Copy_of_BID_SCHEDULE_11.3.2025_CR395_TO_COUNTY.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 25-23
- Issued by
- Walton County, Florida
About this file
This is a bid schedule for the CR 395 North Road Reconstruction Multi-Use Path Project, a comprehensive infrastructure improvement initiative being procured by Walton County, Florida. The project involves extensive roadway construction including approximately 7,200 linear feet of road reconstruction and resurfacing along County Road 395 North in Santa Rosa Beach, along with construction of a new 10-foot wide asphalt multi-use path. The bid schedule itemizes 58 line items organized into roadway, stormwater, and miscellaneous work categories, including asphalt concrete placement (ranging from 230 to 1,460 tons across various specifications), lime rock base installation (up to 17,322 square yards), concrete and stabilized subgrade work, demolition and removal of existing pavement and structures (up to 15,645 square yards of asphalt), pavement markings, signage installation, utility relocations including mailboxes, signs, water valves, and fire hydrant adjustments, stormwater infrastructure including elliptical and round concrete pipe installation and inlets, timber retaining wall construction (1,064 linear feet), sediment barriers (13,100 linear feet total), site clearing and grubbing (2.32 acres), earthwork, hydro-seeding (35,000 square yards), and sodding (10,000 square yards). The contract duration is 365 days for substantial completion with an additional 30 days for punch list items. A non-mandatory pre-bid conference was scheduled for September 8, 2025, at 8:30 am, with bid responses due by October 1, 2025, at 3:30 pm.
The estimated total construction cost is $3,359,370.57, with a construction cost subtotal of $3,139,598.67 before bonds and mobilization allocations. Bonds are capped at 2% of the bid ($62,791.97) and mobilization is capped at 5% of the bid ($156,979.93). Six alternative bid items are provided for optional scope elements including timber headwall demolition and replacement, CMP pipe replacement, resurfacing and base group work in specific project stations, and asphaltic removal. Bidders must be Florida Department of Transportation (FDOT) prequalified in specific work classes including drainage, flexible paving, grading, grassing, pavement marking, and roadway signage. Liquidated damages are established at $2,667 per day for failure to achieve substantial completion and $1,333 per day for delays in final completion. Environmental permits from the Northwest Florida Water Management District and Florida Department of Environmental Protection have been obtained, including wetland mitigation requirements of 0.56 credits from the Nokuse Plantation Mitigation Bank for approximately 0.922 acres of wetland impacts. The project will be funded through the county's annual appropriation with a mandatory 5% bid security requirement.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Untitled
| Line Item | NO. | Description | Quantity | Unit of Measure | Unit Cost | Total |
| ROADWAY ITEMS | ||||||
| 1 | 0334 1 12 | 1.5" SUPERPAVE ASPH CONC, TRAF B, PG76-22 (SP-12.5 MULT-PATH) STRUCTURE COURSE / M.O.T. | 415 | TN | ||
| 2 | 0334 1 12 | 1" SUPERPAVE ASPH CONC, TRAF B, PG76-22 (SP-9.5 MULT-PATH) FRICTION COURSE | 280 | TN | ||
| 3 | 0334 1 12 | 2" SUPERPAVE ASPH CONC, TRAF B, PG76-22 (SP-12.5 MULT-PATH) FRICTION COURSE | 265 | TN | ||
| 4 | 0522 1 | (4") CONCRETE 3000 PSI (MULTI-USE PATH) | 415 | SY | ||
| 5 | 285704 | OPTIONAL BASE GROUP 4 (MULTI-USE PATH) 6" LIME ROCK BASE (LBR-100) | 2500 | SY | ||
| 6 | 285704 | OPTIONAL BASE GROUP 4 (MULTI-USE PATH) 8" LIME ROCK BASE (LBR-100) FOR M.O.T. | 5500 | SY | ||
| 7 | 0160 4 | (12") TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (MULTI-USE PATH) M.O.T. | 5500 | SY | ||
| 8 | 0334 1 12 | 1.5" SUPERPAVE ASPH CONC, TRAF B, PG76-22 (SP-12.5 ROADWAY) STRUCTURE COURSE | 1460 | TN | ||
| 9 | 0334 1 12 | 1.25" SUPERPAVE ASPH CONC, TRAF B, PG76-22 (SP-9.5 ROADWAY) FRICTION COURSE | 1290 | TN | ||
| 10 | 285706 | OPTIONAL BASE GROUP 6 (ROADWAY) 8" LIME ROCK BASE (LBR-100) | 17322 | SY | ||
| 11 | 0160 4 | (12") TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (ROADWAY) | 17322 | SY | ||
| 12 | 0334 1 12 | 2" SUPERPAVE ASPH CONC, TRAF B, (SP-12.5 DRIVEWAYS) | 788 | TN | ||
| 13 | 285706 | OPTIONAL BASE GROUP 6 (DRIVEWAYS) | 7167 | SY | ||
| 14 | 0160 4 | (12") TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (DRIVEWAYS) | 7167 | SY | ||
| 15 | - | TEMP. ROADWAY BASE (TEMP. LANE WIDENING) 6" ASPHALT MILLINGS FOR M.O.T. | 3344 | SY | ||
| 16 | 285706 | TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (TEMP. LANE WIDENING) FOR M.O.T. | 3822 | SY | ||
| 17 | 0334 1 12 | 1.25" SUPERPAVE ASPH CONC, TRAF B (SP-9.5 OVERLAY) | 230 | TN | ||
| 18 | 0110 3 | SAW CUT, DEMOLISH AND REMOVE EXISTING ASPHALT | 15645 | SY | ||
| 19 | 0110 3 | SAW CUT, DEMOLISH AND REMOVE EXISTING BRICK PAVER | 198 | SY | ||
| 20 | 0110 3 | SAW CUT, DEMOLISH AND REMOVE EXISTING CONCRETE | 166 | SY | ||
| 21 | S-1 | TEMPORARY STRIPING IN ACCORDANCE WITH MUTCD INCLUDING LAYOUT, CENTERLINE, AND STOP BARS | 1 | LS | ||
| 22 | S-2 | THERMOPLASTIC PAVEMENT MARKINGS IN ACCORDANCE WITH MUTCD INCLUDING EDGE, CENTER, STOP BARS, LAYOUT, RPMs, AND PAVED SIDE STREETS | 1 | LS | ||
| 23 | S-3 | SIGNAGE PER PLANS INSTALLED WITH 3" ALUMINUM POLES | 31 | AS | ||
| 24 | S-4 | RELOCATE EXISTING MAILBOX | 21 | EA | ||
| 25 | S-5 | RELOCATE EXISTING SIGN | 27 | EA | ||
| 26 | S-6 | RELOCATE EXISTING WATER VALVE | 8 | EA | ||
| 27 | S-7 | RELOCATE EXISTING BACK FLOW PREVENTER | 1 | EA | ||
| 28 | S-8 | ADJUST EXISTING FIRE HYDRANT ASSEMBLY | 4 | EA | ||
| 29 | S-9 | RELOCATE EXISTING FORCE MAIN VALVE | 2 | EA | ||
| STORMWATER ITEMS | ||||||
| 30 | 430174130 | 24"x38" ELLIPTICAL RCP (INSTALLED) | 70 | LF | ||
| 31 | 430174118 | 18" HP (INSTALLED) | 1522 | LF | ||
| 32 | 430982125 | 18" MES INDEX 430-022 (INSTALLED) | 53 | EA | ||
| 33 | 0425 1521 | TYPE "C" INLET INDEX 232 (INSTALLED) | 8 | EA | ||
| 34 | 0425 1541 | TYPE "D" INLET INDEX 430-052 (INSTALLED) | 1 | EA | ||
| 35 | 430536100 | STRAIGHT 18" ROUND CONCRETE HEADWALL SINGLE (INSTALLED) | 1 | EA | ||
| 36 | 430536100 | STRAIGHT 24"x38" ELLIPTICAL CONCRETE HEADWALL SINGLE (INSTALLED) | 2 | EA | ||
| MISCELLANEOUS | ||||||
| 37 | 0110 3 | DEMOLISH AND REMOVE EXISTING MES | 52 | EA | ||
| 38 | 0110 3 | DEMOLISH OF EXISTING PIPE | 1309 | LF | ||
| 39 | S-5 | TIMBER RETAINING WALL (1'-3' HEIGHT) | 1064 | LF | ||
| 40 | 0104 10 3 | SEDIMENT BARRIER (DOUBLE TYPE III SILT FENCE) | 1350 | LF | ||
| 41 | 0104 10 3 | SEDIMENT BARRIER (SINGLE TYPE III SILT FENCE) | 11750 | LF | ||
| 42 | 0104 11 | FLOATING TURBIDITY BARRIER | 520 | LF | ||
| 43 | S-6 | MAINTENANCE OF TRAFFIC | 1 | LS | ||
| 44 | 0120 1 | OVER EXCAVATION (REMOVAL OF UNSUITABLE MATERIALS) | 1720 | CY | ||
| 45 | 0110 1 1 | CLEARING AND GRUBBING | 2.32 | AC | ||
| 46 | 0120 1 | EARTHWORK LUMP SUM (EXCAVATION AND BORROW) | 1 | LS | ||
| 47 | 0570 1 1 | HYDROSEED | 35000 | SY | ||
| 48 | 0570 1 2 | SODDING | 10000 | SY | ||
| 49 | - | 12" RIBBON CURB | 150 | LF | ||
| 50 | - | TEMP MOT CROSSOVERS CONSTRUCTION & REMOVAL | 1 | LS | ||
| CONSTRUCTION COST SUBTOTAL | ||||||
| GENERAL | ||||||
| 51 | S-10 | BONDS (MAX 2% OF BID) | 1 | LS | ||
| 52 | S-11 | MOBILIZATION (MAX 5% OF BID) | 1 | LS |
| TOTAL CONSTRUCTION COST | ||||
| ALT. BID ITEMS | ||||
| 53 | 1 | DEMOLISH AND REMOVE EXISTING TIMBER HEAD WALL. CONSTRUCT CONCRETE HEADWALL. | 1 | EA |
| 54 | 2 | DEMOLISH AND REMOVE EXISTING 15" CMP PIPE. REPLACE W/ 15" ADS N-12 PIPE (DR-153 & DR-154) | 30 | LF |
| 55 | 3 | RESURFACE FROM STA 36+25 TO 46+00 1.25" SUPERPAVE ASPH CONC, TRAF B, PG76-22 SP-9.5 FRICTION COURSE | 255 | TN |
| 56 | 4 | OPTIONAL BASE GROUP 6 (ROADWAY) 8" LIME ROCK BASE (LBR-100) FOR AREAS TO BE WIDENED FROM STA 36+25 TO 46+00 | 680 | SY |
| 57 | 5 | (12") TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (ROADWAY) FOR AREAS TO BE WIDENED FROM STA 36+25 TO 46+00 | 680 | SY |
| 58 | 6 | REMOVAL OF EXISTING ASPHLAT AND BASE MATERIAL FROM STA 36+25 TO 46+00 | 1 | LS |