The document is a construction cost summary for the Walton County CR 395 North Reconstruction Multi-Use Path project. The project involves road and multi-use path reconstruction, including roadway items, stormwater infrastructure, and miscellaneous construction activities. Key components include 830 tons of 2" Superpave asphalt concrete for the multi-use path, 415 square yards of 4" concrete, 8,671 square yards of 6" lime rock base, and various roadway and driveway improvements. The project also includes relocating existing infrastructure such as mailboxes, signs, water valves, fire hydrants, and installing new drainage systems, guardrails, and pavement markings.

The document details extensive site preparation and construction activities, including clearing and grubbing 2.32 acres, earthwork, hydro-seeding 24,667 square yards, and sodding 16,444 square yards. The project incorporates erosion control measures like sediment barriers and floating turbidity barriers. While specific total project costs are not filled in, the document includes line items for bonds (max 2% of bid) and mobilization (max 5% of bid), indicating a comprehensive approach to project financial management. The project is scheduled for completion by 7/16/2025, with a detailed breakdown of construction items across roadway, stormwater, and miscellaneous categories.

View the file

Other files

File Type Posted
CR_395_North_Road_Reconstruction_Multi-Use_Path_Project_(Addendum_#12_Revision).pdf PDF
Copy_of_BID_SCHEDULE_11.3.2025_CR395_TO_COUNTY.xlsx XLSX spreadsheet
BID_SCHEDULE_10.2.2025_CR395_TO_COUNTY_(1).xlsx XLSX spreadsheet
50084172_CR_395_2025-10-2_BID_SET_CIVIL_(2).pdf PDF
50084172_CR_395_FOR_BID_11.3.2025.pdf PDF
CR_395_North_Road_Reconstruction_Multi-Use_Path_Project_(Addendum_#6_Revision).pdf PDF
MOT_Sketch_CR395.pdf PDF
MOT_Sketch_CR395.pdf PDF
50084172_CR_395-Bid_Set_2025-7-16-1.pdf PDF
50084172_CR_395_2025-10-2_BID_SET_CIVIL_(2).pdf PDF
BID_SCHEDULE_10.2.2025_CR395_TO_COUNTY_(1).xlsx XLSX spreadsheet
BID_SCHEDULE_7-16-2025_PDF.pdf PDF
50084172_CR_395-Bid_Set_2025-7-16-1.pdf PDF
BID_SCHEDULE_7-16-2025_PDF.pdf PDF
CR_395_North_Road_Reconstruction_Multi-Use_Path_Project.pdf PDF
Contract_No._25-23.pdf PDF
Contract_No._25-23.pdf PDF
Contract_No._25-23.pdf PDF
ERP_permit_395.pdf PDF
395.pdf PDF
ERP_permit_395.pdf PDF
395.pdf PDF
395.pdf PDF
ERP_permit_395.pdf PDF
50084172_CR_395-Bid_Set_2025-7-16-1.pdf PDF
EOPC_7-16-2025.pdf PDF
50182251_CR395_North_Road_Reconstruction_Multi-Use_Path_Specs_8.4.25.pdf PDF
EOPC_7-16-2025.pdf PDF
50182251_CR395_North_Road_Reconstruction_Multi-Use_Path_Specs_8.4.25.pdf PDF
50182251_CR395_North_Road_Reconstruction_Multi-Use_Path_Specs_8.4.25.pdf PDF
EOPC_7-16-2025.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WALTON COUNTY CR 395 NORTH RECONSTRUCTION MULTI-USE PATH

NO. ITEM QUANTITY UNIT UNIT PRICE TOTAL PRICE

0334 1 12 2" SUPERPAVE ASPH CONC, TRAF B (SP-12.5 MULT-PATH) 830 TN

0522 1 (4") CONCRETE 3000 PSI (MULTI-USE PATH) 415 SY

285704 OPTIONAL BASE GROUP 4 (MULTI-USE PATH) 6" LIME ROCK BASE (LBR-100) 8671 SY

0334 1 12 1.5" SUPERPAVE ASPH CONC, TRAF B, PG76-22 (SP-12.5 ROADWAY) 1460 TN

0334 1 12 1.25" SUPERPAVE ASPH CONC, TRAF B, PG76-22 (SP-9.5 ROADWAY) 1290 TN

285706 OPTIONAL BASE GROUP 6 (ROADWAY) 8" LIME ROCK BASE (LBR-100) 17322 SY

0160 4 (12") TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (ROADWAY) 17322 SY

0334 1 12 2" SUPERPAVE ASPH CONC, TRAF B, (SP-12.5 DRIVEWAYS) 788 TN

285706 OPTIONAL BASE GROUP 6 (DRIVEWAYS) 7167 SY

0160 4 (12") TYPE "B" STABILIZED SUBGRADE LBR 40 MIN (DRIVEWAYS) 7167 SY

0334 1 12 1.25" SUPERPAVE ASPH CONC, TRAF B (SP-9.5 OVERLAY) 230 TN

0110 3 SAW CUT, DEMOLISH AND REMOVE EXISTING ASPHALT 15645 SY

0110 3 SAW CUT, DEMOLISH AND REMOVE EXISTING BRICK PAVER 198 SY

0110 3 SAW CUT, DEMOLISH AND REMOVE EXISTING CONCRETE 166 SY

S-1

TEMPORARY STRIPING IN ACCORDANCE WITH MUTCD INCLUDING LAYOUT,

CENTERLINE, AND STOP BARS

1 LS

S-2

THERMOPLASTIC PAVEMENT MARKINGS IN ACCORDANCE WITH MUTCD

INCLUDING EDGE, CENTER, STOP BARS, LAYOUT, RPMs, AND PAVED SIDE

STREETS

1 LS

S-3 SIGNAGE PER PLANS INSTALLED WITH 3" ALUMINUM POLES 31 AS

S-4 RELOCATE EXISTING MAILBOX 21 EA

S-5 RELOCATE EXISTING SIGN 27 EA

S-6 RELOCATE EXISTING WATER VALVE 8 EA

S-7 RELOCATE EXISTING BACK FLOW PREVENTER 1 EA

S-8 RELOCATE EXISTING FIRE HYDRANT ASSEMBLY 4 EA

S-9 RELOCATE EXISTING FORCE MAIN VALVE 2 EA

430174130 24"x38" ELLIPTICAL RCP (INSTALLED) 70 LF

430174118 18" ADS N-12 (INSTALLED) 1522 LF

430982125 18" MES INDEX 430-022 (INSTALLED) 53 EA

0425 1521 TYPE "C" INLET INDEX 232 (INSTALLED) 12 EA

0425 1541 TYPE "D" INLET INDEX 430-052 (INSTALLED) 1 EA

430536100 STRAIGHT 18" ROUND CONCRETE HEADWALL SINGLE (INSTALLED) 1 EA

430536100 STRAIGHT 24"x38" ELLIPTICAL CONCRETE HEADWALL SINGLE (INSTALLED) 2 EA

0515 2311 PIPE GUARDRAIL (ALUMINUM) INDEX 515-070 1050 LF

0110 3 DEMOLISH AND REMOVE EXISTING MES 52 EA

50084172 CR 395 NORTH ROAD RECONSTRUCTION & MULTI-USE PATH CONSTRUCTION COST SUMMARY

ROADWAY ITEMS

STORMWATER ITEMS

MISCELLANEOUS

DPR PROJECT NO.: 50084172 7/16/2025 Page 1

WALTON COUNTY CR 395 NORTH RECONSTRUCTION MULTI-USE PATH

50084172 CR 395 NORTH ROAD RECONSTRUCTION & MULTI-USE PATH CONSTRUCTION COST SUMMARY

0110 3 DEMOLISH OF EXISTING PIPE 1309 LF

S-5 TIMBER RETAINING WALL (2'-5' HEIGHT) 1064 LF

0104 10 3 SEDIMENT BARRIER (DOUBLE TYPE III SILT FENCE) 1350 LF

0104 10 3 SEDIMENT BARRIER (SINGLE TYPE III SILT FENCE) 11750 LF

0104 11 FLOATING TURBIDITY BARRIER 520 LF

S-6 MAINTENANCE OF TRAFFIC 1 LS

0120 1 OVER EXCAVATION (DEMUCKING) 1 LS

0110 1 1 CLEARING AND GRUBBING 2.32 AC

0120 1 EARTHWORK LUMP SUM (EXCAVATION AND BORROW) 1 LS

0570 1 1 HYDROSEED 24667 SY

0570 1 2 SODDING 16444 SY

CONSTRUCTION COST SUBTOTAL

S-10 BONDS (MAX 2% OF BID) 1 LS

S-11 MOBILIZATION (MAX 5% OF BID) 1 LS

TOTAL CONSTRUCTION COST

GENERAL

DPR PROJECT NO.: 50084172 7/16/2025 Page 2