CRAC Maintenance Checklist.pdf
PDF 133 KB Posted
- Solicitation number
- FA8773-25-Q-0001
About this file
The document is a comprehensive maintenance checklist for Computer Room Air Conditioning (CRAC) units, detailing monthly, quarterly, and annual inspection procedures. The checklist systematically outlines specific maintenance tasks for various CRAC unit components, including humidifiers, fans, cooling circuits, heat exchangers, condensate transfer pumps, air filters, multi-leaf dampers, electric heaters, and housing. Monthly inspections focus on basic operational checks such as verifying smooth fan operation, checking for contamination, and examining cooling circuit components. Quarterly and annual inspections are more extensive, involving deeper diagnostics like measuring temperature and pressure, checking electrical systems, cleaning internal components, and verifying the functionality of critical systems like expansion valves, condensate discharges, and control units.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Monthly Inspections CRAC Units
Assembly / component Maintenance task Monthly
Humidifier Check for contamination and correct functionality. Check correct operation. x
Fan Check smoothness of fan operation x Check motor bearing for noises x
Cooling circuit Check smoothness of compressor operation x Check pipes for traces of oil (leaks) x
Heat exchanger Check pumped cold water heat exchanger for contamination on the lamella x
Condensate transfer pump Check filter, container and float-actuator switch for contamination x Condensate discharge Unscrew the ball non-return siphon and check for contamination x
Quarterly and Annual Inspections CRAC Units
Assembly / component Maintenance task Quarterly Annual
Fan Check the motor circuit-breaker combination x Air filter Check level of contamination and replace, if necessary x
Check filter and filter support for leaks x Check filter monitoring x
Cooling circuit Measure temperature of the pressure line x Measure temperature of the extraction line; visual check of collar x Measure overheating, undercooling and evaporation/condensation temperature x Check high-pressure and low-pressure switch x Check pressure control of the condenser fan x Check coolant for bubbles in the inspection glass under full load x Examine coolant-carrying parts for traces of oil x Examine coolant-carrying parts for leaks x
Multi-leaf dampers Check that axles are fixed in the servo motors and check for smooth axle movement. Control direction correct? x
Supply and disposal lines Check all flexible connections for leaks x
Clean all condensate discharges, including the siphon x Check functionality of all condensate discharges, including thesiphon x
Clean all trays x Check and clean dirt trap x
Electric heater Safety thermostat on the electric heater: Check functionality x Electric unit/control unit/controller Check all fuses x
Check functionality of guards and relays x Check connection clamps and signal lights x Set limits OK? x
Determine actual temperature and humidity values and comparewith setpoints x Housing Clean inside of unit x
Humidifier
Clean inlet and drainage valves, drainage channel and internal parts; check drainage lines including the siphon, plus all hoses and electrical lines.
x
Check for contamination and correct functionality. If necessary, replace the cylinder and reset the maintenance display.
x
Check functionality and calcification of steam lance and condensate discharge.
x
Fan Clean fan impellor x Check power consumption of the drive motor x
Cooling circuit Measure power consumption of the compressor at the maximum permissible operating pressure x
Check filter dryer for icing and replace, if necessary x Check functionality of expansion valve and injection x