must be included to complete the respective Kits as a deliverable per Section B.

The Installation Kit and the Infrastructure Kit consist of commercial-off-the-shelf (COTS), modified COTS, and custom parts. The Installation Wiring Kit and Infrastructure Wiring Kit consist of custom cables and connectors.

Specific tasks include:

a. Procuring parts

b. Receiving and storing Government-furnished material

c. Developing kitting instructions

d. Assembling kits

e. Packaging, labeling, and shipping kits to the FAA Logistics Center

Section C Page 3

C.3 PERIOD OF PERFORMANCE

The period of performance for the base period is 12 months from contract award. If the Government exercises the 12-month option period, the period of performance will be 24 months from contract award.

C.4 GOVERNMENT-FURNISHED MATERIAL AND GOVERNMENT-FURNISHED

INFORMATION

The Contractor will receive from the Government the materials listed in Attachment J-1, DCE Hardware Parts - GFM no later than 30 calendar days after contract award. The Government will pay the cost of shipping Government-furnished material (GFM) from the Government to the Contractor facility. The Contractor must provide the Government with a shipping destination for receipt of GFM. The Contractor must conduct a physical examination, upon receipt of the GFM to determine if it is free from defects prior to assembly of the Installation Kit, and Infrastructure Kit.

The Contractor must return all unused GFM to the Government upon completion of performance. The Government will pay the cost of shipping unused GFM from the Contractor facility to the Government.

The Contractor should refer to Section J of the Screening Information Request (SIR) for the complete listing of Government Furnished Information.

The Contractor must acquire the parts as defined in the associated Attachment J Parts Lists. If the Contractor cannot obtain the specified parts, the Contractor must request in writing to the Government Contracting Officer’s Representative (COR) a form fit function equivalent (FFF).

The request should include supporting data demonstrating that the part is a FFF equivalent and receive prior approval.

C.5 CONTRACTOR REQUIREMENTS

5.1 Program Management (CLIN 0001)

The Contractor must perform the following tasks at the Contractor facility in managing the DCE Modernization Contract:

a. The Contractor must designate a Program Manager (PM) who is responsible and accountable for the total effort as described in this statement of work.

b. The Contractor must develop and maintain a Government-approved Project Schedule

(CDRL 001) to track the tasks and activities required to complete all contract line items and contract data requirements.

Section C Page 4

c. The Contractor must use methods and metrics for assessing the on-time completion of project milestones and deliverables including: identification and procurement of long lead time material/parts; estimated schedule for start and completion for first article units; and estimated schedule for start and completion of production of Installation Kits, Infrastructure Kits, Installation Wiring Kits, Infrastructure Wiring Kits, and GFM delivery and inspection.

d. The Contractor must identify and avoid or mitigate the impact of cost, technical, and schedule risks.

e. The Contractor must submit a Project Status Report (CDRL 002) to the Contracting Officer’s Representative (COR) each month that includes the following information: the status of parts procurements and receipt; the status of the contract deliverables; progress toward the completion of meeting project milestones and deliverables as noted above;

and descriptions of risks to or issues that have affected the successful and timely achievement of milestones and of strategies to prevent or mitigate adverse impacts on performance.

5.2 Installation and Infrastructure Kit First Article Units (CLINs 0002 and 0003)

5.2.1 Acquisition of Parts for Installation and Infrastructure Kit First Article Units The Contractor must procure the first article quantities of COTS, modified COTS, and custom parts listed in Attachment J-2, DCE Hardware Parts - Installation Parts. The Contractor must procure the first article quantities of COTS, modified COTS, and custom parts listed in Attachment J-3, DCE Hardware Parts -Infrastructure Parts. The Contractor must use Attachment J-4, Custom Parts Documentation (zip file), to fabricate the custom parts. The Contractor must notify the Government when the custom parts are ready for inspection.

5.2.2 Packaging and Labeling Instructions for Installation and Infrastructure Kits The Contractor must develop Packaging and Labeling Instructions for Installation and Infrastructure Kits (CDRL 003) to group the parts listed in Attachment J-2, DCE Hardware Parts -Installation Parts and Attachment J-3, DCE Hardware Parts -Infrastructure Parts in accordance with the instructions provided in Section D of the SIR.

5.2.3 Installation and Infrastructure Kit First Article Units The Contractor must produce the first article quantities specified in Section F.3 of the SIR for the Installation Kits and Infrastructure Kits in accordance with the Government-approved Packaging and Labeling Instructions for Installation and Infrastructure Kits. The Contractor must notify the Government when the first article units are ready for inspection.

Section C Page 5

5.3 Production of Installation and Infrastructure Kits (CLINs 0004 and 0005)

5.3.1 Acquisition of Parts for Installation and Infrastructure Kits The Contractor must procure the production quantities of COTS, modified COTS, and custom parts listed in Attachment J-2, DCE Hardware Parts-Installation Parts. The Contractor must procure the production quantities of COTS, modified COTS, and custom parts listed in Attachment J-3, DCE Hardware Parts-Infrastructure Parts. The Contractor must use Attachment J-4, Custom Parts Documentation (zip file), to fabricate the custom parts. The Contractor must notify the Government when the custom parts are ready for inspection. Refer to Figure 1 in C.2 for the associated Installation Sub-Kits and Infrastructure Sub-Kits.

5.3.2 Installation and Infrastructure Kit Production Units

The Contractor must produce the production quantities specified in Section F.3 of the SIR for the Installation Kits and Infrastructure Kits in accordance with the Government-approved Packaging and Labeling Instructions for Installation and Infrastructure Kits. The Contractor must notify the Government when the production units are ready for inspection.

5.4 First Article Installation Wiring Kits and Infrastructure Wiring Kits (CLINs 0006 and 0007)

5.4.1 Acquisition of Cables and Connectors

The Contractor must procure the quantities specified in Section F.3 of the SIR for the Installation Wiring Kits and Infrastructure Wiring Kits in accordance with Attachment J-5, Wiring Kit Manufacturing Specification.

5.4.2 Test Plan and Procedures for Wiring Kits

The Contractor must develop a Test Plan and Procedures (CDRL 004) to ensure conformance with the requirements, quality, and packing in accordance with Attachment J-5, Wiring Kit Manufacturing Specification.

5.4.3 Wiring Kit First Article Units

Upon Government approval of the Test Plan and Procedures, the Contractor must produce the first article quantities specified in Section F.3 of the SIR for the Installation Wiring Kits and Infrastructure Wiring Kits in accordance with Attachment J-5, Wiring Kit Manufacturing Specification and approved Test Plan and Procedures. The Contractor must notify the Government when the wiring kits are ready for inspection.

Section C Page 6

5.5 Production of Installation Wiring Kits and Infrastructure Wiring Kits (CLINs 0008 and 0009)

5.5.1 Acquisition of Cables and Connectors

The Contractor must procure the production quantities specified in Section F.3 of the SIR for the Installation Wiring Kits and Infrastructure Wiring Kits in accordance with Attachment J-5, Wiring Kit Manufacturing Specification. Refer to Figure 1 in C.2 for the associated Installation Wiring Sub-Kits and Infrastructure Wiring Sub-Kits.

5.5.2 Wiring Kit Production Units

The Contractor must produce the production quantities specified in Section F.3 of the SIR for the Installation Wiring Kits and Infrastructure Wiring Kits in accordance with Attachment J-5, Wiring Kit Manufacturing Specification and approved Test Plan and Procedures. The Contractor must notify the Government when the wiring kits are ready for inspection.

5.6 Physical Location and Storage of Materials and Fabricated Components

The Contractor must use their commercial address as the physical location for performing kitting, inspection, and acceptance. The Contractor must store all materials and fabricated components in a temperature and humidity controlled environment.

5.7 Optional CLINs

The Contractor may be required to deliver additional quantities of deliverables stated herein and as identified in Section B.3 as optional CLINs. This includes additional quantities of all hardware and custom parts (Section B.3 and Attachment J-6) per CLIN 1010. The Government, upon exercise of this Option, will define the quantity of DCE Modernization Kits, sub-kits, and/or hardware or custom parts delivered under this contract.

PART I – SECTION C
STATEMENT OF WORK
C.1 Background
C.2 Scope
C.3 Period of Performance
C.4 Government-Furnished Material and Government-Furnished Information
C.5 Contractor Requirements
5.1 Program Management (CLIN 0001)
5.2 Installation and Infrastructure Kit First Article Units (CLINs 0002 and 0003)
5.2.1 Acquisition of Parts for Installation and Infrastructure Kit First Article Units
5.2.2 Packaging and Labeling Instructions for Installation and Infrastructure Kits
5.2.3 Installation and Infrastructure Kit First Article Units
5.3 Production of Installation and Infrastructure Kits (CLINs 0004 and 0005)
5.3.1 Acquisition of Parts for Installation and Infrastructure Kits
5.3.2 Installation and Infrastructure Kit Production Units
5.4 First Article Installation Wiring Kits and Infrastructure Wiring Kits (CLINs 0006 and 0007)
5.4.1 Acquisition of Cables and Connectors
5.4.2 Test Plan and Procedures for Wiring Kits
5.4.3 Wiring Kit First Article Units
5.5 Production of Installation Wiring Kits and Infrastructure Wiring Kits (CLINs 0008 and 0009)
5.5.1 Acquisition of Cables and Connectors
5.5.2 Wiring Kit Production Units
5.6 Physical Location and Storage of Materials and Fabricated Components
5.7 Optional CLINs