Material_Supplier_Acknowledgement_Form.pdf

PDF 32 KB Posted

Attached to
Omega Park CCUA Connection State and local contract opportunity
Solicitation number
25/26-007
Issued by
Clay County, Miramar Beach CDP, Florida

About this file

This is a Material Supplier Acknowledgement Form issued by Clay County Utility Authority (CCUA) for the Omega Park CCUA Connection project located at 4317 County Road 218 in Middleburg, Florida. The form requires material suppliers and contractors to acknowledge and agree that they will provide only materials conforming to CCUA's specifications, details, and Approved Materials Manual. The project involves furnishing and installing new water and sewer mains, including approximately 190 linear feet of 8" PVC gravity sewer main, 335 linear feet of 2" water service, and 484 linear feet of 2" force main, along with constructing a new lift station and decommissioning existing septic tanks. A mandatory pre-bid meeting is scheduled for October 30, 2025, at 1:00 PM at the park, with bids due November 20, 2025, at 4:00 PM. The project requires substantial completion within 120 days from the Notice to Proceed and final completion within 150 calendar days. Contractors must have been in business for a minimum of five years performing similar work and must provide a 5% bid bond.

The form establishes CCUA's procedure whereby the Material Supplier Acknowledgement takes the place of individual shop drawings for standard materials listed in CCUA's Materials Manual, with exceptions for alternate materials requested by the engineer, unlisted materials, and materials associated with pumping stations and plant installations, which require individual shop drawing submissions for CCUA approval prior to installation. The design engineer retains the right to require additional submittals and shop drawings as deemed necessary. Total connection charges for the project amount to $27,670.30, which includes potable water capacity charges, alternative water supply surcharges, wastewater capacity charges, and environmental impact fees. Bidders must comply with comprehensive insurance requirements, including commercial general liability, business automobile liability, workers' compensation, and property coverage. Chen Moore and Associates is serving as the engineering design firm for the project.

View the file

Other files for this state and local contract opportunity

Other files attached to Omega Park CCUA Connection, newest first.
File Type Posted
Contractors_Acknowledgement_form.pdf PDF
Contractors_Acknowledgement_form.pdf PDF
Omega_Park_CCUA_Connection_(Addendum_#1_Revision).pdf PDF
Omega_Park_CCUA_Connection_(Addendum_#1_Revision).pdf PDF
Recorded_Developer_Agreement.pdf PDF
Recorded_Developer_Agreement.pdf PDF
Material_Supplier_Acknowledgement_Form.pdf PDF
Omega_Park_CCUA_Connection.pdf PDF
CCUA_Dev_Agreement_No._2024_2025-291.pdf PDF
CCUA_Dev_Agreement_No._2024_2025-291.pdf PDF
CCUA_Dev_Agreement_No._2024_2025-291.pdf PDF
Omega_Park_100P_Plans_2.pdf PDF
Omega_Park_100P_Plans.pdf PDF
Omega_Park_100P_Plans.pdf PDF
Omega_Park_100P_Plans_2.pdf PDF
Omega_Park_100P_Plans_2.pdf PDF
Omega_Park_100P_Plans.pdf PDF
Clay_County_Agreement,_Contract_No._-31_-_Omega_Park_100P.pdf PDF
Clay_County_Agreement,_Contract_No._-31_-_Omega_Park_100P.pdf PDF
Clay_County_Agreement,_Contract_No._-31_-_Omega_Park_100P.pdf PDF
Certificate_of_partial_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
W-9_(2024).pdf PDF
EFT_FORM.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Certificate_of_final_payment.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Certificate_of_final_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
W-9_(2024).pdf PDF
Warranty_Letter_.pdf PDF
Certificate_of_partial_payment.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Warranty_Letter_.pdf PDF
Certificate_of_final_payment.pdf PDF
W-9_(2024).pdf PDF
Warranty_Letter_.pdf PDF
Certificate_of_partial_payment.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clay County Utility Authority 3176 Old Jennings Road

Middleburg, Florida 32068-3907 Telephone (904) 272-5999 Facsimile (904) 213-2469

Working together to protect public health, conserve our natural resources, and create long-term value for our ratepayers.

Shop Drawings and CCUA's Approved Materials List Form Material Supplier Acknowledgement

Date: ________________________

Project Name:

The undersigned does hereby acknowledge and agree to provide only materials which are in accordance with CCUA's specifications, details, and its Approved Materials Manual.

Acknowledged By:

Company Name:

Authorized Signature:

Title:

Address:

Telephone Number:

Contractor Name: __________________________

NOTE: (1) This form shall take the place of individual shop drawings for each item of materials with the following exceptions: any alternate materials requested by the Engineer; any material not listed in the CCUA's Materials Manual; and materials associated with pumping stations and plant installations. Those exceptions shall have an individual shop drawing submitted for CCUA's review and approval prior to any installation of said materials.

(2) This is CCUA's procedure and it does not preclude the design engineer from requiring additional submittals and shop drawings as he deems necessary for the project.

Clay County Utility Authority
Middleburg, Florida 32068-3907
Telephone (904) 272-5999
Facsimile (904) 213-2469
Working together to protect public health, conserve our natural resources, and create long-term value for our ratepayers.
Shop Drawings and CCUA's Approved Materials List Form
Material Supplier Acknowledgement
Date:
Project Name:
Company Name:
Title:
Address 1:
Address 2:
Address 3:
Telephone Number:
Contractor Name:

File details come from the government source that posted it. Updated .