Construction Drawings.pdf
PDF 12 MB Posted
- Solicitation number
- 36C24226B0039
About this file
This is an image of a PDF portfolio cover page. The image displays a red and white binder or folder with the Adobe Acrobat logo prominently featured in the center. The page contains instructional text stating "For the best experience, open this PDF portfolio in Acrobat X or Adobe Reader X, or later" along with a button prompting users to "Get Adobe Reader Now!" This is a technical interface element rather than contract-related documentation and contains no substantive information regarding federal contract opportunities, products, services, pricing, timelines, or other procurement details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs - C02 GAS VENTILATION - BUF.docx | DOCX document | |
| 36C24226B0039 0002.docx | DOCX document | |
| Site Visit Sign In - CO2 Gas Room 2026.pdf | ||
| 36C24226B0039 0001.docx | DOCX document | |
| LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.docx | DOCX document | |
| Specifications CO2 Gas Ventilation 528-22-125.pdf | ||
| P07 - WAGE DETERMINATION.pdf | ||
| BUY AMERICAN ACT CERTIFICATE 52.225-2.docx | DOCX document | |
| 36C24226B0039_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
A
B
C
D
E
F
1 2
MANIFOLD FOR CO2 GAS
SPRINKLER HEAD
MGS-450 CO2 GAS
DETECTOR
TO BLOOD BANK
DUPLEX OUTLET
a
-TO MICROBIOLOGY
PROPOSED NEW GAS ROOM (N.T.S)
I Revisions: !Date:
1 I 2 I
� IGHT SWITCH
ALARM CONTROL
CONSULTANT
3 I
5 6 7 8 9
,,--TO THE ROOF TOP UNIT (EF-1)
'----RTU EMERGENCY
SHUTDOWN PUSH
BUTTON
II ARCHITECT/ENGINEER OF RECORD II STAMP
WNYHCS ENGINEERING
BUFFALO VETERANS ADMINISTRATION MEDICAL CENTER
3495 BAILEY AVENUE
BUFFALO, NEW YORK 14215
716-834-9200
I 5 I
�----t-MANIFOLD FOR MIX GAS
EILING LIGHT
------"11ANIFOLD FOR FUTURE EXPANSION
DESCRIPTION QTY MAKE MODEL DRAWING NO.
EF-1 ( ROOF TOP UNIT ) 1 GREENHECK VECTOR-H-9 M-7/E-7
GAS MANIFOLD 3 AMICO M4DE-DL-HH(H)-L-XXX M-2/E-2
ALARM CONTROL 3 AMICO A4AR-U-CCN M-2/E-2
GAS TANKS 10 ---------- CO2 / MIX GAS M-1/E-1
INCUBATOR,MICROBIOLOGY 2 PHCBI MCO-230A1CUVL-PA M-1/E-1
INCUBATOR,BLOOD BANK 1 PHCBI MCO-230A1CUVL-PA M-1/E-1
ANOXOMAT,MICROBIOLOGY 1
ADVANCED
ANX2J2G M-1/E-1
INSTRUMENTS
CO2 GAS DETECTOR 1 BACHARACH MGS-450 M-1/E-1
EB
EQUIPMENT SCHEDULE
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
I
ACQUISITION AND NOTES.
* C C - CONTRACTOR FURNISHED AND INSTALLED
* V C - GOVERNMENT FURNISHED, CONTRACTOR INSTALLED
* V V - GOVERNMENT FURNISHED AND INSTALLED
* FOR EQUIPMENT WHERE A MAKE AND MODEL HAVE BEEN IDENTIFIED,
THE MAKE AND MODEL ARE CONSIDERED TO BE BASIS OF DESIGN
DrawingTille PROPOSED NEW GAS ROOM
3D ISOMETRIC AND
EQUIPMENT SCHEDULE
Phase Project Title
PHASE TWO CO2 GAS VENTILATION
ILocation
• BLDG1- 2ND FLOOR-EWING
Issue Date Checked Drawn
12/08/2025 RJC MTA
7 I 8 I 9 I
ACQ
cc vc vv vc
Project Number 528-22-125 Building Number
I Drawing Number
A-3
L
C I
1 2 3 4 5
@ GENERAL NOTES,
(D INSTALL CO2 GAS DETECTOR SUPPLIED BY VA, CONTRACTOR IS RESPONSIBLE FDR FULL INSTALLATION INCLUDES ALL THE ASSOCIATED CONDUIT, \,/IRES, LO\,/ VOLTAGE TRANSFORMER AND FINAL TERMINATION AND CONNECTION, REFER TD DETAIL@ IN THIS SHEET FDR MORE INF□, ALSO THE EXACT LOCATION □F THE DETECTOR \,/ILL BE DETERMINED IN FIELD PRIOR TD INSTALL BY VA ENGINEER, ® FURNISH AND INSTALL ANDOVER CONTINUUM 12800 SERIES "BUILDING MANAGEMENT SYSTEM", CONTRACTOR IS RESPONSIBLE FDR ALL ASSOCIATED MATERIAL AND PROVIDE FULL INSTALLATION □F THE CONDUIT /\,/IRE AND THE EXACT ROUTE □F CONDUITS \,/ILL BE DETERMINED IN FIELD \,/ITH VA ENGINEER PRIOR TD INSTALL, PROVIDE FINAL TERMINATION AND CONNECTION TD THE \,/IRES IN THE GAS SENSOR, REFER TD DETAIL@IN THIS SHEET FDR ADDITIONAL INF□ AND REFER TD SHEET M-4/E-4 FDR MORE INF□ ABOUT THE □NE LINE DIAGRAM □F GAS CONTROL SYSTEM, G) CONTRACTOR SHALL BE RESPONSIBLE TD CONNECT THE NE\,/ ANDOVER SYSTEM TD THE EXISTING MASTER BUILDING MANAGEMENT SYSTEM, PROVIDE ALL ASSOCIATED MATERIAL AND FULL INSTALLATION, INCLUDING BUT NOT LIMITED T□, CONDUIT /\,/IRE, FITTINGS, SUPPORT, TERMINATION, LABELING, ETC .. COORDINATE \,/ITH VA ENGINEER FDR EXACT LOCATION □F NEAREST EXISTING MASTER MANAGEMENT BUILDING MANAGEMENT SYSTEM PRIOR TD INSTALLATION, LAST, CONTRACTOR SHALL BE RESPONSIBLE TD PROVIDE FULL PROGRAMMING TD THE NE\,/ SYSTEM AND PROVIDE TEST REPORT \,/ITH FULL
ALARMS TD THE VA FDR REVIE\,/ AND APPROVAL,
MIX GAS
I I I I I 'l C
\ I□ i'l □ ('\.J q i'l sJ uJ
6 7
NEW GAS ROOM
N
MIX GAS
223-E
8 9
234E-1
□ L--'L--'
I II 71 II □ □
228-E
226-E
P I
234-E □□
P I
MICRBIOLOGY
218-E
218-E 3 11219-E
234E-2
234E-31
234E-
201E-1
A A □ A
3/ 4 INCH EMT CONDUIT
218E-2 BLOOD BANK
r-+---------, Ql) s
CO2 GAS
DETECTOR
MGS-45O
PROVIDE 24VAC POWER SUPPLY
USE 2-CORE SHIELDED CABLE, 16-24 AWG
IN 3/ 4 INCH EMT CONDUIT
12OVAC-24VAC 12OVAC
M1 6 Cable Glands {:•-6) 2 Rubber Gasket (IP66 Version Only)
3 Internal Alar·m Buzzer 4 Power Connections (><2) 5 Digital Connection (Modbu�) 6 Analog Connection 7 Tactile Switch #1 8 Ribbon Cable Connection (To Sensor) -- I � 0 � :J•:•·:g,";m 9 TactileSwitch#2 ,-- - - • ,:t, - - . ·· · � G
_ <t,) _ - .�-s='e' ___ G ... • 10 Relay 3 Connecrion (FAULT) ' I I ., G) tt) , I 11 Relay 2 Connecti on (HIGH)
1 ,,.. 12 Relay 1 Connection (LOW)
@ CO2 GAS DETECTOR MGS-450 SUPPLIED BY VA
13 Magnetic Switch #1 14 Magnetic Switch #2
15 M20 Cable Glands (><2)
ANDOVER
CONTINUUM
i28OO SERIES
BUILDING
MANAGEMENT
SYSTEM
22 GAUGE STRANDED SHIELDED
AND TWISTED PAIR CABLE
PROVIDE 24VAC POWER SUPPLY
USE 2-CORE SHIELDED CABLE, 16-24 AWG
IN 3/4 INCH EMT CONDUIT
120VAC-24VAC 12OVAC
II
T I Black (Ground) I
Orange(15VDC)I I I I I
L
Optional: Abnormal Alarm
CH +1 Generic Alarm Dry- I I
CH-
Contact Fault Indicator I(to Building Milnagement I
HI 11111 II II II
f<Z><Z><Z><Z><Z>'"'""'"" ,,, .. , - - -
System/Master)
I - - -
OOOO«iCOOOOOC:0000 j ! i i ! I '
El4 el Bl Bl
8�, 1, � --0� 11 -
0 ..
o-
ANDOVER CONTINUUM i28OO SERIES
BUILDING MANAGEMENT SYSTEM
@ GAS SENSOR WIRING DIAGRAM FOR BUILDING MANAGEMENT SYSTEM
CONSULTANT ARCHITECT/ENGINEER OF RECORD 11
Drawing Title Phase
STAMP Office of PROPOSED CO2 GAS DETECTOR/
Revisions: Date:
2 3 4
WNYHCS ENGINEERING
BUFFALO VETERANS ADMINISTRATION MEDICAL CENTER
3495 BAILEY AVENUE
BUFFALO, NEW YORK 14215
716-834-9200
5 6
Construction and Facilities Management
VA I
U.S. Department
I of Veterans Affairs
PHASE TWO
BUILDING MANAGEMENT SYSTEM
7 I 8 I
201E-2
218E-1 201 E-3
FURNISH AND INSTALL YELLOW
ORANGE ENCLOSURE RAL2OOO
OR APPROVED EQUAL
Project Title
CO2 GAS VENTILATION
Project Number 528-22-125 Building Number
Location
: BLDG1- 2ND FLOOR-EWING I
Drawin ��B�E-B
Issue Date
05/10,2023
Checked
RJC
EJ A
File details come from the government source that posted it. Updated .