About this file

This document includes a roof plan drawing and details for the Newington Metal Coping and Roof Repair/Replacement Project at the Newington CT Campus of the Connecticut VA Health Care System. The project involves removing and replacing the existing adhered modified bitumen roofing system and all related flashing in its entirety. It will prepare the roof surface for an aliphatic liquid applied roof system. All roof-mounted HVAC units, condenser units, plumbing and ventilation penetrations, roof drains, and electrical and communications equipment and conduit will be disconnected, removed, or reworked as needed to facilitate the new roof and flashing installation. Bidders should follow all drawing notes, specifications, and details for preparing their responses due by August 12th, 2022. The Department of Veterans Affairs Veterans Health Administration VISN 1 is the contracting agency for this project located at 555 Willard Ave, Newington, CT.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWN BY

CGS

APPROVED

A HALL

DATE

P R

O J E

C T

N e w i n g t o n

V

A

M e d i c a l

C e n t e r

A1.3

T h e r m a l

S c a n

R e s t o r a t i o n

Roof Work Plan

DRAWING NAME:

DRAWING NUMBER:

& General Notes

P r o j e c t

O w n e r

L O

C A

T I O

N

DRAWING STATUS:

A1.3

W i l l a r d

A v e

N e w i n g t o n

C

T

DATE No. REVISIONS

Issued for Review:

27 JULY 2022

27 JULY 2022

U S

V e t e r a n s

A f f a i r s

D e p

M e d i c a l

C e n t e r

AutoCAD SHX Text

SITE LOCUS PLAN

AutoCAD SHX Text

- WET INSULATION

AutoCAD SHX Text

ROOF PLAN

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text

ROOF SF - 8,071 SF WET SF - 0 SF DRY SF - 8,071 SF

AutoCAD SHX Text

- WET INSULATION

AutoCAD SHX Text

ROOF SF - 1,498 SF WET SF - 0 SF DRY SF - 1,498 SF

AutoCAD SHX Text

ROOF 2W

AutoCAD SHX Text

ROOF 168

AutoCAD SHX Text D1.1

AutoCAD SHX Text D16.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.4

AutoCAD SHX Text D1.1

AutoCAD SHX Text D16.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.4

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.2

AutoCAD SHX Text

TYP

AutoCAD SHX Text D1.1

AutoCAD SHX Text

DEMOLITION GENERAL WORK NOTES::

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITHOUT ARROW INDICATE ENTIRE SPACE/AREA

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITH ARROWS INDICATE SPECIFIC AREAS &/OR ITEMS

AutoCAD SHX Text D1

AutoCAD SHX Text

ROOFING/FLASHING

AutoCAD SHX Text D1.2

AutoCAD SHX Text R&D EXISTING FASCIA AND RELATED FLASHING. REFER TO DETAIL 1/A2.1 FOR NEW PERIMETER FASCIA DETAILS. MATCH TO EXISTING METAL. SEE BID FORM UNIT COST FOR REPLACEMENT

AutoCAD SHX Text PREP & CLEAN ADHERED MOD-BIT ROOFING SYSTEM INCLUDING ALL RELATED FLASHING IN ITS ENTIRETY - PREPARE ROOF SURFACE FOR ALIPHATIC LIQUID APPLIED ROOF SYSTEM. SEE DRAWING A1.0 FOR EXISTING ROOF CONSTRUCTION CORE INFORMATION

AutoCAD SHX Text D15

AutoCAD SHX Text

PLUMBING AND HVAC PENETRATIONS

AutoCAD SHX Text D15.2

AutoCAD SHX Text ALL ROOF MOUNTED HVAC UNITS & CONDENSER UNITS ARE TO REMAIN. IF DISCONNECTION IS REQUIRED COORDINATE WITH VA. NEW PITCH POCKETS + SUPPORT BLOCKING TO BE F&I BY THE ROOFING CONTRACTOR - REFER TO DETAILS 7/A2.1 FOR EQUIPMENT SUPPORT AND PITCH POCKET / WORK BOX DETAILS

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.1

AutoCAD SHX Text EXISTING CURB MOUNTED HVAC UNITS / FAN UNIT / DUCT PENETRATIONS TO REMAIN. REFER TO DETAIL 3/A2.1 FOR CURB FLASHING DETAIL. DISCONNECT AND RE-CONNECT BY OWNER'S DESIGNATED CONTRACTOR. IF DISCONNECTION IS REQUIRED COORDINATE WITH VA.

AutoCAD SHX Text EXISTING VENT STACKS TO REMAIN UNLESS NOTED OTHERWISE - ALL VENT PIPE FLASHING F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 6/A2.1 FOR VENT FLASHING DETAIL

AutoCAD SHX Text D15.4

AutoCAD SHX Text ALL ROOF DRAINS ARE TO BE REMOVED AND REPLACED WITH NEW CAST IRON ROOF DRAIN ASSEMBLY, INCLUDING TOP SET DECK PLATE AND ADJUSTABLE DECK CLAMP AND CAST IRON STRAINER - TO TIE INTO EXISTING ROOF DRAIN PIPING BY THE ROOFING CONTRACTOR - REFER TO DRAWING 4/A2.1 FOR ROOF DRAIN DETAIL

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16

AutoCAD SHX Text UNLESS NOTED OTHERWISE ALL EXISTING ROOF MOUNTED ELECTRICAL AND COMMUNICATIONS CONDUIT AND RELATED WORK BOXES, CONTROL PANELS, SECURITY CAMERAS, ETC. IS TO BE REMOVED AND/OR RE-WORKED TO ALLOW FOR INSTALLATION OF NEW ROOFING AND FLASHING SYSTEMS BY THE OWNER'S DESIGNATED ELECTRICAL CONTRACTOR. THE ROOFING CONTRACTOR SHALL CAREFULLY COORDINATE AND FACILITATE WORK BETWEEN THE TWO TRADES & THE VA.

AutoCAD SHX Text

ELECTRICAL AND COMMUNICATIONS SYSTEMS

Sheets and Views
2022_VA Newington_CAD-ROOF PLAN 4.1

File details come from the government source that posted it. Updated .