Contractors_Acknowledgement_form.pdf

PDF 32 KB Posted

Attached to
Omega Park CCUA Connection State and local contract opportunity
Solicitation number
25/26-007
Issued by
Clay County, Miramar Beach CDP, Florida

About this file

This is a Contractor's Acknowledgment form issued by Clay County Utility Authority (CCUA) in Middleburg, Florida, required for the Omega Park CCUA Connection project (Invitation for Bid #25/26-007). The project involves utility improvements at Omega Community Park located at 4317 County Road 218 in Middleburg, including furnishing and installing approximately 190 linear feet of 8-inch PVC gravity sewer main, 335 linear feet of 2-inch water service, and 484 linear feet of 2-inch force main, along with new lift station construction, septic tank decommissioning, and site restoration. A mandatory pre-bid meeting is scheduled for October 30, 2025, at 1:00 PM at the park location, with bids due November 20, 2025, at 4:00 PM. The project requires substantial completion within 120 days from the Notice to Proceed and final completion within 150 calendar days.

The acknowledgment form mandates that contractors provide only materials compliant with CCUA's specifications, details, and Approved Materials Manual, with manholes designed according to CCUA Standard Details. Contractors are responsible for correction, removal, and replacement of all non-compliant items at their own expense. While the form serves as acknowledgment for standard materials listed in CCUA's Materials Manual, exceptions requiring individual shop drawings include alternate materials requested by the engineer, unlisted materials, and submittals for pumping stations and plant installations. Contractors must submit executed acknowledgments from each individual supplier before material installation. The total connection charges for the project amount to $27,670.30, which includes potable water capacity charge, alternative water supply surcharge, wastewater capacity charge, and environmental impact charges. Contractors must have been in business for a minimum of five years performing similar work and are required to provide a 5% bid bond and comprehensive insurance coverage including commercial general liability, business automobile liability, workers' compensation, and property coverage.

View the file

Other files for this state and local contract opportunity

Other files attached to Omega Park CCUA Connection, newest first.
File Type Posted
Contractors_Acknowledgement_form.pdf PDF
Omega_Park_CCUA_Connection_(Addendum_#1_Revision).pdf PDF
Omega_Park_CCUA_Connection_(Addendum_#1_Revision).pdf PDF
Material_Supplier_Acknowledgement_Form.pdf PDF
Recorded_Developer_Agreement.pdf PDF
Recorded_Developer_Agreement.pdf PDF
Material_Supplier_Acknowledgement_Form.pdf PDF
Omega_Park_CCUA_Connection.pdf PDF
CCUA_Dev_Agreement_No._2024_2025-291.pdf PDF
CCUA_Dev_Agreement_No._2024_2025-291.pdf PDF
CCUA_Dev_Agreement_No._2024_2025-291.pdf PDF
Omega_Park_100P_Plans.pdf PDF
Omega_Park_100P_Plans_2.pdf PDF
Omega_Park_100P_Plans_2.pdf PDF
Omega_Park_100P_Plans.pdf PDF
Omega_Park_100P_Plans.pdf PDF
Omega_Park_100P_Plans_2.pdf PDF
Clay_County_Agreement,_Contract_No._-31_-_Omega_Park_100P.pdf PDF
Clay_County_Agreement,_Contract_No._-31_-_Omega_Park_100P.pdf PDF
Clay_County_Agreement,_Contract_No._-31_-_Omega_Park_100P.pdf PDF
EFT_FORM.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Certificate_of_final_payment.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Certificate_of_final_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
Certificate_of_partial_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
W-9_(2024).pdf PDF
Certificate_of_final_payment.pdf PDF
W-9_(2024).pdf PDF
Warranty_Letter_.pdf PDF
Certificate_of_partial_payment.pdf PDF
W-9_(2024).pdf PDF
Warranty_Letter_.pdf PDF
Certificate_of_partial_payment.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Warranty_Letter_.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clay County Utility Authority 3176 Old Jennings Road

Middleburg, Florida 32068-3907 Telephone (904) 272-5999 Facsimile (904) 213-2498

Working together to protect public health, conserve our natural resources, and create long-term value for our ratepayers.

Shop Drawings and CCUA's Approved Materials List Form Contractor's Acknowledgment

Date: _______________________

Project Name:

The undersigned does hereby acknowledge and agree to provide only materials which are in accordance with CCUA's specifications, details, and its Approved Materials Manual.

Manholes shall be designed in accordance with CCUA's Standard Details, and it shall be the contractor's responsibility to verify that they are designed and built accordingly.

Correction, removal, and replacement of all Non-Compliant items shall be the contractor's responsibility and expense.

Acknowledged By:

Company Name:

Authorized Signature:

Title:

Address:

Telephone Number:

NOTE: (1) This form shall take the place of individual shop drawings for each item of materials with the following exceptions: any alternate materials requested by the Engineer; any material not listed in the CCUA's Materials Manual; and submittals associated with pumping stations and plant installations. Those exceptions shall have an individual shop drawing submitted for CCUA's review and approval prior to any installation of said materials. Please attach your executed acknowledgement from each individual supplier you plan to use on the project.

(2) This is CCUA's procedure and it does not preclude the design engineer from requiring additional submittals and shop drawings as he deems necessary for the project.

Clay County Utility Authority
Middleburg, Florida 32068-3907
Telephone (904) 272-5999
Facsimile (904) 213-2498
Working together to protect public health, conserve our natural resources, and create long-term value for our ratepayers.
Shop Drawings and CCUA's Approved Materials List Form
Contractor's Acknowledgment
Date:
Project Name:
Company Name:
Title:
Address 1:
Address 2:
Address 3:
Telephone Number:

File details come from the government source that posted it. Updated .