Cost_Proposal_Form.xlsx
XLSX spreadsheet 34 KB Posted
- Solicitation number
- 27-006
- Issued by
- Charles County, Maryland
About this file
This is a Cost Proposal Form for the Charles County Government Department of Public Works Waldorf Facility project in Maryland. The form structures bidder pricing across three categories: Base Bid Items, Contingency Items, and Add/Alternate Items. Base Bid Items include Civil Site Design Services, Phase II Environmental Site Assessment, Building Design Services, and Construction Bidding Phase Services (80 hours). Contingency Items comprise Construction Engineering Services (990 hours), Baseline Wetland Delineation Services, Additional Wetland Delineation Services (50 square feet), Soil Borings (150 vertical feet), and Phased Construction Drawings (2 each). Add/Alternate Items include Construction Inspection Services (3,200 hours), Pole Barn Design Services, Vehicle Wash Area Design Services, Salt Barn Design Services, Fuel Station Design Services, and Traffic Impact Analysis.
The proposal form requires bidders to submit unit costs and total costs for each line item across all three bid categories, culminating in a grand total for all Base Bid Items, Contingency Items, and Add/Alternate Items combined. The form does not specify pricing thresholds, payment terms, or contract duration on this document. Bidders must complete the cost proposal in conjunction with the broader solicitation for the 10-acre Waldorf Regional Facility project, which encompasses approximately 63,000 square feet of building space and associated on-site improvements located at 2660 & 2690 Old Washington Road, Waldorf, MD 20601.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Charles County Government DPW Waldorf Facility Cost Proposal Form
| Bidder: | |||||
| Date: | |||||
| Base Bid Items | |||||
| Line Item: | Description: | Qty: | Unit: | Unit Cost: | Total: |
| A-1 | Civil Site Design Services | 1 | Lump Sum | ||
| A-2 | Phase II Environmental Site Assessment | 1 | Lump Sum | ||
| A-3 | Building Design Services | 1 | Lump Sum | ||
| A-4 | Construction Bidding Phase Services | 80 | Hour | ||
| Total Base Bid: |
| Contingency Items | |||||
| Line Item: | Description: | Qty: | Unit: | Unit Cost: | Total: |
| C-1 | Construction Engineering Services | 990 | Hour | ||
| C-2 | Baseline Wetland Delineation Services | 1 | Lump Sum | ||
| C-3 | Additional Wetland Delineation Services | 1 | 50sqft | ||
| C-4 | Soil Borings | 150 | Vertical Foot | ||
| C-5 | Phased Construction Drawings | 2 | ea | ||
| Total Contingency Items: |
| Add/Alternate Items: | |||||
| Line Item: | Description: | Qty: | Unit: | Unit Cost: | Total: |
| AE-1 | Construction Inspection Services | 3,200 | Hour | ||
| AE-2 | Pole Barn Design Services | 1 | Lump Sum | ||
| AE-3 | Vehicle Wash Area Design Services | 1 | Lump Sum | ||
| AE-4 | Salt Barn Design Services | 1 | Lump Sum | ||
| AE-5 | Fuel Station Design Services | 1 | Lump Sum | ||
| AE-6 | Traffic Impact Analysis | 1 | Lump Sum | ||
| Total Add/Alternate Items: |
Total Base Bid Items, Contingency Items, and Add/Alternate Items: