Att B Price Breakdown.pdf

PDF 134 KB Posted

Attached to
Z1DA--NRM 654-23-001 | Reroof Bldgs 1D and 10
Solicitation number
36C26123R0113
Issued by

About this file

This document is an attachment providing a divisional cost breakout template for a federal contract solicitation to replace and re-roof two buildings at a Department of Veterans Affairs facility. The template requires bidders to provide line item costs for general requirements and other applicable construction divisions, along with separate line items for bonds and insurance, overhead, and profit. Bidders must use this template to provide a total project bid amount in response to solicitation number 36C26123R0113 for the reroofing of buildings 1D and 10 under Veterans Integrated Service Network 21. Costs should be broken out by division to allow for evaluation of the proposed pricing structure. The closing date for bids in response to this solicitation was not specified in the attachment.

View the file

Other files

File Type Posted
RFIs response 1D and 10 Roof.pdf PDF
Attachment 5 WD NV20230040 09152023.pdf PDF
Attachment 6 Sign-in sheet 1011.pdf PDF
18-078 SubReg 100_.pdf PDF
36C26123R0113 0002.docx DOCX document
2010 Asbestos Report-Building 1D.pdf PDF
ASBESTOS DRAWINGS - 30x42.pdf PDF
36C26123R0113 0001.docx DOCX document
RENO PLAN SET - RECORD.pdf PDF
36C26123R0113_1.docx DOCX document
Wage Determination NV20230026 08182023.pdf PDF
Combined Specs.pdf PDF
Attachment C_Contractor Certification RE Safety and EMR.docx DOCX document
Combined Drawings.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B DIVISIONAL COST BREAK-OUT

CLIN 0001

Replace and Re-Roof Buildings 1D and 10.

Provide complete Divisional Cost Break-Out for complete project. If necessary, add additional lines for each Division applicable to this project.

REF DESCRIPTION TOTAL

010000

DIVISION 1 - GENERAL REQUIREMENTS

OTHER

OTHER $

OTHER OTHER $

SUB TOTAL:

BONDS &

INSURANCE

OVERHEAD

PROFIT

TOTAL PROJECT BID AMOUNT:

ATTACHMENT B DIVISIONAL COST BREAK-OUT