This is an invitation for bid (IFB) solicitation for a metal coping and roof repair/replacement project at the Newington CT campus of the VA Connecticut Healthcare System. The solicitation requests bids to replace existing modified bituminous membrane roofing and metal coping at multiple buildings on the campus under project number 689A4-22-203. Bids are due by 2:00 PM Eastern on September 12, 2022 and will be publicly opened at that time. The estimated cost range for the project is between $500,000 and $1,000,000. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Award is expected to be made by September 30, 2022 to the responsible bidder whose bid, conforming to the solicitation, is lowest in price.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Veterans Affairs Department Date of Issue (08/03/2022) VA Connecticut Healthcare System (Campus Restoration) VA Hospital

070150.73 - Page 1 of 13

REHABILITATION OF MODIFIED BITUMINOUS MEMBRANE ROOFING

SECTION 070150.73 - REHABILITATION OF MODIFIED BITUMINOUS MEMBRANE ROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Roof re-coating preparation.

2. Application of fluid-applied roof membrane and flashings over existing smooth-surfaced modified bituminous membrane roofing.

1.2 ROOFING CONFERENCES

A. Roofing Rehabilitation Preinstallation Conference: Conduct conference at Project site to review methods and procedures related to roofing system.

1. Meet with Owner; Owner’s Consultant; roofing re-coating materials manufacturer's representative; roofing re-coating Installer including project manager and foreman; and installers whose work interfaces with or affects re-coating including installers of roof accessories and roof-mounted equipment requiring removal and replacement as part of the Work.

2. Review methods and procedures related to re-coating preparation, including membrane roofing system manufacturer's written instructions.

3. Procedures for salvaging and recycling of demolition and construction waste

4. Review temporary protection requirements for existing roofing system that is to remain, during and after installation.

5. Review roof drainage during each stage of re-coating and review roof drain plugging and plug removal procedures.

6. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

7. Review base flashings, special roofing details, drainage, penetrations, equipment curbs, and condition of other construction that will affect re-coating.

8. Review HVAC shutdown and sealing of air intakes.

9. Review shutdown of fire-suppression, -protection, and -alarm and -detection systems.

10. Review procedures for asbestos removal or unexpected discovery of asbestos-containing materials.

VA Hospital

070150.73 - Page 2 of 13

11. Review governing regulations and requirements for insurance and certificates if applicable.

12. Review existing conditions that may require notification of Owner before proceeding.

1.3 MATERIALS OWNERSHIP

A. Demolished materials shall become Contractor's property and shall be removed from Project site.

1.4 DEFINITIONS

A. Roofing Terminology: Refer to ASTM D1079 "Standard Terminology Relating to Roofing and Waterproofing" and glossary in NRCA's "The NRCA Roofing Manual: Membrane Roof Systems" for definition of terms related to roofing work in this Section.

B. Roofing Coating Preparation: Existing roofing that is to remain and be prepared to accept restorative coating application.

C. Patching: Removal of a portion of existing membrane roofing system from deck or removal of selected components and accessories from existing membrane roofing system and replacement with compatible similar materials.

D. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and reinstalled.

E. Existing to Remain: Existing items of construction that are not indicated to be removed.

F. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

G. Demolition Waste: Building and site improvement materials resulting from re-roofing preparation, demolition, or selective demolition operations.

H. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.

I. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.

J. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.

K. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product specified.

VA Hospital

070150.73 - Page 3 of 13

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer, Manufacturer, and Roofing Inspector.

1. Letter written for this Project indicating manufacturer approval of Installer to apply specified products and provide specified warranty.

B. Contractor's Product Certificate: Submit notarized certificate, indicating products intended for Work of this Section, including product names and numbers and manufacturers' names, with statement indicating that products to be provided meet the requirements of the Contract Documents.

1. Provide manufacturer's UL listing certificate for roofing system.

C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, and for dust control. Indicate proposed locations and construction of barriers.

D. Warranties: Unexecuted sample copies of special warranties.

E. Existing Conditions Photographs: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces, which might be misconstrued as having been damaged by re-coating operations. Submit before Work begins.

F. Inspection Reports: Reports of Roofing Inspector. Include weather conditions, description of work performed, tests performed, defective work observed, and corrective actions required and carried out.

1. Submit report within 48 hours after inspection.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance Data: To include in maintenance manuals.

B. Warranties: Executed copies of approved warranty forms.

1.8 QUALITY ASSURANCE

A. Installer Qualifications: An employer of workers trained and certified by manufacturer, including a full-time on-site supervisor with a minimum of three years' experience installing products comparable to those specified, able to communicate verbally with Contractor, and employees, and the following:

1. Qualified by the manufacturer to install manufacturer's product and furnish warranty of type specified.

B. Manufacturer Qualifications: Primary product manufacturer that is UL listed for roofing system identical to that specified for this Project with minimum five years' experience in manufacture of comparable products in successful use in similar applications, and able to furnish warranty with provisions matching specified requirements.

VA Hospital

070150.73 - Page 4 of 13

C. Roofing Inspector Qualifications: A technical representative of manufacturer not engaged in the sale of products and experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality Control Article, to determine Installer's compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be one of the following:

1. An authorized full-time technical employee of the manufacturer.

2. An independent party certified as a Registered Roof Observer by the International Institute of Building Enclosure Consultants (formerly the Roof Consultants Institute) retained by the Contractor or the Manufacturer and approved by the Manufacturer.

1.9 FIELD CONDITIONS

A. Weather Limitations: Proceed with rehabilitation work only when existing and forecasted weather conditions permit Work to proceed without water entering into existing roofing system or building.

1. Store all materials prior to application at temperatures recommended by manufacturer.

2. Apply coatings within range of ambient and substrate temperatures recommended by manufacturer.

3. Do not apply roofing in snow, rain, fog, or mist.

B. Protect building to be rehabilitated, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from rehabilitation operations.

C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

D. Daily Protection: Coordinate installation of roofing so insulation and other components of roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.

E. Owner will occupy portions of building immediately below re-coating area. Conduct re-coating so Owner's operations will not be disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.

1.10 WARRANTY

A. Manufacturer's Warranty: Roof System Manufacturer's standard form in which Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within warranty period, as follows.

1. Form of Warranty: Manufacturer's standard warranty form.

2. Scope of Warranty: Work of this Section and including sheet metal details and termination details installed by the roof system Installer and approved by the Roof System Manufacturer.

VA Hospital

070150.73 - Page 5 of 13

3. Warranty Period: 20 years from date of completion.

B. Manufacturer Inspection and Preventive Maintenance Service: To report maintenance responsibilities necessary for preservation of Owner's warranty rights and to perform periodic routine maintenance required, as described in Manufacturer's standard form. The cost of manufacturer's inspections and preventive maintenance is included in the Contract Sum.

1. Scope of Service: Manufacturer's standard form.

2. Inspections to occur in following years: 2, 5, 10, 15 following completion.

C. Installer Warranty: Installer's warranty signed by Installer, as follows.

1. Form of Warranty: Form included in Project Manual.

2. Scope of Warranty: Work of this Section.

3. Warranty Period: 2 years from date of completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Approved: Subject to compliance with requirements, provide products by one of the following:.

1. Qualification requirements are specified in: Part 1 Quality Assurance Article.

B. Source Limitations: Obtain components for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. General Performance: Rehabilitated roofing shall withstand exposure to weather without failure or leaks due to defective manufacture or installation.

1. Accelerated Weathering: Roofing system shall withstand 5000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155.

B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by roofing manufacturer based on testing and field experience.

C. Exterior Fire-Test Exposure: Roofing system exterior fire-test exposure performance following application of rehabilitation coating shall be not be less than that of the pre-rehabilitated roof performance when tested in accordance with ASTM E108, based upon manufacturer's tests of identical applications.

D. Energy Performance: Provide rehabilitated roofing according to one of the following when tested according to CRRC-1:

VA Hospital

070150.73 - Page 6 of 13

1. Three-year, aged solar reflectance of not less than 0.55 and emissivity of not less than 0.75.

E. Three-year, aged solar reflectance index of not less than 64 when calculated according to

ASTM E1980.

F. Bio-Based Content: Provide roofing rehabilitation coating materials meeting requirements of USDA Bio-based Affirmative Procurement Program, with not less than 20 percent bio-based content.

2.3 MATERIALS

A. General: Re-coating materials recommended by roofing system manufacturer for intended use and compatible with components of existing membrane roofing system.

B. Infill Materials: Where required to replace test cores and to patch existing roofing, use infill materials matching existing membrane roofing system materials, unless otherwise indicated.

C. Temporary Roof Drainage: Design and selection of materials for temporary roof drainage are responsibilities of the Contractor.

2.4 FLUID-APPLIED ROOFING MEMBRANE

A. Polyurethane Elastomeric Fluid-Applied System: Two-coat fluid-applied roofing membrane formulated for application over prepared existing roofing substrate.

1. Polyurethane Roof Coating System Base Coat: Bio-based, low-odor low-VOC two-part, for use with a compatible top coat.

a. Combustion Characteristics, UL 790: Maintains combustion characteristics of existing roof system.

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 1 g/L.

c. Accelerated Weathering, 5000 hours, ASTM G154: Pass.

d. Hardness, Shore A, minimum, ASTM D2240: 80.

e. Solids, by volume, ASTM D2697: 100 percent.

f. Bio-Based Content, Minimum: 70 percent.

g. Minimum Thickness, Base Coat reinforced over Smooth BUR, MB, Concrete, Single-Ply: 48 mils (1.22 mm) wet.

2. Polyurethane roof coating system top coat, bio-based low-odor low-VOC two-part, for application over compatible base coat.

a. Combustion Characteristics, UL790: Maintains combustion characteristics of existing roof system.

VA Hospital

070150.73 - Page 7 of 13

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 6 g/L.

c. Solar Reflectance Index (SRI), ASTM E1980: For white, not less than 103.

d. Accelerated Weathering, 5000 hours, ASTM G 154: Pass.

e. Hardness, Shore A, minimum, ASTM D2240: 81.

f. Solids, by volume, ASTM D2697: 100 percent.

g. Bio-Based Content, Minimum: 60 percent.

h. Minimum Thickness, reinforced system: 32 mils (0.81 mm) wet.

i. Color: White.

B. Primers:

1. Primer for Asphaltic and Single-Ply Membranes: Water-based, polymer-modified quick-dry low odor primer.

a. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 1 g/L.

b. Solids, by weight: 70 percent.

2. Primer for Non-Porous Surfaces: Single-part, water based primer to promote adhesion of urethanes to metals, PVC and other non-porous surfaces.

a. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 22 g/L.

b. Nonvolatile Content, minimum, ASTM D2369: 5 percent.

c. Density at 77 deg F (25 deg C): 8.3 lb/gal (1kg/L).

C. Fluid-Applied Membrane Reinforcing Fabric:

1. Polyester Reinforcing and Protection Fabric: 100 percent stitch-bonded mildew-resistant polyester fabric intended for reinforcement of compatible fluid-applied membranes and flashings and as a protection layer under pavers or stone aggregates.

a. Tensile Strength, Minimum, ASTM D1682: 50 lbf (23 kg) avg..

b. Elongation, Minimum, ASTM D1682: 60 percent.

c. Tear Strength, Minimum, ASTM D1117: 16 lbf (7.3 kg) avg..

d. Weight: 3 oz./sq. yd (102 g/sq. m).

VA Hospital

070150.73 - Page 8 of 13

2.5 AUXILIARY MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with existing roofing system and fluid-applied roofing system.

B. Seam Sealer: Waterproof seam and patching material compatible with applied coating.

1. Seam Sealer: Aromatic polyurethane sealer, single-component, high solids, moisture curing, formulated for compatibility and use with a variety of roofing and flashing substrates.

a. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 189 g/L.

b. Tensile Strength, ASTM D412: 270 psi (1860 kPa).

c. Tear Strength, ASTM D412: 35 pli (6.13 kNm).

d. Elongation, ASTM D412: 220 percent.

e. Color: Gray.

C. Seam and Detail Reinforcing Fabric:

1. Polyester Reinforcing and Protection Fabric: 100 percent stitch-bonded mildew-resistant polyester fabric intended for reinforcement of compatible fluid-applied membranes and flashings and as a protection layer under pavers or stone aggregates.

a. Tensile Strength, Minimum, ASTM D1682: 50 lbf (23 kg) avg..

b. Elongation, Minimum, ASTM D1682: 60 percent.

c. Tear Strength, Minimum, ASTM D1117: 16 lbf (7.3 kg) avg..

d. Weight: 3 oz./sq. yd (102 g/sq. m).

D. Joint Sealant: Elastomeric joint sealant compatible with applied coating, with movement capability appropriate for application.

1. Joint Sealant, Polyurethane: ASTM C920, Type S, Grade NS, Class 50 single-component moisture curing sealant, formulated for compatibility and use in dynamic and static joints; paintable.

a. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 40 g/L.

b. Hardness, Shore A, ASTM C661: 40.

c. Adhesion to Concrete, ASTM C794: 35 pli.

d. Tensile Strength, ASTM D412: 350 psi (2410 kPa).

VA Hospital

070150.73 - Page 9 of 13

e. Color: Closest match to substrate.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine existing roofing substrates, with Installer present, for compliance with requirements and for other conditions affecting application and performance of roof coatings.

1. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance.

2. Verify compatibility of approved re-coating system with and suitability of substrates.

3. Verify that substrates are visibly dry and free of moisture.

4. Verify that roofing membrane surfaces have adequately aged to enable proper bond with re-coating system base coat.

5. Verify that existing roofing membrane is free of blisters, splits, open laps, indications of shrinkage, and puncture damage or other indications of impending roof system failure.

6. Commencing application of fluid-applied re-coating membrane indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Protect existing roofing system that is indicated not to be rehabilitated, and adjacent portions of building and building equipment.

1. Mask surfaces to be protected. Seal joints subject to infiltration by coating materials.

2. Limit traffic and material storage to areas of existing roofing membrane that have been protected.

3. Maintain temporary protection and leave in place until replacement roofing has been completed.

B. Pollution Control: Comply with environmental regulations of authorities having jurisdiction.

Limit spread of dust and debris.

1. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

2. Remove debris from building roof by chute, hoist, or other device that will convey debris to grade.

C. Shut down air intake equipment in the vicinity of the Work in coordination with the Owner.

Cover air intake louvers before proceeding with re-coating work that could affect indoor air quality or activate smoke detectors in the ductwork.

VA Hospital

070150.73 - Page 10 of 13

1. Verify that rooftop utilities and service piping affected by the Work have been shut off before commencing Work.

D. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday.

Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.

1. Do not permit water to enter into or under existing membrane roofing system components that are to remain.

3.3 ROOFING COATING PREPARATION

A. Removal of Wet Insulation: Remove portions of roofing membrane with underlying wet insulation. Remove wet insulation, fill in tear-off areas to match existing insulation and membrane, and prepare patched membrane for roof coating application specified below.

Remove wet insualtion on West side of Roof 2E & install a tapered insulation system to provide positive drainage on pooling areas.

B. Repair of Ponding Areas: Repair areas indicated as ponding areas or areas of inadequate drainage by removing roof membrane, adding additional insulation as required to provide minimum slopes to drain required by roofing rehabilitation coating manufacturer, and replace membrane with material matching existing. Submit photographic report indicating compliance.

C. Membrane Surface Preparation:

1. Remove loose granular aggregate from granular aggregate-surfaced built-up bituminous roofing with a power broom.

2. Remove pavers and walkway pads from roofing membrane.

3. Remove blisters, ridges, buckles, roofing membrane fastener buttons projecting above the membrane, and other substrate irregularities from existing roofing membrane that would inhibit application of uniform, waterproof coating.

4. Broom clean existing substrate.

5. Substrate Cleaning: Clean substrate in accordance with requirements of Division 07 Section "Maintenance Cleaning of Membrane Roofing."

6. Substrate Cleaning: Clean substrate of contaminants such as dirt, debris, oil, and grease that can affect adhesion of coating by power washing at minimum 2,000 psi. (13,800 kPa).

a. Dispose of waste water in accordance with requirements of authorities having jurisdiction.

7. Verify that existing substrate is dry before proceeding with application of coating. Spot check substrates with an electrical capacitance moisture-detection meter.

VA Hospital

070150.73 - Page 11 of 13

8. Verify adhesion of new products.

D. Existing Flashing and Detail Preparation: Repair flashings, gravel stops, copings, and other roof-related sheet metal and trim elements. Reseal joints, replace loose or missing fasteners, and replace components where required to leave in a watertight condition.

1. Do not damage metal counterflashings that are to remain. Replace metal counterflashings damaged during removal with counterflashings of same metal, weight or thickness, and finish.

2. Roof Drains: Remove drain strainer and clamping ring. Grind metal surfaces down to clean, bare, metal.

E. Surface Priming: Prime surfaces to receive fluid-applied coating using coating manufacturer's recommended product for surface material. Apply at application rate recommended by manufacturer.

1. Ensure primer does not puddle and substrate has complete coverage.

2. Allow to cure completely prior to application of coating.

3.4 FLUID-APPLIED FLASHING APPLICATION

A. Fluid-Applied Flashing and Detail Base Coat Application: Complete base coat and fabric reinforcement at parapets, curbs, penetrations, and drains prior to application of field of fluid-applied membrane. Apply base coat in accordance with manufacturer's written instructions.

1. Apply base coat on prepared and primed surfaces and spread coating evenly. Extend coating minimum of 8 inches (200 mm) up vertical surfaces and 4 inches (100 mm) onto horizontal surfaces.

2. Back roll to achieve not less than minimum coating thickness indicated in Part 2 product listing, unless greater thickness is recommended by manufacturer. Verify thickness as work progresses.

3. Fabric Reinforcement: Embed fabric reinforcement into wet base coat. Lap adjacent flashing pieces of fabric minimum 3 inches (75 mm) along edges and 6 inches (150 mm) at end laps.

a. Roll surface of fabric reinforcing to completely embed and saturate fabric. Leave finished base coat with fabric free of pin holes, voids, or openings.

4. Roof Drains: Install base coat onto surrounding membrane surface and metal drain bowl flange. Install target piece of fabric reinforcement immediately into wet base coat and roll to fully embed and saturate fabric. Reinstall clamping ring and strainer following application of top coat. Replace broken drain ring clamping bolts.

5. Allow base coat to cure prior to application of top coat.

VA Hospital

070150.73 - Page 12 of 13

3.5 FLUID-APPLIED MEMBRANE APPLICATION

A. Fluid-Applied Membrane Base Coat: Apply base coat to field of membrane in accordance with manufacturer's written instructions.

1. Apply base coat on prepared and primed surfaces and spread coating evenly.

2. Back roll to achieve not less than minimum coating thickness indicated in Part 2 product listing, unless greater thickness is recommended by manufacturer. Verify thickness as work progresses.

3. Fabric Reinforcement: Embed fabric reinforcement into wet base coat. Lap adjacent flashing pieces of fabric minimum 3 inches (75 mm) along edges and 6 inches (150 mm) at end laps.

a. Roll surface of fabric reinforcing to completely embed and saturate fabric. Leave finished base coat with fabric free of pin holes, voids, or openings.

b. Following curing of base coat and prior to application of top coat, sand raised or exposed edges of fabric reinforcement.

B. Top Coat Application: Apply top coat to field of membrane and flashings uniformly in a complete, continuous installation.

1. Allow base coat to cure prior to application of top coat.

2. Following curing of base coat and prior to application of top coat, sand raised or exposed edges of fabric reinforcement.

3. Prime base coat prior to application of top coat if top coat is not applied within 72 hours of the base coat application, using manufacturer's recommended primer.

4. Apply top coat extending coating up vertical surfaces and out onto horizontal surfaces.

Install top coat over field base coat and spread coating evenly.

5. Back roll to achieve not less than minimum coating thickness indicated in Part 2 product listing, unless greater thickness is recommended by manufacturer. Verify thickness as work progresses.

6. Avoid foot traffic on new fluid-applied membrane for a minimum of 24 hours.

3.6 FIELD QUALITY CONTROL

A. Roofing Inspector: Contractor shall engage a qualified roofing inspector to perform roof tests and inspections and to prepare test reports.

1. Roofing Inspector: Contractor shall engage a qualified roofing inspector for a minimum of 5 full-time days on site, per 40-hour crew week, to perform roof tests and inspections and to prepare start up, interim, and final reports. Roofing Inspector's quality assurance

VA Hospital

070150.73 - Page 13 of 13 inspections shall comply with criteria established in Quality Control and Quality-assurance Guidelines for the Application of Membrane Roof Systems."

B. Roof Inspection: Engage roofing system manufacturer's technical personnel to inspect roofing installation, and submit report. Notify Owner’s Consultant 48 hours in advance of dates and times of inspections. Inspect work as follows:

1. Upon completion of preparation of roof coating substrate, prior to application of coating materials.

2. Following application of coating to flashings and application of base coat to field of roof.

3. Upon completion of coating but prior to re-installation of other roofing components.

C. Repair fluid-applied membrane where test inspections indicate that they do not comply with specified requirements.

D. Arrange for additional inspections, at Contractor's expense, to verify compliance of replaced or additional work with specified requirements.

3.7 DISPOSAL

A. Collect demolished materials and place in containers. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

1. Storage or sale of demolished items or materials on-site is not permitted.

B. Transport and legally dispose of demolished materials off Owner's property.

3.8 PROTECTING AND CLEANING

A. Protect roofing system from damage and wear during remainder of construction period.

B. Correct deficiencies in or remove coating that does not comply with requirements, repair substrates, and reapply coating.

C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

END OF SECTION 070150.73

VA Hospital

077100 - Page 1 of 10

ROOF SPECIALTIES

SECTION 077100 - ROOF SPECIALTIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Manufactured copings.

2. Manufactured roof-edge specialties (fasciae, drip edges and gravel stops).

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site, in conjunction with roofing preinstallation conference specified in Division 07 roofing section.

1. Meet with Owner, Owner's Consultant, Owner's insurer if applicable, Installer, and installers whose work interfaces with or affects roof specialties including installers of roofing materials and accessories.

2. Examine substrate conditions for compliance with requirements, including flatness and attachment to structural members.

3. Review special roof details, roof drainage, and condition of other construction that will affect roof specialties.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.

B. Shop Drawings: For roof specialties.

1. Include plans, elevations, expansion-joint locations, keyed details, and attachments to other work. Distinguish between plant- and field-assembled work.

2. Include details for expansion and contraction; locations of expansion joints, including direction of expansion and contraction.

3. Indicate profile and pattern of seams and layout of fasteners, cleats, clips, and other attachments.

4. Detail termination points and assemblies, including fixed points.

5. Include details of special conditions.

VA Hospital

077100 - Page 2 of 10

C. Samples for Initial Selection: For each type of roof specialty indicated with factory-applied color finishes.

D. Samples for Verification: For each roof specialty product made from 12-inch (300-mm) lengths of full-size components including fasteners, cover joints, accessories, and attachments.

E. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for copings.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For manufacturer.

B. Product Certificates: Provide manufacturer’s certificates for [copings] [and] [roof-edge specialties] indicating compliance with performance requirements including the following:

1. ANSI/SPRI/FM 4435/ES-1 compliance.

2. Florida Product Approval.

3. Miami-Dade Notice of Acceptance.

C. Sample Warranty: For manufacturer's special warranty.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance Data: For roofing specialties to include in maintenance manuals.

1.6 QUALITY ASSURANCE

A. Manufacturer Qualifications: A qualified manufacturer offering products meeting requirements that are ANSI/SPRI ES-1 tested to specified design pressure.

B. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and set quality standards for fabrication and installation.

1. Build mockup of typical roof edge as shown on Drawings.

2. Build mockup of typical roof edge, including fascia, approximately 6 feet (1829 mm) long, including supporting construction, seams, attachments, underlayment, and accessories.

3. Build mockup of typical roof edge, including coping, approximately 10 feet (3.0 m) long, including supporting construction, seams, attachments, underlayment, and accessories.

4. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Owner specifically approves such deviations in writing.

VA Hospital

077100 - Page 3 of 10

5. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Do not store roof specialties in contact with other materials that might cause staining, denting, or other surface damage. Store roof specialties away from uncured concrete and masonry.

B. Protect strippable protective covering on roof specialties from exposure to sunlight and high humidity, except to extent necessary for the period of roof specialties installation.

1.8 PROJECT / FIELD CONDITIONS

A. Field Measurements: Verify profiles and tolerances of roof-specialty substrates by field measurements before fabrication, and indicate measurements on Shop Drawings.

B. Coordination: Coordinate roof specialties with flashing, trim, and construction of parapets, roof deck, roof and wall panels, and other adjoining work to provide a leakproof, secure, and noncorrosive installation.

1.9 WARRANTY

A. Roofing-System Warranty: Roof specialties are included in warranty provisions in Division 07 roofing Section.

B. Special Warranty on Painted Finishes: Manufacturer's standard form in which manufacturer agrees to repair finish or replace roof specialties that show evidence of deterioration of factory-applied finishes within specified warranty period.

1. Fluoropolymer Finish: Deterioration includes, but is not limited to, the following:

a. Color fading more than 5 Hunter units when tested according to ASTM D2244.

b. Chalking in excess of a No. 8 rating when tested according to ASTM D4214.

c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.

2. Finish Warranty Period: 20years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. General Performance: Roof specialties shall withstand exposure to weather and resist thermally induced movement without failure, rattling, leaking, or fastener disengagement due to defective manufacture, fabrication, installation, or other defects in construction

B. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 25 percent.

VA Hospital

077100 - Page 4 of 10

C. SPRI Wind Design Standard: Manufacture and install [copings][ and ][roof-edge specialties] tested according to ANSI/SPRI ES-1.

D. High Wind Design Approval: Provide copings approved for use in high wind design area and hurricane high velocity wind zone by one of the following:

1. Florida Product Approval, Florida Department of Business and Professional Regulation.

2. Miami-Dade County Regulatory and Economic Resources, Notice of Acceptance.

3. Include documented acceptance of use in hurricane high wind design zone.

E. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, hole elongation, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Provide clips that resist rotation and avoid shear stress as a result of thermal movements. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

2.2 MANUFACTURERS

A. Approved: Subject to compliance with requirements, provide products by one of the following:.

1. Tremco CPG Inc.

2. Manufacturer of comparable products: Approved by Architect prior to bid.

B. Source Limitations: Obtain roof specialties approved by manufacturer providing roofing-system warranty specified in Division 07 roofing Section.

2.3 EXPOSED METALS

A. Aluminum Sheet: ASTM B209/B209M, alloy as standard with manufacturer for finish required, with temper to suit forming operations and performance required.

1. Surface: Smooth, flat finish as indicated.

B. Zinc-Coated (Galvanized) Steel Sheet: ASTM A653/A653M, G90 (Z275) coating designation.

1. Surface: Smooth, flat finish as indicated.

2.4 CONCEALED METALS

A. Aluminum Extrusions: ASTM B221/B221M, alloy and temper recommended by manufacturer for type of use and structural performance indicated, mill finished.

B. Zinc-Coated (Galvanized) Steel Sheet: ASTM A653/A653M, G90 (Z275) coating designation.

VA Hospital

077100 - Page 5 of 10

2.5 UNDERLAYMENT MATERIALS

A. Felt: ASTM D226/D226M, Type II (No. 30), asphalt-saturated organic felt, nonperforated.

B. Self-Adhering, High-Temperature Sheet: Minimum 30 to 40 mils (0.76 to 1.0 mm) thick, consisting of slip-resisting polyethylene-film top surface laminated to layer of butyl or SBS-modified asphalt adhesive, with release-paper backing; cold applied. Provide primer when recommended by underlayment manufacturer.

1. Thermal Stability: ASTM D1970/D1970M; stable after testing at 240 deg F (116 deg C).

2. Low-Temperature Flexibility: ASTM D1970/D1970M; passes after testing at minus 20 deg F (29 deg C).

C. Slip Sheet: Building paper, 3-lb/100 sq. ft. (0.16-kg/sq. m) minimum, rosin sized.

2.6 MISCELLANEOUS MATERIALS

A. General: Provide materials and types of fasteners, protective coatings, sealants, and other miscellaneous items required by manufacturer for a complete installation.

B. Fasteners: Manufacturer's recommended fasteners, suitable for application and designed to meet performance requirements. Furnish the following unless otherwise indicated:

1. Exposed Penetrating Fasteners: Gasketed screws with hex washer heads matching color of sheet metal.

2. Fasteners for Aluminum: Aluminum or Series 300 stainless steel.

3. Fasteners for Zinc-Coated (Galvanized) Steel Sheet: Series 300 stainless steel or hot-dip zinc-coated steel according to ASTM A153/A153M or ASTM F2329.

C. Elastomeric Sealant: ASTM C920, elastomeric silicone polymer sealant of type, grade, class, and use classifications required by roofing-specialty manufacturer for each application.

D. Bituminous Coating: Cold-applied asphalt emulsion complying with ASTM D1187/D1187M.

E. Asphalt Roofing Cement: ASTM D4586/D4586M, asbestos free, of consistency required for application.

2.7 MANUFACTURED COPINGS

A. Copings: Manufactured coping system consisting of formed-metal coping cap in section lengths not exceeding 12 feet (3.6 m), concealed anchorage; corner units, end cap units, and concealed splice plates with same finish as coping caps.

1. Coping Profile:

a. Unit Face Height: Accommodate existing height plus additional insulation and blocking indicated.

VA Hospital

077100 - Page 6 of 10

2. Basis-of-Design Product: Subject to compliance with requirements, provide Tremco, TremLock Infinity Coping.

3. Coping-Cap Material: Formed aluminum sheet, nominal 0.050-inch (1.27-mm) thick.

a. Finish: High-performance organic (PVDF) coating.

b. Color: As selected by Owner's Consultant from manufacturer's full range.

4. Corners: Factory mitered and continuously welded.

5. Special Fabrications: Radiused sections.

6. Coping-Cap Attachment Method: Snap-on, fabricated from coping-cap material.

7. Snap-on-Coping Anchor Plates: Concealed, galvanized-steel sheet, 12 inches (300 mm) wide, with integral cleats.

2.8 MANUFACTURED ROOF-EDGE SPECIALTIES

A. Roof-Edge Fascia: Snap-on type fascia with vertical profile.

1. Description: Manufactured two-piece roof-edge fasciae systems consisting of formed-metal fascia covers in section lengths not exceeding 12 feet (3.6 m), with an extruded anchor bar to engage and secure fascia cover, and concealed splice plates. Provide matching prefabricated continuously welded corner units.

a. Splice Plates: Of same material and finish as roof edge flashing units, 8 inches (203 mm) long with factory-installed dual non-curling butyl sealant strips.

2. Basis-of-Design Product: Tremco, TremLock 215 Fascia.

3. Fascia Cover Securement: Snap-on, over continuous extruded aluminum anchor bar.

4. Roofing System: Single-ply.

5. Fascia Cover Material: Zinc-coated steel, nominal 24 ga.; 0.028-inch (0.71-mm) thickness.

a. Finish: High-performance organic (PVDF) coating.

b. Color: As selected by Owner's Consultant from manufacturer's full range.

2.9 MANUFACTURED REGLETS AND COUNTERFLASHINGS

A. Reglets: Manufactured units formed to provide secure interlocking of separate reglet and counterflashing pieces.

1. Fabricate from the following exposed metal:

VA Hospital

077100 - Page 7 of 10

a. Material: Formed aluminum sheet, nominal 0.025-inch (0.64-mm) thick.

2. Corners: Factory prefabricated.

3. Surface-Mounted Type: Provide reglets with slotted holes for fastening to substrate, with neoprene or other suitable weatherproofing washers, and with channel for sealant at top edge.

4. Concrete Type, Embedded: Provide temporary closure tape to keep reglet free of concrete materials, special fasteners for attaching reglet to concrete forms, and guides to ensure alignment of reglet section ends.

B. Counterflashings: Manufactured units of heights to overlap top edges of base flashings by 4 inches (100 mm) and in lengths not exceeding 12 feet (3.6 m) designed to snap into reglets and compress against base flashings with joints lapped.

1. Fabricate from the following exposed metal:

a. Material: Formed aluminum sheet, nominal 0.025-inch (0.64-mm) thick.

C. Accessories:

1. Counterflashing Wind-Restraint Clips: Provide clips to be installed before counterflashing to prevent wind uplift of counterflashing lower edge.

2. Flexible-Flashing Retainer: Provide resilient plastic or rubber accessory to secure flexible flashing in reglet where clearance does not permit use of standard metal counterflashing or where reglet is provided separate from metal counterflashing.

D. Finishes: High-performance organic (PVDF) coating.

1. Color: As selected by Owner from manufacturer's full range.

2. Stainless Steel Finish: ASTM A480/A480M; No. 3 (coarse, polished directional satin) finish.

2.10 FINISHES

A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

B. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

C. Appearance of Finished Work: Noticeable variations in same piece are not acceptable.

Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

VA Hospital

077100 - Page 8 of 10

D. High-Performance Organic (PVDF) Coating: Prepare, pretreat, and apply coating to exposed metal surfaces to comply with ASTM A755/A755M and coating and resin manufacturers' written instructions.

E. Concealed Surface Finish: Apply pretreatment and manufacturer's standard acrylic or polyester backer finish consisting of prime coat and wash coat with a minimum total dry film thickness of

0.5 mil (0.013 mm).

F. Mill Finish: As manufactured.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions, and other conditions affecting performance of the Work.

B. Examine walls, roof edges, and parapets for suitable conditions for roof specialties.

C. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION OF UNDERLAYMENT

A. Felt Underlayment: Install with adhesive for temporary anchorage to minimize use of mechanical fasteners under roof specialties. Apply in shingle fashion to shed water, with lapped joints of not less than 2 inches (50 mm).

B. Self-Adhering Sheet Underlayment: Install wrinkle free. Apply primer if required by underlayment manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation; use primer rather than nails for installing underlayment at low temperatures. Apply in shingle fashion to shed water. Overlap edges not less than 3-1/2 inches (90 mm). Roll laps with roller. Cover underlayment within 14 days.

C. Slip Sheet: Install with tape or adhesive for temporary anchorage to minimize use of mechanical fasteners under roof specialties. Apply in shingle fashion to shed water, with lapped joints of not less than 2 inches (50 mm).

3.3 INSTALLATION, GENERAL

A. General: Install roof specialties according to manufacturer's written instructions. Anchor roof specialties securely in place, with provisions for thermal and structural movement. Use fasteners, solder, protective coatings, separators, sealants, and other miscellaneous items as required to complete roof-specialty systems.

1. Install roof specialties level, plumb, true to line and elevation; with limited oil-canning and without warping, jogs in alignment, buckling, or tool marks.

2. Provide uniform, neat seams with minimum exposure of solder and sealant.

VA Hospital

077100 - Page 9 of 10

3. Install roof specialties to fit substrates and to result in watertight performance. Verify shapes and dimensions of surfaces to be covered before manufacture.

4. Torch cutting of roof specialties is not permitted.

5. Do not use graphite pencils to mark metal surfaces.

B. Metal Protection: Protect metals against galvanic action by separating dissimilar metals from contact with each other or with corrosive substrates by painting contact surfaces with bituminous coating or by other permanent separation as recommended by manufacturer.

1. Coat concealed side of uncoated aluminum roof specialties with bituminous coating where in contact with wood, ferrous metal, or cementitious construction.

2. Underlayment: Where installing metal flashing directly on cementitious or wood substrates, install a course of self-adhering, high-temperature sheet underlayment.

3. Bed flanges in thick coat of asphalt roofing cement where required by manufacturers of roof specialties for waterproof performance.

C. Expansion Provisions: Allow for thermal expansion of exposed roof specialties.

1. Space movement joints at a maximum of 12 feet (3.6 m) with no joints within 18 inches (450 mm) of corners or intersections unless otherwise shown on Drawings.

2. When ambient temperature at time of installation is between 40 and 70 deg F (4 and 21 deg C), set joint members for 50 percent movement each way. Adjust setting proportionately for installation at higher ambient temperatures.

D. Fastener Sizes:

1. Wood Blocking or Sheathing: Use fasteners of sizes that penetrate wood blocking or sheathing not less than 1-1/4 inches (32 mm) for nails and not less than 3/4 inch (19 mm) for wood screws.

2. Other Substrates: Use fasteners of sizes that penetrate substrate not less than recommended by fastener manufacturer to achieve maximum pull-out resistance.

E. Seal joints with elastomeric sealant as required by roofing-specialty manufacturer.

F. Seal joints as required for watertight construction. Place sealant to be completely concealed in joint. Do not install sealants at temperatures below 40 deg F (4 deg C).

3.4 INSTALLATION OF COPINGS

A. Install clips, cleats, anchor plates, and other anchoring and attachment accessories and devices with concealed fasteners.

B. Anchor copings with manufacturer's required devices, fasteners, and fastener spacing to meet performance requirements.

VA Hospital

077100 - Page 10 of 10

1. Interlock face and back leg drip edges of snap-on coping cap into cleated anchor plates anchored to substrate at manufacturer's required spacing that meets performance requirements.

2. Interlock face-leg drip edge into continuous cleat anchored to substrate at manufacturer's required spacing that meets performance requirements.

3.5 INSTALLATION OF ROOF-EDGE SPECIALTIES

A. Install clips, cleats, cants, and other anchoring and attachment accessories and devices with concealed fasteners.

B. Anchor roof edgings with manufacturer's required devices, fasteners, and fastener spacing to meet performance requirements.

3.6 INSTALLATION OF REGLETS AND COUNTERFLASHINGS

A. General: Coordinate installation of reglets and counterflashings with installation of base flashings.

B. Surface-Mounted Reglets: Install reglets to receive flashings where flashing without embedded reglets is indicated on Drawings. Install at height so that inserted counterflashings overlap 4 inches (100 mm) over top edge of base flashings.

C. Counterflashings: Insert counterflashings into reglets or other indicated receivers; ensure that counterflashings overlap 4 inches (100 mm) over top edge of base flashings. Lap counterflashing joints a minimum of 4 inches (100 mm) and bed with elastomeric sealant. Fit counterflashings tightly to base flashings.

3.7 CLEANING AND PROTECTION

A. Clean exposed metal surfaces.

B. Clean off excess sealants.

C. Clean and neutralize flux materials. Clean off excess solder.

D. Remove temporary protective coverings and strippable films as roof specialties are installed. On completion of installation, clean finished surfaces including removing unused fasteners, metal filings, pop rivet stems, and pieces of flashing. Maintain roof specialties in a clean condition during construction.

E. Replace roof specialties that have been damaged or that cannot be successfully repaired by finish touchup or similar minor repair procedures.

END OF SECTION 077100