CVCC 260-B0260-042 (MR20023) Addendum No. 3 2026-03-30.pdf
PDF 246 KB Posted
- Attached to
- Replace Roof Bedford Hall at Central Virginia Community College, PC#260-B0260-042 (MR20023)
- Solicitation number
- DBB-114885
- Issued by
- Caroline County, Virginia
About this file
This is Addendum No. 3 to the sealed bid procurement documents for the Replace Roof Bedford Hall project at Central Virginia Community College (CVCC), issued by the Virginia Community College System. The addendum, dated March 30, 2026, modifies the original bidding documents from February 13, 2026, and must be acknowledged by bidders on the bid form to avoid disqualification. The project involves the complete removal and replacement of the existing roof system at Bedford Hall in Lynchburg, Virginia, encompassing approximately 13,880 square feet of new fully adhered EPDM roofing membrane installation. The primary modification in this addendum clarifies that the existing steel deck is believed to be 1-inch narrow rib construction with unknown gauge, and bidders are required to field-verify the actual flute pattern, size, and gauge during their site inspections. Additionally, the addendum confirms that Section 075323 (EPDM Roofing) is a performance specification, meaning EPDM products meeting all technical, single source, and warranty requirements will be acceptable, with bidders responsible for verifying compliance. The bid due date has been extended to April 7, 2026, with bid opening scheduled for April 8, 2026; all other bidding information, including time and location, remains unchanged from the original procurement documents.
The addendum does not address pricing terms, set-asides, incumbents, or funding sources, as these matters are governed by the original bidding documents and the primary state and local contract opportunity. Bidders must acknowledge receipt of this addendum and comply with all specifications and requirements outlined in both the original documents and this modification. A Standard Commonwealth Bid Bond (Form CO-10.2) and contract security are required for all bids regardless of amount. The contractor will be required to provide a 20-year manufacturer's warranty on roofing materials and a 2-year workmanship warranty, with Substantial Completion required within 90 consecutive calendar days from Notice to Proceed and Final Completion within 30 days thereafter. A full-time Owner's roof inspector will be on-site during roofing installation, and all work must comply with prevailing wage requirements and applicable environmental, dust control, and worker safety regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CVCC – REPLACE ROOF BEDFORD HALL
PC: CVCC 260-B0260-042 MR20023
SFCS – 20301.03
ADDENDUM NO. 3 1
ADDENDUM NO. 3 – MARCH 30, 2026
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated February 13, 2026.
Acknowledge receipt of this Addendum in the space provided on the BID FORM. Failure to do so may subject the Bidder to disqualification.
This Addendum consists of 2 page narrative.
The following items clarify, modify, change, delete from or add to the Contract Documents. When any paragraph, subparagraph, or sub-subparagraph thereof is modified or deleted by this Addendum, the unaltered provisions of that paragraph, subparagraph, sub-subparagraph shall remain in effect.
SPECIFICATIONS:
1. SECTION 070150.19 – PREPARATION FOR REROOFING:
Response:
Existing steel deck is believed to be 1 ½” narrow rib, from existing drawings. Gauge is unknown.
Actual flute pattern, size and gauge of deck shall be field verified by bidders.
2. SECTION 075323 – ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING:
Air Tech Solutions Inc., Alejandra Espinal
CVCC – REPLACE ROOF BEDFORD HALL
PC: CVCC 260-B0260-042 MR20023
SFCS – 20301.03
ADDENDUM NO. 3 2
Response:
Section 075323 is a performance specification. EPDM products that meet all technical, single source and warranty requirements as specified will be acceptable. Verification of compliance with requirements is the responsibility of the bidder.
3. Bid due date has been changed to April 7, 2026, with opening the following day. All other bidding information, including time and location remains unchanged.
END OF ADDENDUM NO. 3
03/30/2026