Combined Drawings.pdf
PDF 8 MB Posted
- Attached to
- Z1DA--NRM 654-23-001 | Reroof Bldgs 1D and 10
- Solicitation number
- 36C26123R0113
About this file
This is a solicitation for a roof replacement project at two buildings on the campus of the Veterans Affairs Sierra Nevada Health Care System in Reno, Nevada. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is seeking bids to remove and replace the roofing systems on buildings 1D and 10. The project includes demolishing existing roofing materials, installing new rigid insulation and single-ply TPO roofing membrane, as well as associated flashing and details. Bids are due by July 13, 2022. The awarded contract is for a fixed-price design-bid-build project with a period of performance of 120 calendar days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs response 1D and 10 Roof.pdf | ||
| Attachment 5 WD NV20230040 09152023.pdf | ||
| Attachment 6 Sign-in sheet 1011.pdf | ||
| 18-078 SubReg 100_.pdf | ||
| 36C26123R0113 0002.docx | DOCX document | |
| 2010 Asbestos Report-Building 1D.pdf | ||
| ASBESTOS DRAWINGS - 30x42.pdf | ||
| 36C26123R0113 0001.docx | DOCX document | |
| RENO PLAN SET - RECORD.pdf | ||
| Att B Price Breakdown.pdf | ||
| 36C26123R0113_1.docx | DOCX document | |
| Wage Determination NV20230026 08182023.pdf | ||
| Combined Specs.pdf | ||
| Attachment C_Contractor Certification RE Safety and EMR.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP CAMPUS MAP
PROJECT IMAGE
1D & 10
/2
/2
:0
:3
A
M
GC001
COVER
1 3AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
REMOVE AND REPLACE ROOFING
BUILDINGS 1D AND 10
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE, RENO, NV 89502
VA PROJECT #: 654-18-815 APOGEE PROJECT #: 18-078
WVS
DRAWING LIST
GENERAL
GC001 COVER 1 3
GC100 GENERAL SITE INFORMATION 2 3
GC101 INFECTION CONTROL RISK MANAGEMENT 3 3
ARCHITECTURAL
AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 7
AD101 ROOF DEMOLITION PLAN BUILDING ID 2 7
AD110 ROOF DEMOLITION PLAN BUILDING 10 3 7
AE101 ROOF PLAN - BUILDING ID 4 7
AE110 ROOF PLAN - BUILDING 10 5 7
AE501 TYPICAL ROOF DETAILS 6 7
AE502 EXISTING ROOF BUILDING 1D 7 7
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS 1 2
E-501 ELECTRICAL DETAILS 2 2
BUILDINGS INCLUDED ON SCOPE OF WORK
DocuSign Envelope ID: 8A2E514C-AFA8-417D-AC95-21D72CF7574D
6/29/2020
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
/2
/2
:0
:3
A
M
GC100
GENERAL SITE INFORMATION
2 3WVS AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
1D & 10
2 1 7
5 4
1 POTENTIAL AREA TO SET CRANE TO STAGE
MATERIALS ON ROOF FOR BUILDING 1D (4
STORIES). COORDINATE CRANE LOCATION AND
TIME WITH COR 13 DAYS IN ADVANCE.
2 EXISTING EMERGENCY DEPARTMENT ENTRANCE
AREA. DO NOT IMPEDE.
3 AREA FOR SCAFFOLDING STAIR TOWER FOR ROOF
ACCESS. NO ROOF ACCESS THRU BUILDING.
COORDINATE EXACT LOCATION AND
CONFIGURATION WITH COR. SCAFFOLDING
TOWER TO ADHERE TO ALL OSHA GUIDELINES.
SUBMITTAL DRAWINGS REQUIRED.
4 POTENTIAL AREA TO SET CRANE TO STAGE
MATERIALS ON ROOF FOR BUILDING 10. (1 STORY)
COORDINATE CRANE LOCATION & TIME WITH COR
15 DAYS IN ADVANCE
5 ACCESS TO BUILDING 10 ROOF TO BE BY
CONTRACTOR SUPPLIED OSHA COMPLIANT
LADDERS. COORDINATE LOCATIONS WITH COR.
6 CONTRACTOR TO PROVIDE TEMPORARY
EXTERIOR RESTROOM FACILITIES AT EACH
BUILDING. COORDINATE LOCATIONS WITH COR.
7 POTENTIAL LOCATION FOR DEBRIS CHUTE AND
DUMPSTER. DUMPSTER TO HAVE DUST COVER.
1D
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove or isolation of HVAC system in areas where work was being performed.
1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration unit.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant
5. Remove isolation of HVAC system in areas where work is being performed.
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covers.
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
6. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. W ipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
- painting (but not sanding)
- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
• Cardiology
• Echocardiography
• Endoscopy
• Nuclear Medicine
• Physical Therapy
• Radiology / MRI
• Respitory Therapy
• CCU
• Emergency Room
• Labor & Delivery
• Laboratories (soecimen)
• Newborn Nursery
• Outpatient Surgery
• Pediatrics
• Pharmacy
• Post Anesthesia Care Unit
• Surgical Units
• Any area caring for immunocompromised patients
• Burn Unit
• Cardiac Cath Lab
• Central Sterile Supply
• Intensive Care Units
• Medical Unit
• Negative pressure isolation rooms
• Oncology
• Operation rooms including C-section rooms
• Office Spaces
C L
A S
S I
V C
L A
S S
I
II
C L
A S
S I
I C
L A
S S
PATIENT RISK GROUPS
LOW Risk Group
MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
TYPE A TYPE B TYPE C TYPE D
I II II III/IV
I II III IV
I II III/IV IV
II III/IV I/IV IV
During Construction Project: Upon Completion of Project:
TYPE D
TYPE C
TYPE B
TYPE A
Group 1 Low Risk
Group 2 Medium Risk
Group 3 High Risk
Group 4 Highest Risk
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project ny Ptient Risk
Construction Project Type
Note: Infection Control approval will be required when the Contruction Activity and Risk Level indicated that Class III or Class IV Control procedures are necessary.
It's the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
Type of Construction Project activity (Type A-D)
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
GENERAL NOTES
INFECTION CONTROL RISK ASSESSMENT NOTES:
1. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION PRIOR TO START OF WORK AND ORDERING OF MATERIALS.
2. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFECTION CONTROL PRECAUTION MEASURES BASED ON THE TYPE AND LOCATION OF WORK BEING PERFORMED. CONFIRM PRECAUTION MEASURES WITH COR PRIOR TO BEGINNING WORK IN SAID AREA.
3. PENETRATIONS THRU RATED CONSTRUCTION (FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS, SMOKE PARTITIONS, HORIZONTAL ASSEMBLIES, AND VERTICAL OPENINGS) SHALL MAINTAIN CONTINUITY OF RATED CONSTRUCTION. CONTRACTOR RESPONSIBLE FOR IDENTIFYING RATED AREAS AND FIRESTOPPING ALL PENETRATIONS. CONTACT COR AND A/E FOR CLARIFICATION AS
NEEDED. VA GUIDELINES STATE ALL RATED CONSTRUCTION TO BE CLEARLY LABELED.
4. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1 SPECIFICATIONS.
5. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. (IF DAMAGED, REPAIR, PATCH, REPLACE, OR SAND SMOOTH AND TO MATCH EXISTING ADJACENT MATERIALS.)
6. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.
7. CONTRACTOR TO INSTALL TEMPORARY BALL-IN-TUBE SYSTEM TO MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA GUIDELINE WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS) WITH VA COR PRIOR TO INSTALLATION.
* OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
DO NOT REMOVE BARRIERS FROM W ORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA W ITH DISINFECTANT. REMOVE ISOLATION OF HVAC SYSTEM
IN AREAS WHERE WORK IS BEING PERFORMED.
COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSES WITH FILTER MEDIA OR BLANKED OFF ENTIRELY PER ICRA
REQUIREMENTS.
KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.
CONTRACTOR TO CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND INFECTION CONTROL'S INSPECTION AND
FINAL CLEANING BY VA ECM STAFF.
VA ECM STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING AND SANITATION.
ICRA ENCLOSURE NOTES
ICRA BARRIERS MUST MATCH FIRE RATING OF WALL IT IS CREATING AN ENCLOSURE TO.
EXAMPLE: 2 HOUR FIRE BARRIER, ICRA ENCLOSURE AROUND DOOR MUST MAINTAIN 2 HOUR RATING.
NON RATED ICRA ENCLOSURES/BARRIERS CAN BE PLASTIC TYPE, BASIS OF DESIGN EDGEGUARD TYPE SYSTEM (OR EQUAL), OR CONSTRUCTED PARTITION TYPE. NON RATED ENCLOSURES/BARRIERS MUST CONTROL AND ISOLATE DUST.
CONTRACTOR TO VERIFY TYPE OF BARRIER PER LOCATION AND COORDINATE WITH C.O.R. PRIOR TO INSTALLATION
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1D & 10
/2
/2
:0
:3
A
M
GC101
INFECTION CONTROL RISK
MANAGEMENT
3 3AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
WVS
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ICRA INFECTION CONTROL RISK
ASSESSMENT
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYW D PLYW OOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE W ORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAW INGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOW N.
CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE
NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A W HOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A
COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. W HERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE
CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR
ORDERING MATERIAL. NOTIFY THE COR OF ANY DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR
DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS W ASTE LAWS, ETC. THE CONTRACTOR SHALL
FURNISH ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY W ORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
13. LIGHTING PROTECTION - CONTRACTOR SHALL DESIGN A LIGHTNING PROTECTION SYSTEM THAT MEETS VA SPECIFICATION 26 41 00 "FACILITY LIGHTNING PROTECTION" AND ALL NFPA RELATED DOCUMENTS. LIGHTNING PROTECTION SYSTEM SHALL MEET U.L. REQUIREMENTS SUCH THAT THE SYSTEM SHALL HAVE A MASTER LABEL
CERTIFICATE.
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1D & 10
/2
/2
:0
:4
P
M
AG001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 7AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
WVS
ABBREVIATIONS
GENERAL NOTES
GENERAL SYMBOL LEGEND
DocuSign Envelope ID: E0E46BA5-6986-441F-82F6-2ACF9BB87656
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1D
/2
/2
:0
:4
P
M
AD101
ROOF DEMOLITION PLAN BUILDING ID
2 7AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
WVS
0 4 8 16
NORTH
PLAN
01 REMOVE EXISTING BALLAST, PAVERS AND DISPOSE
OF PROPERLY.
02 REMOVE EXISTING SINGLE PLY ROOF SYSTEM,
INSTALLATION, PROTECTION BOARD, ETC. TO
SUBSTRATE.
03 EXISTING EXHAUST FAN TO REMAIN.
04 EXISTING ROOF TOP EQUIPMENT TO REMAIN.
05 EXISTING ROOF DRAIN TO REMAIN.
06 REMOVE EXISTING CHILLER WATER PIPING NO
LONGER IN USES.
07 EXISTING ROOF HATCH TO BE REMOVED.
08 EXISTING EQUIPMENT STANDS NO LONGER IN USES,
REMOVE FROM ROOF.
09 EXISTING DUCTWORK ON RAISED SUPPORTS TO
REMAIN.
11 EXISTING PIPE ON ROOF TO REMAIN.
12 EXISTING SOLAR ARRAY TO BE REMOVED AND
DISPOSED OF. DISCONNECT AND REMOVE ALL
EXISTING ASSOCIATED CONDUCTORS, CONDUITS,
MOUNTING BRACKETS, AND HARDWARE.
13 EXISTING 16 TON RTU TO BE REPLACED WITH SIMILAR
SIZE UNIT BEFORE REROOF PROJECT TO START.
14 EXISTING ANTENNA TO REMAIN, ANTENNA IS
MOVABLE NOT SECURED TO ROOF DECK.
15 EXISTING VENTS THRU ROOF TO REMAIN.
16 EXISTING SOLAR ARRAY EQUIPMENT ENCLOSURE
AND RACK-MOUNTED COMMUNICATION EQUIPOMENT
TO BE REMOVED. REMOVE ALL EQUIPMENT,
ENCLOSURE, STAND CONDUCTORS, AND CONDUIT
ASSOCIATED WITH THE SOLAR ARRAY EQUIPMENT.
REMOVE THE ASSOCIATED EQUIPMENT FEEDING
CONDUCTORS BACL TO THE CONNECTION POINT
WITH EXISTING ELECTRICAL DISTRIBUTION
EQUIPMENT (PANEL).
17 EXISTING SPS EXHAUST EQUIPMENT TO REMAIN IN
SERVICE.
18 DISCONNECT AND REMOVE ALL CONDUCTORS AND
CONNECTIONS AND REMOVE SOLAR PANEL OR PART
OF SOLAR PANEL SYSTEM.
19 EXISTING WOOD EQUIPMENT CURBS ON ROOF TO BE
REMOVED AND REPLACE WITH EQUIPMENT CURBS.
20 EXISTING PIPE PENTHOUSE TO REMAIN.
21 EXISTING PIPING MOUNTED ON EXISTING EQUIPMENT
STANDS TO REMAIN.
22 EXISTING OPENING TO BE ENCLOSE AND REROOF AS
PART OF PROJECT.
23 EXISTING DUCT WORK TO REMAIN.
24 EXISTING CATWALK TO REMAIN.
25 EXISTING LIGHTING PROTECTION CONDUCTORS
LOCATED ON THE BUILDING ROOF AND PARAPET
SHALL BE REMOVED.
26 REMOVE EXISTING COPING CAP & DISPOSE OF.
27 EXISTING HANDRAIL MOUNTED TO SIDE WALL TO
REMAIN.
28 EXISTING LADDER TO REMAIN.
29 APPROXIMATE OUTLINE OF SOLAR ARRAY – FIELD
VERIFY.
Scale: 3/32" = 1'-0"
ROOF DEMOLITION PLAN - BUILDNG 1D
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF WHERE
WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/FALL
PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON TAG
PARAPET OF THE ROOF PERIMETER, IDENTIFY +
PROTECT EXISTING CONNECTIONS TO LIGHTING
PROTECTION SYSTEM DOWN CONDUCTOR FOR
CONNECTION TO NEW SYSTEM COMPONENTS.
NEW LIGHTING PROTECTION TO BE INSTALLED,
SEE ELECTRICAL DOCUMENTS FOR VA
REQUIREMENTS.
E. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON
ALL ROOFS INCLUDING EQUIPMENT, VTR, FANS,
ETC. NOT SPECIFICALLY INDICATED ON PLANS.
F. CONTRACTOR TO VERIFY ALL EXISTING ROOF
CURBS, PENETRATIONS, OR ANYTHING
ATTACHED TO THE ROOF MEET ROOFING
MANUFACTURER'S MINIMUM HEIGHT
REQUIREMENTS. NOTIFY COR IMMEDIATELY
PRIOR TO STARTING WORK.
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
01 02
01 02
01 02
01 02
1818 19
AH411
AH410
AH412
SPS EXHAUST SYSTEM
AH415
AH414
22 07
02 08 19
AH401
ELEVATOR
PENTHOUSE
AH416
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:4
P
M
AD110
ROOF DEMOLITION PLAN BUILDING 10
3 7AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
WVS
0 4 8 16
NORTH
PLAN
Scale: 3/32" = 1'-0"
ROOF DEMOLITION PLAN - BUILDNG 10
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF WHERE
WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/FALL
PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON TAG
PARAPET OF THE ROOF PERIMETER, IDENTIFY +
PROTECT EXISTING CONNECTIONS TO LIGHTING
PROTECTION SYSTEM DOWN CONDUCTOR FOR
CONNECTION TO NEW SYSTEM COMPONENTS.
NEW LIGHTING PROTECTION TO BE INSTALLED,
SEE ELECTRICAL DOCUMENTS FOR VA
REQUIREMENTS.
E. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON
ALL ROOFS INCLUDING EQUIPMENT, VTR, FANS,
ETC. NOT SPECIFICALLY INDICATED ON PLANS.
F. CONTRACTOR TO VERIFY ALL EXISTING ROOF
CURBS, PENETRATIONS, OR ANYTHING
ATTACHED TO THE ROOF MEET ROOFING
MANUFACTURER'S MINIMUM HEIGHT
REQUIREMENTS. NOTIFY COR IMMEDIATELY
PRIOR TO STARTING WORK.
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
04 03
02 10
02 10
08 08 08 08
01 REMOVE EXISTING BALLAST, PAVERS AND DISPOSE
OF PROPERLY.
02 REMOVE EXISTING SINGLE PLY ROOF SYSTEM,
INSTALLATION, PROTECTION BOARD, ETC. TO
SUBSTRATE.
03 EXISTING EXHAUST FAN TO REMAIN.
04 EXISTING ROOF TOP EQUIPMENT TO REMAIN.
05 REMOVE EXISTING ROOF DRAIN AND GRATE.
06 EXISTING EXPANSION JOINT TO BE REMOVED AND
REPLACE WITH NEW ROOF SYSTEM.
07 REMOVE EXISTING ROOF HATCH AND REPLACE AS
PART OF NEW ROOF.
08 EXISTING EQUIPMENT STANDS NO LONGER IN USES,
REMOVE FROM ROOF.
09 EXISTING DUCT WORK ON RAISED SUPPORTS TO
REMAIN.
10 EXISTING VENTS THRU ROOF TO REMAIN.
11 EXISTING PIPE ON ROOF TO REMAIN.
12 ROOF AREA AND EQUIPMENT NOT IN SCOPE OF
WORK.
13 REMOVE EXHAUST FAN NO LONGER BEING USED.
14 REMOVE EXHAUST PIPE ASSEMBLY NO LONGER
BEING USED.
15 REPLACE WOOD TIMBER CURBS WITH NEW ROOF
EQUIPMENT CURBS.
16 EXISTING LIGHTING PROTECTION CONDUCTORS
LOCATED ON THE BUILDING ROOF AND PARAPET
SHALL BE REMOVED.
17 REMOVE EXISTING COPING CAP AND DISPOSE OF.
18 EXISTING PIPE STACK TO REMAIN.
19 EXISTING SCUPPER THRU PARAPET WALL TO BE
REFLASHED AS PART OF REROOF.
20 EXISTING ANTENNA MOUNTED TO PARAPET WALL,
REMOVE AS NECESSARY TO REROOF PARAPET.
PROTECT EXISTING CABLE-CONNECTIONS WHICH
ARE TO REMAIN FOR RE-USE WITH ANTENNA
EQUIPMENT AFTER ROOF REPLACEMENT IS
COMPLETE.
21 EXISTING CONDENSATE DRAIN LINE TO REMAIN.
10 10 10
15 13
041005
05 05 05
050505
050505
CRICKET/TAPERED INSULATION
INDICATES ROOF SLOPE
SLOPE: 1/4"
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1D
/2
/2
:0
:4
P
M
AE101
ROOF PLAN - BUILDING ID
4 7AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
WVS
0 4 8 16
NORTH
PLAN
ROOF LEGEND
Scale: 3/32" = 1'-0"
ROOF PLAN BUILDNG - 1D
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF WHERE
WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/FALL
PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON TAG
PARAPET OF THE ROOF PERIMETER, IDENTIFY +
PROTECT EXISTING CONNECTIONS TO LIGHTING
PROTECTION SYSTEM DOWN CONDUCTOR FOR
CONNECTION TO NEW SYSTEM COMPONENTS.
NEW LIGHTING PROTECTION TO BE INSTALLED,
SEE ELECTRICAL DOCUMENTS FOR VA
REQUIREMENTS.
E. CONTRACTOR SHALL ENSURE ROOF SLOPE TO
DRAINS, MINIMUM SLOPE IS 1/4" PER 1'-0"
F. CONTRACTOR SHALL PROVIDE FLASHING, WATER
PROOFING, AND FIRE STOPPING AS REQUIRED
FOR ALL PIPING, SUPPORTS, CONDUIT OR ANY
ITEM ON THE NEW ROOF.
G. FOLLOW ALL TPO MEMBRANE MANUFACTURER'S
RECOMMENDATION AND STANDARD DETAILS.
H. EXISTING SUBSTRATE IS FLAT CONCRETE ROOF
DECK.
01 INSTALL NEW SINGLE PLY FULLY ADHERED TPO ROOF
SYSTEM PER SPECIFICATION SECTION 07.54.23
02 INSTALL NEW RIGID INSULATION PER SPECIFICATION
07.22.00, MIN R-30 USE TAPERED INSULATION TO
OBTAIN PROPER SLOPE MINIMUM 1/4" PER 1'-0
03 NEW METAL COPING CAP ON BUILDING 117.
04 NEW ALUMINUM GUTTER, DOWN SPOUTS AND
SPLASH BLOCKS AS INDICATED.
05 NEW FLASHING WHERE ROOF SYSTEM TERMINATES
AT WALL AT ADJACENT BUILDING, SEE DETAILS
2/AE501
06 NEW FLASHING AT CURB MOUNTED EQUIPMENT, SEE
DETAIL 1/AE501.
07 NEW FLASHING WHERE ROOF SYSTEM TERMINATES
AT WALL, SEE DETAIL 8/AE501.
TERMINATES AT WALL, SEE DETAIL 3/AE501.
08 NEW FLASHING AT VENTS THROUGH ROOF, SEE
DETAIL 6/AE501.
09 NEW FLASHING AT RAISED EQUIPMENT SUPPORT,
SEE DETAIL 9/AE501.
10 NEW EXPANSION JOINT COVER, SEE DETAIL 6/AE501.
11 NEW LIGHTING PROTECTION ATTACHED TO COPING
CAP AROUND BUILDING PERIMETER, SEE ELECTRICAL
DRAWINGS FOR DETAILS.
12 NEW SCUPPER FLASHING THROUGH EXISTING
OPENINGS IN PARAPET WALLS AS INDICATED, SEE
DETAIL 7/AE501.
13 REUSE ROOF DRAIN ASSEMBLY AND PROVIDE NEW
COVER, SEE DETAIL 4/AE501 FOR REFERENCE.
14 EXISTING PIPING MOUNTED ON EXISTING EQUIPMENT
STANDS TO REMAIN.
15 INSTALL NEW GUTTER AND DOWNSPOUT.
01 02
01 02
01 02
01 02
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
01 02
CRICKET/TAPERED INSULATION
INDICATES ROOF SLOPE
SLOPE: 1/4"
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:0
:4
P
M
AE110
ROOF PLAN - BUILDING 10
5 7AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
WVS
Scale: 3/32" = 1'-0"
ROOF PLAN - BUILDNG 10
01 INSTALL NEW SINGLE PLY TPO ROOF SYSTEM PER
SPECIFICATION SECTION 07.54.23
02 INSTALL NEW RIGID INSULATION PER SPECIFICATION
SECTION 07 22 00, MIN R-30. USE TAPERED
INSULATION TO OBTAIN PROPER SLOPE MINIMUM 1/4"
PER 1'-0.
03 NEW METAL COPING CAP ON BUILDING 117.
04 NEW ROOF HATCH ASSEMBLY WITH SAFETY RAILING.
05 NEW FLASHING WHERE ROOF SYSTEM TERMINATES
AT WALL AT ADJACENT BUILDING, SEE DETAILS
2/AE501.
06 NEW FLASHING AT CURB MOUNTED EQUIPMENT, SEE
DETAIL 1/AE501.
07 NEW FLASHING WHERE ROOF SYSTEM TERMINATES
AT PARAPET WALL, SEE DETAIL 8/AE501.
08 NEW FLASHING AT VENTS THROUGH ROOF, SEE
DETAIL 6/AE501.
09 NEW FLASHING AT RAISED EQUIPMENT SUPPORT,
SEE DETAIL 5/AE501.
10 NEW EXPANSION JOINT COVER, SEE DETAIL 6/AE501.
11 NEW LIGHTING PROTECTION ATTACHED TO COPING
CAP AROUND BUILDING PERIMETER, SEE ELECTRICAL
DRAWINGS FOR DETAILS.
12 NEW SCUPPER FLASHING THROUGH EXISTING
OPENINGS IN PARAPET WALLS AS INDICATED, SEE
DETAIL 7/AE501.
13 NEW ROOF DRAIN ASSEMBLY AND COVER GRATE,
SEE DETAIL 4/AE501.
14 NEW FLASHING AS NECESSARY AT EXISTING
EXHAUST FANS.
15 EXISTING ROOF AND EQUIPMENT NOT IN SCOPE OF
WORK.
16 NEW FLASHING AT BASE OF DUCT WORK SUPPORTS
PER ROOF MANUFACTURERS SYSTEM.
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF WHERE
WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/FALL
PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON TAG
PARAPET OF THE ROOF PERIMETER, IDENTIFY +
PROTECT EXISTING CONNECTIONS TO LIGHTING
PROTECTION SYSTEM DOWN CONDUCTOR FOR
CONNECTION TO NEW SYSTEM COMPONENTS.
NEW LIGHTING PROTECTION TO BE INSTALLED,
SEE ELECTRICAL DOCUMENTS FOR VA
REQUIREMENTS.
E. CONTRACTOR SHALL ENSURE ROOF SLOPE TO
DRAINS, MINIMUM SLOPE IS 1/4" PER 1'-0"
F. CONTRACTOR SHALL PROVIDE FLASHING, WATER
PROOFING, AND FIRE STOPPING AS REQUIRED
FOR ALL PIPING, SUPPORTS, CONDUIT OR ANY
ITEM ON THE NEW ROOF.
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
ROOF LEGEND
01 02
1313 13 13 13 13
08 08 08 08
03 11
03 11
03 11
03 11
11 03
1313 13
03 11
03 11
03 11
03 11
03 11
03 11
03 11
01 02
13 08
01 02
03 11
03 11
SEALANT
CUT IN PEGLET
SECURED TO
MASONRY AT
MORTAR JOINTS
PRESSURE AND
FIRE TREATED
WOOD BLOCKING
CANT STRIP
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MINIMUM R30 RIGID
INSULATION
EXISTING STRUCTURE
EXISTING STUCO FINISH
PRESSURE AND
FIRE TREATED
WOOD BLOCKING
CONTINUOUS CANT
STRIP
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MINIMUM R30 RIGID
INSULATION
EXISTING STRUCTURE
EXISTING EQUIPMENT
TO BE REINSTALLED
EXISTING EQUIPMENT
SHAFT
WOOD BLOCKING
EXISTING EQUIPMENT CURB.
NEW TAPERED RIGID
INSULATION
INSTALL NEW DRAIN
STRAINER
NEW TPO ROOF
SYSTEM
FLASHING CLAMP
DEVICE
EXISTING STRUCTURE
ROOF DRAIN BODY
TO REMAIN
SEALANT
METAL RAIN COLLAR
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MINIMUM R30 RIGID
INSULATION
EXISTING STRUCTURE
CONTINUOUS
SEALANT AT BASE
EXISTING STEEL
EQUIPMENT STAND
STAINLESS STEEL
DRAW BAND WITH
RUBBER GASKET
2 PIECE METAL
FLANGE IN BED OF
MASTIC
LEAD FLASHING
ROLLED MIN 1"
DOWN PIPE
EXISTING VENT PIPE
THROUGH ROOF
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MINIMUM R30
RIGID INSULATION
EXISTING CONCRETE
STRUCTURE
SET LEAD FLASHING
FLANGE IN BED OF
MASTIC
NEW METAL COPING
CAP WITH CONT.
CLEATS
EXITING WALL
CONTINUOUS
SEALANT AROUND
EDGE OF SCUPPER
NEW TPO ROOF
SYSTEM PER
SPECIFICATION
SECTION 07 54 23
NEW TAPERED RIGID
INSULATION
EXISTING BUILDING
STRUCTURE
(2) PT F.T 2X WOOD BLOCKING
10"
" 4
/8
MATCH EXIST.
INSULATED
EXPANSION JOINT
COVER
CONT. METAL
CAP WITH
COUNTER
FLASHING ON
CONT. CLEAT
CONT. MEMBRANE
COATED METAL
FLASHING
CONT. EDGE
SEALANT AT ROOF
TERMINATION
POINTS
SLOPE: 1/4" SLOPE: 1/4"
CONT. 2X2 BLOCKING
CONT. COMPRESSIBLE
INSULATION FILLER
CONT. 2X12
BLOCKING
CONT. CANT STRIP
RIGID INSULATION
ON EXISTING
DECKING
EXISTING ROOF
MEMBRANE
PT 2X WOOD NAILERS
ANCHOR TO DECK
MATCH EXIST.
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MIN R30 RIGID
INSULATION
EXISTING PIPE
PENETRATION
(VIF LOCATIONS)
24 OZ COPPER
PITCH POCKET W /
POURABLE SEALANT
PT 2X6 ON PT 2X4
WOOD NAILER
ANCHOR TO DECK
EXISTING ROOF
DECK TO REMAIN
SEALANT
RD. METAL
HOOD WITH
DRAWBAND
CONT. CANT
STRIP
CONT. EDGE
SEALANT AT
ROOF
TERMINATION
POINTS
1/2" COVER
BOARD ON RIGID
INSULATION
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
EXISTING CAST
STONE CAP
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MINIMUM R30 RIGID
INSULATION
EXISTING BUILDING
STRUCTURE
CONTINUOUS FIBER
CANT STRIP
NEW METAL COPING
CAP WITH CONT.
CLEATS
(2) P.T F.T. WOOD
BLOCKING
P.T W OOD BLOCKING
10"
" 4
/8
EXISTING WALL
CARRY BASE FLASHING AND
CAP FLASHING UP AND
UNDER COUNTER FLASHING
BASE FLASHING
CAP FLASHING
SINGLE PLY MEMBRANE
COVER BOARD
PRE-FABRICATED ROOF
HATCH INTEGRAL
COUNTER FLASHING
(DOUBLE-WALLED CURB)
ROOF HATCH FRAME WORK
SUPPORT BEAM, SEE
STRUCTURAL DRAWINGS
ROOF DECK
ROOF
INSULATION
SLOPE: 1/4"
P.T F.T WOOD BLOCKING
SLOPE: 1/4" SLOPE: 1/4"
2 1/2" X 3/8" BAR
2 1/2" X 3/8" STRAP
ANCHORS @ 4'-0"
VERT. MAX.
4'-0"
NOTE:
PROVIDE LADDER
BRACING AND
ADDITIONAL SUPPORT
PER MFR
RECOMMENDATIONS
INSTALL
MEMBRANE
FLASHING
AROUND
POSTS
P.T F.T WOOD
BLOCKING
ROOF HATCH
(48"X36" CLEAR
OPENING)
SAFETY POST
SUBSTRATE
6"
FIRESTONE INSULATION
WALL
PLATINUM TPO BONDING ADHESIVE
APPROPRIATE 10"
PLATINUM TPO MEMBRANE
WOOD NAILER
CONTINUOUS CLEAT
22 GAUGE MINIMUM
ULTRAPLY TPO
COATED METAL
ULTRAPLY TPO MEMBRANE
CONTINOUSE BEAD OF
FIRESTONE WATERBLOCK
GUTTER
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
FULLY SPRINKLERED
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
/2
/2
:0
:4
P
M
AE501
TYPICAL ROOF DETAILS
6 7AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
1D & 10
WVS
Scale: 3" = 1'-0"
FLASHING DETAIL AT PENTHOUSE WALL
Scale: 3" = 1'-0"
EQUIPMENT CURB DETAIL
Scale: 3" = 1'-0"
TYPICAL ROOF DRAIN DETAIL
Scale: 3" = 1'-0"
EQUIPMENT STAND FLASHING DETAIL
Scale: 3" = 1'-0"
VENT THROUGH ROOF DETAIL
Scale: 3" = 1'-0"
SCUPPER DETAIL
A. ALL ROOF AND FLASHING DETAILS ARE GENERIC
AND FOR REFERENCE ONLY. THE FINAL DETAILS
SHALL BE SUBMITTED AS PART OF THE
SUBMITTAL PROCESS WITH THE ROOFING
MANUFACTURER'S RECOMMENDED DETAILS FOR
THEIR ROOFING SYSTEM TO BE INSTALLED.
B. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOW N OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
C. THE ROOFING SYSTEM FOR THIS PROJECT
VARIES SEE SPECIFICATIONS FOR
REQUIREMENTS OF EACH ROOF SYSTEM. ROOF
SYSTEM MANUFACTURER WILL PROVIDE ALL
FINAL DETAILS AND REQUIREMENTS FOR
INSTALLATION OF THEIR SYSTEM.
D. CONTRACTOR TO INSTALL INSULATION PER
SPECIFICATION SECTION 07 22 00, AND ROOF
MANUFACTURER APPROVED SUBMITTALS. R-30
RIGID INSULATION SHOWN ON DETAILS IS THE
MINIMUM INSULATION REQUIRED.
E. ALL METAL COPING CAPS, SCUPPERS, DRIP
EDGE, FLASHING TO BE REPLACED WILL BE
PAINTED TO MATCH THE ORIGINAL METAL
UNLESS NOTED OTHERWISE.
Scale: 3" = 1'-0"
TYPICAL ROOF EXPANSION JOINT DETAIL
Scale: 3" = 1'-0"
RAISED EQUIPMENT SUPPORT DETAIL
Scale: 3" = 1'-0"
PARAPET FLASHING DETAIL
Scale: 1 1/2" = 1'-0"
ROOF HATCH CURB
Scale: 3/8" = 1'-0"
ROOF HATCH LADDER - ELEVATION
Scale: 1 1/2" = 1'-0"
ROOF EDGE GUTTER
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1D
/2
/2
:0
:4
P
M
AE502
EXISTING ROOF BUILDING 1D
7 7AT
REMOVE AND REPLACE
ROOFING BUILDINGS 1D AND
VA SIERRA NEVADA HEALTH CARE
SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
WVS
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
FOR REFERENCE ONLY
L L
ELECTRICAL ABBREVIATIONS LIST
SR SURFACE RACEWAY
SS STAINLESS STEEL
SSW SELECTOR SWITCH
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TC TIMECLOCK
TEL TELEPHONE
TEL/DATA TELEPHONE/DATA
TERM TERMINAL
TP TW ISTED PAIR
TPS TW ISTED PAIR SHIELDED
TR TAMPER RESISTANT
T-STAT THERMOSTAT
TTB TELEPHONE TERMINAL BOARD
TTC TELEPHONE TERMINAL
CABINET
TV TELEVISION
TYP TYPICAL
UC UNDER COUNTER
UE UNDERGROUND ELECTRICAL
UG UNDERGROUND
UH UNIT HEATER
UL UNDERW RITER'S LABORATORY
UT UNDERGROUND TELEPHONE
UTP UNSHIELDED TWISTED PAIR
UTIL UTILITY
UV UNIT VENTILATOR OR
ULTRAVIOLET
V VOLT
VA VOLT-AMPERES
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT
W/ WITH
WH WATER HEATER
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
ANGLE
@ AT
DELTA
' FEET
" INCHES
# NUMBER
Φ PHASE
C CENTER LINE
P PLATE
MTR MOTOR, MOTORIZED
MTS MANUAL TRANSFER SWITCH
NA NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NFDS NON-FUSED SAFETY DISCONNECT
SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OL OVERLOAD
PA PUBLIC ADDRESS
PB PULL BOX OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT
UNIT
PCB POLYCHLORINATED BYPHENYL
PC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
POE POWER-OVER-ETHERNET
PR PAIR
PRI PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (CONDUIT)
PWR POWER
QTY QUANTITY
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
RTU ROOF TOP UNIT
SC SURFACE CONDUIT
SEC SECONDARY
SF SQUARE FEET/FOOT
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SIM SIMILAR
S/N SOLID NEUTRAL
SPEC SPECIFICATION
SPKR SPEAKER
SP SPARE
1P 1 POLE (2P, 3P, 4P, ETC.)
1PH 1 PHASE
2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)
W2 TWO-WIRE (3W, 4W, ETC.)
3PH 3 PHASE
A AMPERE
AAP ALARM ANNUNCIATOR PANEL
AC ABOVE COUNTER
AIR CONDITIONER
ALTERNATING CURRENT
ACC ACCESSIBLE
ACLG ABOVE CEILING
ADO AUTOMATIC DOOR OPENER
A/E ARCHITECT/ENGINEER
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT (KILOAMPS)
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFI ARC FAULT CIRCUIT INTERRUPTER
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
APPROX APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BYP BYPASS
C CONDUIT
CAB CABINET
CALC CALCULATED
CAP CAPACITY
CAT CATALOG, CATEGORY
CATV COMMUNITY ANTENNA TELEVISION
CB CIRCUIT BREAKER
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR-FURNISHED
CKT CIRCUIT
CLG CEILING
CO CONTRACTING OFFICER
COAX COAXIAL CABLE
COMM COMMUNICATION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION OR CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPT CONTROL POW ER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CTR CENTER
CU COPPER
CU FT CUBIC FEET
dB DECIBEL
DB DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLISH/DEMOLITION
DEPT DEPARTMENT
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOW N
DS SAFETY DISCONNECT SWITCH
DT DOUBLE THROW
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EG EQUIPMENT GROUND
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EPO EMERGENCY POWER OFF
EQUIP EQUIPMENT
ESMT EASEMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WALL HEATER
ELECTRIC WATER HEATER
EX EXISTING
EXP EXPLOSION PROOF
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FCU FAN COIL UNIT
FIXT FIXTURE
FLR FLOOR
FLUOR FLUORESCENT
FU FUSE
FUDS FUSED SAFETY DISCONNECT SWITCH
FVR FULL VOLTAGE REVERSING
FVNR FULL VOLTAGE NON-REVERSING
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYP BDGYPSUM BOARD
HID HIGH-INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HTR HEATER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
IES ILLUMINATION ENGINEERING SOCIETY
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
I/W INTERLOCK WITH
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LED LIGHT-EMITTING DIODE
LF LINEAR FEET/FOOT
LM LUMEN
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFR MANUFACTURER
MFS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MIC MICROPHONE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MOA MULTIOUTLET ASSEMBLY
MSBD MAIN SW ITCHBOARD
MT MOUNT
GENERAL ELECTRICAL NOTES
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL
ELECTRICAL CODE AND VA STANDARDS.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING
CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING
HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.
6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.
7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT
DURING CONSTRUCTION.
8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.
9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.
PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST
COMPLY WITH "BUY AMERICAN ACT".
10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT
MANUFACTURER'S SPECIFICATIONS.
11. CIRCUITRY TO SW ITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S
SCREW TERMINALS.
12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED
(MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED
THIRD PARTY TESTING AGENCY.
17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY W HERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY. PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.
18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE
GOVERNMENT, SHALL BE PROVIDED.
19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1D & 10
/2
/2
:0
:2
A
M
E-001
ELECTRICAL GENERAL NOTES AND
ABBREVIATIONS
1 2JWB
REMOVE AND REPLACE
ROOFING BUILDINGS 1D & 10
VA SIERRA NEVADA
HEALTH CARE SYSTEM
975 KIRMAN AVE, RENO, NV 89502 6/29/2020
100% CONSTRUCTION DOCUMENTS
654-18-81518-078
MJJ
A
D
A
V
E
N F
E
T
A
T
S
R
E
ENI
G
N
E
N o
E
O
MICHAEL J.
JENSEN
ELECTRICAL
A
N
O I
S S
E
F
R
P
L
Exp.
06/30/21
DocuSign Envelope ID: 81DD736D-4FF4-44FA-8842-1B7AD3F3F585
ECLEUL
STEP 1. FILE STRUCTURE CONNECTION AREA (3 IN. X 3. IN. MIN)
TO BARE SHINY METAL AND CLEAN.
NOTES:
1. ALL CABLES AND WELDS SHALL BE MINIMUM 3 INCHES APART.
2. STANDARD WELD CARTRIDGES SHALL BE USED FOR STEEL SURFACES. FOR DIP USE XF-19
WE…
This is the start of the file's text. The full file is on GovTribe.