This document contains three Contract Data Requirements Lists (CDRLs) related to a solicitation for the P5 Combat Training System System Security Update program.

The CDRLs require the following deliverables: a First Article Test and Evaluation Program Plan detailing the overall test program and detailed test event information due 60 days prior to test readiness reviews; First Article Test Procedures for each test event including requirements traceability tables due 30 days prior to test readiness reviews; and a First Article Test/Inspection Report for each conducted test including copies of test records and procedures with any deviations due 15 days after test completion. The Air Force Lifecycle Management Center is the requiring office, distribution is limited, and contractors must submit using the Wide Area Workflow system or approved secure electronic means. Resubmittals addressing government comments are due 15 days after receipt for all deliverables.

The related solicitation seeks proposals to produce System Security Update retrofit kits to replace obsolete Data Guard Processors in P5 Combat Training System Airborne Subsystems. The kits must implement encrypted data transmission and a National Security Agency certified control interface to meet current cybersecurity requirements and enable training with advanced aircraft through 2030. Proposals are sought under full and open competition procedures.

View the file

Other files for this federal contract opportunity

Other files attached to P5 Combat Training System (P5CTS) System Security Update (SSU) Solicitation, newest first.
File Type Posted
Section M (Amend 0007).pdf PDF
Section L (Amend 0007).pdf PDF
FA821021R5002_______0007.pdf PDF
FA821021R5002_______0006.pdf PDF
Section L (Amend 0005).pdf PDF
Section L (Amend 0005) Tracked Changes.docx DOCX document
FA821021R5002_______0005.pdf PDF
Section L (Amend 0004).docx DOCX document
FA821021R5002_______0004.pdf PDF
FA821021R5002_______0003.pdf PDF
Section M Amend 0003.docx DOCX document
CUI Statement of Work Tracked Changes.docx DOCX document
Contract Data Requirements List - Exhibit B (amend 0002).pdf PDF
Statement of Work (Amend 0002).pdf PDF
Contract Data Requirements List - Exhibit A (amend 0002).pdf PDF
FA821021R5002_______0002.pdf PDF
Government responses to questions from FA821021R20050001.pdf PDF
Contract Data Requirements List -Exhibit B (amend 0001).pdf PDF
Contract Data Requirements List - Exhibit A (Amend 0001) .pdf PDF
Statement of Work (Amend 0001).pdf PDF
Section L Attachments (Amend 0001).pdf PDF
P5 SSU Section L attachments Tracked Changes.docx DOCX document
CUI P5 SSU SOW Tracked Changes.docx DOCX document
CUI P5 SSU Section LTracked Changes.docx DOCX document
Section L (Amend 0001).pdf PDF
P5 SSU RFP Questions and Answers .pdf PDF
Corrected Gov Responses to draft RFP comments Final.pdf PDF
CUI P5 SSU Section M Tracked Changes.docx DOCX document
Section M (Amend 0001).pdf PDF
Attachment L-2 Requirements Traceability Cross-Reference Matrix (Amend 0001).pdf PDF
SSU Pricing Workbook(Amend 0001).pdf PDF
FA821021R5002_______0001.pdf PDF
Section L Attachments.pdf PDF
Statement of Work.pdf PDF
Contract Data Requirements List -Exhibit C.pdf PDF
Gov Responses to draft RFP comments Final.docx DOCX document
Attachment L-6 Government Rights in Data (GRID).pdf PDF
Section M.pdf PDF
Contract Data Requirements List -Exhibit A.pdf PDF
Section L.pdf PDF
First Article Requirements.pdf PDF
SSU Pricing Workbook.xlsx XLSX spreadsheet
Contract Data Requirements List -Exhibit B.pdf PDF
Contract Data Requirements List -Exhibit T.pdf PDF
FA821021R5002.pdf PDF
Attachment L-2 Requirements Traceability Cross-Reference Matrix.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

P5 SSU

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

D001

2. TITLE OF DATA ITEM

First Article Test and Evaluation Program Plan (TEPP)

3. SUBTITLE

First Article Integrated Test Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-81284/T

5. CONTRACT REFERENCE

SOW Para 4.2.7

6. REQUIRING OFFICE

AFLCMC/HBZP

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE 16

Draft

Final

Reg Repro

16. REMARKS

Ref Blk 4: Add to DID Paragraph 10.2.2: “The test plan shall encompass both Contractor and Government conducted (Contractor supported) tests, applicable prior test efforts, and all proposed tests to meet contractual requirements documented in the order of test event occurrence. Information used from previous test efforts may consist of any pertinent test documentation with supportive explanations as to how it will meet the current contract test requirements. Plans to use previous test data to satisfy test requirements shall be clearly identified and require Government approval. “

Add to Paragraph 10.2.5.1: “The TEPP main body shall describe the overall test program.

For each separate test event as defined in the body of the TEPP, an additional appendix shall be included that contains added detailed test event and schedule information.”

Add to DID Paragraph 10.2.5.5, Special tests: Special tests include security.

Add to 10.2.6: “Prepare a requirements traceability table that lists each P5CTS

Specification; e.g., System/Subsystem Specification, Interface Specification, and Software

Requirement Specification, etc, requirement, along with a Unique Specification identifier, that shall be verified by one of the verification methods listed below. Cross reference each listed requirement to: a) specification abbreviation and requirement number (list each specification document name, number, date and abbreviation used in this column in a legend at the beginning of matrix); b) specification paragraph number (when applicable) and requirement test; c) test procedure name; and, d) method of verification using “T” for test, “D” for demonstration, “E” for examination, “A-P” for analysis – previously tested, and “A” for analysis.” Provide the requirements traceability table as an appendix.

Ref Blk 8: The Government will provide response NLT 20 calendar days after submittal.

The Government will provide response NLT 10 calendar days after receipt of resubmittal.

Approved TEPP required for entrance to CDR.

Ref Blk 9: The Contractor shall coordinate the distribution statement with the Government prior to use to ensure other or special circumstances have not occurred that may warrant change in the distribution statement and that the most current information is applied.

Apply Export Control Statement and Destruction Notice IAW DoDI 5230.24

Ref Blks 10, 11 12 and 13. The Contractor shall submit NLT 60 calendar days prior to

First Article Test Readiness Reviews (TRR) for each event. Annotate all changes with change bars. The Contractor shall resubmit, incorporating Government comments, NLT 15 calendar days after receipt of Government comments. The Contractor shall provide updates when changes occur to the test program.

See Block 16*

AFLCMC/HBZP 2 2

6049 Wardleigh Rd

Bldg 1205

Hill AFB, UT 84056

15. TOTAL 2 0 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

FA8210-21-R-5002

DD FORM 1423-1, FEB 2001 Reset Page 2 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

P5 SSU

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Ref Blk 14: Data Items are to be delivered in the governments Wide Area Workflow (WAWF) system. For data items that exceed the file size limit of the WAWF system, a Letter of Submittal containing a listing of the Data Items shall be submitted in WAWF and the Data Items shall be submitted concurrently through approved secure electronic means. The contractor shall notify the government via email when Data Items are being delivered outside of WAWF.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

P5 SSU

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

D002

2. TITLE OF DATA ITEM

First Article Test Procedure

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80603A/T

5. CONTRACT REFERENCE

SOW Para 4.2.7

6. REQUIRING OFFICE

AFLCMC/HBZP

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE 16

Draft

Final

Reg Repro

16. REMARKS

Ref Blk 4: Contractor format acceptable. Required for each test. Also includes acceptance test procedures for pod and SRAs (e.g, SSU, end cap) (except for NSA 0N Number test procedures, which are covered by separate NSA CDRLs)

Add Paragraph 3.1.1.i: Document titles shall contain the CLIN number, if applicable, system title, contract number, test category [e.g., Computer Software Configuration Item

(CSCI), Environmental, Acceptance, Integration, Electromagnetic, Functional, First article, ST&E /SBSA security, to include UCDSMO required test, etc], CDRL number, and date.

Combine Paragraph 3.2.5 Table of Tests into Paragraph 3.2.3.3 Test Requirements and change text to read: Prepare a requirements traceability table that lists each requirement that shall be verified by these test procedures. List in a table the following information: a) specification abbreviation and requirement number (list each specification document name, number, date and abbreviation used in this column in a legend at the beginning of the table);

b) specification paragraph number (when applicable) and requirement text; c) test case name where requirement is tested; d) steps in procedures where requirement is verified;

e) method of verification using “T” for test, “D” for demonstration, “E” for examinations, “A-P” for analysis previously tested, and “A” for analysis; f) pass/fail criteria. Provide the requirements traceability tables as an appendix in each test procedure document.

Add Paragraph 3.2.6.g. Provide signature and data blocks at the end of each test case for test witness signoff by Government Representative, Contractor Test Director, and

Contractor QA.

Add Paragraph 3.2.7.g. Data recording steps shall correlate to the data input blocks as they occur in the step-by-step procedures of Paragraph 3.2.6.

Add Paragraph 3.2.9: “Provide a copy of the actual signed off Master Copy of the as run test procedures and any changes (red-lines) to the test procedures that occurred during testing to the Government representative on site at the conclusion of each test. Contractor may scan in color for digital presentation to the Government representative.”

Ref Blk 8: The Government will provide response NLT 20 calendar days after receipt of submittals. The Government will provide response to resubmittal NLT 10 calendar days after receipt. Approval is required prior to TRR.

Ref Blk 9: The Contractor shall coordinate the distribution statement with the Government prior to use to ensure other or special circumstances have not occurred that may warrant change in the distribution statement and that the most current information is applied. Apply

Export Control Statement and Destruction Notice IAW DoDI 5230.24.

See Block 16*

AFLCMC/HBZP 2 2

6049 Wardleigh Rd

Bldg 1205

Hill AFB, UT 84056

15. TOTAL 2 0 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP

DD FORM 1423-1, FEB 2001 Reset Page 2 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

P5 SSU

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Ref Blks 10, 11, 12 and 13: The Contractor shall submit NLT 30 calendar days prior to First Article Test Readiness Reviews (TRR) for each event.

Resubmit incorporating all Government comments NLT 15 calendar days after receipt of Government comments. The Contractor shall mark all changes to the previous submittal using the track changes function. The Contractor shall provide a copy of the actual as run signed off test procedures and any changes (red-lines) to the test procedures that occurred during testing and a copy of any test data to the Government at the conclusion of each test.

Ref Blk 14: Data Items are to be delivered in the governments Wide Area Workflow (WAWF) system. For data items that exceed the file size limit of the WAWF system, a Letter of Submittal containing a listing of the Data Items shall be submitted in WAWF and the Data Items shall be submitted concurrently through approved secure electronic means. The contractor shall notify the government via email when Data Items are being delivered outside of WAWF.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

P5 SSU

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

D003

2. TITLE OF DATA ITEM

First Article Test/Inspection Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B/T

5. CONTRACT REFERENCE

SOW Para 4.2.7

6. REQUIRING OFFICE

AFLCMC/HBZP

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

SEE BLK 16

12. DATE OF FIRST SUBMISSION

SEE 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE 16 Draft

Final

Reg Repro

16. REMARKS

Ref Blk 4: Contractor format acceptable. Required for each test (except for NSA 0N Number test procedures, which are covered by separate CDRLs) Add to Paragraph 10.1: The Contractor shall deliver a report for each conducted test under the Test Procedure (DI-NDTI-80603A) CDRL. All test reports shall include copies of the Test Incident Reports (TIR), Problem Change Requests (PCR), Deficiency Reports (DR) and any other documentation associated with all problems and known errors.

Change Paragraph 10.2.6.3 to: “Provide a complete copy of the ‘Master as run’ test procedures including any red-lines (additions, deletions and deviations) with the test report.

Contractor may scan for digital delivery.”

Change Paragraph 10.2.6.4.1 “Recorded data to read: “Provide copies of all data recorded for each test (for example, log book, recorded pod data on DRDs, CSCIs, Live Monitor, ICADS, RRU recordings, etc.) on CD(s) or DVD(s). Any data recorded on paper such as test logs, etc., may be scanned and loaded onto CD(s) or DVD(s) for digital presentation.”

Ref Blk 9: The Contractor shall coordinate the distribution statement with the Government prior to use to ensure other or special circumstances have not occurred that may warrant change in the distribution statement and that the most current information is applied. Apply Export Control Statement and Destruction Notice IAW DoDI 5230.24.

Ref Blks 10, 11, 12, 13: The Contractor shall submit NLT 15 calendar days after test completion. Resubmit, if required, NLT 15 calendar days after receipt of Government comments. Mark changes with track changes on.

Ref Blk 14: Data Items are to be delivered in the governments Wide Area Workflow (WAWF) system. For data items that exceed the file size limit of the WAWF system, a Letter of Submittal containing a listing of the Data Items shall be submitted in WAWF and the Data Items shall be submitted concurrently through approved secure electronic means.

The contractor shall notify the government via email when Data Items are being delivered outside of WAWF.

See Block 16*

AFLCMC/HBZP 2 2

6049 Wardleigh Rd Bldg 1205 Hill AFB, UT 84056

15. TOTAL 2 0 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP

D001_First Article Test and Evaluation Program Plan (TEPP)
D002_First Article Test Procedure
D003_First Article Test_Inspection Report
2021-04-22T07:46:57-0600
ADAMSON.STEVEN.JOEL.1599119724
2021-04-22T07:47:16-0600
ADAMSON.STEVEN.JOEL.1599119724
2021-04-22T07:47:35-0600
ADAMSON.STEVEN.JOEL.1599119724
2021-04-22T09:11:05-0600
SMITH.GILES.K.1054935443
2021-04-22T09:11:30-0600
SMITH.GILES.K.1054935443
2021-04-22T09:11:59-0600
SMITH.GILES.K.1054935443

File details come from the government source that posted it. Updated .