CRAC CDRL List.pdf

PDF 114 KB Posted

Attached to
Computer Room Air Conditioning (CRAC) II Maintenance, Repairs, and Replacement
Solicitation number
FA8773-25-Q-0001
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) detailing eight specific deliverables for a Computer Room Air Conditioning (CRAC) maintenance and replacement contract at Joint Base Lewis-McChord (JBLM). The deliverables include As-Built Drawings (A001), Work Schedule (A002), Status Reports (A003), Meeting Minutes (A004), Test Reports (A005), Test Plan (A006), OPSEC Plan (A007), and Quality Control Plan (A008). Each deliverable has a specific purpose, such as ensuring proper installation, tracking project progress, documenting unit functionality, and maintaining operational security for critical infrastructure. All deliverables are subject to government acceptance and must meet professional standards outlined in the Performance Work Statement (PWS), and must be produced using government-approved software tools and versions.

View the file

Other files

File Type Posted
Attachment 2 Unit Information and Locations Rev2.pdf PDF
Attachment 3 CRAC Maintenance Checklist Rev2 marked.pdf PDF
J01205.zip ZIP file
Amendment 3.pdf PDF
Solicitation Amendment FA877325Q00010003 SF 30.pdf PDF
J01216.zip ZIP file
J00851.zip ZIP file
J01119.zip ZIP file
Attachment 1 CRAC Performance Work Statement Rev2 marked 1.pdf PDF
J00309.zip ZIP file
J00007.zip ZIP file
Attachment 3 CRAC Maintenance Checklist Rev2.pdf PDF
CRAC II Q and A_27 May 25 Revised.xlsx XLSX spreadsheet
Attachment 1 CRAC Performance Work Statement_Rev2.pdf PDF
J01145.zip ZIP file
Attachment 2 Unit Information and Locations Rev2 marked.pdf PDF
J01141.zip ZIP file
CRAC II Q and A.xlsx XLSX spreadsheet
CO Signed Solicitation Amendment FA877325Q00010002 SF- 30.pdf PDF
Amendment 2.pdf PDF
Attachment 1 CRAC Performance Work Statement.pdf PDF
Amendment 1 .pdf PDF
CRAC Performance Work Statement_Rev1.pdf PDF
CRAC Performance Work Statement_Rev1_Marked.pdf PDF
Solicitation Amendment FA877325Q00010001 SF 30.pdf PDF
Attachment 2 Unit Information and Locations.pdf PDF
CRAC II RFP Pricing Matrix 1.xlsx XLSX spreadsheet
CRAC Maintenance Checklist.pdf PDF
CRAC II Performance Work Statement.pdf PDF
CRAC RFQ FA8773-25-Q-0001_Info.pdf PDF
Q and A Submission Form.xlsx XLSX spreadsheet
CRAC Unit Information and Locations.pdf PDF
Solicitation - FA877325Q0001.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIST OF DELIVERABLES.

All deliverables are subject to Government acceptance and approval. They shall meet professional standards and the requirements set forth in the Performance Work Statement (PWS).

All deliverables shall be produced using recommended software tools/versions as accepted by the Government. The Contractor shall submit the following deliverables:

CDRL Data Item Title Data Item Description

A001 As-Built Drawings As-built requirements to ensure proper installation of new CRAC units, as well as continuity for future projects on units.

A002 Work Schedule Work schedule required to ensure required tasks for contract are being addressed, and the required timeframe for when tasks will be completed.

A003 Status Report Status reports required to update Customer on CRAC unit functionality.

A004 Meeting Minutes Meeting minutes required to ensure all parties are prepared for meetings and to provide continuity between Contractor and Customer on what was discussed during the meeting.

A005 Test Report Test reports required to provide Customer with CRAC unit functionality.

A006 Test Plan Test plan required to update Customer on what tests will be performed on CRAC units to provide updates to other key personnel on CRAC unit functionality.

A007 OPSEC Plan OPSEC plan required as CRAC units support critical infrastructure to the installation and is also required for work performed on JBLM.

A008 Quality Control Plan Quality control plan required to explain how the contractor will check their own work to ensure it is up to standards outlined in the PWS and verifiable by government Quality Assurance Representatives.

LIST OF DELIVERABLES.

File details come from the government source that posted it. Updated .