18-078 SubReg 100_.pdf

PDF 848 KB Posted

Attached to
Z1DA--NRM 654-23-001 | Reroof Bldgs 1D and 10
Solicitation number
36C26123R0113
Issued by

About this file

This submittal register outlines the required submissions for a roof replacement project at a Department of Veterans Affairs medical facility. It includes shop drawings, product data, samples, test reports, certificates, qualifications, photographs, plans, manuals, and other documentation for various construction specifications involving site preparation, asbestos abatement, concrete, masonry, metals, carpentry, roofing, flashing, insulation, sealants, electrical work, and lightning protection. Submissions are due prior to the pre-construction meeting and on a monthly basis thereafter, with approvals from the contracting officer's representative required before procurement or installation of materials.

View the file

Other files

File Type Posted
RFIs response 1D and 10 Roof.pdf PDF
Attachment 5 WD NV20230040 09152023.pdf PDF
Attachment 6 Sign-in sheet 1011.pdf PDF
36C26123R0113 0002.docx DOCX document
2010 Asbestos Report-Building 1D.pdf PDF
ASBESTOS DRAWINGS - 30x42.pdf PDF
36C26123R0113 0001.docx DOCX document
RENO PLAN SET - RECORD.pdf PDF
Att B Price Breakdown.pdf PDF
36C26123R0113_1.docx DOCX document
Wage Determination NV20230026 08182023.pdf PDF
Combined Specs.pdf PDF
Attachment C_Contractor Certification RE Safety and EMR.docx DOCX document
Combined Drawings.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT: Remove and Replace Roofing Bldg. 1D and 10

SUBMITTAL REGISTER

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv ity

Tr an sm itt al

Pa ra gr ap h

Description

R eq ui re d R ev ie w b y

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de d

By

M at er ia l N ee de

Ac tio n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au th

D e R

C D fr om

C O

N

TR

e

FW

D to

O th er R ev w r

D at e R

C D fr om

O th er R ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R C fro m

A

PP

R

Spec Section 01 33 23 Shop Drawings, Product Data, and Samples 1.3A The submittal register shall list items of equipment and materials for which submittals are required by the specifications. This list may not be all inclusive and additional submittals shall be required by the specifications. The Contractor is not relieved from supplying submittals required by the contract documents but which have been omitted from the submittal register.

1.3B The submittal register shall serve as a scheduling document for submittals and shall be used to control submittal actions throughout the contract period.

1.3C The VA shall provide the initial submittal register in electronic format. Thereafter, the Contractor shall track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the VA.

1.3D The Contractor shall update the submittal register as submittal actions occur and maintain the submittal register at the project site until final acceptance of all work by COR.

1.3E The Contractor shall submit formal monthly updates to the submittal register in electronic format. Each monthly update shall document actual submission and approval dates for each submittal.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O er ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 01 45 00 Quality Control 1.3A Government approval is required for all submittals. CQC inspection reports shall be submitted under this Specification section and follow the [Applicable CQC Control Phase (Preparatory, Initial, or Follow-Up)]:

[Applicable Specification section] naming convention.

1.3A.1 Preconstruction Submittals

1.3A.1a Interim CQC Plan

1.3A.1b CQC Plan

1.3A.1c Additional Requirements for Design Quality Control (DQC) Plan

1.3A.2 Design Data

1.3A.2a Discipline-Specific Checklists

1.3A.2b Design Quality Control

1.3A.3 Test Reports

1.3A.3a Verification Statement

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w b y

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

DATES

APPROVING

AUTHORITY DATES Remarks

Su bm it

Ap pr ov a l er ia l

N ee de n C od e

D at e of e

FW

to

AP

PR

e

FW

e

R n D at e of

Se nt

O

Spec Section 01 57 19 Temporary Environmental Controls 1.4A In accordance with Section, 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES, furnish the following:

1.4A.1 Environmental Protection Plan: After the contract is awarded and prior to the commencement of the work, the Contractor shall meet with the COR to discuss the proposed Environmental Protection Plan and to develop mutual understanding relative to details of environmental protection. Not more than 20 days after the meeting, the Contractor shall prepare and submit to the Contracting Officer’s Representative (COR) for approval, a written and/or graphic Environmental Protection Plan including the following:

1.4A.1a Name(s) of person(s) within the Contractor's organization who is (are) responsible for ensuring adherence to the Environmental Protection Plan.

1.4A.1b Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site.

1.4A.1c Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.

1.4A.1d Description of the Contractor's environmental protection personnel training program.

1.4A.1e A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, noise control and abatement that are applicable to the Contractor's proposed operations and the requirements imposed by those laws, regulations, and permits.

1.4A.1f Methods for protection of features to be preserved within authorized work areas including trees, shrubs, vines, grasses, ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, and archeological and cultural resources.

1.4A.1g Procedures to provide the environmental protection that comply with the applicable laws and regulations. Describe the procedures to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures as described in the Environmental Protection Plan.

1.4A.1h Permits, licenses, and the location of the solid waste disposal area.

1.4A.1i Drawings showing locations of any proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials.

Include as part of an Erosion Control Plan approved by the District Office of the U.S.

Soil Conservation Service and the Department of Veterans Affairs.

1.4A.1j Environmental Monitoring Plans for the job site including land, water, air, and noise.

1.4A.1k Work Area Plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas. This plan may be incorporated within the Erosion Control Plan.

1.4B Approval of the Contractor's Environmental Protection Plan will not relieve the Contractor of responsibility for adequate and continued control of pollutants and other environmental protection measures.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 01 74 19 Construction Waste Management 1.5A In accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, and SAMPLES, furnish the following:

1.5B Prepare and submit to the COR a written demolition debris management plan. The plan shall include the following information:

1.5B.1 Procedures to be used for debris management.

1.5B.2 Techniques to be used to minimize waste generation.

1.5B.3 Analysis of the estimated job site waste to be generated:

1.5B.3a List of each material and quantity to be salvaged, reused, recycled.

1.5B.3b List of each material and quantity proposed to be taken to a landfill.

1.5B.4 Detailed description of the Means/Methods to be used for material handling.

1.5B.4a On site: Material separation, storage, protection where applicable.

1.5B.4b Off site: Transportation means and destination.

Include list of materials.

1.5B.4b.

Description of materials to be site-separated and self-hauled to designated facilities.

1.5B.4b.

Description of mixed materials to be collected by designated waste haulers and removed from the site.

1.5B.4c The names and locations of mixed debris reuse and recycling facilities or sites.

1.5B.4d The names and locations of trash disposal landfill facilities or sites.

1.5B.4e Documentation that the facilities or sites are approved to receive the materials.

1.5C Designated Manager responsible for instructing personnel, supervising, documenting and administer over meetings relevant to the Waste Management Plan.

1.5D Monthly summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O th er R ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 01 91 00 General Commissioning Requirements 1.13A Preliminary Commissioning Plan Submittal:

The Commissioning Agent has prepared a Preliminary Commissioning Plan based on the final Construction Documents. The Preliminary Commissioning Plan is included as an Appendix to this specification section. The Preliminary Commissioning Plan is provided for information only. It contains preliminary information about the following commissioning activities:

1.13A.1 The Commissioning Team: A list of commissioning team members by organization.

1.13A.2 Systems to be commissioned. A detailed list of systems to be commissioned for the project. This list also provides preliminary information on systems/equipment submittals to be reviewed by the Commissioning Agent; preliminary information on Pre-Functional Checklists that are to be completed; preliminary information on Systems Performance Testing, including information on testing sample size (where authorized by the VA).

1.13A.3 Commissioning Team Roles and Responsibilities: Preliminary roles and responsibilities for each Commissioning Team member.

1.13A.4 Commissioning Documents: A preliminary list of commissioning-related documents, include identification of the parties responsible for preparation, review, approval, and action on each document.

1.13A.5 Commissioning Activities Schedule:

Identification of Commissioning Activities, including Systems Functional Testing, the expected duration and predecessors for the activity.

1.13A.6 Pre-Functional Checklists: Preliminary Pre- Functional Checklists for equipment, components, subsystems, and systems to be commissioned. These Preliminary Pre- Functional Checklists provide guidance on the level of detailed information the Contractor shall include on the final submission.

1.13A.7 Systems Functional Performance Test Procedures: Preliminary step-by-step System Functional Performance Test Procedures to be used during Systems Functional Performance Testing. These Preliminary Systems Functional Performance procedures provide information on the level of testing rigor, and the level of Contractor support required during performance of system’s testing.

1.13B Final Commissioning Plan Submittal: Based on the Final Construction Documents and the Contractor’s project team, the Commissioning Agent will prepare the Final Commissioning Plan as described in this section. The Commissioning Agent will submit three hard copies and three sets of electronic files of Final Commissioning Plan. The Contractor shall review the Commissioning Plan and provide any comments to the VA. The Commissioning Agent will incorporate review comments into the Final Commissioning Plan as directed by the VA.

1.13C Systems Functional Performance Test Procedure: The Commissioning Agent will submit preliminary Systems Functional Performance Test Procedures to the Contractor, and the VA for review and comment. The Contractor shall return review comments to the VA and the Commissioning Agent. The VA will also return review comments to the Commissioning Agent. The Commissioning Agent will incorporate review comments into the Final Systems Functional Test Procedures to be used in Systems Functional Performance Testing.

1.13D Pre-Functional Checklists: The Commissioning Agent will submit Pre- Functional Checklists to be completed by the Contractor.

1.13E Test and Inspection Reports: The Commissioning Agent will submit test and inspection reports to the VA with copies to the Contractor and the Architect/Engineer.

1.13F Corrective Action Documents: The Commissioning Agent will submit corrective action documents to the VA COR with copies to the Contractor and Architect.

1.13G Preliminary Commissioning Report Submittal:

The Commissioning Agent will submit three electronic copies of the preliminary commissioning report. One electronic copy, with review comments, will be returned to the Commissioning Agent for preparation of the final submittal.

1.13H Final Commissioning Report Submittal: The Commissioning Agent will submit four sets of electronically formatted information of the final commissioning report to the VA. The final submittal will incorporate comments as directed by the VA.

1.13I Data for Commissioning:

1.13I.1 The Commissioning Agent will request in writing from the Contractor specific information needed about each piece of commissioned equipment or system to fulfill requirements of the Commissioning Plan.

1.13I.2 The Commissioning Agent may request further documentation as is necessary for the commissioning process or to support other VA data collection requirements, including Construction Operations Building Information Exchange (COBIE), Building Information Modeling (BIM), etc.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 02 82 13.21 Asbestos Roofing Abatement

2.5.1 Submit to the VA a minimum of 14 days prior

to the pre-start meeting the following for review and approval. Meeting this requirement is a prerequisite for the pre-start meeting for this project:

2.5.1A Submit a detailed work schedule for the entire project reflecting contract documents and the phasing/schedule requirements from the CPM chart.

2.5.1B Submit a staff organization chart showing all personnel who will be working on the project and their capacity/function. Provide their qualifications, training, accreditations, and licenses, as appropriate. Provide a copy of the "Certificate of Worker's Acknowledgment" and the "Affidavit of Medical Surveillance and Respiratory Protection" for each person.

2.5.1C Submit Asbestos Hazard Abatement Plan developed specifically for this project, incorporating the requirements of the specifications, prepared, signed and dated by the CPIH/CIH.

2.5.1D Submit the specifics of the materials and equipment to be used for this project with manufacturer names, model numbers, performance characteristics, pictures/diagrams, and number available for the following:

2.5.1D.1 Supplied air system, negative air machines, HEPA vacuums, air monitoring pumps, calibration devices, pressure differential monitoring device and emergency power generating system.

2.5.1D.2 Waste water filtration system, shower system, containment barriers.

2.5.1D.3 Encapsulants, surfactants, hand held sprayers, airless sprayers, and fire extinguishers.

2.5.1D.4 Respirators, protective clothing, personal protective equipment.

2.5.1D.5 Fire safety equipment to be used in the regulated area.

2.5.1E Submit the name, location, and phone number of the approved landfill; proof/verification the landfill is approved for ACM disposal;

the landfill's requirements for ACM waste;

the type of vehicle to be used for transportation; and name, address, and phone number of subcontractor, if used. Proof of asbestos training for transportation personnel shall be provided.

2.5.1F Submit required notifications and arrangements made with regulatory agencies having regulatory jurisdiction and the specific contingency/emergency arrangements made with local health, fire, ambulance, hospital authorities and any other notifications/arrangements.

2.5.1G Submit the name, location and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samples. Personal air monitoring must be done in accordance with OSHA 29 CFR

1926.1101 (f) and Appendix A. And area or clearance air monitoring in accordance with EPA AHERA protocols.

2.5.1H Submit qualifications verification: Submit the following evidence of qualifications.

Make sure that all references are current and verifiable by providing current phone numbers and documentation.

2.5.1H.1 Asbestos Abatement Company: Project experience within the past 3 years; listing projects first most similar to this project:

Project Name; Type of Abatement; Duration;

Cost; Reference Name/Phone Number; Final Clearance; and Completion Date

2.5.1H.2 List of project(s) halted by owner, A/E, IH, regulatory agency in the last 3 years:

Project Name; Reason; Date; Reference Name/Number; Resolution

2.5.1H.3 List asbestos regulatory citations (e.g., OSHA), notices of violations (e.g., Federal and state EPA), penalties, and legal actions taken against the company including and of the company’s officers (including damages paid) in the last 3 years. Provide copies and all information needed for verification.

2.5.1I Submit information on personnel: Provide a resume; address each item completely; copies of certificates, accreditations, and licenses. Submit an affidavit signed by the CPIH/CIH stating that all personnel submitted below have medical records in accordance with OSHA 29 CFR 1926.1101(m) and 29 CFR 1910.20 and that the company has implemented a medical surveillance program and written respiratory protection program, and maintains recordkeeping in accordance with the above regulations. Submit the phone number and doctor/clinic/hospital used for medical evaluations.

2.5.1I.1 CPIH/CIH and IH Technician: Name; years of abatement experience; list of projects similar to this one; certificates, licenses, accreditations for proof of AHERA/OSHA specialized asbestos training; professional affiliations; number of workers trained;

samples of training materials; samples of AHAP(s) developed; medical opinion; and current respirator fit test.

2.5.1I.2 Competent Person(s)/Supervisor(s): Number;

names; social security numbers; years of abatement experience as Competent Person/Supervisor; list of similar projects in size/complexity as Competent Person/Supervisor; as a worker;

certificates, licenses, accreditations;

proof of AHERA/OSHA specialized asbestos training; maximum number of personnel supervised on a project; medical opinion (asbestos surveillance and respirator use);

and current respirator fit test.

2.5.1I.3 Workers: Numbers; names; social security numbers; years of abatement experience;

certificates, licenses, accreditations;

training courses in asbestos abatement and respiratory protection; medical opinion (asbestos surveillance and respirator use);

and current respirator fit test.

2.5.1J Submit copies of State license for asbestos abatement; copy of insurance policy, including exclusions with a letter from agent stating in plain language the coverage provided and the fact that asbestos abatement activities are covered by the policy; copy of AHAP(s) incorporating the requirements of this specification;

information on who provides your training, how often; who provides medical surveillance, how often; who performs and how is personal air monitoring of abatement workers conducted; a list of references of independent laboratories/IH's familiar with your air monitoring and standard operating procedures; and copies of monitoring results of the five referenced projects listed and analytical method(s) used.

2.5.1K Rented equipment must be decontaminated prior to returning to the rental agency.

2.5.1L Submit, before the start of work, the manufacturer's technical data for all types of encapsulants, all MSDS, and application instructions.

2.5.2A The Competent Person shall maintain and submit a daily log at the regulated area documenting the dates and times of the following: purpose, attendees and summary of meetings; all personnel entering/exiting the regulated area; document and discuss the resolution of unusual events such as barrier breeching, equipment failures, emergencies, and any cause for stopping work;

representative air monitoring and results/TWAs/ELs. Submit this information daily to the VPIH/CIH.

2.5.2B The CPIH/CIH shall document and maintain the inspection and approval of the regulated area preparation prior to start of work and daily during work.

2.5.2B.1 Removal of any poly barriers.

2.5.2B.2 Visual inspection/testing by the CPIH/CIH or IH Technician prior to application of lockdown encapsulant.

2.5.2B.3 Packaging and removal of ACM waste from regulated area.

2.5.2Bb.4 Disposal of ACM waste materials; copies of Waste Shipment Records/landfill receipts to the COR on a weekly basis.

2.5.3A The CPIH/CIH shall submit a project report consisting of the daily log book requirements and documentation of events during the abatement project including Waste Shipment Records signed by the landfill's agent. It will also include information on the containment and transportation of waste from the containment with applicable Chain of Custody forms. The report shall include a certificate of completion, signed and dated by the CPIH/CIH, in accordance with Attachment #1. All clearance and perimeter area samples must be submitted. The COR will retain the abatement report after completion of the project and provide copies of the abatement report to VAMC Office of Engineer and the Safety Office.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 03 30 00 Cast-In-Place Concrete 1.5A Submit in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, and SAMPLES.

1.5B Shop Drawings: Reinforcing steel: Complete shop drawings

1.5C Mill Test Reports:

1.5C.1 Reinforcing Steel.

1.5C.2 Cement.

1.5D Manufacturer's Certificates:

1.5D.1 Abrasive aggregate.

1.5D.2 Lightweight aggregate for structural concrete.

1.5D.3 Air-entraining admixture.

1.5D.4 Chemical admixtures, including chloride ion content.

1.5D.5 Waterproof paper for curing concrete.

1.5D.6 Liquid membrane-forming compounds for curing concrete.

1.5D.7 Non-shrinking grout.

1.5D.8 Adhesive Binder.

1.5E Testing Agency for Concrete Mix Design: Approval request including qualifications of principals and technicians and evidence of active participation in program of Cement and Concrete Reference Laboratory (CCRL) of National Institute of Standards and Technology and copy of report of latest CCRL, Inspection of Laboratory. Test Report for Concrete Mix Designs: Trial mixes including water-cement ratio curves, concrete mix ingredients, and admixtures.

1.5F Shoring and Reshoring Sequence: Submit for approval a shoring and reshoring sequence for flat slab/flat plate portions, prepared by a registered Professional Engineer. As a minimum, include timing of form stripping, reshoring, number of floors to be re-shored and timing of re-shore removal to serve as an initial outline of procedures subject to modification as construction progresses. Submit revisions to sequence, whether initiated by COR (see FORMWORK) or Contractor.

1.5G Test reports on splitting tensile strength (Fct) of lightweight concrete.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 04 01 00 Maintenance of Masonry 1.4A Submittal Procedures: Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES.

1.4B Manufacturer's Literature and Data:

1.4B.1 Description of each product.

1.4B.2 Replacement units indicating manufacturer recommendation for each application.

1.4C Samples:

1.4C.1 Pointing Mortar: Molded, 150 mm (6 inches) long for each type, texture, and color.

1.4D Test reports:

1.4D.1 Preconstruction test results of existing masonry mortar and units.

1.4D.2 Recommended mortar mix and mortar materials sources.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 04 05 13 Masonry Mortar

1.4B Manufacturer's Literature and Data:

1.4B.1 Description of each product.

1.4C Test Reports: Certify each product complies with specifications.

1.4C.1 Mortar.

1.4C.2 Admixtures.

1.4D Certificates: Certify each product complies with

1.4D.1 Portland cement.

1.4D.2 Masonry cement.

1.4D.3 Mortar cement.

1.4D.4 Hydrated lime.

1.4D.5 Fine aggregate.

1.4D.6 Color admixture.

1.4E Qualifications: Substantiate qualifications comply with specifications.

1.4E.1 Testing laboratory.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 05 50 00 Metal Fabrications 1.2A Submit in accordance with Section 01 33 23, SHOP

1.2B Manufacturer's Literature and Data:

1.3C Shop Drawings:

1.3C.1 Each item specified, showing complete detail, location in the project, material and size of components, method of joining various components and assemblies, finish, and location, size and type of anchors.

1.3C.2 Mark items requiring field assembly for erection identification and furnish erection drawings and instructions.

1.3C.3 Provide templates and rough-in measurements as required.

1.3D Manufacturer's Certificates:

1.3D.1 Anodized finish as specified.

1.3D.2 Live load designs as specified.

1.3E Design Calculations for specified live loads including dead loads.

1.3F Furnish setting drawings and instructions for installation of anchors to be preset into concrete and masonry work, and for the positioning of items having anchors to be built into concrete or masonry construction.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 06 10 00 Rough Carpentry 1.2A Submit in accordance with Section 01 33 23, SHOP

1.2B Shop Drawings showing framing connection details, fasteners, connections and dimensions.

1.2C Manufacturer’s Literature and Data:

1.2C.1 Submit data for lumber, panels, hardware and adhesives.

1.2C.2 Submit data for wood-preservative treatment from chemical treatment manufacturer and certification from treating plants that treated materials comply with requirements. Indicate type of preservative used and net amount of preservative retained.

1.2C.3 Submit data for fire retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Include physical properties of treated materials based on testing by a qualified independent testing agency.

1.2C.4 For products receiving a waterborne treatment, submit statement that moisture content of treated materials was reduced to levels specified before shipment to project site.

1.2D Manufacturer’s certificate for unmarked lumber.

Design Modular Medical Specialty Clinic

Mather, CA

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 18-237 18-237

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 07 01 50.19 Preparation for Re-Roofing 1.5A Submittal Procedures: Section 01 33 23, SHOP

1.5B Submittal Drawings:

1.5B.1 Show size, configuration, and installation details.

1.5C Manufacturer's Literature and Data:

1.5C.1 Description of each product.

1.5C.2 Description of temporary roof system and components.

1.5C.3 List of patching materials.

1.5C.4 Recover board fastening requirements.

1.5C.5 Temporary roofing installation instructions and preparation instructions to receive new roofing.

1.5C.6 Existing roofing warrantor's instructions.

1.5D Photographs: Document existing conditions potentially affected by roofing operations before work begins.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 07 22 00 Roof And Deck Insulation

1.4B Submittal Drawings:

1.4B.1 Show size, configuration, and installation details.

1.4B.1a Nailers, cants, and terminations.

1.4B.1b Layout of insulation showing slopes, tapers, penetrations, and edge conditions.

1.4C Manufacturer's Literature and Data:

1.4C.1 Description of each product.

1.4D Samples:

1.4D.1 Roof insulation, each type.

1.4D.2 Fasteners, each type.

1.4E Sustainable Construction Submittals:

1.4E.1 Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

1.4E.2 Biobased Content:

1.4E.2a Show type and quantity for each product.

1.4E.3 Low Pollutant-Emitting Materials:

1.4E.3a Show volatile organic compound types and quantities.

1.4F Qualifications: Substantiate qualifications meet

1.4F.1 Installer.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 1.5A Submittal Procedures: Section 01 33 23, SHOP

1.5B Submittal Drawings:

1.5B.1 Roof membrane layout.

1.5B.2 Roofing membrane fastener pattern and spacing.

1.5B.3 Roofing membrane seaming and joint details.

1.5B.4 Roof membrane penetration details.

1.5B.5 Base flashing and termination details.

1.5B.6 Paver layout.

1.5B.7 Paver anchoring locations and details.

1.5C Manufacturer's Literature and Data:

1.5C.1 Description of each product.

1.5C.2 Minimum fastener pullout resistance.

1.5C.3 Installation instructions.

1.5C.4 Warranty.

1.5D Samples:

1.5D.1 Roofing Membrane: 150 mm (6 inch) square.

1.5D.2 Base Flashing: 150 mm (6 inch) square.

1.5D.3 Fasteners: Each type.

1.5D.4 Roofing Membrane Seam: 300 mm (12 inches) square.

1.5E Sustainable Construction Submittals:

1.5E.1 Solar Reflectance Index (SRI) for roofing membrane.

1.5E.2 Low Pollutant-Emitting Materials:

1.5E.2a Show volatile organic compound types and quantities.

1.5E.3 Energy Star label for roofing membrane.

1.5F Certificates: Certify products comply with

1.5F.1 Fire and windstorm classification.

1.5F.2 High wind zone design requirements.

1.5F.3 Energy performance requirements.

1.5G Qualifications: Substantiate qualifications comply with specifications.

1.5G.1 Installer, including supervisors with project experience list.

1.5G.2 Manufacturer's field representative with project experience list.

1.5H Field quality control reports.

1.5I Temporary protection plan. Include list of proposed temporary materials.

1.5J Operation and Maintenance Data:

1.5J.1 Maintenance instructions.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 07 60 00 Flashing and Sheet Metal

1.5B Shop Drawings: For all specified items, including:

1.5B.1 Flashings

1.5B.2 Copings

1.5B.3 Gravel Stop-Fascia

1.5B.4 Gutter and Conductors

1.5B.5 Expansion joints

1.5B.6 Fascia-cant

1.5C Manufacturer's Literature and Data: For all specified items, including:

1.5C.1 Two-piece counterflashing

1.5C.2 Thru wall flashing

1.5C.3 Expansion joint cover, each type

1.5C.4 Nonreinforced, elastomeric sheeting

1.5C.5 Copper clad stainless steel

1.5C.6 Polyethylene coated copper

1.5C.7 Bituminous coated copper

1.5C.8 Copper covered paper

1.5C.9 Fascia-cant

1.5D Certificates: Indicating compliance with specified finishing requirements, from applicator and contractor.

Specialty Clinic

Mather, CA

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 18-237 18-237

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 07 71 00 Roof Specialties

DRAWINGS, PRODUCT DAvTA, AND SAMPLES.

1.5B Sustainable Design Submittals, as described below:

1.5B.1 Postconsumer and preconsumer recycled content as specified in PART 2 - PRODUCTS.

1.5C Samples: Representative sample panel of color-anodized aluminum not less than 101 x 101 mm (4 x 4 inches), except extrusions are to be of a width not less than section to be used. Submit sample that shows coating with integral color and texture. Include manufacturer's identifying label.

1.5D Shop Drawings: Each item specified showing design, details of construction, installation and fastenings.

1.5E Manufacturer's Literature and Data: Each item specified.

1.5F Certificates: Stating that aluminum has been given specified thickness of anodizing.

Specialty Clinic

Mather, CA

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 18-237 18-237

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 07 72 00 Roof Accessories 1.4A Submit in accordance with Section 01 33 23, SHOP

1.4B Sustainable Design Submittals, as described

1.4B.1 Postconsumer and preconsumer recycled content as

1.4C Samples: Submit representative sample panel of color anodized aluminum not less than 101 x 101 mm (4 x 4 inches). For extrusions, submit width not less than section to be installed. Show coating with integral color and texture and include manufacturer's identifying label.

1.4D Shop Drawings: Each item specified showing design, details of construction, installation and fastenings.

1.4E Manufacturer's Literature and Data: Each item specified.

1.4F Certificates: Stating that aluminum has been given specified thickness of anodizing.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 07 84 00 Firestopping 1.3A Submit in accordance with Section 01 33 23, SHOP

1.3B Sustainable Design Submittals, as described

1.3B.1 Volatile organic compounds per volume as

1.3C Installer qualifications.

1.3D Inspector qualifications.

1.3E Manufacturers literature, data, and installation instructions for types of firestopping and smoke stopping used.

1.3F List of FM, UL, or WH classification number of systems installed.

1.3G Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use.

1.3H Submit certificates from manufacturer attesting that firestopping materials comply with the specified requirements.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R at e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 07 92 00 Joint Sealants

1.5B Sustainable Design Submittals, as described

1.5B.1 Volatile organic compounds per volume as

1.5C Installer qualifications.

1.5D Contractor certification.

1.5E Manufacturer's installation instructions for each product used.

1.5F Cured samples of exposed sealants for each color.

1.5G Manufacturer's Literature and Data:

1.5G.1 Primers

1.5G.2 Sealing compound, each type, including compatibility when different sealants are in contact with each other.

1.5H Manufacturer warranty.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O th er R ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 26 05 11 Requirements For Electrical Installations 1.12A Submit to the COR in accordance with Section 01

33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

1.12B The Government's approval shall be obtained for all materials and equipment before delivery to the job site. Delivery, storage or installation of materials and equipment which has not had prior approval will not be permitted.

1.12C All submittals shall include six copies of adequate descriptive literature, catalog cuts, shop drawings, test reports, certifications, samples, and other data necessary for the Government to ascertain that the proposed materials and equipment comply with drawing and specification requirements. Catalog cuts submitted for approval shall be legible and clearly identify specific materials and equipment being submitted.

1.12D Submittals for individual systems and equipment assemblies which consist of more than one item or component shall be made for the system or assembly as a whole. Partial submittals will not be considered for approval.

1.12D.1 Mark the submittals, "SUBMITTED UNDER

SECTION__________________".

1.12D.2 Submittals shall be marked to show specification reference including the section and paragraph numbers.

1.12D.3 Submit each section separately.

1.12E The submittals shall include the following:

1.12E.1 Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, manuals, pictures, nameplate data, and test reports as required.

1.12E.2 Elementary and interconnection wiring diagrams for communication and signal systems, control systems, and equipment assemblies. All terminal points and wiring shall be identified on wiring diagrams.

1.12E.3 Parts list which shall include information for replacement parts and ordering instructions, as recommended by the equipment manufacturer.

1.12F Maintenance and Operation Manuals:

1.12F.1 Submit as required for systems and equipment specified in the technical sections. Furnish in hardcover binders or an approved equivalent.

1.12F.2 Inscribe the following identification on the cover: the words "MAINTENANCE AND OPERATION MANUAL," the name and location of the system, material, equipment, building, name of Contractor, and contract name and number.

Include in the manual the names, addresses, and telephone numbers of each subcontractor installing the system or equipment and the local representatives for the material or equipment.

1.12F.3 Provide a table of contents and assemble the manual to conform to the table of contents, with tab sheets placed before instructions covering the subject. The instructions shall be legible and easily read, with large sheets of drawings folded in.

1.12F.4 The manuals shall include:

1.12F.4 a

Internal and interconnecting wiring and control diagrams with data to explain detailed operation and control of the equipment.

A control sequence describing start-up, operation, and shutdown.

c

Description of the function of each principal item of equipment.

Installation instructions.

1.12F.4 e

Safety precautions for operation and maintenance.

f

Diagrams and illustrations.

g

Periodic maintenance and testing procedures and frequencies, including replacement parts numbers.

h

Performance data.

1.12F.4 i

Pictorial "exploded" parts list with part numbers. Emphasis shall be placed on the use of special tools and instruments. The list shall indicate sources of supply, recommended spare and replacement parts, and name of servicing organization.

j

List of factory approved or qualified permanent servicing organizations for equipment repair and periodic testing and maintenance, including addresses and factory certification qualifications.

1.12G Approvals will be based on complete submission of shop drawings, manuals, test reports, certifications, and samples as applicable.

1.12H After approval and prior to installation, furnish the COR with one sample of each of the following:

1.12H.1 A minimum 300 mm (12 inches) length of each type and size of wire and cable along with the tag from the coils or reels from which the sample was taken. The length of the sample shall be sufficient to show all markings provided by the manufacturer.

1.12H.2 Each type of conduit coupling, bushing, and termination fitting.

1.12H.3 Conduit hangers, clamps, and supports.

1.12H.4 Duct sealing compound.

1.12H.5 Each type of receptacle, toggle switch, lighting control sensor, outlet box, manual motor starter, device wall plate, engraved nameplate, wire and cable splicing and terminating material, and branch circuit single pole molded case circuit breaker.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O th er R ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 26 05 19 Low-Voltage Electrical Power Conductors and Cables 1.4A Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:

1.4A.1 Shop Drawings:

1.4A.1a Submit sufficient information to demonstrate compliance with drawings and specifications.

1.4A.1b Submit the following data for approval:

1.4A.1b .1

Electrical ratings and insulation type for each conductor and cable.

.2

Splicing materials and pulling lubricant.

1.4A.2 Certifications: Two weeks prior to final inspection, submit the following:

1.4A.2a Certification by the manufacturer that the conductors and cables conform to the requirements of the drawings and specifications.

1.4A.2b Certification by the Contractor that the conductors and cables have been properly installed, adjusted, and tested.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O th er R ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 26 05 26 Grounding and Bonding For Electrical Systems

1.4A.1b Submit plans showing the location of system grounding electrodes and connections, and the routing of aboveground and underground grounding electrode conductors.

1.4A.2 Test Reports:

1.4A.2a Two weeks prior to the final inspection, submit ground resistance field test reports to the COR.

1.4A.3 Certifications:

1.4A.3a Certification by the Contractor that the grounding equipment has been properly installed and tested.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O th er R ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 26 05 33 Raceway and Boxes For Electrical Systems

1.4A.1a Size and location of main feeders.

1.4A.1b Size and location of panels and pull-boxes.

1.4A.1c Layout of required conduit penetrations through structural elements.

1.4A.1d Submit the following data for approval:

1.4A.1d .1

Raceway types and sizes.

1.4A.1d .2

Conduit bodies, connectors and fittings.

1.4A.1d .3

Junction and pull boxes, types and sizes.

inspection, submit the following:

1.4A.2a Certification by the manufacturer that raceways, conduits, conduit bodies, connectors, fittings, junction and pull boxes, and all related equipment conform to the requirements of the drawings and specifications.

1.4A.2b Certification by the Contractor that raceways, conduits, conduit bodies, connectors, fittings, junction and pull boxes, and all related equipment have been properly installed.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O th er R ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 26 29 21 Enclosed Switches and Circuit Breakers

1.4A.1b Submit the following data for approval:

.1

Electrical ratings, dimensions, mounting details, materials, required clearances, terminations, weight, fuses, circuit breakers, wiring and connection diagrams, accessories, and device nameplate data.

1.4A.1c Certification from the manufacturer that representative enclosed switches and circuit breakers have been seismically tested to International Building Code requirements.

Certification shall be based upon simulated seismic forces on a shake table or by analytical methods, but not by experience data or other methods.

1.4A.2 Manuals:

1.4A.2a Submit complete maintenance and operating manuals including technical data sheets, wiring diagrams, and information for ordering fuses, circuit breakers, and replacement parts.

1.4A.2a .1

Include schematic diagrams, with all terminals identified, matching terminal identification in the enclosed switches and circuit breakers.

1.4A.2a .2

Include information for testing, repair, troubleshooting, assembly, and disassembly.

1.4A.2b If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection.

1.4A.3 Certifications: Two weeks prior to final inspection, submit the following.

1.4A.3a Certification by the manufacturer that the enclosed switches and circuit breakers conform to the requirements of the drawings and

1.4A.3b Certification by the Contractor that the enclosed switches and circuit breakers have been properly installed, adjusted, and tested.

LOCATION: Reno

PROJECT NO: 654-18-815 ACG: 18-078 CONTRACT NO:

CONTACTOR: TASK ORDER NO:

Ac tiv sm itt gr ap h

Description

R eq ui re d R ev ie w

CONTRACTOR

ACTION

DATES

APPROVING AUTHORITY

DATES Remarks

Su bm it

Ap pr ov al

N ee de er ia l N ee de n C od e

D at e of

A ct io n

D at e

FW

D to

A

PP

R

Au e R

C D fr om

C O e

FW

D to

O th er R ev w r

D at e R

C D fr om

O th er R ev w r

Ac tio n C od e

D at e of

A ct io n

Se nt to C

O N

TR

/ D at e

R

A

Spec Section 26 41 00 Facility Lightning Protection

1.4A.1b Show locations of air terminals, connections to required metal surfaces, down conductors, and grounding means.

1.4A.1c Show the mounting hardware and materials used to attach air terminals and conductors to the structure.

inspection, submit the following.

1.4A.2a Certification by the manufacturer that the lightning protection system conforms to the requirements of the drawings and specifications.

1.4A.2b Certification by the Contractor that the lightning protection system has been properly installed and inspected.

1.4A.2c Certification that the lightning protection system has been inspected by a UL representative and has been approved by UL without variation.

SubReg-013323-ShopDrawings
SubReg-014500-QualControl
SubReg-015719-TempEnviroCtrls
SubReg-017419-ConstWast
SubReg-019100-GenCommissioning
SubReg-028213.21-AsbestosRoofingAbatement
SubReg-033000-Concrete
SubReg-040100-MaintainMasonry
SubReg-040513-MasonryMortar
SubReg-055000-MetalFab
SubReg-061000-RghCarpentry
SubReg-070150.19-PrepforReroofing
SubReg-072200-Roof&Deck Insulation
SubReg-075423-TPO Roofing
SubReg-076000-FlashSheetMetal
SubReg-077100-RoofSpecialties