Construction Drawings.pdf

PDF 12 MB Posted

Attached to
Y1DA--PROJECT # 528-22-125 CO2 Gas Ventilation BUFFALO VAMC
Solicitation number
36C24226B0039
Issued by

About this file

This is an image of a PDF portfolio cover page. The image displays a red and white binder or folder with the Adobe Acrobat logo prominently featured in the center. The page contains instructional text stating "For the best experience, open this PDF portfolio in Acrobat X or Adobe Reader X, or later" along with a button prompting users to "Get Adobe Reader Now!" This is a technical interface element rather than contract-related documentation and contains no substantive information regarding federal contract opportunities, products, services, pricing, timelines, or other procurement details.

View the file

Other files

File Type Posted
RFIs - C02 GAS VENTILATION - BUF.docx DOCX document
36C24226B0039 0002.docx DOCX document
Site Visit Sign In - CO2 Gas Room 2026.pdf PDF
36C24226B0039 0001.docx DOCX document
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.docx DOCX document
Specifications CO2 Gas Ventilation 528-22-125.pdf PDF
P07 - WAGE DETERMINATION.pdf PDF
BUY AMERICAN ACT CERTIFICATE 52.225-2.docx DOCX document
36C24226B0039_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

A

B

C

D

E

F

1 2

MANIFOLD FOR CO2 GAS

SPRINKLER HEAD

MGS-450 CO2 GAS

DETECTOR

TO BLOOD BANK

DUPLEX OUTLET

a

-TO MICROBIOLOGY

PROPOSED NEW GAS ROOM (N.T.S)

I Revisions: !Date:

1 I 2 I

� IGHT SWITCH

ALARM CONTROL

CONSULTANT

3 I

5 6 7 8 9

,,--TO THE ROOF TOP UNIT (EF-1)

'----RTU EMERGENCY

SHUTDOWN PUSH

BUTTON

II ARCHITECT/ENGINEER OF RECORD II STAMP

WNYHCS ENGINEERING

BUFFALO VETERANS ADMINISTRATION MEDICAL CENTER

3495 BAILEY AVENUE

BUFFALO, NEW YORK 14215

716-834-9200

I 5 I

�----t-MANIFOLD FOR MIX GAS

EILING LIGHT

------"11ANIFOLD FOR FUTURE EXPANSION

DESCRIPTION QTY MAKE MODEL DRAWING NO.

EF-1 ( ROOF TOP UNIT ) 1 GREENHECK VECTOR-H-9 M-7/E-7

GAS MANIFOLD 3 AMICO M4DE-DL-HH(H)-L-XXX M-2/E-2

ALARM CONTROL 3 AMICO A4AR-U-CCN M-2/E-2

GAS TANKS 10 ---------- CO2 / MIX GAS M-1/E-1

INCUBATOR,MICROBIOLOGY 2 PHCBI MCO-230A1CUVL-PA M-1/E-1

INCUBATOR,BLOOD BANK 1 PHCBI MCO-230A1CUVL-PA M-1/E-1

ANOXOMAT,MICROBIOLOGY 1

ADVANCED

ANX2J2G M-1/E-1

INSTRUMENTS

CO2 GAS DETECTOR 1 BACHARACH MGS-450 M-1/E-1

EB

EQUIPMENT SCHEDULE

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

I

ACQUISITION AND NOTES.

* C C - CONTRACTOR FURNISHED AND INSTALLED

* V C - GOVERNMENT FURNISHED, CONTRACTOR INSTALLED

* V V - GOVERNMENT FURNISHED AND INSTALLED

* FOR EQUIPMENT WHERE A MAKE AND MODEL HAVE BEEN IDENTIFIED,

THE MAKE AND MODEL ARE CONSIDERED TO BE BASIS OF DESIGN

DrawingTille PROPOSED NEW GAS ROOM

3D ISOMETRIC AND

EQUIPMENT SCHEDULE

Phase Project Title

PHASE TWO CO2 GAS VENTILATION

ILocation

• BLDG1- 2ND FLOOR-EWING

Issue Date Checked Drawn

12/08/2025 RJC MTA

7 I 8 I 9 I

ACQ

cc vc vv vc

Project Number 528-22-125 Building Number

I Drawing Number

A-3

L

C I

1 2 3 4 5

@ GENERAL NOTES,

(D INSTALL CO2 GAS DETECTOR SUPPLIED BY VA, CONTRACTOR IS RESPONSIBLE FDR FULL INSTALLATION INCLUDES ALL THE ASSOCIATED CONDUIT, \,/IRES, LO\,/ VOLTAGE TRANSFORMER AND FINAL TERMINATION AND CONNECTION, REFER TD DETAIL@ IN THIS SHEET FDR MORE INF□, ALSO THE EXACT LOCATION □F THE DETECTOR \,/ILL BE DETERMINED IN FIELD PRIOR TD INSTALL BY VA ENGINEER, ® FURNISH AND INSTALL ANDOVER CONTINUUM 12800 SERIES "BUILDING MANAGEMENT SYSTEM", CONTRACTOR IS RESPONSIBLE FDR ALL ASSOCIATED MATERIAL AND PROVIDE FULL INSTALLATION □F THE CONDUIT /\,/IRE AND THE EXACT ROUTE □F CONDUITS \,/ILL BE DETERMINED IN FIELD \,/ITH VA ENGINEER PRIOR TD INSTALL, PROVIDE FINAL TERMINATION AND CONNECTION TD THE \,/IRES IN THE GAS SENSOR, REFER TD DETAIL@IN THIS SHEET FDR ADDITIONAL INF□ AND REFER TD SHEET M-4/E-4 FDR MORE INF□ ABOUT THE □NE LINE DIAGRAM □F GAS CONTROL SYSTEM, G) CONTRACTOR SHALL BE RESPONSIBLE TD CONNECT THE NE\,/ ANDOVER SYSTEM TD THE EXISTING MASTER BUILDING MANAGEMENT SYSTEM, PROVIDE ALL ASSOCIATED MATERIAL AND FULL INSTALLATION, INCLUDING BUT NOT LIMITED T□, CONDUIT /\,/IRE, FITTINGS, SUPPORT, TERMINATION, LABELING, ETC .. COORDINATE \,/ITH VA ENGINEER FDR EXACT LOCATION □F NEAREST EXISTING MASTER MANAGEMENT BUILDING MANAGEMENT SYSTEM PRIOR TD INSTALLATION, LAST, CONTRACTOR SHALL BE RESPONSIBLE TD PROVIDE FULL PROGRAMMING TD THE NE\,/ SYSTEM AND PROVIDE TEST REPORT \,/ITH FULL

ALARMS TD THE VA FDR REVIE\,/ AND APPROVAL,

MIX GAS

I I I I I 'l C

\ I□ i'l □ ('\.J q i'l sJ uJ

6 7

NEW GAS ROOM

N

MIX GAS

223-E

8 9

234E-1

□ L--'L--'

I II 71 II □ □

228-E

226-E

P I

234-E □□

P I

MICRBIOLOGY

218-E

218-E 3 11219-E

234E-2

234E-31

234E-

201E-1

A A □ A

3/ 4 INCH EMT CONDUIT

218E-2 BLOOD BANK

r-+---------, Ql) s

CO2 GAS

DETECTOR

MGS-45O

PROVIDE 24VAC POWER SUPPLY

USE 2-CORE SHIELDED CABLE, 16-24 AWG

IN 3/ 4 INCH EMT CONDUIT

12OVAC-24VAC 12OVAC

M1 6 Cable Glands {:•-6) 2 Rubber Gasket (IP66 Version Only)

3 Internal Alar·m Buzzer 4 Power Connections (><2) 5 Digital Connection (Modbu�) 6 Analog Connection 7 Tactile Switch #1 8 Ribbon Cable Connection (To Sensor) -- I � 0 � :J•:•·:g,";m 9 TactileSwitch#2 ,-- - - • ,:t, - - . ·· · � G

_ <t,) _ - .�-s='e' ___ G ... • 10 Relay 3 Connecrion (FAULT) ' I I ., G) tt) , I 11 Relay 2 Connecti on (HIGH)

1 ,,.. 12 Relay 1 Connection (LOW)

@ CO2 GAS DETECTOR MGS-450 SUPPLIED BY VA

13 Magnetic Switch #1 14 Magnetic Switch #2

15 M20 Cable Glands (><2)

ANDOVER

CONTINUUM

i28OO SERIES

BUILDING

MANAGEMENT

SYSTEM

22 GAUGE STRANDED SHIELDED

AND TWISTED PAIR CABLE

PROVIDE 24VAC POWER SUPPLY

USE 2-CORE SHIELDED CABLE, 16-24 AWG

IN 3/4 INCH EMT CONDUIT

120VAC-24VAC 12OVAC

II

T I Black (Ground) I

Orange(15VDC)I I I I I

L

Optional: Abnormal Alarm

CH +1 Generic Alarm Dry- I I

CH-

Contact Fault Indicator I(to Building Milnagement I

HI 11111 II II II

f<Z><Z><Z><Z><Z>'"'""'"" ,,, .. , - - -

System/Master)

I - - -

OOOO«iCOOOOOC:0000 j ! i i ! I '

El4 el Bl Bl

8�, 1, � --0� 11 -

0 ..

o-

ANDOVER CONTINUUM i28OO SERIES

BUILDING MANAGEMENT SYSTEM

@ GAS SENSOR WIRING DIAGRAM FOR BUILDING MANAGEMENT SYSTEM

CONSULTANT ARCHITECT/ENGINEER OF RECORD 11

Drawing Title Phase

STAMP Office of PROPOSED CO2 GAS DETECTOR/

Revisions: Date:

2 3 4

WNYHCS ENGINEERING

BUFFALO VETERANS ADMINISTRATION MEDICAL CENTER

3495 BAILEY AVENUE

BUFFALO, NEW YORK 14215

716-834-9200

5 6

Construction and Facilities Management

VA I

U.S. Department

I of Veterans Affairs

PHASE TWO

BUILDING MANAGEMENT SYSTEM

7 I 8 I

201E-2

218E-1 201 E-3

FURNISH AND INSTALL YELLOW

ORANGE ENCLOSURE RAL2OOO

OR APPROVED EQUAL

Project Title

CO2 GAS VENTILATION

Project Number 528-22-125 Building Number

Location

: BLDG1- 2ND FLOOR-EWING I

Drawin ��B�E-B

Issue Date

05/10,2023

Checked

RJC

EJ A

File details come from the government source that posted it. Updated .