Attachment 4

ATTACHMENT 1

th Street East Access to work area Work Area Approach-Departure Clearance Surface Slope (50:1) AICUZ Clear Zone Graded Surface Clear Zone Runway – 14L End Work Staging Area )Phasing Plan:

Preparation of Liquid Oxygen/Liquid Nitrogen Storage Tanks (tanks will be drained and purged by LRS personnel prior to turning them over to the contractor for painting) – Start on one tank, repair any damaged paint areas, sand remaining areas to be touched up, prime all bare areas, and finish coat. Once first tank is done then the contractor can start on second tank.

Preparation of Canopy: Scrape or sandblast existing paint off the metal structural supports and roofing supports. Paint one coat of primer and two coats of finish coat paint.

Joint Seal Existing Slabs: Remove existing joint seal and replace with compression joint seal. Once complete the contractor is to clean the area.